Attachment 4 - Bid Schedule O and M Base Paint.xlsx
XLSX spreadsheet 20 KB Posted
- Attached to
- Basewide Paint, FY23 Travis AFB, CA - AMENDED V2 Federal contract opportunity
- Solicitation number
- FA442723R0009
About this file
This document contains a bid schedule template for a basewide painting contract at Travis Air Force Base in California. The bid schedule includes line items for rubber removal, waste hauling and disposal, friction testing of runways, equipment rentals, labor costs for superintendents, project managers, and laborers, as well as costs for airfield painting, striping, storage tanks, signage, barricades, and biologist services. Pricing is provided for material costs, labor costs, other direct costs, overhead, profit, and total proposed contract price.
The related federal contract opportunity is a solicitation from the Air Force Air Mobility Command to provide basewide painting services at Travis Air Force Base for fiscal year 2023. The solicitation number is FA442723R0009 and it has been amended to version two. Responses to the solicitation are due on the specified date. The contract will be awarded to the successful offeror to carry out the painting work required across the base.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation Amendment FA442723R00090002 SF 30.pdf | ||
| Solicitation Amendment FA442723R00090001 SF 30.pdf | ||
| SOW FY23 Base Wide Paint 08-31-2023 Rev2.pdf | ||
| SOW FY23 Base Wide Paint 08-30-2023.pdf | ||
| ALL RFIs - Answered.pdf | ||
| Amendment Memo.pdf | ||
| Solicitation - FA442723R0009.pdf | ||
| Contract Security Clause (2).pdf | ||
| Attachment 5 - Bid Schedule TWCF Base Paint.xlsx | XLSX spreadsheet | |
| SECTION 01 56 00_Environmental Specifications April 2019.pdf | ||
| SECTION 01 03 00 PROJECT CLOSEOUT AUG 13.pdf | ||
| SOW FY23 Base Wide Paint 07-21-2023.pdf | ||
| Attachment 6 - Bid Schedule Pickleball.xlsx | XLSX spreadsheet | |
| SECTION 01000 Mar 2019.pdf | ||
| wage determination.pdf | ||
| Travis Facilities Excellence Guide.pdf |
Show all 16
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
P1
IGE- XDAT 21-1000
| 60 CES | FOUO | |
| TRAVIS AFB, CA | ||
| FY21 Rubber Removal Base | PROPOSED CONTRACT PRICE | $ - 0 |
| Ph I: Oct 2020 |
| MATERIAL COST | LABOR COSTS | |||||||||
| UNIT | OTHER | |||||||||
| LINE | ITEM | OF | QUANTITY | UNIT | TOTAL | MANHOURS | AVERAGE | TOTAL | DIRECT | LINE |
| NO | MEASURE | RATE | COSTS | TOTAL |
| (1) | (2) | (3) | (4) | (5) | (6) | (7) | (8) | (9) | (10) | ||
| 1 | Rubber removal excluding hauling, 4-6 passes (RSMEANS 02 41 13.30 6850) | MSF | |||||||||
| 2 | Waste (water) hauling (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) | Mile | |||||||||
| 3 | Waste (water) disposal turnkey (non-contaminated/non-hazardous) | gal | |||||||||
| 4 | Waste (solid) disposal turnkey (non-contaminated/non-hazardous) | Mile | |||||||||
| 5 | Waste (solid) disposal (non-contaminated/non-hazardous) 2 Truck loads (RSMEANS 02 81 20.10 1270) 20yd | ea | |||||||||
| 6 | Friction Test, 40 and 60 MPH, pre and post tests | each | |||||||||
| 7 | Mobilization | LS | |||||||||
| 8 | Pavement Sweeper rental, 8 days, (8HR DAY/4ot, 8 hr/NITE/4OT) | WK | |||||||||
| 9 | Superintendent | hr | |||||||||
| 10 | PM | hr | |||||||||
| 11 | Laborers | hr | |||||||||
| 12 | Paint Removal (airfield, waterblast) (RSMEANS 32 17 23.13 1400) | SF | |||||||||
| 13 | Airfield Striping with reflective Beads (12 lbs/100 SF) (RSMeans 32 17 23.13 1210) | SF | restripe |
+ no bead
| 14 | Airfield Striping (no beads) (RSMeans 32 17 23.13 1200) | SF | ERROR:#REF! |
| 15 | Storage tank (water waster) Rental, 21K gallon | ls |
| 16 | Runway signs UFC 3-535-01 | ea | |
| 17 | Dumpter (solid waste) rental, 20 CY capacity | ea | |
| 18 | Barricade Rental (30 ea) | week | |
| 19 | Lighted X's (2 each) | week | ERROR:#REF! |
| 20 | Biologist | hr | ERROR:#REF! |
| ERROR:#REF! | |||
| Total (for 1 phase) | |||
| ERROR:#REF! |
Bid Schedule
| CUI | |||
| TOTAL MATERIAL COSTS | $ | 0.00 |
TOTAL LABOR COSTS $ 0.00
TOTAL OTHER DIRECT COSTS $ 0.00
TOTAL DIRECT COSTS $ 0.00
OVERHEAD % $ 0.00
SUBTOTAL $ 0.00
PROFIT % $ 0.00
SUBTOTAL $ 0.00
Bond % $ 0.00
TOTAL PRICE $ 0.00