This document is a detailed technical installation manual and method statement for a Hemodialysis Water Treatment System at the VA Medical Center in San Francisco, California. The project involves a comprehensive water treatment system installation by B. Braun Medical, including multiple components such as a Carbon Tank (7 CU FT), Hurricane Filter Assembly, EcoRO DIA II 1400 HT Reverse Osmosis system, Hot Rinse Smart 30 system, and a 29 KVA Transformer. The installation is divided into two phases, with specific requirements for electrical connections, plumbing, equipment placement, and system commissioning.

The installation method requires careful coordination between B. Braun Medical, the VA Medical Center, and a contractor, with detailed responsibilities outlined for each party. Key requirements include providing proper electrical and water supply, removing existing equipment, installing new water treatment infrastructure, and completing system startup and staff training. The project involves precise technical specifications, such as 3-phase 208V electrical connections, specific pipe and connection types, and rigorous installation procedures. The method statement includes safety protocols, personal protective equipment requirements, and a phased approach to minimize disruption to the dialysis clinic's operations.

View the file

Other files

Show all 17

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Aquaboss

Aquaboss

133 4

23DRAIN DRAIN 21 23

8A

17 185

78B9 DRAIN

ME-1.5

ELECTRICAL AND DRAIN PLAN EQUIPMENT LAYOUT

SAMPLING STATION

PRE-RO FILTER UNIT 20" DUO. 1"

11 RO FEED AND DI

EMERGENCY CONNECTION.

ELEVATION VIEW

8 A. SOFTENER TANK 8 CU/FT OF RESIN

PER TANK. 24" X 72" WEIGHT= 1600 lb

B. BRINE TANK- 24” X 40”. WEIGHT 795 lb

6 DUAL BIG BLUE FILTER (75 lb)

7 CARBON TANK 10 CU/FT OF CARBON.

24" X 72" WEIGHT= 1562 lb

16 HOT RINSE CONTROLLER ( ). 3-N PE, 400v, , FED BY DISCONNECT ITEM 18

15 HOT RINSE SMART 30 HYDRAULIC UNIT (429 lb)

41 AMPS

342 lb

P R

O

JE

C T:

PROJECT NOTES:

Please see files;

REVISIONS

REV. DESCRIPTION DATE

9 8 7 6 5 4 3 2 110

9 8 7 6 5 4 3 2 110

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

824 Twelfth Avenue Bethlehem, PA 18018

1-800-523-9676 www.BBraun.com

PROPRIETARY AND CONFIDENTIAL

C

LE

M

EN

T

ST

SA

N F

R

AN

C

IS

C O

, C A.

FOLDER: S:\CUSTOMER FILES\BBRAUN CUSTOMER FILES\CALIFORNIA\VA SAN

FRANCISCO,CA\ME-1_SAN_FRANCISCO_CA_A1.DWG

LA

ST

E D

IT

ED

B Y:

S

SA

PU

TO

/1

3/

TE

M

PL

AT

E R

EV

IS

IO

N

: A

ULTRAFILTER13

MANIFOLD, PRESSURE RELEASE.22

CONCENTRATE DISTRIBUTION SYSTEM WITH

RUN DRY PROTECTIONS23

120v 20 AMP GFCI DUPLEX RECEPTACLE SURFACE

MOUNTED, 24" A.F.F - SHARED CIRCUT (BY E.C.)

(SEE "ELECTRICAL DROPS" ON ME-1.5)

CONCENTRATE LOOP SAMPLING STATION.25

CONCENTRATE TRANSFER STATION TO

CONCENTRATE STORAGE TANK WITH DRAIN

PURGE VALVE.

CONCENTRATE TANK PRIMARY (RED),

SECONDARY (YELLOW)

1 LOCATION FINALIZED DURING INSTALLATION

2 BLEND VALVE ANALOG

3 BVA MUNICIPAL BOOST 217 LB

TWIST LOCK DISCONNECT - 30 AMP STANDARD 3

WIRE CIRCUT (L1, L2, GND) 220 VAC SINGLE

PHASE 65" ABOVE FINISHED FLOOR (A.F.F)

120v 20 AMP GFCI DUPLEX RECEPTACLE

SURFACE MOUNTED, 78" A.F.F - SHARED

CIRCUIT (BY E.C.) (SEE "ELECTRICAL DROPS" ON

ME-1.5)

10 SACRIFICIAL CARBON 7 CU/FT OF

CARBON. 21" X 62" WEIGHT= 1076 lb

A PRELIMINARY 1/13/23

VA

M

C S

AN

F

R

AN

C

IS

C O

Eco RO Dia II 1400 HT VOLTAGE= 3-N PE 208V CAPACITY= 13.19 kVA. CURRENT= 36 A

FED BY DISCONNECT ITEM 17

RO SAFETY DISCONNECT SWITCH - 60 AMP,

3-N PE 208v, LOAD APPROX. 10.0 KVA 5 WIRE CIRCUIT (L1, L2, L3, N, GND) 60 HZ. SEE NOTE ON PAGE ME-1.5

Trans. DOUBLE SAFETY DISCONNECT SWITCH - 60 AMP, 3-N PE, 400v, LOAD APPROX. 10.0 KVA 5 WIRE CIRCUIT (L1, L2, L3, N, GND) 60 HZ. SEE NOTE ON PAGE ME-1.5

PRIMARY (1ST) DISCONNECT 100 AMPS, SECONDARY (2ND)

60 AMP

29 KVA TRANSFORMER (410 lb). 3-N PE, 208v-400v DEMAND

AMPS: PRIMARY 81, SECONDARY 41

REMOTE ALARM CONNECTION.

2 EACH 18 GA, 7 CORE WIRES ADDITIONAL 15 FEET EACH. 24

VDC SUPPLIED BY RO/HRS CONTROLLER.

17 18 5

8B

111213

8A

9 HURRICANE FILTRATION HOUSING.

WEIGHT=175 LBS

2' -7

" 4 '-0

1/

2" 7'

-1

9' -4

'-9

/2

'-1

/2

3' 7'

5'

3'-3" 3'-4"

7'-3 1/2" 1'

DRAIN

DRAIN

TY

P.

X

1'

Color Legend Blue - Plumber Red - Electrician Black - BBRAUN Purple - Contractor

Rev 1.3 Color coding responsible groups Rev 1.4 Station locations added & No.

Rev 1.4 Added trans. disconnect

Rev 1.5 Edit transformer disconnect requirements.

1st

2nd

Color Legend Blue - Plumbing Red - Electrician Black - BBRAUN Purple - General Contractor

Secure staging of creates will be necessary within facility property.

Water and electrical connections will need to be completed by 3rd day of phase 2 visit (Usually Wednesday. All prep work for terminating points can be done ahead of time.

1 SAMPLING STATION LOCATION FINALIZED DURING INSTALLATION (BBRAUN)

• Installed by B.Braun in the designated location on the ME-1.

• Location my vary to grant the best access to the handover staff at the dialysis unit.

2 BLEND VALVE (BBRAUN / Plumber)

• Mounting performed by B.Braun with the appropriate hardware

• Hot and Cold water inputs will convert to PVC and CPVC for hot water.

Building cold and hot water piping will need to be installed, tying into the Blend Valve• 1" Threaded female connections with manual shutoff valve within 2' of Blend Valve connection•

3 BVA MUNICIPAL BOOST 217 LB (BBRAUN)

• Floor placement

• Will utilize the following #4 Item on the ME-1

• 1 1/2" PVC attachment to and from next component

4 TWIST LOCK DISCONNECT (Electrician)

• 30 Amp dedicated

• 3 wire circuit (L1, L2 GND)

• 220 VAC single phase

• 65" above the finished floor

• Surface mount outlet provided by B.Braun pre-treatment kit upon installation delivery

• Wiring to be ran from facility breaker box to the designated wall location in the water room

• Connection made to the provided outlet

• Labeling at the breaker box "WR Boost Pump" and or outlet number

5 120v 20 AMP GFCI DUPLEX RECEPTACLE (Electrician)

• Surface or in wall mounting 78" from finished floor as designated on ME-1 (Cross section spacing at G7, and F7)

• Outlets to be provided by installing electrical contractor

• Shared 15 amp GFCI

• Labeling at the breaker box "Pre-Treatment" and or outlet number

6 DUAL BIG BLUE FILTER (75 LB) (BBRAUN)

• Wall mounted wit hardware

• 1 1/2" PVC attachment

• Height my vary from 54" from floor to best suit filter replacement access by 12"

7 CARBON TANKS 10 CU/FT 24" X 72 (BBRAUN/Electrician)

• Requires completion of #5 item

Expanded Description of ME-1 Requirements

VAMC San Fran Page 1

• Requires completion of #5 item

• Bedding, hydration, and programing done in place

• 1 1/2" PVC connections from and to next component

• Height of PVC valve assembly 54" from floor, may vary to suit for best access by

12" 8 SOFTENER TANK 24"X72" & BRINE TANK 24"X40" (BBRAUN/Electrician)

• Requires completion of #5 item

• Bedding, hydration, and programing done in place

• 1 1/2" PVC connections from and to next component

• Height of PVC valve assembly 54" from floor, may vary to suit for best access by 12"

• Brine tank fluid line connection to softener

9 HURRICANE FILTRATION BBRAUN

• Floor placement

• PVC 1 1/2" attachment

Activation filer installed•

10 SACRIFICIAL CARBON 21"X62" (BBRAUN/Electrician)

• Requires completion of #5 item

• Bedding, hydration, and programing done in place

• 1 1/2" PVC connections from and to next component

• Height of PVC valve assembly 54" from floor, may vary to suit for best access by 12"

11 RO FEED DI (BBRAUN)

• 1" PVC connections from and to next component

• Height of PVC valve assembly 54" from floor, may vary to suit for best access by 12"

12 PRE-RO FILTER 20" DUO 1" (BBRAUN)

• Wall mounted with hardware

• 1 1/2" PVC attachment

• Height my vary from 54" from floor to best suit filter replacement access by 12"

13 ULTRAFITLER (option)

• Not installed

14 ECO RO DiaII 1400HT (BBRAUN / Electrician)

• Floor Placement

• 1" PVC attachment

• To be attached to disconnect item #17

Hardwired inside the RO cabinet L1, L2, L3, GND, Neutral using appropriate gauge wiring for 36A -208V - 13.19 kVA Wiring

• Option 1: Wiring to have watertight flex covering if ran at cabinet level

• Option 2: Overhead run with dropdown to cabinet in standard rigid conduit 15 Hot Rinse Smart 30 Hydraulic Unit (BBRAUN)

• Wall mounted with hardware

• PEX loop feed and return connected with proper hardware

• RO feed and return connected to HRS with proper hardware

• Voltage and communication lines to HRS Cabinet #16

16 HOT RINSE CONTROLLER (BBRAUN / Electrician)

• Floor placement with proper hardware anchoring to wall

• Voltage and communication lines to be attached to HRS hydraulic #15

VAMC San Fran Page 2

• Voltage and communication lines to be attached to HRS hydraulic #15

• Hardwiring inside the HRS cabinet L1, L2, L3, GND, Neutral using appropriate gauge wiring for 60 amp - 400 V - 10 kVA from Safety disconnect #18, watertight flex covering

• Connection of low voltage communication to remote alarm #20, wiring ran by electrician

17 SAFETY DISCONNECT SWITCH (Electrician)

• Wiring hardwired inside the RO cabinetL1, L2, L3, GND, Neutral using appropriate gauge wiring for

36A - 208V - 13.19 kVA

• Hardwired to facility breaker panel

• Labeling on disconnect and breaker panel "Reverse Osmosis and or connection number

18 DOUBLE SAFETY DISCONNECT SWITCH (Electrician)

• First disconnect- hardwired to facility breaker panel feed

• First disconnect- hardwiring to inside the Transformer item #19 L1, L2, L3, GND, Neutral using appropriate gauge wiring for 60 amp - 400 V - 10 kVA, watertight flex covering

• Second disconnect- hardwiring from Transformer item #19 L1, L2, L3, GND, Neutral using appropriate gauge wiring for 60 amp - 400 V - 10 kVA, watertight flex covering Second disconnect- hardwiring to inside the HRS cabinet #16 L1, L2, L3, GND, Neutral using appropriate gauge wiring for 60 amp - 400 V - 10 kVA (from Safety disconnect #16,) watertight flex covering

19 29KVA TRANSFORMER(Electrician)

• Option 1: Floor placement (with 1"-4" standoff) in water room per ME-1

• Option 2: Elevated strut mounting above existing transformer in Dialysis electrical room.

• Hardwiring to First safety disconnect #18 item #19 L1, L2, L3, GND, Neutral using appropriate gauge wiring for 100 amp - 400 V - 10 kVA, watertight flex covering

• Hardwiring from Second disconnect #18 L1, L2, L3, GND, Neutral using appropriate gauge wiring for 60 amp - 400 V - 10 kVA, watertight flex covering

20 REMOTE ALARM CONNECTION (BBRAUN / Electrician)

• 2 cables, each 7core - 18 gauge provided by electrician

• Cable runs from designated remote placement at nurses station wall to designated Hot Rinse Control Cabinet #16

• Nurse station end to have minimum 4' excess at termination

• Water room end to have minimum 30' excess at termination

• Connections to HRS #16 and RO #14 cabinets made by B.Braun

21 CONCENTRATE TANK PRIMARY AND SECONDARY (BBRAUN)

• Floor placement

• Tank, delivery pump and delivery lines installed by B.Braun

• VAMC San Francisco to provide designated concentrate for each delivery system (100 gal)

22 MANIFOLD PRESSURE RELAESE (FOR CONCENTRATE TANK SYSTEMS) (BBRAUN)

• Wall mounting with proper hardware and connection to tank system

23 CONCENTRATE DISTRIBUTION SYSTEM WITH RUN DRY PROTECTION (BBRAUN)

Floor placement and connection to tank system•

24 20amp GFI DUPLEX RECEPTICALS (Electrician)

• Surface or in wall mounting 24" from finished floor as designated on ME-1 (Cross section spacing at G9, and G8) Outlets to be provided by installing electrical contractor•

• Shared 20 amp GFCI

• Labeling at the breaker box "Concentrate pumps" and or outlet number

VAMC San Fran Page 3

• Labeling at the breaker box "Concentrate pumps" and or outlet number

25 CONCENTRATE LOOP SAMPLING (BBRAUN)

• Wall mounting with proper hardware and connection to concentrate loop system

26 CONCENTRATE TRANSFER STATION TO TANK WITH DRAIN PURGE (BBRAUN)

• Wall mounting with proper hardware and connection to tank system

STATION BOX (BBRAUN/Plumber / General Contractor)

• Provided at during phase 1 delivery of material

• Cabinet modification for proper mounting

• Installation in cabinet mounting for each station

Drain connection to facility (See ME-1 WALL BOX DETAILS)•

VAMC San Fran Page 4

NOTES:

1.) MOUNTED 65” TO THE BOTTOM TO BE PROVIDED, INSTALLED,

AND WIRED BY E.C. LOCATION SUBJECT TO CHANGE PER E.C.

DISCONNECT ELECTRICAL DROPS TO BE COILED AT CEILING WITH

15'-0" OF COIL UNTIL PRE-TREATMENT VENDOR FINALIZES

LOCATION. FINAL CONNECTION FROM DISCONNECT TO WATER

SYSTEM TO BE MADE BY ELECTRICAL CONTRACTOR.

JUNCTION BOX

DO NOT TERMINATE AT DISCONNECT.

CEILING

COIL ABOVE CEILING FOR

TERMINATION UPON DISCONNECT

PLACEMENT.ELECTRICIAN TO MAKE

CONNECTIONS ONCE DISCONNECT

PLACEMENT IS DETERMINED.

BREAKER BOX

MECHANICAL

ROOM

WATER

TREATMENT

ROOM

ELECTRICAL DROPS

5'-5" 6'-6"

2'

1" FNPT

1" MNPT

INCLUDED WITH WALL BOX

MUST SLOPE TO TEE

ROTATE TO SET SLOPE

MAIN DRAIN TRUNK

WALL BOX DRAIN ATTACHMENT

PEX/RO WATER

8"

9"

CONNECT DRAIN FOR

EASE OF ACCESS

1'

TOP 8" OF CLEARANCE

RESERVED FOR RO PEX AND

CONCENTRATION ONLY

AREA RESERVED FOR

ELECTRICAL

TOP OF DRAIN MUST NOT EXCEED 12" ON HIGH SIDE OF

DRAIN TO ALLOW FOR WALL BOX CLEARANCE.

FINISHED

FLOOR

DRAIN SLOPES DOWN

WALL BOX DRAIN INSTALLATION

TANK CLEARANCE

FINISHED

FLOOR

1'

MAX

1'-2 1/2"

1'-2 1/2"

WALL BOX CUT OUT

1'-5"

11"

WALL BOX ISO

FINISHED

FLOOR

TRUNK LINE LOCATION

4'-7"

1'-8 1/2"

FINISHED FLOOR

INCOMING HOT WATER

INCOMING COLD WATER

BLEND VALVE LOCATION

(DISTANCE TO WALL) 6'-9 1/2"

INLET WATER LINES ABOVE CEILING. FINAL

CONNECTIONS TO BE MADE (BY P.C.)

AFTER BLEND VALVE IS INSTALLED.

PLUMBING NOTE:

1"

ESTIMATED TRANSFORMER SIZING

HRS

SIZE

TRANSFORMER

208-400v

PRIMARY

DEMAND

AMPS 208v

SECONDARY

DEMAND

AMPS 400v

POST

TRANSFORMER

DISCONNECT

100 FT WIRE

SIZE PRIMARY

20 22.5 kVA 63 26 45A 1 AWG

30 29 kVA 81 41 60A 1/0 AWG 40 38 kVA 106 54 60A 2/0 AWG

50 47 kVA 131 67 80A 3/0 AWG

HRS

SIZE

TRANSFORMER

480-400v

PRIMARY

DEMAND

AMPS 480v

SECONDARY

DEMAND

AMPS 400v

POST

TRANSFORMER

DISCONNECT

100 FT WIRE

SIZE PRIMARY

20 22.5 kVA 27 26 45A 8 AWG

30 29 kVA 34 41 60A 8 AWG

40 38 kVA 45 54 60A 6 AWG

50 47 kVA 57 67 80A 4 AWG

ALL INFORMATION OBTAINED WHILE USING THIS CHART SHOULD BE CONFIRMED BY A

QUALIFIED ELECTRICAL CONTRACTOR OR ENGINEER.

FUSED DISCONNECT MUST BE LOCATED BETWEEN THE TRANSFORMER AND HRS

CONTROLLER.

P R

O

JE

C T:

PROJECT NOTES:

Please see files;

REVISIONS

REV. DESCRIPTION DATE

9 8 7 6 5 4 3 2 110

9 8 7 6 5 4 3 2 110

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

824 Twelfth Avenue Bethlehem, PA 18018

1-800-523-9676 www.BBraun.com

PROPRIETARY AND CONFIDENTIAL

C

LE

M

EN

T

ST

SA

N F

R

AN

C

IS

C O

, C A.

FOLDER: S:\CUSTOMER FILES\BBRAUN CUSTOMER FILES\CALIFORNIA\VA SAN

FRANCISCO,CA\ME-1_SAN_FRANCISCO_CA_A1.DWG

LA

ST

E D

IT

ED

B Y:

S

SA

PU

TO

/1

3/

TE

M

PL

AT

E R

EV

IS

IO

N

: AME-1.5

VA

M

C S

AN

F

R

AN

C

IS

C O

4' -7

Color Legend Blue - Plumber Red - Electrician Black - BBRAUN Purple - Contractor castmnus Highlight castmnus Highlight castmnus Highlight castmnus Highlight castmnus Highlight castmnus Highlight castmnus Highlight castmnus Highlight castmnus Highlight castmnus Highlight castmnus Highlight castmnus Cross-Out castmnus Cross-Out castmnus Cross-Out

4'-7"

1'-8 1/2"

FINISHED FLOOR

INCOMING HOT WATER 1"

INCOMING COLD WATER 1"

BLEND VALVE LOCATION

(DISTANCE TO WALL) 6'-9 1/2"

INLET WATER LINES ABOVE CEILING. FINAL

CONNECTIONS TO BE MADE (BY P.C.)

AFTER BLEND VALVE IS INSTALLED.

PLUMBING NOTE:

X'-XX" P

R

O

JE

C T:

PROJECT NOTES:

Please see files;

REVISIONS

REV. DESCRIPTION DATE

9 8 7 6 5 4 3 2 110

9 8 7 6 5 4 3 2 110

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

824 Twelfth Avenue Bethlehem, PA 18018

1-800-523-9676 www.BBraun.com

PROPRIETARY AND CONFIDENTIAL

FOLDER: S:\CUSTOMER FILES\BBRAUN CUSTOMER FILES\OHIO\DAVITA BELMONT\GENERAL_AQUABASE.DWG

LA

ST

E D

IT

ED

B Y:

S

SA

PU

TO

/3

1/

TE

M

PL

AT

E R

EV

IS

IO

N

: AME-1.5

W

AT

ER

C

O N

N

EC

TI

O

N

Color Legend Blue - Plumber Red - Electrician Black - BBRAUN Purple - Contractor

(Hot Water)(Cold Water)

Shut off valves installed by plumber

1" MNPT

1" FNPT

INCLUDED WITH WALL BOX

MUST SLOPE TO TEE

ROTATE TO SET SLOPE

MAIN DRAIN TRUNK

WALL BOX DRAIN ATTACHMENT

PEX/RO WATER

8"

9"

CONNECT DRAIN FOR

EASE OF ACCESS

1'

TOP 8" OF CLEARANCE

RESERVED FOR RO PEX AND

CONCENTRATION ONLY

AREA RESERVED FOR

ELECTRICAL

TOP OF DRAIN MUST NOT EXCEED 12" ON HIGH SIDE OF

DRAIN TO ALLOW FOR WALL BOX CLEARANCE.

FINISHED

FLOOR

DRAIN SLOPES DOWN

WALL BOX DRAIN INSTALLATION

1'-2 1/2"

1'-2 1/2"

WALL BOX CUT OUT

1'-5"

11"

WALL BOX ISO

P R

O

JE

C T:

PROJECT NOTES:

Please see files;

REVISIONS

REV. DESCRIPTION DATE

9 8 7 6 5 4 3 2 110

9 8 7 6 5 4 3 2 110

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

824 Twelfth Avenue Bethlehem, PA 18018

1-800-523-9676 www.BBraun.com

PROPRIETARY AND CONFIDENTIAL

FOLDER: \\SWT-SERVER1\USERS\SSAPUTO\DESKTOP\TEMP\B.BRAUN EXTRA PAGES.DWT

LA

ST

E D

IT

ED

B Y:

S

SA

PU

TO

/2

0/

TE

M

PL

AT

E R

EV

IS

IO

N

: AME-1.5

W

AL

L

BO

X D

ET

AI

LS

Color Legend Blue - Plumber Red - Electrician Black - BBRAUN Purple - Contractor

17.25

6.

7.

14.00

.6

3.

1" FNPT

SWT Wall Station Cut Sheet

DO NOT SCALE DRAWING

SWT Wall Station Cut Sheet

SHEET 1 OF 1

UNLESS OTHERWISE SPECIFIED:

SCALE: 1:5 WEIGHT:

REVDWG. NO.

A

SIZE

TITLE:

NAME DATE

COMMENTS:

Q.A.

MFG APPR.

ENG APPR.

CHECKED

DRAWN

FINISH

MATERIAL

INTERPRET GEOMETRIC

TOLERANCING PER:

DIMENSIONS ARE IN INCHES

TOLERANCES:

FRACTIONAL

ANGULAR: MACH BEND

TWO PLACE DECIMAL

THREE PLACE DECIMAL

PROPRIETARY AND CONFIDENTIAL

THE INFORMATION CONTAINED IN THIS

DRAWING IS THE SOLE PROPERTY OF

SPECIALTY WATER TECHNOLOGIES, INC.

ANY REPRODUCTION IN PART OR AS A

WHOLE WITHOUT THE WRITTEN PERMISSION

OF SPECIALTY WATER TECHNOLOGIES, INC.

IS PROHIBITED.

5 4 3 2 1

6'-8 1/2"

5'-11 1/2"

HOT RINSE SMART

429 lb

Aquaboss

Aquaboss

2'-7 1/4"

6'-9 3/4"

HOT RINSE SMART

CONTROL CABINET

342 lb

2'-2 1/4"

2'-3 1/4"

29 kVA

TRANSFORMER

410 lb

1'-2 1/2"

CONCENTRATE TANK

2355 LBS

1'-8"1'-4 1/2"

2'

3'-4"

BRINE TANK

24" DIA X 40"

795 LB

8'-3"

3'-2 1/2"

BVA MUNICIPLE

BOOST 217 LBS

2'-6"

4'-9"

1'-7 1/2"

10 CU FT

1561 LBS

CARBON TANK SOFTENER TANK

8 CU FT

1599 LBS

2'

6'

2'

6'

6'

5'-10"

EcoRO Dia II - 1400

1685 LBS

2'-11"

7 CU FT

1076 LBS

CARBON TANK

1'-9"

5'-2"

FRONT

VIEWS

TOP

VIEWS

P R

O

JE

C T:

PROJECT NOTES:

Please see files;

REVISIONS

REV. DESCRIPTION DATE

9 8 7 6 5 4 3 2 110

9 8 7 6 5 4 3 2 110

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

824 Twelfth Avenue Bethlehem, PA 18018

1-800-523-9676 www.BBraun.com

PROPRIETARY AND CONFIDENTIAL

C

LE

M

EN

T

ST

SA

N F

R

AN

C

IS

C O

, C A.

FOLDER: S:\CUSTOMER FILES\BBRAUN CUSTOMER FILES\CALIFORNIA\VA SAN

FRANCISCO,CA\ME-1_SAN_FRANCISCO_CA_A1.DWG

LA

ST

E D

IT

ED

B Y:

S

SA

PU

TO

/1

3/

TE

M

PL

AT

E R

EV

IS

IO

N

: AME-1.5

VA

M

C S

AN

F

R

AN

C

IS

C O

Color Legend Blue - Plumber Red - Electrician Black - BBRAUN Purple - Contractor

P R

O

JE

C T:

PROJECT NOTES:

Please see files;

REVISIONS

REV. DESCRIPTION DATE

9 8 7 6 5 4 3 2 110

9 8 7 6 5 4 3 2 110

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

824 Twelfth Avenue Bethlehem, PA 18018

1-800-523-9676 www.BBraun.com

PROPRIETARY AND CONFIDENTIAL

C

LE

M

EN

T

ST

SA

N F

R

AN

C

IS

C O

, C A.

FOLDER: S:\CUSTOMER FILES\BBRAUN CUSTOMER FILES\CALIFORNIA\VA SAN

FRANCISCO,CA\ME-1_SAN_FRANCISCO_CA_A1.DWG

LA

ST

E D

IT

ED

B Y:

S

SA

PU

TO

/1

3/

TE

M

PL

AT

E R

EV

IS

IO

N

: AME-1.5

VA

M

C S

AN

F

R

AN

C

IS

C

OX

Remote wiring termination for remote box (4' extra)

X

Remote wire termination point for HRS and RO cabinet connection (30' extra)

Remote Wiring terminating points

P R

O

JE

C T:

PROJECT NOTES:

Please see files;

REVISIONS

REV. DESCRIPTION DATE

9 8 7 6 5 4 3 2 110

9 8 7 6 5 4 3 2 110

A

B

C

D

E

F

G

H

A

B

C

D

E

F

G

H

824 Twelfth Avenue Bethlehem, PA 18018

1-800-523-9676 www.BBraun.com

PROPRIETARY AND CONFIDENTIAL

C

LE

M

EN

T

ST

SA

N F

R

AN

C

IS

C O

, C A.

FOLDER: S:\CUSTOMER FILES\BBRAUN CUSTOMER FILES\CALIFORNIA\VA SAN

FRANCISCO,CA\ME-1_SAN_FRANCISCO_CA_A1.DWG

LA

ST

E D

IT

ED

B Y:

S

SA

PU

TO

/1

3/

TE

M

PL

AT

E R

EV

IS

IO

N

: AME-1.5

VA

M

C S

AN

F

R

AN

C

IS

C O

LOOP INCLUDES RO WATER,

PRIMARY, AND SECONDARY

CONCENTRATE (BBRAUN)

Water loop flow path installed by BBraun

Rev 1.4 Station locations added with No..

T T

Biomed

T

T T T T

7 8

11 12 13 14 15

16 17

Building Site Preparations Performed by Customer/Contractor:

General constructional actions Close all wall- and ceiling-breakthroughs after pipe laying Fire protection (if requested) Mason’s, and carpenter’s preparation All sanitary works modifications including patient station boxes (raw and waste water) Decommission and removal of old equipment Temporary DI setup for treatments with monitoring and supplies Loop coverings for exposed segments (from cabinets to ceilings)

Osmosis Room Facilities

Acid-resistant flooring Removal/disposal of existing equipment Floor drain at the lowest point (floor drain channel with minimum 5 m³/h culvert) or sealing of the room on all sides in connection with water saving control or a closed floor tub for the osmosis system

4 each, TAE connection (telephone socket) or LAN connection (CAT5) (with process visualisation) (optional)

Pre-treatment

(cold water only application) Raw water supply 1½ ” with ball valve 1½ ” (min. 2.0 bar - max.

4.0 bar (30 to 60 psi)) regulated by flow pressure of 3-5 m³/h), pipe disconnector to connect to Schedule 80 PVC

(Blended water application) Raw water supply 1” Hot and 1” Cold post backflow. Backflow preventers not supplied or installed by Braun (min. 2.0 bar - max. 4.0 bar (30 to 60 psi)) regulated. Connections to Schedule 80 PVC via 1” threaded male adapter.At the start of the inlet water cascade, for the municipal boost system, there will need to be 208-230 volt, single phase 30 AMP dedicated circuit. 4 wire, 2 lines (hot) neutral and ground. Wire receptacle to local codes.

Floor drain for waste water discharge for pre-treatment cascade, volume required 18 GPM for 45 minutes.

regulated. Connections to Schedule 80 PVC via 1” threaded male adapter.At the start of the inlet water cascade, for the municipal boost system, there will need to be 208-230 volt, single phase 30 AMP dedicated circuit. 4 wire, 2 lines (hot) neutral and ground. Wire receptacle to local codes.

Floor drain for wastewater discharge for pre-treatment cascade, volume required 18 GPM for 45 minutes.

Reverse Osmosis System (Dia I/II 1400 HT)

(Eco)RO Dia I, (Eco)RO Dia I / II HT 3 Phase-208v, 45 amp safety disconnect. Connection between RO and safety Disconnect to be provided and installed by local electrician using a codes approved FLEX conduit. Flex Conduit must be liquid tight and heat resistant with UL approval. Full load 36 Amps

Electrical Connection EcoRO I/II The EcoRO Dia I/II (HT) requires pre-fuses, ground fault protector and an external power switch according to the following performance data. Observe backup fuse requirements on-site in accordance with local codes.

Device Type Voltage Capacity Current Disconnect EcoRO Dia I 700 HT 3-N PE 208V 6kVA 22A 30A EcoRO Dia I 900 HT 3-N PE 208V 6kVA 22A 30A

EcoRO Dia I 1050 HT 3-N PE 208V 7kVA 25.1A 30A EcoRO Dia I 1400 HT 3-N PE 208V 5.2kVA 20.1A 30A EcoRO Dia I 1800 HT 3-N PE 208V 5.2kVA 22A 30A EcoRO Dia I 2100 HT 3-N PE 208V 6kVA 25.1A 30A EcoRO Dia I 2450 HT 3-N PE 208V 7kVA 22A 30A EcoRO Dia I 2800 HT 3-N PE 208V 6kVA 22A 30A EcoRO Dia I 3600 HT 3-N PE 208V 7kVA 25.1A 30A EcoRO Dia II 700 HT 3-N PE 208V 11.54kVA 31A 45A EcoRO Dia II 900 HT 3-N PE 208V 11.54kVA 31A 45A

EcoRO Dia II 1050 HT 3-N PE 208V 14.92kVA 41A 45A

EcoRO Dia II 1400 HT 3-N PE 208V 13.19kVA 36A 45A EcoRO Dia II 1800 HT 3-N PE 208V 14.92kVA 41A 60A EcoRO Dia II 2100 HT 3-N PE 208V 16.58kVA 45A 60A EcoRO Dia II 2450 HT 3-N PE 208V 16.58kVA 46A 60A EcoRO Dia II 2800 HT 3-N PE 208V 16.58kVA 47A 60A EcoRO Dia II 3600 HT 3-N PE 208V 16.58kVA 48A 60A

General Remote control- or alarm-circuit 2 each 7 core, 18 ga wires run from water room to treatment floor. Alarm furnished by BBM, wire furnished and pulled by contractor Advanced pretreatment monitor cable, provided ^ka fkpq^iiba by `lkqo^`qlo and `lkkb`qba _v

?+?o^rk castmnus Cross-Out

2.1 Heat Disinfection System

Transformer provided by BBM, placed and installed by local contractor Hot Rinse Smart 30 Power requirement: approx. 29 kVA (Smart 30) transformer provided by B.Braun, placed and installed by contractor. 3 Phase 208v input, 400 volt output to HRS cabinet. Equipment cabinet to be wired directly by contractor electrician.

Safety disconnect between transformer and HRS cabinet to be supplied and installed by contractor electrician. HRS has an overall max. Power intake of 28.5 kVA rated at 60 amps Phase 2 start-up of Equipment

Customer will need to have 10 bags of softener salt and 1 drum of each acid concentrate on hand for rinse and equipment start-up.

Customer will need Acid Concentrate for the distribution loops of ~100 gal Customer will need to sample product water for AAMI analysis, and cultures Customer will need to remove Dialog+ (hemo equipment) drain hose and use station quick connect (secondary lines) to connect to product water

Estimated Transformer Sizing All information obtained while using this chart should be confirmed by a qualified electrical contractor or engineer. Fused disconnect must be located between the transformer and HRS controller.

HRS Size Transformer 208v-400v

Primary Demand Amps

Secondary Demand Amps Disconnect

HRS 20 22.5k VA 63 26 45A

HRS 30 29k VA 81 41 60A HRS 40 38k VA 106 54 60A

HRS 50 47k VA 131 67 80A

HRS Size Transformer 480v-400v

Primary Demand Amps

Secondary Demand Amps Disconnect

HRS 20 22.5k VA 27 26 45A

HRS 30 29k VA 34 41 60A

HRS 40 38k VA 45 54 60A

HRS 50 47k VA 57 67 80A castmnus Cross-Out castmnus Cross-Out

Method Statement of Work w/ Method

BBraun Medical Date : January 21, 2025 824 Twelfth Avenue Bethlehem, PA 18018-3524

(800) 523-9676

Scope of Work Information:

Project: VA San Francisco Start Date: TBD Completion Date: TBD

Key Contact List:

Russell Dimmitt BBraun Medical Manuel Castro-Delanoe BBraun Medical Dawn Balcomb BBraun Medical

Installers: OSHA 30 Respirator Fit Test AHERA Supervisor Cert.

Chase Stetz BBraun Medical Yes Yes Yes Samuel Dotson BBraun Medical Yes Yes Yes Joshua Mesina BBraun Medical Yes Yes Yes

Installation Requirements:

BM will need access to utility power source (120V) for power tools Access to job site : TBD When Patient Treatments finish Storage Location for (1) Job Box, (1) Ladder Box, (1) Workshop Crate

(1) crate 24"x24"x120", (1) pallet 48"x48" x108", (1) crate 48"x72"x80", (1) crate 36"x80"x24", (1) crate 84"x20"x78"

PPE Requirements:

Safety Glasses Work gloves Work Boots

Pre-Installation Requirements:

BBM will need access to a utility power source (120V) for power tools Access holes made in exterior wall of water room to accommodate piping at locations specified Ceiling Access Unit (Following VAMC procedure) Access to chases and cabinets, above ceiling grid, cat walk Compliance with the Customer Checklist (attached to this file)

1st Phase Method:

BBM will Check in at the job site (VA San Francisco) to obtain clearance to enter and perform the installation of the first phase material

BBM will Locate and accept the 1st phase material & job box / workshop at the job site, inventory and secure into a storage location.

BBM will Review floor plans, path of ringline, hazards/obstructions and assign tasks BBM will Anchor the loop supports to the walls in the treatment area and technical room chases BBM will and cabinets that will be serviced by the purified water loop . ** BBM will Run the Pex ring piping and fasten to loop supports** BBM will Avoid large penetrations on abated walls and only use surface mount hardware that seals.

BBM will Connect pressure differential bulbs BBM will Seal wall and ceiling feed threws with fire caulking in applicable areas BBM will Insulate ringline (do not insulate pressure differential bulbs)** BBM will Insulate and connect the secondary loops to the ringlines pressure differential bulbs BBM will Perform pressure test of ring piping BBM will Complete 1st phase documentation BBM will Clean jobsite & remove all regular trash related to 1nd phase BBM will Exit review with VAMC representatives (sign pressure test results & sign off on 1st / 2nd phase) BBM will Follow OSHA 29 CFR 1910.134 where applicable BBM will

Loop Install Procedure

Notify Central Plant of activity

Slide the second securing spring over the unsecured end of the bend former/pipe. Make adjustments so that the pipe changes direction appropriately

Feed the PEX pipe through the obstructions pass-through’s and to the first connection point. Leave extra pipe at the end of the run / connection points (between 150mm – 250mm) to facilitate proper connection location.

Taking appropriate measurements & using a metal saw / reciprocating or band saw, measure and cut the support channel needed for the area you are working following the Pipe Support Channel procedure outlined in section 13 of Rautitan systems planning and assembly instructions.

Clip support channel onto the pipe and secure pipe/support channel to the pipe brackets installed following the procedure outlined in sections 13 & 14 of Rautitan systems planning and assembly instructions.

Connect pipe to the appropriate connecting points (bends, differential bulbs, termination connectors, V4A connectors) following the procedure outlined in section 10 of Rautitan systems planning and assembly instructions, confirm the proper direction of flow when connecting the differential bulbs as outlined in Lauer drawing secondary loop diagram & document 03755-00

Maximum pipe clamp interval must be < 2m and the first pipe fastener must not exceed .5m from the pipe end or when changing directions.

Bend pipe so that it rests against the bend former. Use a heat gun if needed to assist in bending the PEX to the bend former.

Slide the second securing spring over the unsecured end of the bend former/pipe.

Consult the floor plan; examine the projected path for the primary ring line and mounting locations for the differential bulbs and MPC’s.

Using a 4” hole saw or reciprocating saw and measuring tape, locate and generate pass-through’s of obstructions (i.e.

cabinets, walls, casings and ceilings) that will interfere with the path of the ring line.

Using the coach bolts and appropriate sized pipe clamps included in the installation kit and following the installation procedures outlined in sections 13 & 14 of Rautitan systems planning and assembly instructions mount the pipe brackets along the projected path of the ring line.

Taking appropriate measurements fasten the Hilti coach bolts and pipe brackets so that the ring line will run straight and parallel to the floor and nearest wall.

Change direction of the pipe at the appropriate locations following the bending procedure outlined in section 12 of Rautitan systems planning and assembly instructions, so that the pipe channel is straight and looks professional.

At the appropriate location, fasten one end of the bend former between the securing spring and pipe.

Detail Work Hemodialysis clinic

Work Hours

> Hours of schedule

MWF TBD

TTS TBD

Sun TBD

> No training of clinical staff for this portion of work

> Working with clinical team, schedule Phase 2 of the water room equipment installation

Storage/Supplies

> Primary Storage of equipment is in current Basement location.

> Transportation will be prompt by hand, utilizing carts, dollies, furniture movers, and pallet jack.

> Use of cargo elevators to bring up supplies

Thorough inspection of Hemo Unit before hand off. To include placement of original building material, sealing of openings and cleanliness.

Insulate secondary ring piping following the procedure outlined in the Wurth Flexen fleece protective hose B2 “notes of applications”. Insulate entire primary ring line following the procedure outlined in the Wurth flexen rock wool .

Short term storage requested at room 3050 across from clinic. To be used for installation supplies aprox 10'X10' space. This is to eliminate hall storage and obstructions.

Loop & secure secondary ring pipes to the MPC’s and cover & tape the primary ringline ends (V4A connectors) to prevent contaminants from entering the ring piping prior to installing the Hot Rinse Smart or EcoRO Dia I/II .

Will vary to prevent disruption of normal Hemodialysis clinic operations up to the point of heavy equipment installation (HRS, HRS cabinet, & RO). This is due to current equipment being used to be evacuated by facility.

Statement of Work w/Method

BBraun Medical Date : January 21, 2025 824 Twelfth Avenue Bethlehem, PA 18018-3524

(800) 523-9676

Scope of Work Information:

Project: VA San Francisco Start Date: TBD Completion Date: TBD

Key Contact List:

Russell Dimmitt BBraun Medical Manuel Castro-Delanoe BBraun Medical Dawn Balcomb BBraun Medical

Installers:

Chase Stetz BBraun Medical Yes Yes Yes Samuel Dotson BBraun Medical Yes Yes Yes Joshua Mesina BBraun Medical Yes Yes Yes

Installation Requirements:

BM will need access to utility power source (120V) for power tools Access to job site : TBD When Patient Treatments finish Proper electical work completed by others per BBM Customer Requirements Proper plumbing work completed by others per BBM Customer Requirement Sheet Storage Location for (1) Job Box, (1) Ladder Box, (1) Workshop Crate

(1) crate 24"x24"x120", (1) pallet 48"x48" x108", (1) crate 48"x72"x80", (1) crate 36"x80"x24", (1) crate 84"x20"x78"

PPE Requirements:

Safety GlaSafety Glasses

Work Boots

Pre-Installation Requirements:

BBM will need access to a utility power source (120V) for power tools Access holes made in exterior wall of water room to accommodate piping at locations specified Ceiling Access Unit (Following VAMC procedure) Access to chases and cabinets, above ceiling grid, cat walk Compliance with the Customer Checklist (attached to this file)

2nd Phase Method:

BBM will Check in at the job site (VA San Francisco) to obtain clearance and safety checks to enter and perform the installation of the first phase material

BBM will Locate and accept the 2nd phase material & job box / workshop at the job site, inventory and secure into a storage location.

BBM will Review floor plans, equipment layout, electrical connections, plumbing connections hazards/obstructions and assign tasks BBM will Verify temporary water source provided by others BBM will Verify old equipment has been removed and does not obstruct the new equipment installation BBM will Work with VAMC represenative, electricians and, plumber to begin new equipment installation BBM will Begin equipment installation BBM will Connect New RO/HRS system to the previously installed loop system BBM will During non-dialysis treatments start-up the new system and commission (estimated time 3 days) BBM will Begin clinical staff training as their schedule will allow in small groups BBM will Complete commissioning paperwork BBM will Ensure VAMC performs culture, endotoxin and AAMI sample collection BBM will Clean jobsite & remove all regular trash related to 2nd phase BBM will Exit rview with VAMC representatives (sign pressure test results & sign off on 1st / 2nd phase) BBM will Follow OSHA 29 CFR 1910.134 where applicable

VAMC Responsibility:

VAMC will Follow the BBM Customer requirements sheet as agreed upon VAMC will VAMC will Provide information and access of properly designated electrical supply VAMC will VAMC will VAMC will

Contractor will Provide and install low voltage wiring for the remote alarm panel to a previous location

VAMC will

Attend the clinical staff training in coordination with handover of system Schedule the technical training attendance in Bethlehem PA Upon Medical Director approval, secondary rings will be connected to the existing dialysis machines

Contractor Responsibility:

Contractor will Be responsible for existing equipment removal and disposal Contractor will Provide all electrical work per the BBM Customer Requirements for the RO Disconnect, HRS Disconnect, Pretreatment connections

Provide information and access of properly designated water supply

Contractor will Perform installation of the HRS transformer which is provided by Braun, installed by electrician Contractor will Provide and install three each electrical disconnects as outlined in the Customer Requirments.

Contractor will Provide trash disposal / removal service for installation specific trash

Client Name VAMC San Francisco Address 4150 Clement St

State USA/CA Zipcode 94121

City San Francisco

Pcs. Art No Description Phase 1 Material

Phase 2 Material

1 HWK-TE-8000-BB TEST KIT FOR B. BRAUN X

1 LD-8000 VALVE TAG KIT X

1 KAMT5F65408BT2B ST-8 CU FT, 24x72, 2815-17 15 DLFC, X 1 A-PT-5725 Hurricane Filter Assembly (w/o filter) X 1 D-FM-0641-20 Hurricane Filer 1 Micron 19 1/2" Pleat X 1 K-A-MT-4H54-307-SC Carbon Tank (7 CU FT) 21" x 62" Fleck SXT 2815 X 1 LA2000060 Comb. Filter unit 20" Duo, Lockable, 1" X 1 LA1107142 EcoRO DIA II 1400 HT X 1 LA2050431 Hot Rinse Smart 30 X 1 LA9335203 Filter Unit Sterli Hot Polysulfon 20", Ou X 1 MTWP29H20-LI 29 KVA Transformer 208-400+Neutral X 1 LA9394800 Clamp RS with 90° PEX Connection Ø32 X 1 LA9395000 Clamp VS with 90° PEX Connection Ø32 X 2 LA9348600 180º Double Elbow For PEX REHAU NW32 X 1 LA9349500v Clamp Connector W. Nose, PEX Conn. D32 X 1 LA9349600v Clamp RS, PEX Connection Ø32 X 1 LA2000305 Remote Control and Fault Detector X 2 LA2521632B Permeate Ringpiping, PEX 32mm, 100m X

200 LA2050051B ringpiping insulation 100% X 17 LA2512813 Differential pressure bulbs SS 316L, 32mm, 40 sta X 14 LA51057 Secondary ring piping (5,000 mm) X 3 LA51058 Secondary ring piping (7,000 mm) X 17 LA2050065 Thermoinsulation secondary loop X

Material Listing

Sheets and Views
ME-1_SAN_FRANCISCO_CA_A1-ME-1.0
OLE1
ME-1_SAN_FRANCISCO_CA_A1-ME-1.1
OLE1
ME-1_SAN_FRANCISCO_CA_A1-ME-1.2
OLE1
ME-1_SAN_FRANCISCO_CA_A1-ME-1.3
OLE1
SWT Blended WATER CONNECTION.pdf
Sheets and Views
General_AQUAbase-blendvalve
OLE1
SWT Wall Box Detail.pdf
Sheets and Views
B.BRAUN EXTRA PAGES-ME-1.1 (2)
OLE1
SWT Wall Station Box Cut Sheet Rev 1.pdf
Sheet1
Drawing View1
Drawing View2
Drawing View3
Drawing View4
VAMC San Fran Statement of work.pdf
Phase 1
Phase 2
Material Listing

File details come from the government source that posted it. Updated .