SOW KNMD240017-LEAD AND ASBESTOS ABATEMENT B3400.docx
DOCX document 305 KB Posted
- Attached to
- HI ANG BLDG 3400 HAZMAT REMEDIATION
- Solicitation number
- W50SLF24R0017
- Issued by
-
Department of the Army National Guard
About this file
This document is a Statement of Work (SOW) for a federal contract opportunity related to hazardous materials abatement and demolition activities in Building 3400 at the Hawaii Air National Guard Campus, JBPHH, Hickam AFB, HI.
The scope of work includes removing asbestos beneath floor tiles, lead-containing paint, and asbestos-containing material in walls. The contractor is responsible for demolishing walls, removing floor tiles and mastic, abating and disposing of hazardous materials, obtaining required licenses and permits, and restoring the facilities to their original condition if any damage occurs. The contractor must coordinate with the 154th Civil Engineering Squadron to access the work site and for hazardous materials storage/disposal. Work shall be completed in accordance with the SOW and contract drawings, while adhering to safety regulations and industry standards. Two design submissions are required, and the government will review the submissions within two weeks. Shop drawings and product data submissions must also be provided. Inspections and tests will be conducted throughout the design and construction process, with the government witnessing.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW KNMD240017-LEAD AND ASBESTOS ABATEMENT B3400 17 Sep 2024.docx | DOCX document | |
| QA HAZMAT Final 19SEP24.docx | DOCX document | |
| B3400 HAZMAT Report 2.pdf | ||
| B3400 HAZMAT Report 1.pdf | ||
| QA HAZMAT 19SEP24.docx | DOCX document | |
| W50SLF24R0017 Solicitation.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT NO: KNMD240017 – LEAD AND ASBESTOS ABATEMENT
STATEMENT OF WORK
PROJECT NO: KNMD240017
LEAD AND ASBESTOS ABATEMENT B3400, JBPHH HI
154th Civil Engineering Squadron
01 Apr 2024
Hawaii Air National Guard 154th Wing Guard Bldg 3392 Hickam Air Force Base, Oahu, Hawai‘i
SCOPE: This project requires all labor, tools, equipment, transportation, and supervision as required for the project elements as described for the following work:
The scope involves hazardous materials abatement and demolition activities in Building 3400, including removing asbestos beneath floor tiles, lead-containing paint (LCP), and asbestos-containing material (ACM) in walls. The contractor is responsible for demolishing walls in Room 1 to create doorways and removing sections of CMU suspected to contain LCP, as well as removing vinyl floor tiles and mastic in Room 2. Additionally, they are tasked with abatement and disposal of hazardous materials, obtaining all necessary licenses, permits, approvals, and notifications, disposing of waste, and ensuring compliance with safety regulations and industry standards.
All work shall be completed as indicated on this SOW and the Contract drawings. The Contractor must coordinate with the 154 CES to access the work site as well as coordinate with the 154 CES environmental section for any hazardous materials storage/disposal.
It will be the responsibility of the Contractor to restore the facilities to their original condition if any damage occurs during construction.
LOCATION: This project is in Building 3400 at the Hawaii Air National Guard Campus, JBPHH, Hickam AFB, HI 96853.
NORMAL HOURS OF OPERATION: 6:00 AM – 4:30 PM, Monday through Friday. Remediation work shall occur on a “Down Monday”. Setup and teardown may occur on workdays before and after the remediation day if needed. The field investigation and subsequent construction can be accomplished anytime during normal hours unless the base is closed for a holiday and 5-4-9 “Down Mondays” (Schedule can be provided upon request). Prior coordination, via Contracting Officer is required.
Contractor shall comply with the following regulations, codes, and any sub-codes contained therein:
· ASTM
· OSHA
· EPA
· Labor and Industry Standards
· ANGETL 01-1-1
· DD 254 Handbook, HQDA G-2
· Contract Documents
References:
· B3400 HAZMAT Report 1 & 2
· NAVFAC Specification 02 82 00 (Asbestos Remediation)
· NAVFAC Specification 02 83 00 (Lead Remediation)
· NAVFAC Specification 01 74 19 (Construction Waste Management and Disposal)
· NAVFAC Specification 02 81 00 (Transportation and Disposal of Hazardous Materials)
· NAVFAC Specification 01 57 19 (Temporary Environmental Controls)
· NAVFAC Specification 01 57 19.01 (Supplemental Temporary Environmental Controls)
ADMIMINISTRATIVE REQUIRMENTS:
Contractor will be required to file and attain the following approvals prior to project mobilization:
1. File and attain DBIDS entry passes for at least 30 days if Performance Period will exceed 30 days.
2. A temporary construction waiver for the duration of the project.
3. Entry authorization (EAL’s) into the flight line area.
4. Flight line driving permits for all vehicles and vehicle operators.
5. Operation Security training (OPSEC) for all contractors and subcontractors.
OPSEC Control Plan (OCP): All contractors (including subcontractors) identified in the Operations Security (OPSEC) Plan under appendix C of the Statement of Work shall supplement their current security practices by requiring any personnel involved in executing the XYZ contract to complete Government-sponsored and administered Operations Security (OPSEC) training. Upon contract award, all identified contractors (including subcontractors) shall sign the contractor's conformance statement contained within the Operations Security (OPSEC) Plan and submit it to the [Government agency] contracting officer thereby acknowledging that they will meet the requirements of the XYZ PMO generated OPSEC Plan. The contractor specialist security officer (CSSO) shall contact the contracting officer or designated contracting officer's representative (COR) in accordance with the OPSEC Plan to schedule key employees to attend the Government-sponsored OPSEC training.
The contractor must immediately notify the Government upon the discovery of any nonconformance with the OPSEC Plan. The required training can be completed online at https://securityawareness.usalearning.gov/opsec/
PRINCIPLE ELEMENTS OF WORK:
1. Licensing and Permitting:
- Obtain all licenses, permits, approvals, and notifications required for hazardous materials abatement.
2. Demolition and HAZMAT Report 1:
· Room 1: Demolish two walls as marked to create doorways.
· Wall 1: CMU construction.
· Wall 2: Drywall.
· Doorway openings: approximately 47” by 81”.
· Install government-provided steel frame door into Wall 1.
· Finish Wall 2 with drywall to encapsulate ACM at the perimeter of the opening. Ensure readiness for painting upon contract completion.
· Verify door dimensions for Wall 1 and adjust demolition limits accordingly.
· Room 2: Remove 3 sections of marked CMU suspected to contain LCP.
· Each section: 4’ wide by 3’ tall.
· Install angle iron as a lintel to prevent collapse.
3. Floor Tile and Mastic Removal (HAZMAT Report 2):
- Remove all vinyl floor tiles and black mastic in Room 2. Demolish to expose a clean surface on non-ACM concrete beneath. Approximately 529sf, room is 22’-11”x22’11”.
4. Remove all waste generated from the project and dispose of it at contractor’s expense.
Dispose of all ACM/LCP in accordance with state and federal laws
Quality Standards:
- Adhere to safety regulations and industry best practices.
General Notes:
a. All work will be accomplished in a clean, safe manner with quality workmanship in accordance with accepted Government and construction industry standards & practices.
b. The Contractor shall be responsible for verification of all quantities and dimensions prior to commencement of work.
c. All materials and/or equipment shall be of high quality, installed in accordance with manufacture’s recommendations and accomplished by workman skilled in this type of work, using standard trade practices.
d. There shall be no deviations or substitutions without prior Government approval. Unless indicated otherwise, all Equipment and Material shall be new, undamaged and meet the requirements of Underwriter's Laboratories, Inc. (UL). Where UL requirements are not applicable, equipment and material shall be identified as such by Contractor and approved by Owner before purchase and installation.
e. All products and materials/equipment installed shall be approved by AF Form 3000 material approval submittal.
DESIGN SUBMISSIONS
Two (2) submissions are required: a draft submission and a final (100% design) submission. The project PE must review the 100% design submission of plans, specifications, submittal register and certify in writing that the design is in compliance with this UFC and all applicable criteria. This certification letter must be submitted with the 100% submission.
Level of Development: In addition to other submission requirements, which may be specified in this contract, the following is required. The draft submission shall depict the program of requirements. The final submission shall include all disciplines required for the project.
Drawings: Sheets shall include, but not be limited to, architectural, structural, mechanical, fire protection, electrical, and life safety drawings.
Calculations: Calculations shall be provided by the contractor.
Registration Seals: At the Final Document Submission each drawing, shop drawing and submitted specification and calculation document shall be signed by, bear the seal of, and show the State Certificate Number of the Architect and/or Engineer who prepared the document and/or is responsible for its preparation.
Quality Control Plan (QCP): The QCP shall be submitted to the Government as a complete document which addresses all types of inspections/tests for work covered by the Final Document submissions.
Content: For each performance and installation requirement, the QCP shall clearly identify:
· Item/system to be tested,
· Exact test(s) to be performed,
· Measured parameters,
· Inspection/testing organization, and
· The stage of construction development when tests are to be performed.
· Each inspection/test shall be included in the overall construction schedule. The Contractor is not relieved from required performance tests should these not be included in the plan. The QCP is intended to document those inspections/tests necessary to assure the Government that product delivery, quality and performance are as required. It also serves as an inspection coordination tool between the Contractor and the Government. The QCP shall be prepared and submitted to the Government for acceptance during final design development.
Updating: During construction, the Contractor must update the QCP if any changes are necessary due to any changes or schedule constraints. The Government's Contracting Officer and Contracting Officer's Representative (COR) must be notified immediately by the contractor of any schedule and/or procedural changes.
Specifications/Calculations: Calculations shall be titled with each analysis clearly indicating subject/problem being studied, applied references, assumptions, and analysis of answer. All numerical references to length, temperature, pressure, energy, mass, weight, work, power, etc. shall be presented in English units.
Drawings: Drawing levels of detail and quality of representation shall adhere to the AIA guideline "Architectural Graphic Standards" and A/E/C CAD Standard Release 6.0 All original drawings shall be at least 24” x 36”, with each sheet offering North-arrows, Key Plans and graphic scales. Minimum lettering height shall be 0.4 centimeters (5/32 inch). All numerical references to length, temperature, pressure, energy, mass, weight, work, power, etc. shall be presented in metric units with English units immediately following in brackets. Site/Floor layout and Elevations shall be at least 1:100 (1/8" = 1'0") scale.
Quantities: The Contractor shall provide the Government via AMRDEC SAFE https://safe.amrdec.army.mil/safe/ electronic copies of all drawings, specifications, calculations, etc. for each required submission. User guide for AMRDEC SAFE is located at https://safe.amrdec.army.mil/safe/.
Procedures: Design submissions shall be made directly to the Contracting Officer and COR Submissions shall be made in accordance with the schedule represented within the Contractor's accepted schedule, having an allowance that the Government will take two (2) weeks to review each submission, and respond to the contractor with comments or acceptance.
DESIGN REVIEWS
Reviews will be made by the Contracting Officer and COR. As part of its review, the Government may offer submission reviews to other governing functional managers.
Review Period: The Government shall be allowed two (2) weeks to review these submission materials from the date of receipt from the contractor.
Purpose: The Government will review Contractor design submissions to verify adherence to contract requirements. Design reviews by the Government are not to be interpreted as resulting in an approval of the Contractor's apparent progress toward meeting contract requirements but are intended to discover any information which can be brought to the Contractor's attention which might prevent costly errors and misdirection. The Contractor shall remain completely responsible for designing, constructing the project in full compliance with the requirements of this contract.
Resolution of Comments: The Contractor shall resolve all design review comments in writing, indicating one of the following:
· Adoption and action taken,
· Adoption with Modifications and action taken,
· Alternative Resolution and action taken, or
· Rejection
In cases other than unqualified adoption, the Contractor shall provide a statement as to why the reviewer's objection and/or recommendation are inappropriate. Design review comments shall not relieve the Contractor from compliance with terms and conditions of this contract. Contractor's comment resolution shall be transmitted to the Government within 14 calendar days of comment receipt.
SHOP DRAWINGS/PRODUCT DATA
Submissions: Shop Drawing/product data submissions to the Government shall be made after review and approval by the Contractor's designer of record. This is in addition to and separate from specification submission material. Product data shall be delivered to the Government within 30 calendar days following the Government's review of Final Document design and/or the Contractor's establishment of subcontract agreements to provide involved work: Shop drawings shall be provided within 60 days of these occurrences. Shop drawing and product data submissions shall be made to the Contracting Officer and the Contracting Officer's Representative in an electronic format. Material samples shall be sent to USPFO-HI and HIANG BCE offices.
Reviews: Reviews of shop drawings and product data by the Government are not to be interpreted as an approval or acceptance of the Contractor's selections or progress toward meeting contract requirements but are intended to discover problems/errors which may avoid costly redirection during construction. The Contractor shall remain completely responsible for design and construction in accordance with contract requirements. The Government shall be allowed two (2) weeks to review these submission materials from the date of receipt from the contractor.
Changes: Should shop drawing and/or product changes take place after initial Government review, the Contractor shall resubmit the altered product data material and shop drawings within two (2) weeks of the change.
Manuals: The Contractor shall combine all product data submission material into hard copy manuals for reference during all phases of construction. Shop drawings shall be bound with product data or separately bound in drawing racks. The Contractor shall maintain duplicate copies for the Government.
INSPECTIONS AND TESTS
The Contractor shall perform inspections and tests throughout the design and construction process, including: design support (existing conditions/needs assessments), construction installation (placement/qualification measurements), and final inspections/tests (commissioning/performance certification). Periodic "Quantity" inspections shall also be conducted to support progress payment requests.
Government Witness: All inspections and tests called for in this RFP and/or required to verify documented contract assumptions, to establish work accomplishment, or to certify performance attainment shall be witnessed by the Government and coordinated through the Quality Control Plan (QCP). The contractor shall notify the Contracting Officer in writing at least two (2) weeks prior to conducting.
SITE MAINTENANCE
The contractor shall dispose of all trash and debris generated during the contract. Disposal shall be by sanitary landfill or other approved methods and shall conform to all local, state, and federal & JBPHH guidelines and regulations.
The contractor shall store all refuse in appropriate trash containers on the jobsite. Location of a dumpster at the site shall be as directed by the Contracting Officer or Contracting Officer Representative. The dumpster shall be covered to prevent possible use by base personnel. The contractor shall have all refuse removal trucks covered and secured prior to entering or leaving the jobsite. If any materials are observed falling off the trucks, the truck shall be stopped and reloaded to prevent damage. The contractor shall bear the monetary responsibility to repair all damage associated with falling debris. The contractor’s dumpster shall be removed prior to Final Inspection. The contractor shall repair any damage the dumpster causes to concrete, asphalt paving or lawns.
All mud, dirt, debris, foreign objects, or spills of any kind from contractor operations (including subcontractors and suppliers) on the aircraft parking apron or streets and parking lots used as access to the work or staging areas, shall be cleaned off the same day. Taxiways, runways, parking aprons, and hard surfaces used as access to the work or staging areas shall be kept clean at all times by the contractor.
The base refuse contract supplies dumpsters for Government produced refuse only. The contractor shall not dump refuse from this project in the Government dumpsters. If the Contracting Officer discovers project refuse in Government dumpsters, he may instruct the contractor to immediately remove the refuse, or have Government resources remove it at the contractor’s expense.
Protection of Contractor’s Equipment: All contractor supplied equipment is the sole responsibility of the contractor. The Government is not liable for the theft, vandalism, or damage of any contractor supplies, equipment or property. The contractor shall secure his materials and protect all equipment from damage. Any equipment/material the contractor removes and which requires reinstallation as part of the job requirements shall be the responsibility of the contractor.
WARRANTY
In addition to any other warranties in this contract, work performed under this contract shall conform to the contract requirements and is free of any defect in equipment, material, or workmanship performed by the Contractor or any subcontractor or supplier at any tier. This warranty shall continue for a period of 1 year from the date of final acceptance of the work. If the Government takes possession of any part of the work before final acceptance, this warranty shall continue for a period of 1 year from the date that the Government takes possession.
The Contractor shall remedy at the Contractor’s expense any failure to conform, or any defect. In addition, the Contractor shall remedy at the Contractor’s expense any damage to Government-owned or controlled real or personal property, when that damage is the result of (1) The Contractor’s failure to conform to contract requirements; (2) Any defect of equipment, material or workmanship; or (3) Contractor negligence. The Contractor shall restore any work damaged in fulfilling the terms and conditions of this clause.
With respect to all warranties, express or implied, from subcontractors, manufacturers, or suppliers for work performed and materials furnished under this contract, the Contractor shall obtain all warranties that would be given in normal commercial practice: Require all warranties to be executed, in writing, for the benefit of the Government, if directed by the Contracting Officer; and enforce all warranties for the benefit of the Government, if directed by the Contracting Officer. In the event the Contractor’s warranty has expired, the Government may bring suit at its expense to enforce a subcontractor, manufacturer or supplier warranty.
SUBMITTALS
Contractor shall provide a design including “sealed” drawings, “sealed” calculations and specifications for review to ensure compliance with this SOW. Materials that do not comply with criteria listed in this SOW may be considered non-adherent or unacceptable. Non-adherent or unacceptable materials shall not be used in the performance of this SOW. All deviations from this statement of work must be specifically requested in writing by the contractor and receive formal acceptance from the Contracting Officer before commencing with installation or work. Design Build contractor shall provide a completed master submittal schedule in AF Form 66 format for review and acceptance by the Contracting Officer within ten days of the receipt of the Notice to Proceed.
1. Before Demolition Start:
- Accreditations, training, and certifications of the contractor.
- Detailed Asbestos Hazard Abatement Plan with safety mitigations.
- Waste disposal documents/landfill approvals (Request for Clearance Numbers).
- Conduct safety brief for building occupants.
2. After Demolition Complete:
- Completed disposal documents and chain of custody.
Resource Requirements:
- Hazardous materials abatement equipment and personnel.
- Demolition equipment and tools.
- Materials for encapsulation and finishing.
- Personal protective equipment (PPE).
CLOSE OUT DELIVERABLES
Closeout pursuant to ANG Engineering Technical Letter (ANGETL) 09-11, Project Closeout Process and any other requirements called out by the Contracting Officer.
APPENDIX C
GENERAL CONTRACTOR OPSEC REQUIREMENTS
During the course of this contract, in addition to those restrictions, instructions and guidelines delineated in the contract Statement of Work and/or other references provided, the contractor will adhere to the following minimum requirements in support of the 154 CES OPSEC Program:
a. Awareness Training. Initial training may be provided by both computer-based training and live training. OPSEC training is required initially within 90 days of assignment and annually thereafter.
Each individual will submit a certificate of training within 30 days of signing this document. The computer-based training can be found through the following link: https://securityawareness.usalearning.gov/opsec/ The contractor is required to maintain individual training records for compliance purposes.
b. Introduction of personnel electronic devices into government spaces, laptops, tablet PCs, cellular phones, cameras, recording devices, and data recording/storage devices is STRICTLY controlled and forbidden in most cases. Company issued equipment required for the performance of work must be approved by the Contracting Officer Representative (COR). Photography and recording is not allowed except for official use and by permit only. (Unless otherwise stipulated in the contract, contact the COR for approval.) Photographs will be reviewed by Security to ensure sensitive and/or classified information is not revealed. Secure electronic transmission and storage of critical information. Critical information must be transmitted and stored in accordance with the SOW.
Secure storage of hardcopy critical information. Critical information in hardcopy form must be stored in secure areas and/or containers in accordance with the SOW.
c. Contractor personnel shall not discuss government operations in public or over unprotected or unencrypted communications. Official Business, controlled unclassified information may only be transmitted as directed in the SOW.
d. The Contractor shall not post to company websites, publications, newsletters or other media any images, data or information that reveal sensitive government operations, personnel, equipment, and/or classified or controlled unclassified information. When in doubt, company press releases related to this contract should be coordinated through the COR. Pre-publication procedures are established to ensure no public release concerning program information occurs without the prior written approval of the OPSEC Coordinator.
e. Because observation of events, operations, physical changes, etc. may reveal National Security information, specific restrictions are needed to preclude unintentional release of this information to unauthorized parties. (Unauthorized disclosure and transfer of National Security Information is punishable under 18 USC § 793.) Therefore, contractor personnel shall not disclose to unauthorized third parties, post to unofficial sites (including Social Networking sites) any images, data or information, or observed events that reveal sensitive government operations, personnel, equipment, including, but not limited to:
(1) Tactics, techniques and procedures, production or work schedules, any visible or concealed modifications, upgrades, additions to aircraft, weapons or equipment; increases, change, or decreases in work/deployment frequency or government personnel, vehicle, vessel or aircraft movements;
specialized equipment orders, deliveries, shipments, etc., unauthorized disclosures and attempts to solicit this type of information by unauthorized third parties or others not affiliated with this contract shall be reported to the COR.
f. Service. Non-Disclosure requirements remain in effect during the duration of this contract and indefinitely thereafter. See Annex A.
g. Government issued badges, identification shall be removed and/or concealed from plain sight when off station and shall not be left in vehicles or unprotected. Badges and passes may not be duplicated or copied or loaned to others. Lost or stolen identification badges, vehicle passes etc. will be immediately reported to the COR.
h. Contract personnel must mark and protect related internal production schedules, deliverables, inventories and shortages and identified vulnerabilities related to production of government material. Internal company markings e.g., Business Sensitive, etc., are appropriate for identifying the aforementioned as sensitive information. Specific Government-provided information, drawings etc., will be protected in accordance with guidance in applicable paragraphs of the SOW/PWS and clauses included in the solicitation/contract.
i. All government information must be destroyed at contract termination or returned to the government at the government’s discretion. Critical information must be disposed of by cross-cut shredder or burning. Critical information shall not be disposed of in trash receptacles.
j. Visitor Control. All visitors are required to process through established checkpoints for verification of identity, citizenship, personnel security clearances, appropriate certification of purpose of visit, issuance of badges, and inspection of articles being brought into and out of the facilities and other such measures to assure proper visitor control.
k. Escort Procedures. Escorts for visitors shall be advised of proper escort procedures, limitation on disclosure, and other applicable controls involved in the visit.
l. Unauthorized Personnel. Program personnel shall be alerted when visitors or other unauthorized personnel are admitted to work areas. Personnel shall refrain from inadvertent release of information by visual and aural means when visitors are present. Activities of visitors and nonassigned personnel in the program areas shall be observed to determine that their presence is required by business needs and that no suspicious activities are detected which may pose a threat to the security of information.
m. Conference Rooms. During meetings, attendees will be reminded of conference room procedures to be followed when discussing critical information.