SOW Attachment 4 - EHRM Iron Mountain Floor Layout Combined Set.pdf
PDF 2 MB Posted
- Solicitation number
- 36C77621R0017
About this file
This document provides details for a federal contract opportunity to provide Architect-Engineering services for infrastructure upgrades at the Oscar G. Johnson VA Medical Center in Iron Mountain, Michigan. The scope of work includes upgrades to electrical systems, IT infrastructure, HVAC, and physical security to support a new Electronic Health Record Modernization system. Firms must submit SF-330 qualifications statements by December 23, 2020. A two-phase evaluation process will first shortlist firms based on SF-330 reviews, then invite written responses for final selection. The anticipated period of performance for design is 182 calendar days with options for construction period services. The project value is set at $8,077,375. This is a 100% set-aside for Service-Disabled Veteran-Owned Small Businesses.
View the file
Other files
Show all 13
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHAIRODemeuD Polygonal Line
VHAIRODemeuD Callout Option A: Move to B084 Option B: Tie data into new CLC TR. OIT will need to confirm if possible
VHAIRODemeuD Callout Size is adequate
VHAIRODemeuD
Expand existing
VHAIRODemeuD
Expand existing TR
VHAIRODemeuD
Size is adequate
VHAIRODemeuD Callout Size is adequate
VHAIRODemeuD
Size is adequate
VHAIRODemeuD Callout Relocate
VHAIRODemeuD Polygonal Line
VHAIRODemeuD
VHAIRODemeuD Callout Expand existing
VHAIRODemeuD Polygonal Line
VHAIRODemeuD Callout Relocate
Size is adequate
VHAIRODemeuD Polygonal Line
VHAIRODemeuD
VHAIRODemeuD Callout Expand existing
VHAIRODemeuD Polygonal Line
VHAIRODemeuD
VHAIRODemeuD
Build new TR in basement
Building 4
Polygonal Line
VHAIRODemeuD
Build new room in Bldg.4 Basement
VHAIRODemeuD
Relocate
N
NO INDUSTRY - MEDIA - OR PUBLIC RELEASE.
Warning: This document is FOR OFFICIAL USE ONLY. TOTAL AREA: 2,306FT2
AutoCAD SHX Text
CHILLERS 1-4XFMR
AutoCAD SHX Text 095-00
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text
CHILLERS
AutoCAD SHX Text
SERV ENT
AutoCAD SHX Text 116-00
AutoCAD SHX Text
CHILLERS 1-4 HVL SW 123-00
AutoCAD SHX Text
CHILLERS 5-8XFMR
AutoCAD SHX Text 096-00
AutoCAD SHX Text
BLDG 1
AutoCAD SHX Text
CHILLERS
AutoCAD SHX Text
SERV ENT
AutoCAD SHX Text 116-00
AutoCAD SHX Text
CHILLERS 5-8HVL SW 124-00
AutoCAD SHX Text
13.8 KV FIELD DISTRIBUTION SUBSTATION
AutoCAD SHX Text
CHILLER BLDG. NORM/EMER. SWBD
AutoCAD SHX Text Medical Center
AutoCAD SHX Text Oscar G. Johnson
AutoCAD SHX Text Iron Mountain, MI 49801
AutoCAD SHX Text 325 East "H" Street
AutoCAD SHX Text
PROJECT TITLE:
AutoCAD SHX Text
VA MEDICAL CENTER
AutoCAD SHX Text
IRON MOUNTAIN, MICHIGAN
AutoCAD SHX Text
SHT: OF:
AutoCAD SHX Text Office of Facilities
AutoCAD SHX Text
REVISIONS
AutoCAD SHX Text
DATE
AutoCAD SHX Text
DRAWING TITLE:
AutoCAD SHX Text
DRAWING #:
AutoCAD SHX Text
CONTRACT NUMBER:
AutoCAD SHX Text
CLIENT PROJECT #:
AutoCAD SHX Text
BUILDING NUMBER:
AutoCAD SHX Text
AUTOCAD NAME:
AutoCAD SHX Text
DESIGNED BY:
AutoCAD SHX Text
DRAWN BY:
AutoCAD SHX Text
CHECKED BY:
AutoCAD SHX Text
DATE:
AutoCAD SHX Text
SCALE:
AutoCAD SHX Text
LOCATION:
AutoCAD SHX Text
M. SEDA
AutoCAD SHX Text
NTS
AutoCAD SHX Text
M. SEDA
AutoCAD SHX Text
11AUG17
AutoCAD SHX Text Dept. of Veterans Affairs
AutoCAD SHX Text
ONE
AutoCAD SHX Text Bldg.#11.DWG
AutoCAD SHX Text
RECORD DWGS
AutoCAD SHX Text
BLDG. #11
VHAIRODemeuD
Remove existing cabinet and tie connections to Bldg. 1 Basement TR room
| EHRM Space Planning Bldg. #1 Floor Plans |
| SUB-BASEMENT 11Nov19 |
| 1st FLOOR WEST 11NOV19 |
| 1st FLOOR EAST 11NOV19 |
| 2nd FLOOR 11NOV19 |
| 3rd FLOOR 11NOV19 |
| 4th FLOOR 11NOV19 |
| 6th FLOOR 11NOV19 |
| 7th FLOOR 11Nov19 |
| 8th FLOOR 11Nov19 |
| EHRM Bldg#2 |
| EHRM Bldg.#4 |
| EHRM Bldg#6 |
| Bldg#6 Basement_02Jul19 |
| Bldg#6 First Floor_02Jul19 |
| Bldg#6 Second Floor_02Jul19 |
| EHRM Bldg #11 |
| Sheets and Views |
| 8th FLOOR 11AUG17-12x18 |
| EHRM Space Planning CBOC's Floor Plans |
| CBOC's Floor Plans 21May20 |
| CBOC's Floor Plans 27Jul17 |
| CBOC's Floor Plans 28Apr16 |
| CBOC's Floor Plans 30Aug13 |
| Ironwood 15Sep14 |
Menominee 28Apr16
| Marquette CBOC_12Jul20 |
| Rhinelander CBOC_03Aug20 |
EHRM Gladstone Superior Ave Floorplan Pic
File details come from the government source that posted it. Updated .