SOW FY23 Base Wide Paint 07-21-2023.pdf
PDF 2 MB Posted
- Attached to
- Basewide Paint, FY23 Travis AFB, CA - AMENDED V2 Federal contract opportunity
- Solicitation number
- FA442723R0009
About this file
This statement of work outlines painting, signage, and striping projects at Travis Air Force Base in California. It includes 104 work orders for facilities maintenance and repair painting across multiple buildings on base, with Carl Christian listed as the point of contact. Deliverables include tasks such as repairing and painting drywall, doors, walls, handrails, and parking lot striping. The statement of work also covers 17 additional painting and striping projects at Travis Air Force Base's TWCF facilities, with Carl Christian as the contact. Requirements include general specifications for the contractor's work, storage, disposal, safety protocols, and working conditions.
A related federal contract opportunity is also provided for solicitation number FA442723R0009 for basewide painting services at Travis Air Force Base in California. The opportunity was amended and includes requirements for painting, signage, and striping projects across the base.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA442723R00090002 SF 30.pdf | ||
| Solicitation Amendment FA442723R00090001 SF 30.pdf | ||
| SOW FY23 Base Wide Paint 08-31-2023 Rev2.pdf | ||
| ALL RFIs - Answered.pdf | ||
| SOW FY23 Base Wide Paint 08-30-2023.pdf | ||
| Amendment Memo.pdf | ||
| Attachment 6 - Bid Schedule Pickleball.xlsx | XLSX spreadsheet | |
| SECTION 01000 Mar 2019.pdf | ||
| Attachment 4 - Bid Schedule O and M Base Paint.xlsx | XLSX spreadsheet | |
| wage determination.pdf | ||
| Travis Facilities Excellence Guide.pdf | ||
| Solicitation - FA442723R0009.pdf | ||
| Contract Security Clause (2).pdf | ||
| Attachment 5 - Bid Schedule TWCF Base Paint.xlsx | XLSX spreadsheet | |
| SECTION 01 56 00_Environmental Specifications April 2019.pdf | ||
| SECTION 01 03 00 PROJECT CLOSEOUT AUG 13.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
530 21 Jul 23
STATEMENT OF WORK
FY23 O&M PAINT SIGN STRIPING
GENERAL DESCRIPTION:
The contractor shall provide all materials, labor, supervision, and equipment to complete painting, signage, and striping for work orders listed below. All work shall conform to specifications outlined in the contract, the line-item task listing description, and in accordance with (IAW) the Travis Air Force Base Facilities Excellence Guide, Traffic Engineering for Better Signs and Markings SDDCTEA Pamphlet 55-14, the UFC 3-120-01 Design (Sign standard), UFGS 09 90 00, (Paints and coatings), the Manual of Uniform Traffic Control Devices (MUTCD) and California MUTCD standards. Point of contact for this project is: Carl Christian, 60 CES/CEOES, (707) 424-0793.
DESCRIPTION OF WORK: FY23 O&M Paint sign & striping projects
104 W/O # BLDG POC Name POC Phone
Description
1 WT12229493 665 Carl Christian 424-0793
Bldg 665/Repair/Paint Drywall in rooms 1,2,7,8. 1068sf
2 WT12227392 1301 Carl Christian 424-0793
Bldg 1301/ Paint repair patch in dining room under TV. 12sf
3 WT11849375 570 Carl Christian 424-0793
Bldg 570/Paint Walls in Conference Room. 49sf
4 WT11721284 861 Carl Christian 424-0793
Bldg 861/Paint Interior Metal Handrails (LRS).
194sf
5 WT11675015 226 Carl Christian 424-0793
Bldg 226/Paint two Exterior doors on West and East sides of Bldg. 96sf
6 WT11661898 1308 Carl Christian 424-0793
Bldg 1308/ Paint Drywall Repair Patch in Room
204. 15sf
7 WT11661889 1316 Carl Christian 424-0793
Bldg 1316/ Paint Drywall Repair Patch in Room 204B. 12sf
WT11661899 1355 Carl Christian 424-0793
Bldg 1355 / Rm 230, interior paint, wall repair. 4sf
WT11651648 5572 Carl Christian 424-0793
Bldg 5572/Paint Bathroom Drywall Repairs. 25sf
10 WT11498989 31 Carl Christian 424-0793
Bldg 31/Paint Interior Walls Room 14 CSS Office. 612sf
11 WT6873290 861 Carl Christian 424-0793
Bldg 861(LRS)/Paint Rails and posts.
360sf
WT6046107 724 Carl Christian 424-0793
Bldg 724/Remove Wallpaper, Paint walls and wood baseboard. 3000sf
WT12978555 380A Carl Christian 424-0793
Bldg 380A/Remove Wallpaper/Chair Rail, Texture, and Paint. 15000Ssf Paint/1300lf Chair Rail
WT12978537 905 Carl Christian 424-0793
Bldg 905/Paint interior walls.
1900sf
15 WT11498204 934 Carl Christian 424-0793
Bldg 934/Paint exterior walls.
(Mold buildup, pressure wash needed). 1200sf
WT11386765 665 Carl Christian 424-0793
Bldg 665/Paint Interior walls.
432sf
WT11307952 1314 Carl Christian 424-0793
Bldg 1314/Paint Interior Walls. 4sf
18 WT11307886 1350 Carl Christian 424-0793
Bldg 1350/ Paint above shower, room 110. 9sf
19 WT11304200 665 Carl Christian 424-0793 Bldg 665/Paint Interior walls.
432sf
20 WT11299761 668 Carl Christian 424-0793 Bldg 668/Paint interior walls.
432sf
21 WT11299500 1315 Carl Christian 424-0793 Bldg 1315/ Paint interior wall. 24sf
22 WT11275465 1309 Carl Christian 424-0793
Bldg 1309/Interior Wall Paint (room 107 &
108. 30sf
23 WT11248894 576 Carl Christian 424-0793 Bldg 664/Paint Closet Door (room 10). 21sf
24 WT11227240 1315 Carl Christian 424-0793 Bldg 1315/Paint Interior Walls (room 104). 63sf
25 WT11227203 1315 Carl Christian 424-0793 Bldg 1315/Paint interior wall. 20sf
26 WT11218192 1351 Carl Christian 424-0793
Bldg 1351/Paint Interior wall, room 101. 1sf
27 WT11218237 1351 Carl Christian 424-0793
Bldg 1351/Paint interior wall, room
102. 1sf
28 WT11218640 1351 Carl Christian 424-0793
Bldg 1351/ Paint interior wall, Room 12. 1sf
29 WT11218562 1351 Carl Christian 424-0793
Bldg 1351/Paint Interior walls, Room106. 1sf
30 WT11218611 1351 Carl Christian 424-0793
Bldg 1351/Paint Interior Walls, Room 111. 1sf
31 WT10760891 1314 Carl Christian 424-0793 Bldg 1314/ Paint Interior wall, room 12B and 202B. 45sf
32 WT10760888 1315 Carl Christian 424-0793
Bldg 1315/Paint Interior walls, rooms 104 and 208B. 58sf
33 WT10760911 1316 Carl Christian 424-0793
Bldg 1316/Paint interior walls, rooms 101 and 202B. 156sf
34 WT10738728 402 Carl Christian 424-0793 Bldg 402/ Paint interior wall. 175sf
35 WT10705075 1315 Carl Christian 424-0793
Bldg 1315/Interio Wall Paint, Room 203B.
12sf
36 WT10576755 1356 Carl Christian 424-0793
Bldg 1356/Paint interior Wall, room 326. 9 sf
37 WT10506476 1316 Carl Christian 424-0793
Bldg 1316/Paint Interior Walls (room 104A) 15sf
38 WT10429440 875 Carl Christian 424-0793
Bldg 875/Paint new doors (existing have clear stain). 214 sf
39 WT11832401 924 Carl Christian 424-0793 Bldg 924 Stripe parking stalls.
5428Lf
40 WT10787931 810 Carl Christian 424-0793
Bldg 810 West Side Exterior parking Space next to Knuckle Buster x8 parking stalls. 255Lf
WT10456915 549 Carl Christian 424-0793
Bldg 549 Re-stripe Parking lot for No Parking next to Handicap spaces. 100Lf
ADDITIONAL REQUIREMENTS:
1. All work areas shall be kept as clean as possible during working hours. Debris will not be allowed to accumulate on work site. All debris will be deposited in an authorized container supplied by the contractor.
2. Working drawings shall provide sufficient detail to provide a clear and complete understanding of the work.
3. Special precautions must be made, as needed, to prevent any potential fire hazard. The fire reporting number is 424-4911 from a base phone or 911 from any commercial phone.
4. The contractor shall challenge any requirements in the scope of work (SOW) which are specifically in violation of the governing code. It is the contractor’s responsibility to comply with the governing code unless the construction representative provides specific documentation to the contrary.
5. The contractor shall ensure installation of all items included in the contract. The contractor shall be accountable for all related costs of items not installed.
6. All work shall be in full compliance with the requirements, spirit, and intent of the base compatibility plan (discussed at the Basic Content Pre-construction meeting and a copy provided by the Contracting Officer) and contract specifications.
7. All exposed and visible surfaces shall be finished and provide an aesthetically pleasing appearance.
8. The contractor shall field verify all drawing measurements and any other supplied information given at the site visit.
9. Materials storage and clean up: The contractor’s materials and equipment shall be stored and protected after end of each day. Storage facilities are provided by contractor at an approved Government location. Clean up and removal of all debris, spoil and waste shall be accomplished at the end of each day’s work. Disposal shall be off base upon completion.
10. Working conditions: Contractor shall perform work in such a manner as to cause minimum interference to facility and surrounding areas utilities: Reasonable quantities of water and electricity will be provided to the contractor without charge. Needed temporary connections shall be installed maintained and removed at the contractor’s expense.
530 01 Jun 23
STATEMENT OF WORK
FY23 TWCF PAINT SIGN STRIPING
GENERAL DESCRIPTION:
The contractor shall provide all materials, labor, supervision, and equipment to complete painting, signage, and striping for work orders listed below. All work shall conform to specifications outlined in the contract, the line-item task listing description, and in accordance with (IAW) the Travis Air Force Base Facilities Excellence Guide, the Traffic Engineering for Better Signs and Markings SDDCTEA Pamphlet 55-14, the UFC 3-120-01 Design (Sign standard), UFGS 09 90 00, (Paints and coatings), the Manual of Uniform Traffic Control Devices (MUTCD) and California MUTCD standards. Point of contact for this project is: Carl Christian, 60 CES/CEOES, (707) 424-2706.
DESCRIPTION OF WORK: FY23 TWCF Paint sign & striping projects
104 W/O # BLDG POC Name POC Phone Description
1 WT5927552 819 Carl Christian 424-2706
Bldg 819/Paint west wall of room
28. 91sf
2 WT5781900 836 Carl Christian 424-2706
BLDG 836, Paint New Exterior metal Door. 24sf
3 WT5752007 810 Carl Christian 424-2706
BLDG 810/Paint Roll up Door on West side of Building. 240sf
4 WT5752217 810 Carl Christian 424-2706 BLDG 810/Paint room 115. 144sf
5 WT9120434 810 Carl Christian 424-2706
BLDG 810/Paint interior Double Doors. 100sf
6 WT8807672 819 Carl Christian 424-2706
BLDG 819,
Interior prime and paint room 16.
4000sf
WT8800156 844 Carl Christian 424-2706
BLDG 844/ Paint new Exterior door.
45sf
8 WT8282080 803 Carl Christian 424-2706
BLDG 803 / Rm 139, interior paint.
20sf
9 WT8117153 803 Carl Christian 424-2706
BLDG 803
/Room123, interior paint. 7SF
10 WT8042050 819 Carl Christian 424-2706 Bldg 819/Exterior Door Paint. 50sf
11 WT7785375 859 Carl Christian 424-2706
BLDG 859/Room 124 interior paint.
5428sf
12 WT5569299 352 Carl Christian 424-2706
BLDG 352/Paint Exterior Door.
50sf
WT5517811 819 Carl Christian 424-2706
BLDG 819/Paint Window Rain Hoods. 51sf
WT5409427 3 Carl Christian 424-2706
Bldg 3/Paint Interior Walls.
60sf
15 WT10765400 841 Carl Christian 424-2706
Bldg 841/Paint Interior doors.
144sf
16 WT10244058 819 Carl Christian 424-2706
Bldg 819/Paint Interior Walls.
420sf
17 WT10168323 810 Carl Christian 424-2706
Bldg 810/Paint Clear Zones on Hangar Floors.
400sf
ADDITIONAL REQUIREMENTS:
1. All work areas shall be kept as clean as possible during working hours. Debris will not be allowed to accumulate on work site. All debris will be deposited in an authorized container supplied by the contractor.
2. Working drawings shall provide sufficient detail to provide a clear and complete understanding of the work.
3. Special precautions must be made, as needed, to prevent any potential fire hazard. The fire reporting number is 424-4911 from a base phone or 911 from any commercial phone.
4. The contractor shall challenge any requirements in the scope of work (SOW) which are specifically in violation of the governing code. It is the contractor’s responsibility to comply with the governing code unless the construction representative provides specific documentation to the contrary.
5. The contractor shall ensure installation of all items included in the contract. The contractor shall be accountable for all related costs of items not installed.
6. All work shall be in full compliance with the requirements, spirit, and intent of the base compatibility plan (discussed at the Basic Content Pre-construction meeting and a copy provided by the Contracting Officer) and contract specifications.
7. All exposed and visible surfaces shall be finished and provide an aesthetically pleasing appearance.
8. The contractor shall field verify all drawing measurements and any other supplied information given at the site visit
9. Materials storage and clean up: The contractor’s materials and equipment shall be stored and protected after end of each day. Storage facilities are provided by contractor at an approved Government location. Clean up and removal of all debris, spoil and waste shall be accomplished at the end of each day’s work. Disposal shall be off base upon completion.
10. Working conditions: Contractor shall perform work in such a manner as to cause minimum interference to facility and surrounding areas utilities: Reasonable quantities of water and electricity will be provided to the contractor without charge. Needed temporary connections shall be installed maintained and removed at the contractors expense.
Technical Specifications DATE May 2023
60 FSS/FSVS
Tanya McCormick
TECHNICAL SPECIFICATIONS FOR
FITNESS CENTER
PAINT ADD PICKLEBALL LINES ON
TENNIS COURTS FACILITY 1872
WO#3543443
TRAVIS AFB, CALIFORNIA
DATE: May 2023
U.S. AIR FORCE
60 AMW
60 FSS/FSVS
TRAVIS AFB, CA 94535
60 FSS/FSVS
Tanya McCormick
1. SCOPE OF WORK:
ADD/PAINT PICKLEBALL LINES ON COURTS 1, 3 & 4: The Contractor shall provide all management, tools, supplies, equipment, transportation and qualified personnel necessary to paint 3 existing tennis courts; Re-stripe using two inch white lines. Work with user to develop most efficient layout to:
• Add pickleball lines to three tennis courts 1, 3-4 for multi-purpose tennis and pickleball to use with permanent net at facility 1872. Layout #1
• Add 2 additional pickleball lines to be used with portable nets on courts 1 and 2.
Tennis courts, location, facility 1872 between the band building and swimming pool.
60 FSS/FSVS
Tanya McCormick
POOL SIDE
Court 1
Court 2
Court 4
Court 3
PARKING LOT SIDE
2. WORK SITE CONDITIONS
2.1 The Contractor is permitted to use reasonable quantities of available electricity and water at the work site. The Contractor shall alter characteristics and shall observe conservation practices at all times. All connections shall be the responsibility of the Contractor including restorations to initial conditions.
2.2 Interruption of utilities. Utilities shall not be interrupted until approval is received from the Contracting Officer. Any such need shall be requested in writing by the Contractor at least 10 days in advance of the needed interruption. Requests for utility interruption shall indicate the type of utility to be interrupted, the type of operation requiring the interruption, the date and duration. To the maximum extent possible interruption shall be scheduled on weekends or U.S. holidays in order to minimize impact to base activities.
2.3 If welding is to be performed the Contractor shall ensure a welding permit is obtained from the Travis AFB Base Fire Department prior to performing welding operations.
3. GENERAL NOTES
3.1 The Contractor shall return all areas disturbed during construction to their original condition before final acceptance by the Government.
3.2 Housekeeping and Site Clean-up: At the end of each working day, the Contractor shall be responsible for cleaning of the area. Such functions include disposal of accumulated waste materials and rubbish and other operations necessary to present a neat appearance at all times.
Contractors shall ensure all light weight debris at the construction site is properly secured in waste receptacles so that it does not blow away to another area.
60 FSS/FSVS
Tanya McCormick
4. WORK DESCRIPTION
4.1 Paint/add pickleball lines to three tennis courts to allow multi-purpose play of either tennis or pickleball. See photo
Tennis court dimensions: 78 x 36 for painting line.
1275855584C Cross-Out
1275855584C Cross-Out
1275855584C Cross-Out
60 FSS/FSVS
Tanya McCormick
Courts 1-3 - Pickleball dimensions to overlay on tennis lines on main permanent net
Pickleball court dimensions
Pickleball overlay on Tennis court
60 FSS/FSVS
Tanya McCormick
LAYOUT #1
Courts 1, 3-4 - Add Pickleball overlay on tennis lines.
SUMMARY
Courts 1 will have: 1 pickleball at permanent net.
Court 3 will add painted template: 1 pickleball at permanent net. Layout #1.
Court 4 will add painted template: 1 pickleball at the permanent net Layout #1
| SOW FY23 OM PAINT SIGN STRIPING 7-21-23 |
| STATEMENT OF WORK FY23 O&M PAINT SIGN STRIPING |
| ADDITIONAL REQUIREMENTS: |
| PERIOD OF PERFORMANCE: |
| 21 July 2023 |
| STATEMENT OF WORK |
| DORM 1352 INTERIOR PAINT |
| SOW FY23 TWCF PAINT SIGN STRIPING TWCF |
| 530 01 Jun 23 |
| STATEMENT OF WORK |
| FY23 TWCF PAINT SIGN STRIPING |
| FINAL MINI 2023 SOW Paint Pickleball lines WO3543443_7 |
| 1. SCOPE OF WORK: |
| 2. WORK SITE CONDITIONS |
| 3. GENERAL NOTES |
| 4. WORK DESCRIPTION |
| SUMMARY |