This Statement of Work (SOW) details the installation of 183 GE 6,000 BTU Electronic Window Air Conditioner Units for Assault Craft Unit Five (ACU-5) at Marine Corps Base Camp Pendleton. The project involves installing air conditioning units across two barracks buildings, with 87 units in Building #1 and 96 units in Building #2, requiring specific accompanying materials such as plexiglass inserts, weather stripping, mounting brackets, extension cords, screws, silicone, and foil tape.
The solicitation (N0024425QS055) is a small business set-aside competition under NAICS code 333415 with a 1,250 employee size standard. The contract requires a 30-day performance period following award, with installation to be completed at Donald Cook Road, Building 31940 at Camp Pendleton. The contractor will be escorted by ACU-5 Galley personnel while on the military installation, and payment will be processed through the Wide Area Workflow (WAWF) system. No security clearance is required for personnel performing the installation.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WD 2015-5635.txt | TXT text file | |
| Combined Synopsis Solicitation N00244-25-Q-S055_Amend 05.pdf | ||
| SOW_Amend 04.docx | DOCX document | |
| Combined Synopsis Solicitation N00244-25-Q-S055_Amend 04.pdf | ||
| QA No 3.pdf | ||
| Price List Template for AC Material and Installation_Amend 02.xlsx | XLSX spreadsheet | |
| SOW_Amend 02.docx | DOCX document | |
| QA No 2.pdf | ||
| QA No 1.pdf | ||
| Price List Template for AC Material and Installation.xlsx | XLSX spreadsheet | |
| Combined Synopsis Solicitation N00244-25-Q-S055.pdf |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF WORK (SOW)
Installation of 183 GE 6,000 BTU Electronic Window Air Conditioner Units ASSAULT CRAFT UNIT FIVE Barracks room (ACU-5)
1. PURPOSE: ACU-5 requires installation of 183 GE 6,000 BTU Electronic Window Air Conditioner between two barracks building rooms for health and conform of the crew located at MCB Camp Pendleton.
2. SCOPE: This requirement is to fulfill crew needs during warm weather and summer season. Currently there is no air conditioning units being used nor installed in any of the rooms occupied by ACU-5 crew members at the barracks. NO structural modification required, both PWD at Marine Corps Base and NAVFAC concur and authorized to proceed with the installation. See attached memorandum.
2.1 The contractor shall provide parts and installation of 183 AC units and listed parts below. Required parts must be EQUAL or SAME and compatible with GE 6,000 BTU Electronic Window Air Conditioner model# AHW06LZ.
Building# 1 (87 units)
| Item |
| Nomenclature |
| Part No. |
| QTY |
| Unit |
| 1 |
| Plexiglass Insert 26x27.5 inches Generic Clear .13 inches Acrylic |
| 87 |
| Each |
| 2 |
| Weather Stripping Insulation |
| 00810083557397 |
| 87 |
| Each |
| 3 |
| AC Mounting Bracket |
| DA-080 |
| 87 |
| Each |
| 4 |
| Extension Cord |
| B0D4TNCJ5K |
| 87 |
| Each |
| 5 |
| (5) Tapcon screws per unit |
| 24525 |
| 435 |
| Each |
| 6 |
| (5) 1/2" self-tapping screws per install |
| 21308 |
| 435 |
| Each |
| 7 |
| Silicone (1/8 of tube per install) |
| 317778410 |
| 87 |
| Each |
| 8 |
| Foil tape per install |
| 317579705 |
| 87 |
| Each |
| 9 |
| INSTALLATION OF MATERIAL AND A/C UNITS |
| 87 |
| Each |
Building# 2 (96 units)
| Item |
| Nomenclature |
| Part No. |
| QTY |
| Unit |
| 1 |
| Plexiglass Insert 26x27.5 inches Generic Clear .13 inches Acrylic |
| 96 |
| Each |
| 2 |
| Weather Stripping Insulation |
| 00810083557397 |
| 96 |
| Each |
| 3 |
| AC Mounting Bracket |
| DA-080 |
| 96 |
| Each |
| 4 |
| Extension Cord |
| B0D4TNCJ5K |
| 96 |
| Each |
| 5 |
| (5) Tapcon screws per unit |
| 24525 |
| 480 |
| Each |
| 6 |
| (5) 1/2" self-tapping screws per install |
| 21308 |
| 480 |
| Each |
| 7 |
| Silicone (1/8 of tube per install) |
| 317778410 |
| 96 |
| Each |
| 8 |
| Foil tape per install |
| 317579705 |
| 96 |
| Each |
| 9 |
| INSTALLATION OF MATERIAL AND A/C UNITS |
| 96 |
| Each |
2.2 Contractor MUST prestart AC units and clean-up after completing installation.
3. PERIOD OF PERFORMANCE: 30 DAYS after contract award
4. PLACE OF PERFORMANCE: Place of performance will be at Assault Craft Unit FIVE, Donald Cook Road, Bldg. 31940 Camp Pendleton, Oceanside, CA 92055.
5. Compliance and Standards.
5.1 Items requested must be the SAME or EQUAL based on minimum specifications due to exact measurements of existing windows.
5.2 While on military installation, the Contractor shall be subject to monitoring and inspection, but under no circumstances shall such personnel be deemed employees or agents of the government.
6. Security.
Personnel performing this task do not require a security clearance.
ACU-5 Galley personnel will provide escorts on base for Contractor during and while delivering equipment and working at ACU-5.
7. Invoicing and payment.
Payment will be processed via WAWF system.
WAWF Acceptor: Provided at time of Award.
Telephone number:
WAWF Certifier:
Email address:
File details come from the government source that posted it. Updated .