SOW BAK-12 Clutch Repair Kits_23-Jan-26.pdf
PDF 177 KB Posted
- Attached to
- Clutch Repair Kits
- Solicitation number
- FA481926Q0001
About this file
Summary
This is a Statement of Work for the Air Force Civil Engineering Center (AFCEC/COMX) at Tyndall AFB, Florida, requiring the contractor to furnish 60 new Barrier Arresting Kit (BAK)-12 Clutch Repair Kits. The contractor must supply all required parts, equipment, material, freight, and labor in accordance with applicable codes, specifications, and federal/industry standards. Each assembly consists of a Parts Kit, Clutch (NSN 3010-01-490-6666, P/N 200037000-1) and must meet specifications outlined in eight attached technical drawings covering the repair kit assembly, backing plate, pressure plate, stator plate, rotor plate assembly, rotor core, friction pad, and rivet components. The contractor must provide revised drawings consolidating any discrepancies, subject to AFCEC/COMX approval prior to work initiation, with approved drawings becoming Air Force property.
Prior to production, contractors must either possess current FAT (First Article Testing) approval from the Air Force Life Cycle Management Center (AFLCMC) and have delivered production units within the last three years, or successfully complete the FAT process. FAT requirements include submitting PDF drawings within 60 days of contract award (government review within 15 days), delivering the first article within 180 days of government drawing review, and obtaining approval no later than 285 calendar days after contract award. The contractor must adhere to strict specifications per ASME standards Y14.1 and Y14.5, fabricate precision parts using water jet or laser cutting systems, and comply with American Welding Society (AWS) D1.1 standards with certified welders and inspectors. The government will conduct form, fit, function, and configuration conformity checks within 30 days of first article receipt. The contractor assumes all costs for third-party verification if deficiencies are identified and is responsible for all correction and freight expenses. Delivery must be coordinated 30 days in advance to AFCEC/COMX at Tyndall AFB, Florida, with rejection authority given to AFCEC/COMX for any items with structural, component, or excessive paint damage.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
23 January 2026
AFCEC/ COMX
Barrier Arresting Kit (BAK) -12 Clutch Repair Kits
Statement of Work
1. PURPOSE: The contractor shall furnish all required parts, equipment, material, freight, and labor to provide the following items in accordance with all applicable codes, specifications, and industry/federal standards to CEMIRT, AFCEC/COMX at Tyndall AFB, Florida.
2. SCOPE OF WORK: Prior to production of the required 60 each clutch repair kits; the contractor shall meet the requirements of either paragraph 2.1. or paragraph 2.2 of this Statement of Work. The contractor shall conform with all requirements of this Statement of Work, applicable codes, specifications, industry standards, and federal standards. The contractor is responsible for providing all required equipment, material, labor, and parts required.
2.1 The offeror shall possess FAT approval from the Air Force Life Cycle Management Center (AFLCMC) as an authorized vendor to source, produce, and supply the fairlead beams, and have successfully delivered production units within the last three (3) years of the solicitation issuance date; or
2.2 Successfully complete the First Article Testing (FAT) requirements in accordance with the requirements of paragraph 4 of this Statement of Work, FAR clause 52.209-4 First Article Approval-Government Testing, and:
2.2.1 Adhere to the strict specifications, tolerances, codes, standards, and notes within USAF drawings (reference paragraph 3 of this Statement of Work)
2.2.2 Produce computer-aided design (CAD) drawings and comply with documentation practices per American Society of Mechanical Engineers (ASME) standard Y14.1, unless otherwise noted by AFCEC/COMX
2.2.3 Have all necessary tools, equipment, personnel, facilities, etc. to produce or acquisition parts, components, or hardware associated with fairlead beams.
2.2.4 Fabricate or acquisition parts, components, or hardware to specific dimensions and tolerances per ASME Y14.5
2.2.5 Fabricate or acquisition precision parts from large sheets of steel material with a water jet or laser cutting system. These parts will not be cut utilizing free hand methods.
2.2.6 Follow welding and inspection processes in accordance with American Welding Society (AWS) D1.1 for critically loaded structures. Additionally, welders and inspectors shall be certified in accordance with AWS D1.1.
3. TECHNICAL REQUIREMENTS: The detailed work required is to provide 60 new BAK- 12 Clutch Repair Kits. Each assembly must meet the specifications and notes within the following (attached) drawings and will not include any refurbished parts:
3.1 Parts Kit, Clutch
3.1.1 NATIONAL STOCK NUMBER (NSN): 3010-01-490-6666
3.1.2 PART NUMBER (P/N): 200037000-1
3.1.3 QUANTITY: 60 each
3.1.4 DRAWINGS: eight (8) attachments
3.1.5 Repair Kit, Clutch Drawing #: 200037000
3.1.6 Backing Plate, BAK-12 Clutch, Drawing #: 200037001
3.1.7 Pressure Plate, BAK-12 Clutch, Drawing #: 200037002
3.1.8 Stator Plate, BAK-12 Clutch, Drawing #: 200037003
3.1.9 Rotor Plate Assembly, Drawing #: 2000037004
3.1.10 Rotor Core, Drawing #: 200037005
3.1.11 Friction Pad, Drawing #: 200037006
3.1.12 Rivet, Drawing #: 200037007
3.2 Provide revised drawings that consolidate and fix any discrepancies.
3.3 Drawings must be approved by AFCEC/COMX prior to starting any work.
3.4 Upon approval of the drawing package, the drawings will become Air Force property.
The drawings will be used by the sole discretion of the Air Force and AFCEC/COMX.
4. FIRST ARTICLE TESTING (FAT):
4.1 Completion of the FAT process shall be required for any contactor that:
a. Does not possess FAT approval; and
b. Has not delivered production unit(s) within the last 3 years of the solicitation issuance date.
4.2 The first article shall be in accordance with the scope of work, and all applicable drawings, technical specifications, engineering and special instructions.
4.3 The FAT process shall be coordinated through AFCEC/COMX to meet the form, fit, function, and configuration conformity requirements. FAT Approval shall be obtained no later than 285 calendar days after contract award.
4.4 The contractor shall submit PDF file drawings to AFCEC/COMX within 60 calendar days after contract award. The government review will be completed within 15 calendar days of receipt of a complete drawing submission.
4.5 Contractor submission of the first article for the form, fit, function, and configuration conformity check in accordance with the following:
4.5.1 Contractor shall be responsible for delivering the first article to the address below, clearly marked with “First Article Test Exhibit” no later than 180 calendar days after receipt of government drawing review.
4.5.2 The first article will be considered “submitted” to the government on the date it arrives at AFCEC/COMX, Tyndall AFB, FL.
4.5.3 The contractor shall submit a copy of all applicable drawings, specifications, engineering instructions, certifications, and inspection sheets.
4.5.4 AFCEC/COMX will not accept any third-party results initiated, provided, or completed externally to the government. (except for para 4.6.1.1 and 4.6.1.2)
4.5.5 In the event the contractor submits the first article prior to 180-day suspense after receipt of Government drawing review, the contractor may use the remaining time to correct any deficiencies (if required) noted during the FAT.
4.6 Upon Government receipt of the initial first article, AFCEC/COMX will perform the form, fit, function, and configuration conformity check within 30 calendar days to verify all operational and configuration aspects of the first article.
4.6.1 In the event that the initial first article has deficiencies; the contractor shall assume responsibility for all costs associated with required third party verification to be conducted at the government designated facility. Government approval of the third party utilized must be obtained prior to the conduct of any third-party lab verification of all characteristics of items to include dimensions, materials, welds, hardware, and components. Upon receipt of the third party verification data, the Government will perform visual inspection, inspection of material certifications, inspection of welder’s certifications, and inspection of shipment invoices.
4.6.1.2 If the contractor fails any verification inspection, the contractor shall be responsible for all expenses associated with correcting the first article deficiencies, and any additional third-party verification inspections required to be conducted at the government designated facility, to include freight to/from Tyndall AFB, FL and the contractor’s facility.
4.6.1.3 AFCEC/COMX shall coordinate with the LSE Air Force Aircraft Arresting System Engineer to obtain rejection, conditional approval, or approval of the first article and must provide this documentation to the contracting officer.
4.7 The approved and conditionally approved first article shall be retained by the government for use. Retention of this item will qualify as the first production item.
5.0 DELIVERY/SHIPPING REQUIREMENTS
5.1 The contractor shall coordinate with the POCs below 30 days prior to delivery and will utilize the following address:
AFCEC/COMX
1001 Mississippi Rd; Bldg. 1141 Tyndall AFB, FL 32403
5.2 Any Heavy Weight Fairlead Beam Assembly with structural, component, or excessive paint damage received during shipment will be refused. AFCEC/COMX is the authority to refuse equipment but will provide documentation to the contracting officer.
mailto:jason.frigon.2@us.af.mil mailto:gary.szekely.2@us.af.mil mailto:grant.kincaid.2@us.af.mil
File details come from the government source that posted it. Updated .