QA No 2.pdf
PDF 313 KB Posted
- Solicitation number
- N0024425QS055
About this file
This document is a Questions and Answers (Q&A) file for a federal solicitation to install 183 window air conditioning units. The solicitation (N0024425QS055) is a Small Business Set-Aside for the Department of the Navy, covering the installation of 183 GE 6,000 BTU Electronic Window Air Conditioner units (model AHW06LZ) across two buildings with three floors. The quote due date has been extended to July 23, 2025, at 10:00 AM Pacific Standard Time. The customer (ACU-5) will provide the A/C units, and the contractor is responsible for supplying additional installation materials like Plexiglas, weather stripping insulation, and extension cords. The NAICS code is 333415 with a size standard of 1,250 employees, and the solicitation involves materials and installation for 87 units in one building and 96 units in another.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| WD 2015-5635.txt | TXT text file | |
| Combined Synopsis Solicitation N00244-25-Q-S055_Amend 05.pdf | ||
| SOW_Amend 04.docx | DOCX document | |
| Combined Synopsis Solicitation N00244-25-Q-S055_Amend 04.pdf | ||
| QA No 3.pdf | ||
| Price List Template for AC Material and Installation_Amend 02.xlsx | XLSX spreadsheet | |
| SOW_Amend 02.docx | DOCX document | |
| QA No 1.pdf | ||
| Combined Synopsis Solicitation N00244-25-Q-S055.pdf | ||
| SOW.docx | DOCX document | |
| Price List Template for AC Material and Installation.xlsx | XLSX spreadsheet |
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Q&A # 2 Dated 07/21/2025
1. Will the A/C’s be provided by the customer?
The A/Cs will be provided by the customer. The vendors do not need to provide the A/C units. They are currently at the customer warehouse and will be delivered to the barracks by the customer. The contractor is supplying the materials listed on the price schedule and performing the installation only.
2. The Plexiglas listed as item 1 in the SOW and Price List for building 2 do not match.
Can you clarify?
Item 1 in Building 2 of the SOW has been corrected. Size is 30.250“X 40.500. An additional description has been added to items 2 and 4 as well.
Q&A #1 Dated 07/18/2025
1. Do you have pictures of the AC unit Set-Up?
Here they are:
And these are the A/C units that will need the installation:
2. Can you extend this for another 5 days?
We will extend this to close on Wednesday July 23, 2025 at 10:00 AM Pacific Standard Time.
Additional Information:
There are 2 building side by side in which these will be installed. One building requires 87 units and the other 96 for a total of 183 units.
The buildings have a total of 3 floors.
The customer (ACU-5) will deliver these AC units to the barracks.