This document contains a bid schedule template for a basewide paint project at Travis Air Force Base in California. The bid schedule includes 20 line items for materials, labor, and other direct costs associated with rubber removal, waste hauling and disposal, friction testing, equipment rentals, labor hours, paint removal, airfield striping, storage tanks, signage, barricades, and environmental monitoring. Pricing includes entries for unit costs, quantities, extended totals for materials, labor, overhead rates, subtotals, and total proposed contract prices.

The related federal contract opportunity is a solicitation to provide basewide paint services at Travis AFB for fiscal year 2023. The solicitation was amended with version 2. The Department of the Air Force Air Mobility Command is listed as the contracting agency. The opportunity type is for a solicitation and additional details on products, response dates, set asides, incumbents or award dates are not provided.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

P1

IGE- XDAT 21-1000

60 CESFOUO
TRAVIS AFB, CA
FY21 Rubber Removal BasePROPOSED CONTRACT PRICE$ - 0
Ph I: Oct 2020
MATERIAL COSTLABOR COSTS
UNITOTHER
LINEITEMOFQUANTITYUNITTOTALMANHOURSAVERAGETOTALDIRECTLINE
NOMEASURERATECOSTSTOTAL
(1)(2)(3)(4)(5)(6)(7)(8)(9)(10)
1Rubber removal excluding hauling, 4-6 passes (RSMEANS 02 41 13.30 6850)MSF
2Waste (water) hauling (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270)Mile
3Waste (water) disposal turnkey (non-contaminated/non-hazardous)gal
4Waste (solid) disposal turnkey (non-contaminated/non-hazardous)Mile
5Waste (solid) disposal (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) 20ydea
6Friction Test, 40 and 60 MPH, pre and post testseach
7MobilizationLS
8Pavement Sweeper rental, 8 days, (8HR DAY/4ot, 8 hr/NITE/4OT)WK
9Superintendenthr
10PMhr
11Laborershr
12Paint Removal (airfield, waterblast) (RSMEANS 32 17 23.13 1400)SF
13Airfield Striping with reflective Beads (12 lbs/100 SF) (RSMeans 32 17 23.13 1210)SFrestripe

+ no bead

14Airfield Striping (no beads) (RSMeans 32 17 23.13 1200)SFERROR:#REF!
15Storage tank (water waster) Rental, 21K gallonls
16Runway signs UFC 3-535-01ea
17Dumpter (solid waste) rental, 20 CY capacityea
18Barricade Rental (30 ea)week
19Lighted X's (2 each)weekERROR:#REF!
20BiologisthrERROR:#REF!
ERROR:#REF!
Total (for 1 phase)
ERROR:#REF!

Bid Schedule

CUI
TOTAL MATERIAL COSTS$0.00

TOTAL LABOR COSTS $ 0.00

TOTAL OTHER DIRECT COSTS $ 0.00

TOTAL DIRECT COSTS $ 0.00

OVERHEAD % $ 0.00

SUBTOTAL $ 0.00

PROFIT % $ 0.00

SUBTOTAL $ 0.00

TOTAL PRICE $ 0.00