This is a Statement of Work (SOW) for the renewal of degraded piping and compartment insulation on the USCGC RESOLUTE, a Coast Guard cutter homeported in St. Petersburg, Florida. The contractor must remove approximately 250 linear feet of anti-sweat piping insulation across multiple compartments (CO's Stateroom, XO Head, Main Passageway, Chief's Mess, Dispensary, Reefer Flats, and Sewage Disposal Room) and install approximately 250 square feet of new bulkhead and overhead insulation in spaces including the WR WC & Shower, Helo Shack, Dry Stores, Aft Repair Locker, DC Shop, and Head Tank Space. Work must comply with multiple Coast Guard specifications including SFLC STD Spec 0000, SFLC TS508, SFLC TS635, ASTM F683, and referenced Coast Guard drawings for thermal insulation design standards. The contractor is responsible for all materials, equipment, labor, cleanup, and debris disposal, with the government providing only potable water and 120-volt single-phase electricity. Work is scheduled to commence no later than May 25, 2026, and conclude no later than June 5, 2026, with performance hours Monday through Friday, 8:00 am to 8:00 pm, at 1301 Beach Drive SE, St. Petersburg, FL 33701.

All contractor personnel must possess valid REAL ID-compliant identification to access the vessel at Coast Guard Sector Saint Petersburg South Moorings; failure to comply may result in unexcusable performance delays. The related RFQ (52000QR260002936) is a total small business set-aside with a NAICS code of 336611 and small business size standard of 1,300 employees, processed under FAR Part 12 simplified acquisition procedures on a firm-fixed price basis. Interested vendors must schedule site visits prior to May 1, 2026, with LT Logan Sullivan at (209) 662-4230, and must submit detailed product data sheets and cost breakdowns including specifications for technical review.

View the file

Other files

File Type Posted
SOW_Insulation_CGC Resolute (2).docx DOCX document
Work Item 2 COMPARTMENT INSULATION.pdf PDF
Work Item 1 PIPING INSULATION.pdf PDF
52000QR260002936 FAR CLAUSES.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF WORK (SOW)

FOR

USCGC RESOLUTE INSULATION RENEWAL

BACKGROUND

USCGC RESOLUTE has degraded piping and compartment insulation in multiple compartments. Contractor work is required to complete the project, including the removal of old insulation and installation of new. Contractor will need an escort on board Coast Guard Sector Saint Petersburg South Moorings.

PUBLICATIONS

SFLC STD Spec 0000, General Requirements SFLC STD Spec 6310, Requirements for Preservation of Ship Structures SFLC TS508, Thermal Insulation for Piping and Machinery SFLC TS635, Thermal, Fire, and Acoustic Insulation Design Standards ASTMF683, Standard Practice for Selection and Application of Thermal Insulation for Piping and Machinery

COAST GUARD DRAWINGS

DWG 627-WMEC_635_004, Sheathing and Insulation Hull, Galley, Scullery, and Ventilation Duct Details 627WMEC_635_002, Sheathing & Insulation 627-WMEC_514_1, Diagram: Heating and Chilled Water System 627-WMEC_514_2, Arrangement of Chilled and Hot Water System IMS 627-WMEC_514_3, Arrangement of Chilled and Hot Water OMS 627-WMEC_516_5, Diagram of Refrigeration System

SECURITY REQUIREMENTS

All contractor personnel requiring access to the place of performance to conduct work under this contract must possess a valid state-issued REAL ID compliant driver’s license or identification card, or an acceptable alternative form of identification as defined by the Department of Homeland Security (DHS) [https://www.dhs.gov/real-id]. It is the contractor’s responsibility to ensure that all personnel are properly credentialed to gain base access. Failure to comply with access requirements may result in delays with performance and will not constitute an excusable delay.

SCOPE

This work item includes removing existing and installing new of approximately 250 LF of anti-sweat piping insulation and of approximately 250 SF of bulkhead and overhead insulation. Table 1 identifies the locations for the Contractor to renew designated insulation on piping and Table 2 identifies the same on bulkheads/overheads. The contractor will work in berthing spaces, passageways and machinery spaces. Contractor is responsible for cleanup and disposal of insulation debris.

GENERAL INFORMATION

Government Furnished Items and Services:

The Government must provide the facilities, equipment, materials, and services listed here at no cost to the contractor: Potable Water and Single-Phase Electricity (120 Volt). The Government must provide the following material: None.

Contractor Furnished Items and Services:

Except for those items, services, or commodities specifically stated above as Government Furnished, the contractor must furnish everything needed to perform this contract.

Mold and Mildew:

If mold or mildew is discovered the contractor shall sanitize the material with bleach and remove in accordance with the Manual of Naval Preventative Medicine Chapter 2: Sanitization of Living Areas before continuing.

Coatings:

The contractor is also responsible for properly coating all insulation in accordance with SFLC TS 635 to prevent sweating. All work performed will be in accordance with the attached work specifications.

REQUIREMENTS

Complete work IAW with WORK ITEM 1: Piping Insulation, Renew, WORK ITEM 2: Compartment Insulation, Renew, and WORK ITEM 3: Ventilation Duct Insulation, Renew.

OTHER APPLICABLE CONDITIONS

Period and Time of Performance:

This work shall commence NLT May 25, 2026 and concludes NLT June 5, 2026.

The contractor must work between the following hours: Monday through Friday between 08:00 am and 20:00 pm unless other time is specified and approved by Unit POC.

Place of Performance:

1301 Beach Dr SE St Petersburg, FL 33701 POC: CGC Resolute/LT Logan Sullivan

Site Visit:

A site visit should be scheduled with the unit POC to provide interested parties with an opportunity to gain a better understanding of the requirements. Site visits must be scheduled and completed prior to 01May. To schedule, please contact LT Logan Sullivan. While participation in a site visit is not mandatory for the submission of a proposal, it is highly encouraged to ensure a comprehensive understanding of the project and its requirements.

Point of Contact (POC):

LT Logan Sullivan

(209) 662-4230 Logan.K.Sullivan@uscg.mil Table 1.

COMPARTMENT
Inside Tube Diameter (in)
Space Number
Noun Name
System
≤1”
≤2.5"

Linear Feet (approx.)

01-44-0-L / 01-44-1-L
CO' s Stateroom / Cabin
CW
8
01-87-0-L
XO Head
CW
15
1-52-01-L
Main Passageway
CW
12
1-93-0-L
Chief’s Mess
CW
12
1-114-0-L
Dispensary
CW
6
2-156-01-L
Reefer Flats
REF/CW
60
4-84-0-Q
Sewage Disposal Room
REF/CW
40

TOTALS (LF)

153
80
233

Table 2.

COMPARTMENT

Number
Noun Name
Bulkhead/Hull
Square Feet (approx.)
01-87-0-L
WR WC & SHR
OVHD
25
01-92-0-Q
Helo Shack
OVHD/BKHD
110
2-156-2-A
Dry Stores
OVHD/BKHD
20
2-180-2-A
Aft Repair Locker
OVHD/BKHD
20
2-172-1-A
DC Shop
OVHD
20
02-81-2-Q
Head Tank Space
VENT
25
Total (SF)
220