About this file
This is an Insulation Resistance Test Report template (SOW Attachment 13) for a Fire Alarm & Mass Notification System repair project in Building 29. The document outlines the testing procedures and requirements for low voltage cable installation checkout (Stage 2), with test number CTF-S2F-FE-1-8.
The report includes specific requirements for insulation resistance testing at 1000 VDC on individual conductors, with minimum acceptance criteria of 100 Megohm for new cables and 2 Megohm for previously installed in-service cables per ANSI/NETA standards. The document contains a detailed inspection checklist covering cable verification, labeling, grounding, connections, and sealing methods. It includes a nomograph for correcting insulation resistance values to 25°C and requires recording of ambient temperature and relative humidity during testing. The report is part of quality control documentation for the installation of a fire alarm system, requiring sign-off by a test engineer and documentation of any discrepancies or observations.
View the file
Other files
Show all 17
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
neal.j.moran Text Box SOW Attachment 13 Insulation Resistance Test Report
BLDG 29 FIRE ALARM & MASS NOTIFICATION SYSTEM (FA&MNS) REPAIR
SOW Attachment 13 Insulation Resistance Test Report
SOW Attachment 13 Insulation Resistance Test Report
SOW Attachment 13 Insulation Resistance Test Report
File details come from the government source that posted it. Updated .