SOW Attachment 15 - Salt Lake City MCR Design.pdf
PDF 5 MB Posted
- Solicitation number
- 36C77623R0032
About this file
This pre-solicitation notice seeks statements of qualifications from architecture and engineering firms for a design contract related to data center infrastructure upgrades at the George E. Wahlen VA Medical Center in Salt Lake City, Utah. The project involves constructing a replacement data center in the location of the current T1 and T2 structures and includes networking backbone fiber optics, structured cabling, electrical distribution upgrades, UPS systems, electrical bonding, HVAC, telecommunications room renovations, data center reconfiguration, and security upgrades. The 100% set-aside contract will be a firm-fixed-price award with a performance period of 210 calendar days from notice to proceed. The government estimates the construction cost at $8.75 million. Statements of qualifications are due by 4:00 PM Eastern time on specified date. Firms will be evaluated on their experience with IT infrastructure projects, network design, scheduling, and construction period services. The primary awardee will participate in negotiations and be authorized a site visit.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
PROJECT:
DRAWING No:
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
COVER
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 1 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
COVER
Enterprise Data Center
EngineeringMAIN COMPUTER ROOM TELECOMMUNICATIONS SPACE DESIGN
GEORGE E. WAHLEN VAMC
SALT LAKE CITY, UT
DEVELOPED BY:
DATA CENTER AND INFRASTRUCTURE ENGINEERING
DATA CENTER ENGINEERING
SOLUTION DELIVERY
OFFICE OF INFORMATION & TECHNOLOGY
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
REVISION SHEET
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 2 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
REVISION SHEET
Enterprise Data Center
Engineering
REV. DESCRIPTION DATE BY
.1 Draft – DCIE Internal Use Only 03/24/21 DCIE
1.0 First Release Version 04/13/20 DCIE
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
LEGEND
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 3 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
LEGEND
Enterprise Data Center
Engineering
LEGEND NOTES
ELECTRICAL
AIR CONDITIONER THERMOSTAT
FLOOR TO CEILING HEIGHT:
1. TELECOMMUNICATION ROOMS INCLUDING NETWORK
SUPPORT CENTERS: MAXIMUM EXTENT POSSIBLE
2. DATA CENTERS EXCLUDING EXTRA SMALL NETWORK SUPPORT
CENTERS: MINIMUM 16 FT SLAB TO DECK ABOVE
MECHANICAL
FLOOR COMPOSITION:
1. STATIC DISSIPATING FLOOR TILE OR COATING
2. CONCRETE SLAB 5" THICKNESS AT GROUND
3. STEEL DECK AND FILL FOR FLOORS ABOVE GROUND
4. AVOID ACCESS FLOOR PLENUMS FOR AIR DISTRIBUTION
PURPOSES
WALLS: FULL HEIGHT TO DECK ABOVE FOR ALL TELECOMMUNICATION
SPACES
CEILINGS: NO SUSPENDED CEILINGS ALLOWED
DATA CENTER SIZE ALLOCATION PER CHART BELOW:
CONTACT DATA CENTER AND INFRASTRUCTURE ENGINEERING
(VAITESEDATACENTERENGINEERING2@VA.GOV) TO DETERMINE WHAT
SIZE DATA CENTER IS REQUIRED FOR YOUR FACILITY.
SECONDARY BONDING BUSBAR PLACEMENT DETERMINED BY
OTHERS
PRIMARY BONDING BUSBAR PLACEMENT DETERMINED BY
OTHERS
MINIMUM QTY TWO 110 V 20 A CONVENIENCE POWER
OUTLETS PER WALL; PLACEMENT DETERMINED BY OTHERS 1
30 AMP 208 VOLT THREE-PHASE TWIST LOCK RECEPTACLE (L21-
30R); 8.5 FT AFF {WYE (5-WIRE)} COORDINATE INSTALLATION
LOCATION WITH TELECOMMUNICATIONS CONTRACTOR
20 AMP 208 VOLT THREE-PHASE TWIST LOCK RECEPTACLE (L21-
20R); 8.5 FT AFF {WYE (5-WIRE)} COORDINATE INSTALLATION
LOCATION WITH TELECOMMUNICATIONS CONTRACTOR
SERVICE PANEL FOR B-SIDE POWER, GENERATOR BACKED IF
POSSIBLE. SHALL BE EQUIPPED WITH POWER METER;
PLACEMENT PER OTHERS
SERVICE PANEL FOR A-SIDE POWER, GENERATOR BACKED IF
THE FACILITY HAS GENERATION CAPABILITIES. SHALL BE
EQUIPPED WITH POWER METER; PLACEMENT PER OTHERS
1. LED LIGHTING PLACED IN AISLES DIRECTLY IN FRONT OF
AND BEHIND CABINET ROWS
2. LIGHTING OPERATED BY MOTION SENSOR PER CABINET
ROW OR SECTION
3. 500 LUMENS IN THE HORIZONTAL PLANE AND 200
LUMENS IN THE VERTICAL PLANE REQUIRED MEASURED AT
3 FT AFF IN FRONT OF AND BEHIND EQUIPMENT CABINETS
POWER BUS BAR (VOLTAGE AND AMPERAGE TO SUPPORT
ADEQUATE SINGLE & DOUBLE BREAKER 208V, 20 AMP, L21-20R
BUSWAY TAPS PER SERVER ROW) FED FROM A-SIDE SOURCE
POWER BUS BAR (VOLTAGE AND AMPERAGE TO SUPPORT
ADEQUATE SINGLE & DOUBLE BREAKER 208V, 20 AMP, L21-20R
BUSWAY TAPS PER SERVER ROW) FED FROM B-SIDE SOURCE
POWER BUS BAR (VOLTAGE AND AMPERAGE SUFFICIENT TO
SUPPORT ADEQUATE SINGLE BREAKER 208V, 20 AMP, L21-20R
BUSWAY TAPS PER NETWORK ROW) FED FROM A-SIDE SOURCE
POWER BUS BAR (VOLTAGE AND AMPERAGE SUFFICIENT TO
SUPPORT ADEQUATE 208V, 20 AMP, L21-20R BUSWAY TAPS
PER NETWORK ROW) FED FROM B-SIDE SOURCE
BLUE CABLE PATH FOR A-SIDE UPS12
YELLOW CABLE PATH FOR B-SIDE UPS13
LIGHTING:
TELECOMMUNICATIONS
40" NETWORK CABINET WITH HORIZONTAL CABLE CUTOUTS
AND APPROPRIATE CABLE MANAGEMENT ACCESSORIES,
SUPPORTING 5KW REDUNDANT
1 SERVICE PROVIDER ENTRANCE POINT
SERVICE BACKBONE - ENTRANCE ROOM-MAIN COMPUTER
ROOM (MCR) WITH DUAL REDUNDANT PATHWAYS
MAIN CROSS CONNECT (CAMPUS/BUILDING DISTRIBUTOR) –
BACKBONE CABLING (MCR-TELECOMMUNCIATIONS ROOMS)
ENTRANCE ROOM INTERCONNECT
HORIZONTAL DISTRIBUTION TO WORK AREA OUTLETS
(WAO)
ADDITIONAL CABINETS OR TELECOMMUNICATIONS RACKS
TO MEET REQUIREMENTS.
7 HORIZONTAL DISTRIBUTION AREA (HDA) – SIDE A
8 HORIZONTAL DISTRIBUTION AREA – SIDE B
9 MAIN DISTRIBUTION AREA (MDA) – SIDE A
10 MAIN DISTRIBUTION AREA – SIDE B
STANDARD-DENSITY (SD) CABINET SUPPORTING 5KW
REDUNDANT
HIGH-DENSITY (HD) CABINET SUPPORTING 10KW
REDUNDANT. 12+ SUPPORTS ~15KW
WIRE MESH CABLE TRAY MINIMUM OF 4" X 12" WITH SECOND
LEVEL OF FIBER CHANNEL PATHWAY (4" X 4")
15 BLUE CABLE TRAY PATH FOR CABLES TO THE A-SIDE MDA/HDA
YELLOW CABLE TRAY PATH FOR CABLES TO THE B-SIDE MDA/
HDA
17 NETWORK CHANNEL RACK
ELECTRICAL
TYP
DETAIL NUMBER
TYPICAL THROUGHOUT THIS
SHEET
BONDING BUSBAR
ARCHITECTURAL
TELECOMMUNICATIONS
DETAIL NUMBER#
TYP
TYP
DETAIL NUMBER
DETAIL NUMBER
TYPICAL THROUGHOUT THIS SHEET
MECHANICAL
COLD AISLE CONTAINMENT PVC CURTAIN
WIRE MESH CABLE TRAY SIZE COMMENSURATE
WITH REQUIREMENTS
SLEEVE WITH BUSHING FIRESTOP AND INNERDUCT FOR
FIBER
CONDUIT WITH BUSHING FIRESTOP AND INNERDUCT FOR
FIBER
SLEEVE OR CONDUIT WITH BUSHING FIRESTOP AND
INNERDUCT FOR FIBER
TELECOMMUNICATIONS CHANNEL RACK, 19" RAILS, #12-24
TAPPED EIA HOLE PATTERN, 30" DEEP CHANNEL MINIMUM,
7' HIGH, 45RU, WHITE
VERTICAL CABLE MANAGER WITH DOOR, 6" WIDE
MINIMUM (SIZED TO MEET REQUIREMENT)
SERVER CABINET, 45U, 24" X 48" (NOMINAL), SQUARE
PUNCHED RAIL, SINGLE PERFORATED FRONT DOOR, SOLID
REAR DOOR (VERTICAL EXHAUST DUCT [VED]
IMPLEMENTATION), DOUBLE PERFORATED REAR DOOR (NO
VED), TWO-POINT KEYED LOCKS, WHITE, SOLID SIDE PANELS
OR
TELECOMMUNICATIONS CABINET, 7' HIGH, 45U, 40" X
48" (NOMINAL), SQUARE PUNCHED RAIL, SINGLE
PERFORATED FRONT DOOR, SOLID REAR DOOR
(VERTICAL EXHAUST DUCT [VED] IMPLEMENTATION),
DOUBLE PERFORATED REAR DOOR (NO VED), TWO-
POINT KEYED LOCKS, WHITE, SOLID SIDE PANELS
OR WIRE MESH CABLE TRAY SIZE COMMENSURATE WITH
REQUIREMENTS
RETURN AIR DUCT
COMPUTER ROOM AIR CONDITIONER (CRAC) (SEE
COMPUTATIONAL FLUID DYNAMICS REQUIRED FOR SIZING)
REQUIRED CLEARANCE AROUND CRACS (SIZE VARIES
DEPENDING UPON CRAC MANUFACTURER)
ELECTRICAL SERVICE PANEL
OVERHEAD POWER DROP CORD WITH L21-20 RECEPTACLE
POWER BUSWAY TAP WITH SINGLE BREAKER 3' DROP
CORD WITH L21-20R FOR STANDARD-DENSITY CABINETS
POWER BUSWAY TAP WITH DUAL BREAKERS AND QTY
TWO 3' DROP CORDS WITH L21-20R FOR HIGH-DENSITY
CABINETS
TYPICAL UNSWITCHED 110 VOLT, 20 AMP DUPLEX
CONVENIENCE OUTLET
AC
SPLIT PACKAGE AIR CONDITIONER OR EQUIVALENT 24/7
SUPPLY AIR TO REJECT 12,000 BTU/H (3.5 KW) PER
TELECOMMUNICATIONS RACK
AC ADDITIONAL SPLIT PACKAGE AIR CONDITIONER AS
REQUIRED
4' BY 8' AC GRADE ¾” TRADE SIZE PLYWOOD BACKBOARD
PAINTED HIGH-GLOSS WHITE WITH TWO COATS OF FIRE
RESISTANT PAINT FOR SERVICE PROVIDER / SECURITY /
VIDEO / ET CETERA
STANDARD 25% OPEN PERFORATED FLOOR TILE
C R
A C
MODULAR UPS CABINET (POWER MODULES, BATTERIES,
POWER PANELS)
MODULAR UPS CABINET (POWER MODULES, BATTERIES,
POWER PANELS)
LED LIGHTINGLED LIGHTING
POWER BUSWAY WITH METERED HEADEND FOR B SIDE
POWER DISTRIBUTION
POWER BUSWAY WITH METERED HEADEND FOR A SIDE
POWER DISTRIBUTION
CC FIXED CAMERA, PAN/TILT/ZOOM, PASSIVE INFRARED
CAMERA - DUAL TECHNOLOGY
PIV ENABLED TWO-FACTOR AUTHENTICATION KEYPAD
M
CEILING MOUNTED MOTION SENSOR (LOCATIONS AS
REQUIRED FOR FULL ROOM COVERAGE)
MOTION SENSOR LIGHT SWITCH
POWER JUNCTION BOX FOR 60A CONNECTIONJ
TT
CHANGES TO DESIGN WILL REQUIRE A NEW COMPUTATIONAL
FLUID DYNAMICS (CFD) ANALYSIS TO BE PERFORMED
FLOORPLANS ARE NOT TO SCALE
DOCUMENTS ARE NOT TO BE USED FOR CONSTRUCTION
ARCHITECTURAL
3 FT WIDE, 8 FT HIGH DOOR, FIRE RESISTANT TO ¾ HOUR
OR MORE PER AUTHORITY HAVING JURISDICTION (AHJ)
6 FT WIDE, 8 FT HIGH DOOR, NO CENTER MULLION, FIRE
RESISTANT TO ¾ HOUR OR MORE PER AHJ
OVERHEAD POWER DROP CORD WITH L21-30 RECEPTACLE
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
PROPOSED MCR CAMPUS
LOCATION
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 4 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
PROPOSED MCR CAMPUS
LOCATION
Enterprise Data Center
Engineering
PROPOSED CAMPUS CONSOLIDATED DATA CENTER LOCATION
PROPOSED DATA CENTER SITE
DIMENSIONS OF COMBINED CURRENT STRUCTURES(T1 & T2)
RESPECTING AS-IS SETBACKS ARE 60' X 160' OR 9600 FT2 (MOL)
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
PROPOSED OIT BLDG
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 5 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
PROPOSED OIT BLDG
Enterprise Data Center
Engineering
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
PROPOSED FLOORPLAN
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 6 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
PROPOSED FLOORPLAN
Enterprise Data Center
Engineering28
0"
60'-0"
CRAH
HIGH DENSITY ROLL-IN
SECTION
CRAHCRAH
CRAH
PROPOSED FLOOR PLAN FOR DATA CENTER FLOOR1
9 10 7
12+12 1212 1212+
12+
12+ 121212
12+12+ 121212
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
PROPOSED MCR
ELEVATIONS
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 7 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
PROPOSED MCR ELEVATIONS
Enterprise Data Center
Engineering
SIDE ELEVATION ENCLOSURE
NTS
FLOOR TO ENCLOSURE TOP
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
.0 ft
.0 ft
FLOOR TO BOTTOM OF CABLE TRAY
FLOOR TO BOTTOM OF BUSWAY
ENCLOSURE
.3 ft
.3 ft
REAR ELEVATION ENCLOSURES
NTS
NOTE: HEIGHTS ANNOTATED ARE NOTIONAL.
ACTUAL ELEVATIONS TO BE DETERMINED BY
OTHERS
.0 ft
.0 ft
VERTICAL EXHAUST DUCT
UTP CABLE TRAY WITH DROP OUT KIT
.0 ft
.0 ft
.5 ft
.5 ft
AMPS VOLTS
L1
L2
L3
N KW
.5 ft
.5 ft
R
BLK
GND
R
BLK
GND
R
BLK
GND
R
BLK
GND
RETURN AIR DUCT TO CRACS SIZED TO SUPPORT HEAT REJECTION IN
ACCORDANCE WITH COMPUTATIONAL FLUID DYNAMICS (CFD) ANALYSIS
(3'W X 2.5'H)
FIBER CABLE TRAY
BUSWAY TAP
BUSBAR
VERTICAL EXHAUST DUCT
FIBER PATHWAY
BUSWAY HEADEND
WIRE MESH CABLE TRAY
FLOOR TO BOTTOM OF RETURN DUCT
FLOOR TO TOP OF RETURN DUCT
RETURN AIR DUCT
FLOOR TO SLAB ABOVE
NO SUSPENDED CEILING
MINIMUM 12' REQUIRED
RECOMMENDED 16'
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
ISOMETRIC FLOORPLAN
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 8 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
ISOMETRIC FLOORPLAN
Enterprise Data Center
ISOMETRIC FLOOR PLAN1
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
CFD INLET TEMPS AT FULL
OPERATION
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 9 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
CFD INLET TEMPS AT FULL
OPERATION
Enterprise Data Center
Engineering
1 1 INLET TEMPERATURES AT FULL HEAT REJECTION OPERATION INLET TEMPERATURES AT ~N HEAT REJECTION OPERATION
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
COMPUTATIONAL FLUID
DYNAMICS STUDY
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 10 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
COMPUTATIONAL FLUID
DYNAMICS STUDY
Enterprise Data Center
Engineering
Pressure-velocity field showing how the cooling units supply different areas in the modeled facility and potential limitations on airflow in areas or zones that can impact critical load density at ~48 inches AFF.
Airflow streamer views showing how airflows operate and the temperatures in various parts of the model, showing airflow separation, bypass, and recirculation graphics.
TOTAL HEATLOAD AND AIRFLOW
XY plane temperature billboard showing the general distribution of temperatures at the modeled operating conditions.
XZ plane temperature billboard showing a vertical distribution of temperatures, showing differentials between hot and cold aisles
Pressure-velocity field showing velocity within the hot-air containment plenum at full data center operating capacity.
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
PATHWAYS
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 11 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
PATHWAYS
Enterprise Data Center
Engineering28
0"
60'-0"
CRAH
HIGH DENSITY ROLL-IN
SECTION
CRAHCRAH
CRAH
GENERIC FLOOR PLAN FOR LARGE DATA CENTERS – DATA CABLE TRAYS1
5 RU PATHWAY RACK
SIDE A HDA
78 10
SIDE B HDA
ALL BENDS MUST BE SWEEPING 45 DEGREE BENDS.
EIGHT TRADE SIZE FOUR CONDUITS/SLEEVES FROM ENTRANCE. PROVIDE
WALL-MOUNTED LADDER FROM FLOOR TO CABLE TRAY TO SUPPORT MEDIA
EIGHT TRADE SIZE FOUR CONDUITS/SLEEVES FROM ENTRANCE. PROVIDE
WALL-MOUNTED LADDER FROM FLOOR TO CABLE TRAY TO SUPPORT MEDIA
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
ED & HD
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 12 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
ED & HD
Enterprise Data Center
Engineering
STANDARD DENSITY EQUIPMENT DISTRIBUTOR ELEVATION FOR CABINETS
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
1st LEVEL BACKBONE
12 DUPLEX LC FIBER CONNECTIONS PER SIDE
48 CAT 6A TO SAME MDA
RU44
RU43
RU42
RU41
48-PORT 1RU “B” SIDE PATCH PANEL FOR 10 GbE
48-PORT 1RU “A” SIDE PATCH PANEL
FOR 10 GbE
FIBER DISTRIBUTION FOR 10+ GbE
ANGLED BLANKING PANEL
ANGLED BLANKING PANEL
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
PROPOSED HDA ELEVATIONS FOR ALL THREE ROWS
HD FIBER DISTRIBUTION FROM THE
ED IN EACH CABINET IN THE ROW
HD UTP DISTRIBUTION FROM THE
ED IN EACH CABINET IN THE ROW
SIDE “A” SIDE “B”
22 RU FOR LAN ELEMENTS
AND LEAF OR ACCESS LAYER
SWITCHES
PATHWAY RACK ELEVATION
RU45
1 1
2 2
3 3
4 4
5 5
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON48-PORT 1RU “B” SIDE PATCH PANEL
FOR 10 GbE
48-PORT 1RU “A” SIDE PATCH PANEL
FOR 10 GbE
FIBER DISTRIBUTION FOR 10+ GbE
“A” SIDE
12 DUPEX LC (QTY TWO 12-STRAND
MPO / MPO CABLE, QTY TWO MPO/
LC CASSETTES UNIVERSAL POLARITY)
“B” SIDE
12 DUPEX LC (QTY TWO 12-STRAND
MPO / MPO CABLE, QTY TWO MPO/
LC CASSETTES UNIVERSAL POLARITY)
“A” SIDE
12 DUPEX LC (QTY TWO 12-STRAND
MPO / MPO CABLE, QTY TWO MPO/
LC CASSETTES UNIVERSAL POLARITY)
“B” SIDE
12 DUPEX LC (QTY TWO 12-STRAND
MPO / MPO CABLE, QTY TWO MPO/
LC CASSETTES UNIVERSAL POLARITY)
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
RK1BxxRK1Axx
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
MDA A
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 13 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
MDA A
Enterprise Data Center
Engineering
EIGHT (8) RACK MDA. FOUR (4) RACKS PER SIDE. 1
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
“A” SIDE UTP BACKBONE
PATCH PANELS
FOR 10 GbE
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
24 RU FOR LAN ELEMENTS,
SPINE AND AGGREGATION
LAYER SWITCHES, AND OOB
“A” SIDE FO BACKBONE
FOR 10+ GbE
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
RKxAxx RKxAxx RKxAxx RKxAxx
HORIZONTAL DISTRIBUTION
FOR FIVE (5) PATHWAY RACKS
IN ROLL-IN AREA
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
CAMPUS FIBER BACKBONE
~2400 STRANDS
144 PER FDC
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
MDA B
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 14 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
MDA B
Enterprise Data Center
Engineering
EIGHT (8) RACK MDA. FOUR (4) RACKS PER SIDE. 1
24 RU FOR LAN ELEMENTS,
SPINEAND AGGREGATION
LAYER SWITCHES, AND OOB
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
1 1
2 2
3 3
4 4
5 5
6 6
7 7
8 8
9 9
10 10
11 11
12 12
13 13
14 14
15 15
16 16
17 17
18 18
19 19
20 20
21 21
22 22
23 23
24 24
25 25
26 26
27 27
28 28
29 29
30 30
31 31
32 32
33 33
34 34
35 35
36 36
37 37
38 38
39 39
40 40
41 41
42 42
43 43
44 44
45 45
RKxBxxRKxBxxRKxBxxRKxBxx
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON “B” SIDE UTP BACKBONE
PATCH PANELS
FOR 10 GbE
“B” SIDE FO BACKBONE
FOR 10+ GbE
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
13 14 15 16 17 18 19 20 21 22 23 24
37 38 39 40 41 42 43 44 45 46 47 48
1 2 3 4 5 6 7 8 9 10 11 12
25 26 27 28 29 30 31 32 33 34 35 36 LEVITON
HORIZONTAL DISTRIBUTION
FOR FIVE (5) PATHWAY RACKS
IN ROLL-IN AREA
CAMPUS FIBER BACKBONE
~2400 STRANDS
144 PER FDC
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
CABLE TRAY CAPACITY
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 15 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
CABLE TRAY CAPACITY
Enterprise Data Center
Engineering
PROPOSED CABLE TRAY:
CABLOFIL CF150/450
6" DEEP X 18" WIDE (A)
WHITE POWERCOAT
TRAY INSERT
MAX. CAPACITY:
536 CATEGORY 6a UTP (0.35 OD)
MAXIMUM PLANNED UTP CABLE FILL:
480 CABLES AT .30 OD CMP
MAXIMUM ANTICIPATED MAX LOAD:
18.5 LBS PER FOOT
LOAD IN LBS FT PER SPAN:
5:175.9
6: 155*
7: 113.9
8: 98.3
* RECOMMENDED MAX UNSUPPORTED
SPAN
PROPOSED UTP MEDIA:
LEVITON ATLAS-X1 TRUNKS
CATEGORY 6A PLENUM
SIX CABLES PER BUNDLE
QTY 16 TRUNKS PER CABINET
COMPENENT MEDIA:
BERK-TEK LANMARK 10G2
.30 OD
NOMINAL WEIGHT: 38 LB/KFT
ASSOCIATED PATCH PANEL:
LEVITON 49256-D48 ANGLED QUICKPORT
48 POSITION
TWO (2) RACK UNITS PER PANEL
PROPOSED FO MEDIA:
PANDUIT QUICKNET OM5 SIGNATURE
OM5 50/125 MULTIMODE
12 FIBERS ASSEMBLY
SINGLE MPO INTERFACE PER SIDE
OFNP LIME GREEN
POLARITY METHOD – B
15.9lbs/kft
OD .18 INCHES
ASSOCIATED CASSETTES (ED):
LEVITON 12-FIBER MTP-LC CASSETTE
UNIVERSAL
ASSOCIATED CASSETTES (HD):
BASE-12 12-FIBER MTP-LC (.50 db)
UNIVERSAL
FIBER DISTRIBUTION CABINET:
LEVITON ANGLED OPT-X
144 FIBER
ONE (1) RACK UNIT
CABLE TRAY CAPACITY PLANNING1
UTP PHYSICAL CHARACTERISTICS FOR CP3
FO PHYSICAL CHARACTERISTICS FOR CP5
PROPOSED CABLE TRAY:
CABLOFIL CF 105/100
4" DEEP X 4" WIDE (A)
TRAY INSERT
WHITE POWERCOAT
MAX. CAPACITY:
209 (0.22 OD)
MAXIMUM PLANNED CABLE FILL:
40 CABLES
CABLE TRAY FOR FO45 RU PATHWAY RACK2
RECOMMENDED A-SIDE
JACK COLOR: BLUE
RECOMMENDED B-SIDE JACK
COLOR: YELLOW
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
FIBER DISTRIBUTION PANEL
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 16 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
FIBER DISTRIBUTION PANEL
Enterprise Data Center
Engineering
LEVITON Opt-X® UHDX 1RU Angled Panel
RECOMMENDED (OE) UTP PATCH PANEL:
LEVITON e2XHD-BLK HIGH-DENSITY
ANGLED
48 POSITION
ONE RACK UNIT PER PANEL
WITH REAR CABLE MANAGER
AND ANGLED PANEL COVERS
UTP PATCH PANEL
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
FO POLARITY
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 17 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
FO POLARITY
Enterprise Data Center
Engineering
ED
12 STRAND MPT TO LC
UNIVERSAL POLARITY CAS.
HDA (A OR B)
12 STRAND MPT TO LC
UNIVERSAL POLARITY CAS.
MDA
12 STRAND MPT TO LC
UNIVERSAL POLARITY CAS.
12-STRAND TRUNKS (QTY 4)
POLARITY: B
12-STRAND TRUNKS (QTY 4)
POLARITY: B
FIBER TRUNK POLARITY AND SCHEMATIC
FIBER NETWORK POLARITY DESIGN
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
BUSWAY POWER
DISTRIBUTION
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 18 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
BUSWAY POWER
DISTRIBUTION
Enterprise Data Center
Engineering
R
BLK
GND
R
BLK
GND
R
BLK
GND
R
BLK
GND
R
BLK
GND
R
BLK
GND
R
BLK
GND
R
BLK
GND
R
BLK
GND
R
BLK
GND
R
BLK
GND
R
BLK
GND
POWER FEED UNIT
WITH CURRENT MONITOR TO
SUPPORT ~225 AMPS FOR EACH
SERVER ROW. POWER
CALCULATIONS TO BE PERFORMED
BY OTHERS.
TYPICAL POWER BUSWAY COMPONENTS FOR SERVER ROWS
POWER BUSWAY TAP WITH DUAL BREAKER WITH
TWO 3' DROP CORDS (WITH STRAIN RELIEF) WITH
L21-20R FOR HIGH-DENSITY CABINETS. TWO PER
BUSWAY. 12+ CABINETS MAY REQUIRE A
COMBINATION OF TAPS.
CHANNEL
ALARM
1 2 3 4 CTRL
RS-485
RS-232
POWER BUSWAY TAP WITH SINGLE BREAKER 3'
DROP CORD (WITH STRAIN RELIEF)
WITH L21-20R FOR STANDARD-DENSITY CABINETS.
10 PER BUSWAY.
208V 3 PHASE POWER BUS BAR
208 VOLT PDU FOR EQUIPMENT POWER – TO BE ENERGIZED BY ZONE PDU2
REQUIRES ONE (1)
L21-20R
20A 120/ 208V
Y
CHATSWORTH ECONNECT PDU; VERTICAL; MONITORED; L21-20 PLUG; THREE PHASE; 120/208V INPUT;
20A; (30) C13 (6) C19 OUTLETS; 208V OUTPUT; 3 X 2P 20A HYDRAULIC MAGNETIC BREAKERS; LCD;
ETHERNET, USB, AND ENVIRONMENTAL SENSOR PORTS; IP AND SERIAL MONITORING; IP CONSOLIDATION
(PDU LINKING); TOOL-LESS MOUNTING; 70.5"H (1791 MM) X 2.2"W (56 MM) X 2.2"D (56 MM)
CHATSWORTH
P R O D U C T
Temp/Humidity Out
In / IOIOIO10/100
Reset
Warning
OK
Critical
C B
C B
C B
C B
1 C B
1C B
1C B
C B
C B
C B
C B
2C B
OFF
O
ON
I
CB2
OFF
O
ON
I
CB1
OFF
O
ON
I
CB3
RACK/ENCLOSURE
RACKED
EQUIPMENT PDU
B1
B2
PDU
A1
A2
PS
PS
POWER SCHEMATIC FOR POWER RACK- LEVEL REDUNDANCY
BUS A BUS B
RACK/ENCLOSURE
RACKED
EQUIPMENT
PDU
B1
PDU
A1
PS
PS
BUS A BUS B
HIGH DENSITY – TWO
L21-20 DROPS PER
BUSWAY
STANDARD DENSITY –
ONE L21-20 DROP PER
BUSWAY
THIS DESIGN PROVIDES DIVERSE POWER INPUTS FOR ACTIVE EQUIPMENT BY
SPLITTING THE SOURCE POWER ACROSS TWO BUSES. EACH SERVER CABINET
WILL CONTAIN A MINIMUM OF TWO EQUIPMENT-FACING PDUs – EACH WILL BE
ENERGIZED BY SEPARATE BUSES.
RACK/ENCLOSURE
RACKED
EQUIPMENT PDU
B1
B2
B3
PDU
A1
A2
A3
PS
PS
BUS A BUS B
ULTRA HIGH DENSITY –
TWO L21-20 DROPS PER
BUSWAY
ONE L21-20 DROP PER
BUSWAY
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
TYPICAL SERVER CABINET
DETAIL
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 19 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
TYPICAL SERVER CABINET
DETAIL
Enterprise Data Center
Engineering
TYPICAL ENCLOSURE SPECIFICATION
NTS
TYPICAL ENCLOSURE TOP WITH VERTICAL EXHUAST DUCT
NTS
TYPICAL ENCLOSURE TOP WITH VERTICAL EXHUAST DUCT
NTS
CP3093645 F-Series G2 TeraFrame Cabinet with accessories installed
Configuration includes the following components:
Item Number Description (Qty)
FF1N-111C-E62 F-Series TeraFrame Cabinet System, 23.6" (600mm) W x 43.30" (1100mm) D x 45U H, Square-Punched Rails, Perforated Metal Front Door, Two Point Swing Handle Latch, Single Solid Metal Rear Door, Two Point Swing
Handle Latch, Vertical Exhaust Duct System 34-60" (864-1524mm), 2 Solid Side Panels, Glacier White (1)
024-735000-E97 Frame, F-Series TeraFrame Cabinet, Gen 2 ,23.6"(600mm)Wx43.3"(1100mm)Dx45U H,Glacier White (1)
024-735009-005 Mounting Rail Kit, Square Punched For F-Series TeraFrame Cabinet Gen 2 Cabinets 23.6"(600mm)Wx45U
H,Plated (2)
024-734450-E05 Front Door, Perforated Metal, 23.6 (600mm) W x 45U H, Glacier White (1)
024-734547-C21 Door Latch Kit, Front, Swing Handle, Two Point, Perf or Solid Metal, Keyed Lock, 45U H, Black (1)
024-735054-E05 Door, Solid Rear, F-Series TeraFrame Cabinet, Gen 2 ,23.6"(600mm)Wx45U H,Glacier White (1)
024-734513-C05 Door Latch Kit, Rear, Swing Handle, Two Point, Keyed Lock, 45U, Black (1)
024-735016-E12 Vertical Exhaust Duct System, F-Series TeraFrame Cabinet, Gen 2 ,600mm Wide, 34"-60"
High,1100D,Glacier White (1)
024-735060-E97 Side Panel, F-Series TeraFrame Cabinet, Gen 2 , 43.3"(1100mm)Dx45U H,Glacier White (2)
024-735059-002 Common Parts Kit, F-Series TeraFrame Cabinet, Gen 2 (1)
024-735077-002 F-Series TeraFrame Cabinet Cabinet with Caster Packaging, 600-700mm X 1025-1200mm D X 36-45U H (1)
024-734434-C01 Bracket Kit, 66" Power Strip, Black (1)
024-734587-001 F-Series TeraFrame Cabinet Floor Clamp Kit, 4 Pc,Clear Zinc (1)
UL Listing This F-Series TeraFrame Cabinet and any included accessories are UL Listed under the NWIN category per the UL60950 Standard, UL file number E227626. Note, the UL Listing only applies to cabinets manufactured in the United States.
34521-E05 Air Dam Kit, 23.6 (600mm) W x 45U H, Glacier White, UL Listed (1)
34421-C01 Vertical Cable Manager w/ Short Fingers, 23.6 (600mm) W, 45U H, Black, UL Listed (2)
35051-C01 Caster Kit, F-Series TeraFrame Cabinet, Black (1)
35079-E02 TeraFrame Narrow Baying Brackets, Pair, TeraFrame To TeraFrame, G2 , All Heights, Glacier White (1)
35081-003 TeraFrame Seal Kit, 0 or 1 Side Panel, TeraFrame Cabs using Narrow Baying Brackets (1)
35085-E12 TeraFrame Bottom Panel, G2 , 600 mm W x 1100 mm D,White (1)
35700-705 Vertical Power Strip Mounting Brackets (4)
(VENDOR TO PROVIDE 45 RU OF PLENAFILL BLANKING PANEL PER ENCLOSURE)
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
TYPICAL
TELECOMMUNICATION RACK
DETAIL
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 20 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
TYPICAL
TELECOMMUNICATION RACK
DETAIL
Enterprise Data Center
Engineering
6" WIDE VERTICAL CABLE MANAGEMENT
P/N: OR-MM20VMD706 (OR EQUIVALENT)
MM20 VERTICAL CABLE MANAGEMENT "CAGE", WITH DOOR,
6.45" X 10.26" X 76.94" WHITE
CAPACITY: 350 CATEGORY 6 PATCH CORDS OR 245 CATEGORY
6A PATCH CORDS
LARGER VCM AUTHORIZED IN ACCORDANCE WITH CABLING
REQUIREMENT
6 in
TYPICAL RACK DIMENSIONS AND
SPECIFICATIONS
P/N: OR-MM2073038-W (OR EQUIVALENT)
MIGHTY MO 20 CABLE MANAGEMENT RACK
30" CHANNEL DEPTH, 7' HIGH, WHITE FINISH OR EQUIVALENT
DIMENSIONS:
USABLE HEIGHT: 45RU
DEPTH (US): 30
HEIGHT (US): 7'
WIDTH (US): 23.75"
STATIC LOAD CAPACITY: 2000 LBS
SQUARE HOLE
FRONT AND REAR HEAVY DUTY PERFORATED SECURITY DOOR (OR-
MM20724PDHD-W) (OPTIONAL)
SECURITY DOOR FRONT
MOUNTING HARDWARE (OR-
MM2024DMFHD-W)4
SECURITY DOOR REAR
MOUNTING HARDWARE (OR-
MM2024DMRHD-W)2
PDU MOUNTING BRACKET
KIT (TWO KITS PER RACK)
P/N: OR-MM20PDUMB1D2W-
W3
NOTE:
TELECOMMUNICATION CHANNEL RACKS ARE REQUIRED IN ALL
TELECOMMUNICATION ROOMS. TELECOMMUNICATION
CHANNEL RACKS OR TELECOMMUNICATION CABINETS MAY BE
USED IN THE HORIZONTAL AND MAIN DISTRIBUTION AREAS.
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
TYPICAL NETWORK CABINET
DETAIL
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 21 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
TYPICAL NETWORK CABINET
DETAIL
Enterprise Data Center
Engineering
TYPICAL RACK CONFIGURATION – CHATSWORTH NF8N-115C-E52-1
FRONT VIEW DIMENSIONS
ISOMETRIC VIEW WITH DOORS AND VERTICAL EXHAUST DUCT (VED)
40"
.4
19"
.1
U
35.9"
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
TYPICAL NETWORK CABINET
ACCESSORIES
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 22 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
TYPICAL NETWORK CABINET
ACCESSORIES
Enterprise Data Center
Engineering
PDU BRACKET
CABLE LASHING MANAGER
TELESCOPING CABLE MANAGER
TOP SLOT CAPACITY FILL CHART
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
NETWORK CABINET SIDE
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 23 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
NETWORK CABINET SIDE
Enterprise Data Center
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
TELECOMMUNICATIONS
BONDING
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 24 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
TELECOMMUNICATIONS
BONDING
Enterprise Data Center
Engineering
12"
4"
ANSI/EIA/TIA COMPLIANT
BUSBAR
CHATSWORTH P/N: 40158-012
ALL BONDING SHALL BE DONE IN ACCORDANCE WITH ANSI/TIA/EIA 607-C , NFPA 70, AND IN COMPLIANCE WITH
LOCAL CODES.
EQUIPMENT BONDING CONDUCTORS (EBC) ARE TO BE BONDED TO THE RACK BONDING BUSBAR (RBB) AND THE
BOND POINT ON EACH LAN SWITCH AS ILLUSTRATED IN DETAILS SIX AND SEVEN BELOW. ALL EQUIPMENT
SHALL BE GROUNDED PER MANUFACTURER’S INSTRUCTIONS.
CABLE TRAY BONDING CONDUCTORS WILL BE INSTALLED AT EACH CABLE TRAY PATHWAY JOINT IN THE MAIN
COMPUTER ROOM. SEE DETAIL 1 ON THIS SHEET
ONE RACK BONDING BUSBAR (RBB) TO BE INSTALLED IN EACH TELECOMMUNICATIONS RACK/CABINET IN THE
MAIN COMPUTER ROOM (MCR) AND IN THE TELECOMMUNICATIONS ROOMS (TR). RBB WILL BE BONDED TO
THE TELECOMMUNICATIONS EQUIPMENT BONDING CONDUCTOR (TEBC) AND WILL BOND THE TEBC TO THE
SECONDARY BONDING BUSBAR (SBB). SEE DETAIL 2 ON THIS SHEET.
SECONDARY BONDING BUSBAR (SBB) WILL BE INSTALLED IN THE MCR. SBB WILL BE CONNECTED TO THE
PRIMARY BONDING BUSBAR (PBB). .
NOTES:
DIRECTLY BONDED TO
RBB
GROUNDING PAD
UNDER LIP
TWO-HOLE
COMPRESSION LUG
GROUNDING
PAD
UBC
SCREWS (M4)
20"
4"
ANSI/EIA/TIA COMPLIANT
BUSBAR
CHATSWORTH P/N: 40153-
020 OR EQUIVALENT.
MINIMUM DIMENSION: .25"
THICK, 4" WIDE, 20" LONG.
LENGTH MAY BE DETERMINED
BY INSTALLER. MUST BE
LISTED BY A NRTL.
COMPRESSION
TWO -HOLE
GROUND LUG
TELECOMMUNICATIONS MAIN
BONDING CONDUCTOR TO
GROUND ON MAIN ELECTRICAL
DISTRIBUTION PANEL
TELECOMMUNICATION
S BONDING
CONDUCTOR TO TGB
LOCATED IN TR
THIS EQUIPMENT MUST BE GROUNDED. NEVER DEFEAT THE GROUND CONDUCTOR
OR OPERATE THE EQUIPMENT IN THE ABSENCE OF A SUITABLY INSTALLED GROUND
CONDUCTOR. THIS DEVICE WILL BE BONDED TO THE RBB IN THE SAME RACK. EACH
DEVICE WILL HAVE A DEDICATED UNIT BONDING CONDUCTOR (UBC). THE UBC WILL
NOT BE SHARED.
THIS EQUIPMENT MUST
BE GROUNDED. NEVER
DEFEAT THE GROUND
CONDUCTOR OR
OPERATE THE
EQUIPMENT IN THE
ABSENCE OF A SUITABLY
INSTALLED GROUND
CONDUCTOR. THIS
DEVICE WILL BE BONDED
TO THE RBB IN THE SAME
RACK. EACH DEVICE WILL
HAVE A DEDICATED UNIT
BONDING CONDUCTOR
(UBC). THE UBC WILL
NOT BE SHARED.
JOINING REQUIREMENTS
JOINING REQUIREMENTS
RACK BONDING REQUIREMENTS
RACK BONDING REQUIREMENTS
TELECOMMUNICATIONS SECONDARY BONDING BUSBAR (SBB)
TELECOMMUNICATIONS SECONDARY BONDING BUSBAR (SBB)
COMPRESSION
TWO -HOLE
GROUND LUG
TELECOMMUNICATIONS PRIMARY BONDING BUSBAR (PBB)
TELECOMMUNICATIONS PRIMARY BONDING BUSBAR (PBB)
CISCO 3850 AND 9300 BONDING
CISCO 3850 AND 9300 BONDING
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
Telecommunication Entrance
Rooms
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 25 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
Telecommunication
Entrance Rooms
Enterprise Data Center
Engineering
TT
AC
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
TYP
AC
NOTE:
THERE SHALL BE A MINIMUM OF ONE ENTRANCE ROOM PER BUILDING.
A TELECOMMUNICATIONS ROOM OR EQUIPMENT ROOM (DATA CENTER) CAN SERVE AS AN ENTRANCE ROOM
GROSS FLOOR SPACE
SERVED (FT2)
ENTRANCE FACILITY SIZE
ALLOCATION
<200,000 FT2
<400,000 FT2
<500,000 FT2
<600,000 FT2
<800,000 FT2
<1,000,000 FT2
10'X10'
12'X13'
12'X15.5'
12'X18.5'
12'X22.5'
12'X27.5'
GROSS FLOOR SPACE
SERVED (FT2)
ENTRANCE FACILITY SIZE
ALLOCATION
<200,000 FT2
<400,000 FT2
<500,000 FT2
<600,000 FT2
<800,000 FT2
<1,000,000 FT2
10'X10'
12'X13'
12'X15.5'
12'X18.5'
12'X22.5'
12'X27.5'
GROSS FLOOR SPACE
SERVED (FT2)
WALL LENGTH FOR
ENTRANCE FACILITY
TERMINATION
<10,000 FT2
<20,000 FT2
<40,000 FT2
<50,000 FT2
<60,000 FT2
<80,000 FT2
<100,000 FT2
39"
42"
68"
90"
96"
120"
144"
GROSS FLOOR SPACE
SERVED (FT2)
WALL LENGTH FOR
ENTRANCE FACILITY
TERMINATION
<10,000 FT2
<20,000 FT2
<40,000 FT2
<50,000 FT2
<60,000 FT2
<80,000 FT2
<100,000 FT2
39"
42"
68"
90"
96"
120"
144"
WALL SPACE REQUIREMENT
REQUIRED TERMINATION WALL SPACE FOR AN ENTRANCE
ROOM IN A TR OR ER PER THE CHART BELOW:
FLOOR SPACE REQUIREMENT
ADDITIONAL FLOOR SPACE SHOULD BE PROVIDED FOR
FACILITIES WITH GROSS SQUARE FOOTAGE PER THE
CHART BELOW:
HEALTH CARE FACILITY ENTRANCE ROOMS SHALL BE
170 SQ FT
GENERIC FLOOR PLAN FOR ENTRANCE ROOM (ONE SERVICE PROVIDER)
GENERIC FLOOR PLAN FOR ENTRANCE ROOM (TWO SERVICE PROVIDERS)
GENERIC FLOOR PLAN FOR HEALTHCARE ENTRANCE ROOM
TELECOMMUNICATION ENTRANCE ROOM NOTES
Department of Veterans Affairs
IT Operations and Services
Solution Delivery
DATE
ISSUE:
DESCRIPTIONMARK
FILE: SLC_DCIE_21-9_MCR Design v1.vsdx
DRAWN BY: Michael Julian, RCDD
CHECKED BY:
DOC VERSION No:
PROJECT No:
SHEET TITLE
Telecommunications Rooms
PRINT DATE: Apr 13, 2021
ISSUE DATE: Apr 13,2021
SHEET: 26 OF 28
Kelly Bates, DCIE
Kevin Gzelka, CTDC
1.0
OIT DESIGN GUIDE
TEMPLATES
N/A
A
B
C
D
2 3 4
1 2 3 4
A
B
C
D
Telecommunications Rooms
Enterprise Data Center
Engineering
AC AC
33 4455
TYP
TYP
TYP
5 4
TYP
TYP
TYP
TT
TYP
TYP
TYP
TT
NOTE:
THERE SHALL BE A MINIMUM OF ONE TELECOMMUNICATIONS ROOM (TR) PER FLOOR.
THE EQUIPMENT ROOM CAN SERVE AS A TR. ADDITIONAL ROOMS SHOULD BE PROVIDED WHEN:
A) THE FLOOR AREA TO BE SERVED EXCEEDS 1000 M2 (10 000 FT2);
OR
B) THE HORIZONTAL DISTRIBUTION DISTANCE TO THE WORK AREA EXCEEDS 90 M (295 FT).
FLOOR SPACE REQUIREMENT:
1. MINIMUM OF 80 SQ FT FOR A 1 RACK TR
2. ADD AN ADDITIONAL 20 SQ FT PER ADDITIONAL RACK
3. MINIMUM OF 170 SQ FT FOR A HEALTH CARE FACILITY TR
GENERIC FLOOR PLAN FOR HEALTH CARE FACILITY TELECOMMUNICATIONS ROOMS 2
GENERIC FLOOR PLAN FOR TELECOMMUNICATIONS ROOMS (TWO RACK REQUIREMENT)
(TELECOMMUNICATIONS SPACE SUPPORTING NETWORK DISTRIBUTION TO WORK AREA
OUTLETS)
GENERIC FLOOR PLAN FOR TELECOMMUNICATIONS ROOMS (ONE RACK REQUIREMENT)
(TELECOMMUNICATIONS SPACE SUPPORTING NETWORK DISTRIBUTION TO WORK AREA
OUTLETS )
TELECOMMUNICATION ROOM NOTES
| SLC_DCIE_21-9_MCR Design v1.vsdx |
| COVER |
| REVISION SHEET |
| LEGEND |
| PROPOSED MCR CAMPUS LOCATION |
| PROPOSED OIT BLDG |
| PROPOSED FLOORPLAN |
| PROPOSED MCR ELEVATIONS |
| ISOMETRIC FLOORPLAN |
| CFD INLET TEMPS AT FULL OPERATION |
| COMPUTATIONAL FLUID DYNAMICS STUDY |
| PATHWAYS |
| ED & HD |
| MDA A |
| MDA B |
| CABLE TRAY CAPACITY |
| FIBER DISTRIBUTION PANEL |
| FO POLARITY |
| BUSWAY POWER DISTRIBUTION |
| TYPICAL SERVER CABINET DETAIL |
| TYPICAL TELECOMMUNICATION RACK DETAIL |
| TYPICAL NETWORK CABINET DETAIL |
| TYPICAL NETWORK CABINET ACCESSORIES |
| NETWORK CABINET SIDE |
| TELECOMMUNICATIONS BONDING |
| Telecommunication Entrance Rooms |
| Telecommunications Rooms |
File details come from the government source that posted it. Updated .