SOW Installation of Hemodialysis Water Treatment 6.4.2025.pdf
PDF 913 KB Posted
- Solicitation number
- 36C26125R0066
About this file
This Statement of Work (SOW) details a hemodialysis water system replacement project for the San Francisco VA Medical Center. The project involves removing the existing MAR COR CWP Dialysis Water System in the Hemodialysis area and installing a new BBraun Aquaboss Water Purification System in Room 3A-48A on the third floor of Building 203. The contractor will be responsible for comprehensive work including equipment removal, utility connections (condensate, hot water, de-ionized water, air and drain piping), electrical work, seismic bracing for tanks, connecting new station boxes, and painting the interior room.
The contract has a total duration of 75 calendar days from the Notice to Proceed, with work primarily to be performed outside normal business hours (7:00 am - 7:30 pm Monday through Saturday). Special considerations include managing noise, vibration, and dust control while working in an active hospital environment, with approximately 95% of labor expected to be performed outside standard business hours. The contractor must use construction management software (Submittal Exchange will be provided if the contractor does not have an established platform) and comply with extensive VA information security and privacy requirements, including mandatory training, incident reporting, and strict data protection protocols.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C26125R0066 0005.docx | DOCX document | |
| Specifications Revised 7.29.2025 - Hemodialysis VA San Francisco.pdf | ||
| 662-25-201 SOW revised hemodialysis 29th July 2025.pdf | ||
| 36C26125R0066 0004.docx | DOCX document | |
| RFI - Solicitation 36C26125R0066 - Install of Hemodialysis Water Treatment System.pdf | ||
| 2025 ME-1 SAN FRANCISCO CA V1 5 Updated.pdf | ||
| 36C26125R0066 0003.docx | DOCX document | |
| Hermodialysis Site Visit Log 18th July 2025.pdf | ||
| 36C26125R0066 0002.docx | DOCX document | |
| 36C26125R0066 0001.docx | DOCX document | |
| 36C26125R0066 -Corrected.docx | DOCX document | |
| 36C26125R0066.docx | DOCX document | |
| 2025 ME-1 SAN FRANCISCO CA V1 5.pdf | ||
| Specifications.pdf | ||
| VAAR 852.219-75.pdf | ||
| Davis-Bacon Act WD CA20250019.pdf | ||
| Cost Breakdown Installation of Hemodialysis Water Treatment .pdf |
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
San Francisco VA Medical Center
4150 Clement St
San Francisco, CA 94121
Date: June 4th, 2025
Project: 662-25-201 Remove and Install Hemodialysis
SCOPE OF WORK
The San Francisco VA Medical Center requires the services of a qualified General Contractor to construct Project 662-
25-201, Remove and Install Hemodialysis. The general scope of this requirement is to remove the existing MAR COR
CWP Dialysis Water System in the Hemodialysis area, prepare the space, and replace the old system with a new
BBraun Aquaboss Water Purification System. The nature and requirements of this construction are fully exhibited in the attached Construction Documents (ME-1) which include complete drawings and specifications.
The Expanded Description of ME-1 Requirements are color code to depict the responsibility of the work.
• Type Color Black - BBraun Responsibility
• Type Color Blue - General Contractor/Plumber
• Type Color Red – General Contractor/Electrician
• Type Color Purple – General Contractor
Contractor shall provide all equipment, labor, materials, supervision, tool to perform the requirements of demolition to support with BBraun. Connect all utilities including condensate piping, hot water piping, de-ionized water piping, air and drain piping, insulation, electrical power, and controls. Paint entire interior room 3A-48. Disposal of the existing
Hemodialysis Equipment and auxiliary. Install seismic bracing for carbon tanks, softener tank and brine tank on all
BBraun manufacturer on equipment Aquaboss. Connect the “new station boxes” onto existing cabinets locate at each patient area next to Room 3A-48A. Provide disposal confirmation letter to the Contracting Officer Technical
Representative after completion of the disposal.
The area of construction is located within the main hospital in Building 203, Third Floor, Room 3A-48A. Special care is to be taken as related to impact surrounding clinical areas and utility outages with impact to patients in occupied areas. Noise, vibration, and dust control should be expected to be heavily managed with limitations strictly coordinated. For purposes if pricing, total labor effort should be assumed to comprise roughly 95% of labor outside of normal business hours.
Construction Management software is to be used in the completion of this requirement and will be provided by the government absent an established and acceptable platform utilized by the awardee. The software currently in use is
Submittal Exchange. The government will grant access to all parties associated with the General Contractor as requested by the GC project manager.
The contractors will utilize construction management software on their computers to manage construction submittals and work performance schedules. They are welcome to use their own software, or SFVA will provide them with a web-based Submittal Exchange account to use throughout the project.
PERIOD OF PERFORMANCE
The total contract duration shall be seventy-five calendar days (75 calendar days) from issuance of the Notice to
Proceed. Contractor shall initiate work within 2 weeks of being contacted by the designated Contracting Officer
Representative (COR). Work shall be scheduled through the COR or designee, who will coordinate with SFVAHCS staff. Timelines are subject to change due to SFVAHCS operational requirements.
WORKING HOURS
Business hours are from 7:00 am – 7:30 pm Monday thru Saturday. All work needs to be accomplished outside of the business hours. Contractor may request alternate working hours or additional working hours to meet project requirements. Requests shall be made to the Contracting Officer Representative (COR) in writing.
The contractor is beholden to the City of San Francisco Municipal Code criteria for Construction Noise and shall request work hour exceptions in accordance with permissible criteria.
FEDERAL HOLIDAYS
The following is a list of all Government recognized holidays.
New Year’s Day Labor Day
Martin Luther King Jr.’s Birthday Columbus Day
President’s Day Veteran’s Day
Memorial Day Thanksgiving Day
Juneteenth Christmas Day
Independence Day
If a holiday falls on Sunday, the following Monday shall be observed as the legal holiday. When a holiday falls on a
Saturday, the preceding Friday is observed as a legal holiday by U.S. Government agencies. Also included, would be any other day specifically declared by the President of the United States of America to be a National Holiday.
SPECIFICATION INCLUDED
01 00 00
01 33 23
01 35 26
02 41 00
09 51 00
09 91 00
22 05 11
26 05 11
SECURITY CLAUSES
APPENDIX C — VA INFORMATION AND INFORMATION SYSTEM SECURITY AND PRIVACY
LANGUAGE FOR INCLUSION IN CONTRACTS, AS APPROPRIATE
NOTE: Any sections (1-14) which DO NOT apply should not be included in the Statement of Work (SOW), Performance Work Statement (PWS), Product Description (PD) or contract.
1. GENERAL. This entire section applies to all acquisitions requiring any Information Security and Privacy language. Contractors, contractor personnel, subcontractors and subcontractor personnel will be subject to the same federal laws, regulations, standards, VA directives and handbooks, as VA personnel regarding information and information system security and privacy.
2. VA INFORMATION CUSTODIAL LANGUAGE. This entire section applies to all acquisitions requiring any Information Security and Privacy language.
a. The Government shall receive unlimited rights to data/intellectual property first produced and delivered in the performance of this contract or order (hereinafter “contract”) unless expressly stated otherwise in this contract. This includes all rights to source code and all documentation created in support thereof. The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data – General. The primary clause used to define computer software license (not data/intellectual property first produced under this contractor or order) is FAR 52.227-19, Commercial Computer Software License.
b. Information made available to the contractor by VA for the performance or administration of this contract will be used only for the purposes specified in the service agreement, SOW, PWS, PD, and/or contract. The contractor shall not use VA information in any other manner without prior written approval from a VA Contracting Officer (CO). The primary clause used to define Government and Contractor data rights is FAR 52.227-14 Rights in Data – General.
c. VA information will not be co-mingled with any other data on the contractor’s information systems or media storage systems. The contractor shall ensure compliance with Federal and VA requirements related to data protection, data encryption, physical data segregation, logical data segregation, classification requirements and media sanitization.
d. VA reserves the right to conduct scheduled or unscheduled audits, assessments, or investigations of contractor Information Technology (IT) resources to ensure information security is compliant with Federal and VA requirements. The contractor shall provide all necessary access to records (including electronic and documentary materials related to the contracts and subcontracts) and support (including access to contractor and subcontractor staff associated with the contract) to VA, VA's Office Inspector General (OIG),and/or Government Accountability Office (GAO) staff during periodic control assessments, audits, or investigations.
e. The contractor may only use VA information within the terms of the contract and applicable Federal law, regulations, and VA policies. If new Federal information security laws, regulations or VA policies become applicable after execution of the contract, the parties agree to negotiate contract modification and adjustment necessary to implement the new laws, regulations, and/or policies.
f. The contractor shall not make copies of VA information except as specifically authorized and necessary to perform the terms of the contract. If copies are made for restoration purposes, after the restoration is complete, the copies shall be destroyed in accordance with VA Directive 6500, VA Cybersecurity Program and VA Information Security Knowledge Service.
g. If a Veterans Health Administration (VHA) contract is terminated for default or cause with a business associate, the related local Business Associate Agreement (BAA) shall also be terminated and actions taken in accordance with VHA Directive 1605.05, Business Associate Agreements. If there is an executed national BAA associated with the contract, VA will determine what actions are appropriate and notify the contactor.
h. The contractor shall store and transmit VA sensitive information in an encrypted form, using VA-approved encryption tools which are, at a minimum, Federal Information Processing Standards (FIPS) 140-2, Security Requirements for Cryptographic Modules (or its successor) validated and in conformance with VA Information Security Knowledge Service requirements. The contractor shall transmit VA sensitive information using VA approved Transport Layer Security (TLS) configured with FIPS based cipher suites in conformance with National Institute of Standards and Technology (NIST) 800-52, Guidelines for the Selection, Configuration and Use of Transport Layer Security (TLS) Implementations.
i. The contractor’s firewall and web services security controls, as applicable, shall meet or exceed VA’s minimum requirements.
j. Except for uses and disclosures of VA information authorized by this contract for performance of the contract, the contractor may use and disclose VA information only in two situations: (i) in response to a qualifying order of a court of competent jurisdiction after notification to VA CO (ii) with written approval from the VA CO. The contractor shall refer all requests for, demands for production of or inquiries about, VA information and information systems to the VA CO for response.
k. Notwithstanding the provision above, the contractor shall not release VA records protected by Title 38 U.S.C. § 5705, Confidentiality of medical quality- assurance records and/or Title 38 U.S.C. § 7332, Confidentiality of certain medical records pertaining to drug addiction, sickle cell anemia, alcoholism or alcohol abuse or infection with Human Immunodeficiency Virus (HIV). If the contractor is in receipt of a court order or other requests for the above- mentioned information, the contractor shall immediately refer such court order or other requests to the VA CO for response.
l. Information made available to the contractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract will be protected and secured in accordance with VA Directive 6500 and Identity and Access Management (IAM) Security processes specified in the VA Information Security Knowledge Service.
m. Any data destruction done on behalf of VA by a contractor shall be done in accordance with National Archives and Records Administration (NARA) requirements as outlined in VA Directive 6300, Records and Information Management, VA Handbook 6300.1, Records Management Procedures, and applicable VA Records Control Schedules.
n. The contractor shall provide its plan for destruction of all VA data in its possession according to VA Directive 6500 and NIST 800-88, Guidelines for Media Sanitization prior to termination or completion of this contract. If directed by the COR/CO, the contractor shall return all Federal Records to VA for disposition.
o. Any media, such as paper, magnetic tape, magnetic disks, solid state devices or optical discs that is used to store, process, or access VA information that cannot be destroyed shall be returned to VA.The contractor shall hold the appropriate material until otherwise directed by the Contracting Officer’s Representative (COR) or CO. Items shall be returned securely via VA-approved methods. VA sensitive information must be transmitted utilizing VA-approved encryption tools which are validated under FIPS 140-2 (or its successor) and NIST 800-52. If mailed, the contractor shall send via a trackable method (USPS, UPS, FedEx, etc.) and immediately provide the COR/CO with the tracking information. Self-certification by the contractor that the data destruction requirements above have been met shall be sent to the COR/CO within 30 business days of termination of the contract.
p. All electronic storage media (hard drives, optical disks, CDs, back-up tapes, etc.) used to store, process or access VA information will not be returned to the contractor at the end of lease, loan, or trade-in. Exceptions to this paragraph will only be granted with the written approval of the VA CO.
3. ACCESS TO VA INFORMATION AND VA INFORMATION SYSTEMS. This section applies when any person requires access to information made available to the contractor by VA for the performance or administration of this contract or information developed by the contractor in performance or administration of the contract.
a. A contractor/subcontractor shall request logical (technical) or physical access to VA information and VA information systems for their employees and subcontractors only to the extent necessary to perform the services specified in the solicitation or contract. This includes indirect entities, both affiliate of contractor/subcontractor and agent of contractor/subcontractor.
b. Contractors and subcontractors shall sign the VA Information Security Rule of Behavior (ROB) before access is provided to VA information and information systems (see Section 4, Training, below). The ROB contains the minimum user compliance requirements and does not supersede any policies of VA facilities or other agency components which provide higher levels of protection to VA’s information or information systems. Users who require privileged access shall complete the VA elevated privilege access request processes before privileged access is granted.
c. All contractors and subcontractors working with VA information are subject to the same security investigative and clearance requirements as those of VA appointees or employees who have access to the same types of information. The level and process of background security investigations for contractors shall be in accordance with VA Directive and Handbook 0710, Personnel Suitability and Security Program. The Office of Human Resources and Administration/Operations, Security and Preparedness (HRA/OSP) is responsible for these policies and procedures. Contract personnel who require access to classified information or information systems shall have an appropriate security clearance. Verification of a Security Clearance shall be processed through the Special Security Officer located in HRA/OSP.
Contractors shall conform to all requirements stated in the National Industrial Security Program Operating Manual (NISPOM).
d. All contractors and subcontractors shall comply with conditions specified in VAAR 852.204- 71(d); Contractor operations required to be in United States. All contractors and subcontractors working with VA information must be permanently located within a jurisdiction subject to the law of the United States or its Territories to the maximum extent feasible. If services are proposed to be performed abroad the contractor must state where all non-U.S.
services are provided. The contractor shall deliver to VA a detailed plan specifically addressing communications, personnel control, data protection and potential legal issues. The plan shall be approved by the COR/CO in writing prior to access being granted.
e. The contractor shall notify the COR/CO in writing immediately (no later than 24 hours) after personnel separation or occurrence of other causes. Causes may include the following:
(1) Contractor/subcontractor personnel no longer has a need for access to VA information or VA information systems.
(2) Contractor/subcontractor personnel are terminated, suspended, or otherwise has their work on a VA project discontinued for any reason.
(3) Contractor believes their own personnel or subcontractor personnel may pose a threat to their company’s working environment or to any company- owned property. This includes contractor-owned assets, buildings, confidential data, customers, employees, networks, systems, trade secrets and/or VA data.
(4) Any previously undisclosed changes to contractor/subcontractor background history are brought to light, including but not limited to changes to background investigation or employee record.
(5) Contractor/subcontractor personnel have their authorization to work in the United States revoked.
(6) Agreement by which contractor provides products and services to VA has either been fulfilled or terminated, such that VA can cut off electronic and/or physical access for contractor personnel.
f. In such cases of contract fulfillment, termination, or other causes; the contractor shall take the necessary measures to immediately revoke access to VA network, property, information, and information systems (logical and physical) by contractor/subcontractor personnel. These measures include (but are not limited to): removing and then securing Personal Identity Verification (PIV) badges and PIV – Interoperable (PIV-I) access badges, VA-issued photo badges, credentials for VA facilities and devices, VA-issued laptops, and authentication tokens.
Contractors shall notify the appropriate VA COR/CO immediately to initiate access removal.
g. Contractors/subcontractors who no longer require VA accesses will return VA- issued property to VA. This property includes (but is not limited to): documents, electronic equipment, keys, and parking passes. PIV and PIV-I access badges shall be returned to the nearest VA PIV Badge Issuance Office. Once they have had access to VA information, information systems, networks and VA property in their possessions removed, contractors shall notify the appropriate VA
COR/CO.
4. TRAINING. This entire section applies to all acquisitions which include section 3.
a. All contractors and subcontractors requiring access to VA information and VA information systems shall successfully complete the following before being granted access to VA information and its systems:
(1) VA Privacy and Information Security Awareness and Rules of Behavior course (Talent Management System (TMS) #10176) initially and annually thereafter.
(2) Sign and acknowledge (electronically through TMS #10176) understanding of and responsibilities for compliance with the Organizational Rules of Behavior, relating to access to VA information and information systems initially and annually thereafter; and
(3) Successfully complete any additional cyber security or privacy training, as required for VA personnel with equivalent information system or information access [to be defined by the VA program official and provided to the VA CO for inclusion in the solicitation document – i.e., any role- based information security training].
b. The contractor shall provide to the COR/CO a copy of the training certificates and certification of signing the Organizational Rules of Behavior for each applicable employee within five days of the initiation of the contract and annually thereafter, as required.
c. Failure to complete the mandatory annual training is grounds for suspension or termination of all physical or electronic access privileges and removal from work on the contract until such time as the required training is complete.
5. SECURITY INCIDENT INVESTIGATION. This entire section applies to all acquisitions requiring any Information Security and Privacy language.
a. The contractor, subcontractor, their employees, or business associates shall immediately (within one hour) report suspected security / privacy incidents to the VA OIT’s Enterprise Service Desk (ESD) by calling (855) 673-4357 (TTY: 711). The ESD is OIT’s 24/7/365 single point of contact for IT-related issues. After reporting to the ESD, the contractor, subcontractor, their employees, or business associates shall, within one hour, provide the COR/CO the incident number received from the ESD.
b. To the extent known by the contractor/subcontractor, the contractor/ subcontractor's notice to VA shall identify the information involved and the circumstances surrounding the incident, including the following:
(1) The date and time (or approximation of) the Security Incident occurred.
(2) The names of individuals involved (when applicable).
(3) The physical and logical (if applicable) location of the incident.
(4) Why the Security Incident took place (i.e., catalyst for the failure).
(5) The amount of data belonging to VA believed to have been compromised.
(6) The remediation measures the contractor is taking to ensure no future incidents of a similar nature.
c. After the contractor has provided the initial detailed incident summary to VA, they will continue to provide written updates on any new and relevant circumstances or facts they discover. The contractor, subcontractor, and their employes shall fully cooperate with VA or third-party entity performing an independent risk analysis on behalf of VA. Failure to cooperate may be deemed a material breach and grounds for contract termination.
d. VA IT contractors shall follow VA Handbook 6500, Risk Management Framework for VA Information Systems VA Information Security Program, and VA Information Security Knowledge Service guidance for implementing an Incident Response Plan or integrating with an existing VA implementation.
e. In instances of theft or break-in or other criminal activity, the contractor/subcontractor must concurrently report the incident to the appropriate law enforcement entity (or entities) of jurisdiction, including the VA OIG, and the VA Office of Security and Law Enforcement. The contractor, its employees, and its subcontractors and their employees shall cooperate with VA and any law enforcement authority responsible for the investigation and prosecution of any possible criminal law violation(s) associated with any incident. The contractor/subcontractor shall cooperate with VA in any civil litigation to recover VA information, obtain monetary or other compensation from a third party for damages arising from any incident, or obtain injunctive relief against any third party arising from, or related to, the incident.
f. The contractor shall comply with VA Handbook 6500.2, Management of Breaches Involving Sensitive Personal Information, which establishes the breach management policies and assigns responsibilities for the oversight, management and reporting procedures associated with managing of breaches.
g. With respect to unsecured Protected Health Information (PHI), the contractor is deemed to have discovered a data breach when the contractor knew or should have known of breach of such information. When a business associate is part of VHA contract, notification to the covered entity (VHA) shall be made in accordance with the executed BAA.
h. If the contractor or any of its agents fails to protect VA sensitive personal information or otherwise engages in conduct which results in a data breach involving any VA sensitive personal information the contractor/subcontractor processes or maintains under the contract; the contractor shall pay liquidated damages to the VA as set forth in clause 852.211-76, Liquidated Damages— Reimbursement for Data Breach Costs.
https://www.va.gov/oal/library/vaar/vaar852.asp#85221176 https://www.va.gov/oal/library/vaar/vaar852.asp#85221176
File details come from the government source that posted it. Updated .