SOW_Insulation_CGC Resolute (1).docx
DOCX document 38 KB Posted
- Attached to
- USCGC RESOLUTE INSULATION RENEWAL
- Solicitation number
- 52000QR260002936
About this file
This is a Statement of Work (SOW) for the renewal of degraded piping and compartment insulation on the USCGC RESOLUTE, a Coast Guard cutter homeported in St. Petersburg, Florida. The contractor must remove approximately 250 linear feet of anti-sweat piping insulation across multiple compartments (CO's Stateroom, XO Head, Main Passageway, Chief's Mess, Dispensary, Reefer Flats, and Sewage Disposal Room) and install approximately 250 square feet of new bulkhead and overhead insulation in spaces including the WR WC & Shower, Helo Shack, Dry Stores, Aft Repair Locker, DC Shop, and Head Tank Space. Work must comply with multiple Coast Guard specifications including SFLC STD Spec 0000, SFLC TS508, SFLC TS635, ASTM F683, and referenced Coast Guard drawings for thermal insulation design standards. The contractor is responsible for all materials, equipment, labor, cleanup, and debris disposal, with the government providing only potable water and 120-volt single-phase electricity. Work is scheduled to commence no later than May 25, 2026, and conclude no later than June 5, 2026, with performance hours Monday through Friday, 8:00 am to 8:00 pm, at 1301 Beach Drive SE, St. Petersburg, FL 33701.
All contractor personnel must possess valid REAL ID-compliant identification to access the vessel at Coast Guard Sector Saint Petersburg South Moorings; failure to comply may result in unexcusable performance delays. The related RFQ (52000QR260002936) is a total small business set-aside with a NAICS code of 336611 and small business size standard of 1,300 employees, processed under FAR Part 12 simplified acquisition procedures on a firm-fixed price basis. Interested vendors must schedule site visits prior to May 1, 2026, with LT Logan Sullivan at (209) 662-4230, and must submit detailed product data sheets and cost breakdowns including specifications for technical review.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| SOW_Insulation_CGC Resolute (2).docx | DOCX document | |
| Work Item 2 COMPARTMENT INSULATION.pdf | ||
| Work Item 1 PIPING INSULATION.pdf | ||
| 52000QR260002936 FAR CLAUSES.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
FOR
USCGC RESOLUTE INSULATION RENEWAL
BACKGROUND
USCGC RESOLUTE has degraded piping and compartment insulation in multiple compartments. Contractor work is required to complete the project, including the removal of old insulation and installation of new. Contractor will need an escort on board Coast Guard Sector Saint Petersburg South Moorings.
PUBLICATIONS
SFLC STD Spec 0000, General Requirements SFLC STD Spec 6310, Requirements for Preservation of Ship Structures SFLC TS508, Thermal Insulation for Piping and Machinery SFLC TS635, Thermal, Fire, and Acoustic Insulation Design Standards ASTMF683, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery
COAST GUARD DRAWINGS
DWG 627-WMEC_635_004, Sheathing and Insulation Hull, Galley, Scullery, and Ventilation Duct Details 627WMEC_635_002, Sheathing & Insulation 627-WMEC_514_1, Diagram: Heating and Chilled Water System 627-WMEC_514_2, Arrangement of Chilled and Hot Water System IMS 627-WMEC_514_3, Arrangement of Chilled and Hot Water OMS 627-WMEC_516_5, Diagram of Refrigeration System
SECURITY REQUIREMENTS
All contractor personnel requiring access to the place of performance to conduct work under this contract must possess a valid state-issued REAL ID compliant driver’s license or identification card, or an acceptable alternative form of identification as defined by the Department of Homeland Security (DHS) [https://www.dhs.gov/real-id]. It is the contractor’s responsibility to ensure that all personnel are properly credentialed to gain base access. Failure to comply with access requirements may result in delays with performance and will not constitute an excusable delay.
SCOPE
This work item includes removing existing and installing new of approximately 250 LF of anti-sweat piping insulation and of approximately 250 SF of bulkhead and overhead insulation. Table 1 identifies the locations for the Contractor to renew designated insulation on piping and Table 2 identifies the same on bulkheads/overheads. The contractor will work in berthing spaces, passageways and machinery spaces. Contractor is responsible for cleanup and disposal of insulation debris.
GENERAL INFORMATION
Government Furnished Items and Services:
The Government must provide the facilities, equipment, materials, and services listed here at no cost to the contractor: Potable Water and Single-Phase Electricity (120 Volt). The Government must provide the following material: None.
Contractor Furnished Items and Services:
Except for those items, services, or commodities specifically stated above as Government Furnished, the contractor must furnish everything needed to perform this contract.
Mold and Mildew:
If mold or mildew is discovered the contractor shall sanitize the material with bleach and remove in accordance with the Manual of Naval Preventative Medicine Chapter 2: Sanitization of Living Areas before continuing.
Coatings:
The contractor is also responsible for properly coating all insulation in accordance with SFLC TS 635 to prevent sweating. All work performed will be in accordance with the attached work specifications.
REQUIREMENTS
Complete work IAW with WORK ITEM 1: Piping Insulation, Renew, WORK ITEM 2: Compartment Insulation, Renew, and WORK ITEM 3: Ventilation Duct Insulation, Renew.
OTHER APPLICABLE CONDITIONS
Period and Time of Performance:
This work shall commence NLT May 25, 2026 and concludes NLT June 5, 2026.
The contractor must work between the following hours: Monday through Friday between 08:00 am and 20:00 pm unless other time is specified and approved by Unit POC.
Place of Performance:
1301 Beach Dr SE St Petersburg, FL 33701 POC: CGC Resolute/LT Logan Sullivan
Site Visit:
A site visit should be scheduled with the unit POC to provide interested parties with an opportunity to gain a better understanding of the requirements. Site visits must be scheduled and completed prior to 01May. To schedule, please contact LT Logan Sullivan. While participation in a site visit is not mandatory for the submission of a proposal, it is highly encouraged to ensure a comprehensive understanding of the project and its requirements.
Point of Contact (POC):
LT Logan Sullivan
(209) 662-4230 Logan.K.Sullivan@uscg.mil Table 1.
| COMPARTMENT |
| Inside Tube Diameter (in) |
| Space Number |
| Noun Name |
| System |
| ≤1” |
| ≤2.5" |
Linear Feet (approx.)
| 01-44-0-L / 01-44-1-L |
| CO' s Stateroom / Cabin |
| CW |
| 8 |
| 01-87-0-L |
| XO Head |
| CW |
| 15 |
| 1-52-01-L |
| Main Passageway |
| CW |
| 12 |
| 1-93-0-L |
| Chief’s Mess |
| CW |
| 12 |
| 1-114-0-L |
| Dispensary |
| CW |
| 6 |
| 2-156-01-L |
| Reefer Flats |
| REF/CW |
| 60 |
| 4-84-0-Q |
| Sewage Disposal Room |
| REF/CW |
| 40 |
TOTALS (LF)
| 153 |
| 80 |
| 233 |
Table 2.
COMPARTMENT
| Number |
| Noun Name |
| Bulkhead/Hull |
| Square Feet (approx.) |
| 01-87-0-L |
| WR WC & SHR |
| OVHD |
| 25 |
| 01-92-0-Q |
| Helo Shack |
| OVHD/BKHD |
| 110 |
| 2-156-2-A |
| Dry Stores |
| OVHD/BKHD |
| 20 |
| 2-180-2-A |
| Aft Repair Locker |
| OVHD/BKHD |
| 20 |
| 2-172-1-A |
| DC Shop |
| OVHD |
| 20 |
| 02-81-2-Q |
| Head Tank Space |
| VENT |
| 25 |
| Total (SF) |
| 220 |