15B41325Q00000002 - BRQ Solicitation Packet.pdf
PDF 593 KB Posted
- Solicitation number
- 15B41325Q00000002
About this file
This is a solicitation for construction services to replace boiler controls at the Federal Correctional Institution (FCI) in Sandstone, Minnesota. The project requires replacing controls on three high-pressure boilers with a new Siemens LMV52 system (or equivalent) and installing a compatible master panel with a minimum 12-inch color touch screen.
This is a 100% small business set-aside under NAICS code 238220 with a size standard of $19 million. The estimated project value is between $100,000-$250,000 with a performance period of 245 calendar days after notice to proceed. Offers are due January 24, 2025 by 12:00 PM Central Time. A pre-quotation conference and site visit will be held on January 16, 2025 at 9:00 AM local time, with NCIC background checks required by January 10, 2025. The contractor must provide performance and payment bonds within 10 days of award, maintain specified insurance coverage, and complete required security/privacy training. The Department of Justice Bureau of Prisons will issue the solicitation on January 3, 2025 through SAM.gov.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION NO. 15B41325Q00000002
Replace Boiler Controls
FCI Sandstone
UNITED STATES DEPARTMENT OF JUSTICE
FEDERAL BUREAU OF PRISONS
Sandstone, MN 55072
ISSUE DATE: January 3, 2025
OFFER DUE DATE: January 24, 2024, by 12:00 P.M. CENTRAL
OFFERS SHALL BE ADDRESSED TO:
FEDERAL BUREAU OF PRISONS
P.O. Box 999
Sandstone, MN 5072 ATTN: Jacob J. Polk
INSTRUCTIONS TO OFFERORS
OFFER SUBMISSION PROCEDURES
SOLICITATION/REQUEST FOR QUOTATIONS
15B41325Q00000002
TITLE:
DEADLINE FOR
RECEIPT OF OFFERS:
FCI Sandstone Replace Boiler Controls
January 24, 2025
12:00 P.M. CENTRAL
MAIL OFFERS TO:
FEDERAL BUREAU OF PRISONS
FCI Sandstone P.O. Box 999 Sandstone, MN 55072 ATTN: Jacob J. Polk, CONTRACT SPECIALIST
(320) 245-6204
***********************************IMPORTANT*********************************
CONTRACTORS MUST BE REGISTERED IN THE SYSTEM FOR AWARD MANAGEMENT (SAM) AT
WWW.SAM.GOV. THIS IS A 100% SMALL BUSINESS SET-ASIDE. YOUR BUSINESS SIZE
METRICS INFORMATION IN SAM MUST MEET THE SMALL BUSINESS SIZE STANDARD
REQUIREMENT FOR NAICS CODE 238220 (reference FAR provision 52.219-1 in the Representations & Certifications section of your SAM registration).
I. Each offeror SHALL complete and submit the following forms, clauses, and statements with his/her offer.
Failure to furnish all required information or any rejection of or addition to the terms and conditions of the solicitation may cause your offer to be considered as non-responsive and ineligible for award.
*SUBMIT PAGES 1, 2, 6, 51, 52 and 53 OF THE SOLICITATION DOCUMENT*
A. SECTION 1:
Standard Form-1442 – Solicitation, Offer, and Award, pages 1 & 2
Complete blocks 14 thru 20c (remember to include the signer’s title in block 20a). Ensure the address typed in block 14 matches the address in your SAM registration.
Blocks 21 thru 31c are to be completed only by the Government!
Include UEI#, tax id#, CAGE code, and email address where indicated in block 10.
B. SECTION 2:
Commodity or Services Schedule, page 6
Complete the unit price (JB = job) and Amount blocks (these amounts will be the same).
NOTE: the amounts listed in this section should be the same as the amount listed in block 17 of the Standard Form-1442.
C. SECTION 6:
Provisions, page 35
Provision 52.215-20 Alternate-IV:
Submit a cost breakdown of your quotation pursuant to the instructions in this provision. This listing should be of individual costs (e.g., labor hours and cost per hour, material units and cost per unit, etc.), not merely lump sums.
D. SECTION 7:
Representations and Certifications, pages 37-40
1. FAR Provision 52.204-8
NOTE: Pursuant to section (b)(1) of this provision, provision 52.204-7 is included in this solicitation.
Therefore, offerors should not mark either of the two options under section (b)(2) since paragraph (d) AUTOMATICALLY applies. Leave these options unmarked.
2. FAO-0021
Complete in entirety.
E. Amendments, if any, must be acknowledged and submitted with the offer by one of the methods described in item eleven of the Standard Form-30 (amendment of solicitation/modification of contract).
*SUBMIT PAGES 1, 2, 6, 51, 52 and 53 OF THE SOLICITATION DOCUMENT*
II. PRE-QUOTATION CONFERENCE/SITE VISIT:
********************************IMPORTANT **********************************
A pre-quotation conference and site visit are scheduled for Thursday
January 16, 2025 9:00 a.m. local time at FCI Sandstone Main building 2300 Co Rd 29, Sandstone, MN 55072 This is the only pre-quotation conference/site visit scheduled. The pre-quotation conference/site visit is not mandatory (see provision 52.236-27 Alternate I of the solicitation). However, all offerors are urged to attend.
NCIC background checks will be required for participants attending this conference. The authorization for release of information (Form BP-A0660 NCIC Check) shall be completed for each attendee and submitted to FCI Sandstone no later than Friday January 10, 2025 12:00 p.m. local time, email request for NCIC check and submit documentation to Rebecca Watrin at rwatrin@bop.gov.
For questions on filling out the NCIC form, contact either Rebecca Watrin at 320-245-6531 or Julie Franklin at 320-245-6530.
The forms must include a cover letter indicating they are for the FCI Sandstone – Replace Boiler Controls project in addition to the following information:
• Company name and list/number of individuals from the company who will be attending.
• Phone number/point of contact for the company for notification of any NCICs that are denied.
NOTE: The FBOP is prohibited from divulging any information regarding any reasons for NCIC denials. Only the fact that a person has been denied will be communicated to the company point of contact.
The point of contact for the pre-quotation conference/site visit is Jacob J.
Polk, Contract Specialist, 320-245-6204, j3polk@bop.gov.
Any questions relating to the solicitation after the closing of the pre-quotation conference/site visit shall be sent to Jacob J. Polk, Contract Specialist, via email at j3polk@bop.gov no later than January 22, 2025 at 12:00 p.m. local time. In order to provide sufficient response time prior to the offer due date, the Government is establishing the above cut-off date for questions about the solicitation. All offerors shall offer in accordance with the current solicitation to include all amendments (if any) as issued by the Contracting Officer only.
III. Each offeror is requested to submit the following information in accordance with the instructions:
A. Quotes shall be sent via e-mail or FedEx. E-Mail offers shall be sent to j3polk@bop.gov
B. Offer Label (see template below)
1. This label shall be completed and used on the envelope containing the offer. This envelope shall be placed inside of shipping boxes or envelopes supplied by couriers such as FedEx. Complete the information on the label and cut and paste or transfer it to the LOWER left corner of the mailto:rwatrin@bop.gov mailto:j3polk@bop.gov envelope containing your offer (not on the courier envelope/packaging). Print or type your name and address in the UPPER left corner of the envelope containing your offer.
*Double check all amendments (if issued) for any offer due date extension and enter accordingly on label*
Quote/OFFER
SOLICITATION NO.
15B41325Q00000002
01/24/2025 FOR RECEIPT OF BIDS/OFFERS
1200 FOR RECEIPT OF BIDS/OFFERS
OFFICE DESIGNATED TO RECEIVE BIDS/OFFERS
Federal Bureau of Prisons FCI Sandstone, P.O. Box 999, Sandstone, MN 55072
CONTRACTING OFFICER NAME
Jacob J. Polk
15B41325Q00000002 Page 1 of 54
SOLICITATION,OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION NUMBER
15B41325Q00000002
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
2. TYPE OF SOLICITATION 3. DATE ISSUED
01/03/2025
PAGE OF PAGES
1 54
IMPORTANT -The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
4C3K
CODE 15B413
Federal Bureau of Prisons FCI Sandstone 2300 County Rd. 29 Attn: Business Office Sandstone, MN 55072
7. ISSUED BY
FCI SANDSTONE
P.O. BOX 999
SANDSTONE, MN 55072
Jacob J. Polk
(O) 320-245-6204 j3polk@bop.gov
8. ADDRESS OFFER TO
9. FOR
INFORMATION CALL:
a. NAME
Jacob Polk j3polk@bop.gov
b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
320-245-6204
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" means "bid" and "bidder".
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The Contractor shall begin performance within calendar days and complete it within calendar days after receiving10 245 award, X notice to proceed. This performance period is X mandatory negotiable. (See __________________________.)
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS? (If "YES," indicate within how many calendar days after award in Item 12b).
X YES NO
12b. CALENDAR DAYS
Sealed offers in original and copies to perform the work required are due at the place specified in item 8 by (hour) local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
12:00US/
Central a.
01/24/2025
b. An offer guarantee is, X is not required.
All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.c.
0d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
13. ADDITIONAL SOLICITATION REQUIREMENTS:
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d)
15B41325Q00000002 Page 2 of 54
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code) 15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
CODE FACILITY CODE
The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within ___________ calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
17.
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE.
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE
UNITED STATES CODE AT
26. ADMINISTERED BY 15B413
Federal Bureau of Prisons FCI Sandstone 2300 County Rd. 29 Attn: Business Office Sandstone, MN 55072
Jacob Polk
(O) 320-245-6204 j3polk@bop.gov
Federal Bureau of Prisons FCI Sandstone
PO BOX 999
Sandstone, MN 55072
Accounting Staff
(O) 320-245-2262 sst-businessoffice-s@bop.gov
27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return __________ copies to issuing office.) Contractor agrees to furnish and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
X 29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a.NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
Jacob Polk
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
15B41325Q00000002 Page 3 of 54
Table of Contents
Section Description Page Number
1 Solicitation, Offer and Award 2 Commodity or Services Schedule 3 Special Contract Requirements
52.218-000 CONTINUING CONTRACT PERFORMANCE DURING A PANDEMIC
INFLUENZA OR OTHER NATIONAL EMERGENCY (May 2008) 52.24-403-70 Notice of Contractor Personnel Security Requirements (OCT 2005) FAO-0001 Bonds FAO-0002 Magnitude FAO-0003 Required Insurance FAO-0004 Pre-Construction Conference FAO-0005 Submittals FAO-0006 Contractor Use of Premises FAO-0007 Payment Services FAO-0008 Request for Final Inspection FAO-0009 Contract Security (Program Statement 3000.03 Human Resource Management Manual) FAO-0010 Assignment of Contract Administration Office and Functions FAO-0011 Schedule of Values FAO-0012 Progress Meetings FAO-0013 Contract Closeout Procedures (for construction contracts exceeding $150,000)
4 Contract Clauses 52.246-12 Inspection of Construction (Aug 1996) 52.204-9 Personal Identity Verification of Contractor Personnel (Jan 2011) 52.204-10 Reporting Executive Compensation and First-Tier Subcontract Awards (Jun 2020) 52.204-18 Commercial and Government Entity Code Maintenance (Aug 2020) 52.204-23 Prohibition on Contracting for Hardware, Software, and Services Developed or Provided by Kaspersky Lab Covered Entities (Dec 2023) 52.204-25 Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment (Nov 2021) 52.209-10 Prohibition on Contracting with Inverted Domestic Corporations (Nov 2015) 52.211-10 Commencement, Prosecution, and Completion of Work (Apr 1984) 52.211-18 Variation in Estimated Quantity (Apr 1984) 52.219-6 Notice of Total Small Business Set-Aside (Nov 2020) 52.219-28 Post-Award Small Business Program Rerepresentation (Feb 2024) 52.222-1 Notice to the Government of Labor Disputes (Feb 1997) 52.222-3 Convict Labor (June 2003) 52.222-4 Contract Work Hours and Safety Standards--Overtime Compensation (May 2018) 52.222-6 Construction Wage Rate Requirements (Aug 2018) 52.222-7 Withholding of Funds (May 2014) 52.222-8 Payrolls and Basic Records (Jul 2021) 52.222-9 Apprentices and Trainees (July 2005) 52.222-10 Compliance with Copeland Act Requirements (Feb 1988) 52.222-11 Subcontracts (Labor Standards) (May 2014) 52.222-12 Contract Termination - Debarment (May 2014) 52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations (May 2014) 52.222-14 Disputes Concerning Labor Standards (Feb 1988) 52.222-15 Certification of Eligibility (May 2014) 52.222-21 Prohibition of Segregated Facilities (Apr 2015) 52.222-26 Equal Opportunity (Sept 2016) 52.222-27 Affirmative Action Compliance Requirements for Construction (Apr 2015) 52.222-36 Equal Opportunity for Workers with Disabilities (Jun 2020) 52.222-50 Combating Trafficking in Persons (Nov 2021)
15B41325Q00000002 Page 4 of 54
52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026 (Jan 2022) 52.222-62 Paid Sick Leave Under Executive Order 13706 (Jan 2022) 52.223-5 Pollution Prevention and Right-to-Know Information (May 2024) 52.225-13 Restrictions on Certain Foreign Purchases (Feb 2021) 52.227-1 Authorization and Consent (Jun 2020) 52.227-4 Patent Indemnity-Construction Contracts (Dec 2007) 52.228-2 Additional Bond Security (Oct 1997) 52.228-5 Insurance-Work on a Government Installation (Jan 1997) 52.228-11 Individual Surety-Pledge of Assets (Feb 2021) 52.228-14 Irrevocable Letter of Credit (Nov 2014) 52.228-15 Performance and Payment Bonds-Construction (Jun 2020) 52.232-5 Payments under Fixed-Price Construction Contracts (May 2014) 52.232-17 Interest (May 2014) 52.232-23 Assignment of Claims (May 2014) 52.232-27 Prompt Payment for Construction Contracts (Jan 2017) 52.232-33 Payment by Electronic Funds Transfer-System for Award Management (Oct 2018) 52.232-39 Unenforceability of Unauthorized Obligations (Jun 2013) 52.232-40 Providing Accelerated Payments to Small Business Subcontractors (Mar 2023) 52.233-1 Alt I Disputes (May 2014) - Alternate I (Dec 1991) 52.233-3 Protest after Award (Aug 1996) 52.233-4 Applicable Law for Breach of Contract Claim (Oct 2004) 52.236-2 Differing Site Conditions (Apr 1984) 52.236-3 Site Investigation and Conditions Affecting the Work (Apr 1984) 52.236-5 Material and Workmanship (Apr 1984) 52.236-6 Superintendence by the Contractor (Apr 1984) 52.236-7 Permits and Responsibilities (Nov 1991) 52.236-8 Other Contracts (Apr 1984) 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements (Apr 1984) 52.236-11 Use and Possession Prior to Completion (Apr 1984) 52.236-12 Cleaning Up (Apr 1984) 52.236-13 Alt I Accident Prevention (Nov 1991) - Alternate I (Nov 1991) 52.236-14 Availability and Use of Utility Services (Apr 1984) 52.236-15 Schedules for Construction Contracts (Apr 1984) 52.236-17 Layout of Work (Apr 1984) 52.236-21 Alt II Specifications and Drawings for Construction (Feb 1997) - Alternate II (Apr 1984) 52.236-26 Preconstruction Conference (Feb 1995) 52.242-13 Bankruptcy (July 1995) 52.242-14 Suspension of Work (Apr 1984) 52.243-4 Changes (June 2007) 52.249-2 Alt I Termination for Convenience of the Government (Fixed-Price) (Apr 2012) - Alternate I (Sept 1996) 52.249-10 Default (Fixed-Price Construction) (Apr 1984) 52.252-6 Authorized Deviations in Clauses (Nov 2020) 52.223-20 Aerosols (May 2024) 52.223-21 Foams (May 2024) DOJ-02 Contractor Privacy Requirements (JAN 2022)
5 Attachments 6 Solicitation Provisions
52.204-7 System for Award Management (Oct 2018) 52.204-22 Alternative Line Item Proposal (Jan 2017) 52.207-1 Notice Of Standard Competition (May 2006) 52.215-1 Instructions to Offerors-Competitive Acquisition (Nov 2021) 52.222-23 Notice of Requirement for Affirmative Action to Ensure Equal Emplyment Opportunity for Construction (Feb 1999)
15B41325Q00000002 Page 5 of 54
52.222-5 Construction Wage Rate Requirements - Secondary Site of the Work (May 2014) 52.225-10 Notice of Buy American Requirement-Construction Materials (May 2014) 52.236-27 Site Visit (Construction) (Feb 1995) 52.215-20 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data (Nov 2021)
7 Representations and Certifications 52.209-2 Prohibition on Contracting with Inverted Domestic Corporations--Representation (Nov 2015) 52.223-22 Public Disclosure of Greenhouse Gas Emissions and Reduction Goals- Representation (Dec 2016) 52.204-19 Incorporation by Reference of Representations and Certifications (Dec 2014) 52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements--Representation (Jan 2017) 52.212-3 Offeror Representations and Certifications-Commercial Products and Commercial Services (May 2024) 52.204-8 Annual Representations and Certifications (May 2024) 52.219-1 Small Business Program Representations (Feb 2024) FAO-0021 Business Management Questionnaire
15B41325Q00000002 Page 6 of 54
Section 2 - Commodity or Services Schedule
FY25 FCI Sandstone 24Z4AZ3 Replace Boiler Controls
Firm Fixed Price
SCHEDULE OF SUPPLIES/SERVICES
CONTINUATION SHEET
ITEM NO. SUPPLIES/SERVICES QUANTITY UNIT UNIT PRICE AMOUNT
0001 Upgrade boiler controls for all three (3) institution boilers
Contractor shall be responsible for providing labor, and all materials needed for the removal of old boiler controls and installation, programming and startup of the new boiler controls system. The new boiler control system will be a Siemens LMV52, or equivalent and compatible with a Siemens master panel and have at least a 12-inch color touch screen.
PSC: J045
1 JB $________ $_________________
15B41325Q00000002 Page 7 of 54
Section 3 - Special Contract Requirements
Clauses By Full Text
52.218-000 CONTINUING CONTRACT PERFORMANCE DURING A PANDEMIC INFLUENZA OR OTHER NATIONAL EMERGENCY (May 2008)
During a Pandemic or other emergency we understand that our contractor workforce will experience the same high levels of absenteeism as our federal employees. Although the Excusable Delays and Termination for Default clauses used in Government contracts list epidemics and quarantine restrictions among the reasons to excuse delays in contract performance, we expect our contractors to make a reasonable effort to keep performance at an acceptable level during emergency periods.
The Office of Personnel Management (OPM) has provided guidance to federal managers and employees on the kinds of actions to be taken to ensure the continuity of operations during emergency periods. This guidance is also applicable to our contract workforce. Contractors are expected to have reasonable policies in place for continuing work performance, particularly those performing mission critical services, during a pandemic influenza or other emergency situation.
The types of actions a federal contractor should reasonably take to help ensure performance are:
• Encourage employees to get inoculations or follow other preventive measures as advised by the public health service.
• Cross-train workers as backup for all positions performing critical services. This is particularly important for work such as guard services where telework is not an option.
• Implement telework to the greatest extent possible in the workgroup so systems are in place to support successful remote work in an emergency.
• Communicate expectations to all employees regarding their roles and responsibilities in relation to remote work in the event of a pandemic health crisis or other emergency.
• Establish communication processes to notify employees of activation of this plan.
• Integrate pandemic health crisis response expectations into telework agreements.
• With the employee, assess requirements for working at home (supplies and equipment needed for an extended telework period). Security concerns should be considered in making equipment choices; agencies or contractors may wish to avoid use of employees' personal computers and provide them with PCs or laptops as appropriate.
• Determine how all employees who may telework will communicate with one another and with management to accomplish work.
• Practice telework regularly to ensure effectiveness.
• Make it clear that in emergency situations, employees must perform all duties assigned by management, even if they are outside usual or customary duties.
• Identify how time and attendance will be maintained.
It is the contractor's responsibility to advise the Government Contracting Officer if they anticipate not being able to perform and to work with the Department to fill gaps as necessary. This means direct communication with the Contracting Officer or in his/her absence, another responsible person in the contracting office via telephone or email messages acknowledging the contractor's notification. The incumbent contractor is responsible for assisting the Department in estimating the adverse impacts of nonperformance and to work diligently with the Department to develop a strategy for maintaining the continuity of operations.
The Department does reserve the right in such emergency situations to use Federal employees, employees of other agencies, contract support from other existing contractors, or to enter into new contracts for critical support services. Any new contracting efforts would be acquired following the guidance in the Office of federal Procurement Policy issuance "Emergency Acquisitions", May, 2007 and Subpart 18.2. Emergency Acquisition Flexibilities, of the Federal Acquisition Regulations.
[End of Clause]
15B41325Q00000002 Page 8 of 54
52.24-403-70 Notice of Contractor Personnel Security Requirements (OCT 2005)
Compliance with Homeland Security Presidential Directive-12 (HSPD-12) and Federal Information Processing Standard
Publication 201 (FIPS 201) 1 entitled "Personal Identification Verification (PIV) for Federal Employees and Contractors," Phase I.
1. Long-Term Contractor Personnel:
In order to be compliant with HSPD-12/PIV I, the following investigative requirements must be met for each new long-term 2 contractor employee whose background investigation (BI) process begins on or after October 27, 2005:
a. Contractor Personnel must present two forms of identification in original form prior to badge issuance (acceptable documents are listed in Form I-9, OMB No. 1615-0047, "Employment Eligibility Verification," and at least one document must be a valid State or Federal government-issued picture ID);
b. Contractor Personnel must appear in person at least once before a DOJ official who is responsible for checking the identification documents. This identity proofing must be completed sometime during the clearance process but prior to badge issuance and must be documented by the DOJ official;
c. Contractor Personnel must undergo a BI commensurate with the designated risk level associated with the duties of each position. Outlined below are the minimum BI requirements for each risk level:
• High Risk - Background Investigation (5 year scope)
• Moderate Risk - Limited Background Investigation (LBI) or Minimum Background Investigation (MBI)
• Low Risk - National Agency Check with Inquiries (NACI) investigation
d. The pre-appointment BI waiver requirements for all position sensitivity levels are a:
1) Favorable review of the security questionnaire form;
2) Favorable fingerprint results;
3) Favorable credit report, if required;3
4) Waiver request memorandum, including both the Office of Personnel Management schedule date and position sensitivity/risk level; and
5) Favorable review of the National Agency Check (NAC) 4 portion of the applicable BI that is determined by position sensitivity/risk level.
A badge may be issued following approval of the above waiver requirements.
If the NAC is not received within five days of OPM's scheduling date, the badge can be issued based on a favorable review of the Security Questionnaire and the Federal Bureau of Investigation Criminal History Check (i.e., fingerprint check results).
e. Badge re-validation will occur once the investigation is completed and favorably adjudicated. If the BI results so justify, badges issued under these procedures will be suspended or revoked.
2. Short-Term Contractor Personnel:
It is the policy of the DOJ that short-term contractors having access to DOJ information systems and/or DOJ facilities or space for six months or fewer are subject to the identity proofing requirements listed in items 1a. and 1b. above. The pre-appointment waiver requirements for short-term contractors are:
a. Favorable review of the security questionnaire form;
b. Favorable fingerprint results;
c. Favorable credit report, if required;5 and
d. Waiver request memorandum indicating both the position sensitivity/risk level and the duration of the appointment. The commensurate BI does not need to be initiated.
A badge may be issued following approval of the above waiver requirements and the badge will expire six months from the date of issuance. This process can only be used once for a short-term contractor in a twelve month period. This will ensure that any consecutive short-term appointments are subject to the full PIV-I identity proofing process.
For example, if a contractor employee requires daily access for a three or four-week period, this contractor would be cleared according to the above short-term requirements. However, if a second request is submitted for the same contractor employee within a twelve-month period for the purpose of extending the initial contract or for employment under a totally different contract for another three or four-week period, this contractor would now be considered "long-term" and must be cleared according to the long-term requirements as stated in this interim policy.
3. Intermittent Contractors:
An exception to the above-mentioned short-term requirements would be intermittent contractors.
a. For purposes of this policy, "intermittent" is defined as those contractor employees needing access to DOJ information systems and/or DOJ facilities or space for a maximum of one day per week, regardless of the duration of the required intermittent access. For example, the water delivery contractor that delivers water one time each week and is working on a one-year contract.
15B41325Q00000002 Page 9 of 54
b. Contractors requiring intermittent access should follow the Department's escort policy. Please reference the August 11, 2004, and January 29, 2001, Department Security Officer policy memoranda that conveys the requirements for contractor facility escorted access.
c. Due to extenuating circumstances, if a component requests unescorted access or DOJ IT system access for an intermittent contractor, the same pre-employment background investigation waiver requirements that apply to short-term contractors are required.
d. If an intermittent contractor is approved for unescorted access, the contractor will only be issued a daily badge. The daily badge will be issued upon entrance into a DOJ facility or space and must be returned upon exiting the same facility or space.
e. If an intermittent contractor is approved for unescorted access, the approval will not exceed one year. If the intermittent contractor requires unescorted access beyond one year, the contractor will need to be re-approved each year.
4. An individual transferring from another department or agency shall not be re-adjudicated provided the individual has a current (within the last five years), favorably adjudicated BI meeting HSPD-12 and DOJ's BI requirements.
5. The DOJ's current escorted contractor policy remains unchanged by this acquisition notice.
Notes:
1. FIPS 201 is available at: www.csrc.nist.gov/publications/fips/fips201/FIPS-201-022505.pdf
2. Under HSPD-12, long-term contractors are contractors having access to DOJ information systems and/or DOJ facilities or space for six months or longer. The PIV-I identity proofing process, including initiation and adjudication of the required background investigation, is required for all new long-term contractors regardless of whether it is the current practice to issue a badge. The second phase of HSPD-12 implementation (PIV-II) requires badge issuance to all affected long-term contractors.
3. For contractors in position sensitivity/risk levels above level 1, a favorable review of a credit check is required as part of the pre-appointment waiver package.
4. In order to avoid a delay in the hiring process, components should request an Advance NAC Report when initiating investigations to OPM. Per OPM ' s instructions, to obtain an Advance NAC Report, a Code " 3" must be placed in block " B " of the " Agency Use Only " section of the investigative form. This report is available for all case types.
5.For contractors in position sensitivity/risk levels above level 1, a favorable review of a credit check is required as part of the pre-appointment waiver package.
[End of Clause]
FAO-0001 Bonds
(a) Bid Guarantee. Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in provision 52.228-1, in the form of twenty percent (20) of the bid price or not to exceed $3,000,000. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. A bid bond is not required for bids of $150,000 or less. (FAR 28.102-1)
(b) Performance and Payment Bonds. Within 10 days after award the contractor shall execute and submit to the Contracting Officer two bonds, each with good and sufficient surety or sureties acceptable to the Government, as follows;
a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds will be as follows: (Not required for contracts of $150,000 or less)
(1) Performance Bond: The penal sum of performance bonds at the time of contract award shall be 100 percent of the original contract price.
(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
15B41325Q00000002 Page 10 of 54
(c) For construction contracts greater than $30,000 but not greater than $150,000, the Contracting Officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives (FAR 28.102-1(b)(1)):
(1) A Payment Bond;
(2) An irrevocable letter of credit (ILC);
(3) A tripartite escrow agreement;
(4) A Certificate of Deposit; or
(5) A deposit of the types of security listed in 28.204-1 and 28.204-2.
(d) Individual Sureties.
(1) Bidders may elect to furnish individual surety bonds. If individual surety bonds are furnished for bid guarantees, payment or performance bonds, the individual sureties must submit their bonds proof of ownership and value of the assets which they claim in their net worth at time of bid opening. The Government's preferred method of proof is to have a statement of net worth prepared by a Certified Public Accountant (CPA) in accordance with Generally Accepted Accounting Principles (GAAP). Statements from a CPA that contain disclaimers are not acceptable. The statement of net worth on the Standard Form 28, Affidavit of Individual Surety, is insufficient and will not be accepted without additional proof of value and ownership.
(2) Bidders are cautioned that individual sureties must provide complete and detailed information in Block 9 of Standard Form 28 concerning other contracts on which they have provided bonds. This information shall include contract number, contract location, amount, and type of bond and telephone number of the involved contracting office. Failure to provide the proof and information required may result in rejection of the bid or termination of the contract for failure to provide adequate bonds.
(a) Bid Guarantee. Each bidder shall submit with his bid a Bid Bond (Standard Form 24) with good and sufficient surety or sureties acceptable to the Government, or other security as provided in provision 52.228-1, in the form of twenty percent (20) of the bid price or not to exceed $3,000,000. The bid bond penalty may be expressed in terms of a percentage of the bid price or may be expressed in dollars and cents. A bid bond is not required for bids of $150,000 or less. (FAR 28.102-1)
(b) Performance and Payment Bonds. Within 10 days after award the contractor shall execute and submit to the Contracting Officer two bonds, each with good and sufficient surety or sureties acceptable to the Government, as follows; a Performance Bond (Standard Form 25) and a Payment Bond (Standard Form 25A). The penal sums of such bonds will be as follows: (Not required for contracts of $150,000 or less)
(1) Performance Bond: The penal sum of performance bonds at the time of contract award shall be 100 percent of the original contract price.
15B41325Q00000002 Page 11 of 54
(2) Payment Bond: The penal amount of payment bonds at the time of contract award shall be 100 percent of the original contract price.
(c) For construction contracts greater than $30,000 but not greater than $150,000, the Contracting Officer shall select two or more of the following payment protections, giving particular consideration to inclusion of an irrevocable letter of credit as one of the selected alternatives (FAR 28.102-1(b)(1)):
(1) A Payment Bond;
(2) An irrevocable letter of credit (ILC);
(3) A tripartite escrow agreement;
(4) A Certificate of Deposit; or
(5) A deposit of the types of security listed in 28.204-1 and 28.204-2.
(d) Individual Sureties.
(1) Bidders may elect to furnish individual surety bonds. If individual surety bonds are furnished for bid guarantees, payment or performance bonds, the individual sureties must submit their bonds proof of ownership and value of the assets which they claim in their net worth at time of bid opening. The Government's preferred method of proof is to have a statement of net worth prepared by a Certified Public Accountant (CPA) in accordance with Generally Accepted Accounting Principles (GAAP).
Statements from a CPA that contain disclaimers are not acceptable. The statement of net worth on the Standard Form 28, Affidavit of Individual Surety, is insufficient and will not be accepted without additional proof of value and ownership.
(2) Bidders are cautioned that individual sureties must provide complete and detailed information in Block 9 of Standard Form 28 concerning other contracts on which they have provided bonds. This information shall include contract number, contract location, amount, and type of bond and telephone number of the involved contracting office. Failure to provide the proof and information required may result in rejection of the bid or termination of the contract for failure to provide adequate bonds.
FAO-0002 Magnitude
The magnitude of this project is between $100,000.00 and $250,000.00.
FAO-0003 Required Insurance
See FAR 52.228-5, Insurance - Work on a Government Installation.
The Contractor shall, at its own expense, provide and maintain during the entire performance
15B41325Q00000002 Page 12 of 54 period of this contract, at least the kinds and minimum amounts of insurance required in the Schedule or elsewhere in the contract.
TYPE AMOUNT
(1) WORKERS COMPENSATION & EMPLOYER'S LIABILITY $100,000
The required Workmen's Compensation Insurance shall extend to cover employee's liability for accidental bodily injury or death and for occupational disease with a minimum liability of $100,000.
(2) COMPREHENSIVE GENERAL LIABILITY with a minimum limit of:
PER ACCIDENT OR
OCCURRENCE FOR BODILY INJURY $500,000
This insurance shall include contractor's protective and contractual liability.
(3) COMPREHENSIVE AUTOMOBILE LIABILITY with the following minimum limits:
PER PERSON $200,000
PER OCCURRENCE FOR BODILY INJURY $500,000
PER OCCURRENCE FOR PROPERTY DAMAGE $ 20,000
FAO-0004 Pre-Construction Conference
(a) Prior to the start of construction, Contracting Officers shall call a conference with the contractor, subcontractor(s), Warden, Controller/Business Administrator, Safety Manager, Facilities Administrator, Project Representative, A&E firm, Captain and other interested personnel to discuss the statutory labor standards, prevailing wage requirements, submission of the contractor's payrolls, subcontractor's responsibilities, institution work schedules, local policies, contraband, parking, storage of vehicles and equipment, etc.
Minutes of the conference shall be recorded, listing the names and titles of all attendees, and the subject matter of all items covered. The minutes shall be signed by the contractor and the Contracting Officer, and a signed copy placed in the contract file.
(b) The Contractor shall familiarize himself/herself with all procedures involved in normal institution routines. Any requirements which may constitute a problem or result in conflict, will be brought to the attention of the Contracting Officer or his representative for determination.
FAO-0005 Submittals
Within 10 calendar days after commencement of work or as otherwise established by the Contracting Officer, all materials and articles requiring approval, as contemplated by the Materials and Workmanship clause, shall be submitted by the contractor.
The submittal process is in place to allow the Government the opportunity to determine whether materials or procedures used by the contractor are in accordance with contract requirements. It is ultimately the Contractor's responsibility via the quality control process to ensure submittal items installed under the contract and work performed on site are in accordance with industry standards and general practices.
(a) The types of submittal requirements specified in this contract may include, but is not limited to; shop drawings, product data, samples, certificates of conformance or compliance, certified test or inspection reports, equipment, materials, and miscellaneous work related submittals for construction. Individual submittal requirements are generally specified in applicable sections for each unit of work in the specifications and/or as a whole in one section in the statement of work.
(b) The Bureau of Prisons (BOP) Contracting Officer’s Representative (COR) shall act for the Contracting Officer in the review and acceptance of all submittals. The Contractor shall submit submittals as required by the contract/ specifications to the COR for transmittal to the Contracting Officer. Fabrication of any work or purchase or use of
15B41325Q00000002 Page 13 of 54 any submittals (such as materials for which samples are required or equipment, etc.) shall not take place until written acceptance is given by the COR, except at the Contractor's own risk.
(c) The Contractor shall submit all shop drawings and submittals sufficiently in advance (unless otherwise specified in the specifications) of the construction requirements to allow ample time for checking, re-submitting, and re-checking.
(d) Failure of any materials to pass their specified tests shall be sufficient cause for refusal to consider, under this contract, any further samples of the same brand or make of that material. The Government reserves the right to disapprove any material or equipment which has previously proven unsatisfactory in service.
(e) The Contracting Officer’s or designee’s approval or acceptance of submittals is not to be construed as a complete check. Approval or acceptance will not relieve the Contractor of the responsibility for any error which may exist, as the Contractor is responsible for the satisfactory construction of all work. The Contractor is responsible for delivering a final product/system that is operational as intended by the contract requirements, regardless of any Government approvals or acceptance of submittals. The Government assumes no liability during the submittal approval/acceptance process. It is the sole responsibility of the Contractor to deliver a properly functioning product or system.
FAO-0006 Contractor Use of Premises
Work Hours The project schedule is based on a normal forty (40) hour work week, eight (8) hours per day, Monday through Friday, excluding Federal holidays. The Contracting Officer’s Representative (COR) shall establish the work hour time frames for the duration of the project, subject to the approval of the Contracting Officer. Work hours and work days may be altered only with a 48 hour advance approval of the Contracting Officer.
NOTE: Access to the site will be available during normal working hours except during emergencies. It shall be the responsibility of the Contractor to familiarize himself, his employees, and his subcontractors of the working hours and conditions in the correctional facility, as working hours may not constitute a full eight hour day. The Government assumes no responsibility to the Contractor, nor to any of his subcontractors, for shorter hours due to institutional emergencies or entry and/or exit of workers necessitated by normal institution routines. The procedures and institutional entrance/ exit routines applicable to this project will be explained at both the pre-bid conference/site visit and the pre-construction meeting.
Contraband The Contractor shall inform his employees that intoxicating beverages, drugs, weapons, etc., will not be allowed on the site. Introduction of contraband shall be subject to the penalties prescribed by Title 18 USC-1791.
Explosives The use of explosives is absolutely forbidden without written authorization from the Contracting Officer.
Parking and Temporary Office Parking will be available at the site to the extent it does not interfere with construction activities. Otherwise, parking shall be provided for by the Contractor, at his expense, off the site for workmen employed on the project. Any temporary field office used by the Contractor shall be located in an area approved by the COR.
Safety and Accident Prevention In performing work under this contract the contractor shall:
(a) Conform to the specific safety requirements established by this contract;
(b) Comply with the safety rules of the Government institution that concern related activities not directly addressed in this contract;
(c) Take all reasonable steps and precautions to prevent accidents and preserve the life and health of contractor and Government personnel performing or in any way coming in contact with the performance of this contract; and
(d) Take such additional immediate precautions as the Contracting Officer and/or COR may reasonably require for safety and accident prevention purposes.
15B41325Q00000002 Page 14 of 54
FAO-0007 Payment Services
(a) Original application for payment shall be prepared on AIA (American Institute of Architects) Form G-702 "Application and Certificate for Payment" and submitted to the Contracting Officer. The contractor may use another form;
however, it shall contain similar information as the AIA Form G-702. The Contracting Officer will approve the amount of payment by signing and forwarding the application and certificate as follows: Original to Accounting; Copy for Contract Award File.
(b) All small business contractors are required to self-certify on all invoices their small business status.
FAO-0008 Request for Final Inspection
The Contractor shall give the Contracting Officer’s Representative (COR) a minimum of ten (10) working days advanced written notice of the date on which the work will be fully completed and ready for the Government’s final inspection.
FAO-0009 Contract Security (Program Statement 3000.03 Human Resource Management Manual)
The following security measures will be applied to all contract employees who will be working under the terms of the contract:
National Crime Information Center (NCIC) Check Name Check Fingerprint Check (FD-258) OF-306, Declaration for Federal Employment, and Appropriate Resume or Optional Application Contract Pre-employment Form Release of Information
FAO-0010 Assignment of Contract Administration Office and Functions
Pursuant to FAR 42.201 and 42.202, the assigned Contract Administration Office is listed in Block 26 of the Standard Form 1442 Back. This assignment carries with it the authority to perform all of the contract administration functions listed in FAR 42.302(a) and 42.302(b) to the extent that those functions apply to the contract.
FAO-0011 Schedule of Values
The Contractor shall prepare a Schedule of Values (SOV) for the project and submit to the Contracting Officer for approval prior to submitting the first application for payment. The SOV shall be correlated with the construction schedule.
The SOV shall be formatted per the Construction Specification Institute Master Format structure. The Contractor may propose an alternate organizational format to the Contracting Officer for approval.
(a) The SOV shall include:
(1) Project name, location, and contract number;
(2) Contractor’s name and address;
(3) Date of submittal.
(b) The SOV shall be arranged in a tabular form with separate columns to indicate the following for each item listed:
(1) Description of Work or Material;
(2) Related specification section, if applicable;
(3) Name of subcontractor, if applicable;
(4) Name of manufacturer or fabricator, if applicable;
(5) Name of supplier, if applicable;
(6) Change orders (modifications) that have affected value, if applicable;
(7) Dollar value;
(8) Percentage of Contract sum rounded to the nearest percent, adjusted to total 100 percent.
15B41325Q00000002 Page 15 of 54
(c) The SOV shall breakdown the contract sum in sufficient detail to facilitate continued evaluation of applications for payment and progress reports. The contractor should separate principal subcontract amounts down into several line items.
(d) SOV amounts shall be rounded to the nearest whole dollar. The total of all SOV amounts shall equal the total contract amount.
(e) The contractor shall progress the percentage of completion, with the concurrence of the Contracting Officer’s Representative, for each value in conjunction with the preparation of each monthly application for payment. The progressed value percentages shall directly correlate to the calculated total amount due for each monthly progress payment.
(f) The SOV shall remain fixed for the duration of contract performance. Any revisions to the SOV must be requested in writing, with justification, for approval by the Contracting Officer.
FAO-0012 Progress Meetings
The Administrative Contracting Officer (ACO) shall conduct progress meetings at the project site on a monthly basis, or at intervals as determined by the ACO.
(a) At a minimum, the attendees shall include but is not limited to:
(1) FBOP: Administrative Contracting Officer, Contracting Officer’s Representative (COR), Facility Administrator/Manager, Architect/Engineer (if applicable), Other Personnel (Executive Staff, Captain, Safety Manager, etc.).
(2) Contractor: Project Manager, Superintendent, and technical support disciplines as appropriate (Subcontractors, Manufacturers, Suppliers, etc.).
(b) The meeting should include, but is not limited to issues such as:
Administrative Contracting Officer:
(1) Old business from previous progress meeting(s);
(2) Status of modifications, certified payrolls, submittals, requests for information (RFI);
(3) Review of payments made to date and review/approve current payment request;
(4) Status of modification proposal requests;
(5) Discuss new business.
COR:
(1) Status of escort coverage;
(2) Review gate or sallyport entrance/exit issues;
(3) Discuss other delays contractor may be experiencing;
(4) Discuss performance/quality issues.
Contractor:
(1) Review/discuss updated progress schedule;
(2) Provide 30 day outlook;
15B41325Q00000002 Page 16 of 54
(3) Discuss other issues affecting performance.
FAO-0013 Contract Closeout Procedures (for construction contracts exceeding $150,000)
Contract Closeout must be completed within six (6) months of physical completion of the work.
Prior to payment of final invoice:
The contractor shall submit the following documents:
(1) Contractor’s Affidavit of Release of Liens (AIA Document G706A);
(2) Contractor’s Affidavit of Payment of Debts and Claims (AIA Document G706);
(3) All as-built drawings/shop drawings, if applicable;
(4) Contractor’s final invoice;
(5) Release of Claims (GSA Form 1142);
(6) Consent of Surety to Final Payment (AIA Document G707);
(7) Letter establishing warranty dates;
(8) Complete list of subcontractors with telephone numbers and points of contact;
(9) Guarantees and warranties;
(10) All balance and test reports;
(11) All operation/maintenance manuals;
(12) All permits and certifications.