Attachment 5 - Bid Schedule TWCF Base Paint.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Basewide Paint, FY23 Travis AFB, CA - AMENDED V2
- Solicitation number
- FA442723R0009
About this file
This document contains a bid schedule template for a basewide paint project at Travis Air Force Base in California. The bid schedule includes 20 line items for materials, labor, and other direct costs associated with rubber removal, waste hauling and disposal, friction testing, equipment rentals, labor hours, paint removal, airfield striping, storage tanks, signage, barricades, and environmental monitoring. Pricing includes entries for unit costs, quantities, extended totals for materials, labor, overhead rates, subtotals, and total proposed contract prices.
The related federal contract opportunity is a solicitation to provide basewide paint services at Travis AFB for fiscal year 2023. The solicitation was amended with version 2. The Department of the Air Force Air Mobility Command is listed as the contracting agency. The opportunity type is for a solicitation and additional details on products, response dates, set asides, incumbents or award dates are not provided.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1
IGE- XDAT 21-1000
| 60 CES | FOUO | |
| TRAVIS AFB, CA | ||
| FY21 Rubber Removal Base | PROPOSED CONTRACT PRICE | $ - 0 |
| Ph I: Oct 2020 |
| MATERIAL COST | LABOR COSTS | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QUANTITY | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | LINE |
| NO | MEASURE | RATE | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 1 | Rubber removal excluding hauling, 4-6 passes (RSMEANS 02 41 13.30 6850) | MSF | |||||||||
| 2 | Waste (water) hauling (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) | Mile | |||||||||
| 3 | Waste (water) disposal turnkey (non-contaminated/non-hazardous) | gal | |||||||||
| 4 | Waste (solid) disposal turnkey (non-contaminated/non-hazardous) | Mile | |||||||||
| 5 | Waste (solid) disposal (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) 20yd | ea | |||||||||
| 6 | Friction Test, 40 and 60 MPH, pre and post tests | each | |||||||||
| 7 | Mobilization | LS | |||||||||
| 8 | Pavement Sweeper rental, 8 days, (8HR DAY/4ot, 8 hr/NITE/4OT) | WK | |||||||||
| 9 | Superintendent | hr | |||||||||
| 10 | PM | hr | |||||||||
| 11 | Laborers | hr | |||||||||
| 12 | Paint Removal (airfield, waterblast) (RSMEANS 32 17 23.13 1400) | SF | |||||||||
| 13 | Airfield Striping with reflective Beads (12 lbs/100 SF) (RSMeans 32 17 23.13 1210) | SF | restripe |
+ no bead
| 14 | Airfield Striping (no beads) (RSMeans 32 17 23.13 1200) | SF | ERROR:#REF! |
| 15 | Storage tank (water waster) Rental, 21K gallon | ls |
| 16 | Runway signs UFC 3-535-01 | ea | |
| 17 | Dumpter (solid waste) rental, 20 CY capacity | ea | |
| 18 | Barricade Rental (30 ea) | week | |
| 19 | Lighted X's (2 each) | week | ERROR:#REF! |
| 20 | Biologist | hr | ERROR:#REF! |
| ERROR:#REF! | |||
| Total (for 1 phase) | |||
| ERROR:#REF! |
Bid Schedule
| CUI | |||
| TOTAL MATERIAL COSTS | $ | 0.00 |
TOTAL LABOR COSTS $ 0.00
TOTAL OTHER DIRECT COSTS $ 0.00
TOTAL DIRECT COSTS $ 0.00
OVERHEAD % $ 0.00
SUBTOTAL $ 0.00
PROFIT % $ 0.00
SUBTOTAL $ 0.00
TOTAL PRICE $ 0.00