This is a blank Contractor Production Report form template to be used for daily reporting on the Building 29 Fire Alarm & Mass Notification System repair project. The form requires contractors to document daily work activities, weather conditions, labor hours by trade, safety meetings, accidents, equipment usage, and materials received. Key sections include spaces to record work performed, job safety information, cumulative work hours, equipment/material deliveries, and construction equipment utilized. The form also tracks whether any hazardous materials were released or if specialized work (crane, scaffolding, etc.) was performed. This is purely a reporting template and does not contain any specific project requirements or scope details.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
| CONTRACT NO |
| TITLE AND LOCATION |
REPORT NO
BLDG 29 FIRE ALARM & MASS NOTIFICATION SYSTEM (FA&MNS) REPAIR
CONTRACTOR
SUPERINTENDENT
AM WEATHER
PM WEATHER
| MAX TEMP (F) |
| MIN TEMP (F) |
WORK PERFORMED TODAY
Schedule Activity No.
| WORK LOCATION AND DESCRIPTION |
| EMPLOYER |
| NUMBER |
| TRADE |
| HRS |
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
| |_| YES |
| |_| NO |
| TOTAL WORK HOURS ON JOB SITE, |
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
| |_| YES |
| |_| NO |
| CUMULATIVE TOTAL OF WORK |
HOURS FROM PREVIOUS REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.)
| |_| YES |
| |_| NO |
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.)
| |_| YES |
| |_| NO |
Schedule Activity No.
| LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED |
| |_| |
| SAFETY REQUIREMENTS HAVE BEEN MET. |
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Schedule Activity No.
| Submittal # |
| Description of Equipment/Material Received |
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule Activity No.
| Owner |
| Description of Construction Equipment Used Today (incl Make and Model) |
| Hours Used |
Schedule Activity No.
REMARKS
| CONTRACTOR/SUPERINTENDENT |
| DATE |
SOW Attachment 9 Contractor Production Report Form
BLDG 29 FIRE ALARM & MASS NOTIFICATION SYSTEM (FA&MNS) REPAIR
Sheet 1 of 1