SOW Attachment 15 - Salt Lake City MCR Design.pdf

PDF 5 MB Posted

Attached to
C1BG--660-21-707 EHRM Design Package SLC (VA-22-00028648)
Solicitation number
36C77623R0032
Issued by

About this file

This pre-solicitation notice seeks statements of qualifications from architecture and engineering firms for a design contract related to data center infrastructure upgrades at the George E. Wahlen VA Medical Center in Salt Lake City, Utah. The project involves constructing a replacement data center in the location of the current T1 and T2 structures and includes networking backbone fiber optics, structured cabling, electrical distribution upgrades, UPS systems, electrical bonding, HVAC, telecommunications room renovations, data center reconfiguration, and security upgrades. The 100% set-aside contract will be a firm-fixed-price award with a performance period of 210 calendar days from notice to proceed. The government estimates the construction cost at $8.75 million. Statements of qualifications are due by 4:00 PM Eastern time on specified date. Firms will be evaluated on their experience with IT infrastructure projects, network design, scheduling, and construction period services. The primary awardee will participate in negotiations and be authorized a site visit.

View the file

Other files

File Type Posted
SOW Attachment 11- Appendix B Contract Clause.pdf PDF
Attachment 20 AE Design SOW - EHRM Infrastructure Upgrades -Tier 2.pdf PDF
SOW Attachment 03-1 HEFP SEP Design Alert 1-8.pdf PDF
SOW Attachment 19 - Construction Cost Estimate Template.xlsx XLSX spreadsheet
36C77623R0032.docx DOCX document
SOW Attachment 17 - Electrical Design Manual.pdf PDF
Attachment 21 - Wage Determination SL County.gov.pdf PDF
SOW Attachment 12 - Appendix C Contract Clause.pdf PDF
SOW Attachment 02 - VA OEHRM Site Infrastructure Requirements 2.0.pdf PDF
Attachment 22 - Past Performance Questionnaire.docx DOCX document
SOW Attachment 07 - Seasonal Influenza with Vaccines.pdf PDF
SOW Attachment 16 - Infrastructure Standard for Telecommunication Spaces.pdf PDF
SOW Attachment 13 - 01 32 16.01 EHRM Arch and Eng CPM Schedule Spec.pdf PDF
SOW Attachment 05 - 01 32 16.01 EHRM A-E CPM Schedules - NOA.docx DOCX document
SOW Attachment 08 - VHA Directive 1061.pdf PDF
SOW Attachment 01 - VHA Required Div 01 Spec Sections.docx DOCX document
SOW Attachment 09 - X-Matrix Summary - Site Assessment.xlsx XLSX spreadsheet
SOW Attachment 10 - VHA COVID-19 Supplemental Contract Requirements 12-14-21.pdf PDF
SOW Attachment 14 - Salt Lake City Campus Map.pdf PDF
SOW Attachment 04 - Sensitive Infrastructure Data Classification Memo.pdf PDF
SOW Attachment 18 - Physical Security and Resiliency Design Manual.pdf PDF
SOW Attachment 06 - PG 18-15 A-E Submission Reqs Vol C - EHRM.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

PROJECT:

DRAWING No:

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

COVER

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 1 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

COVER

Enterprise Data Center

EngineeringMAIN COMPUTER ROOM TELECOMMUNICATIONS SPACE DESIGN

GEORGE E. WAHLEN VAMC

SALT LAKE CITY, UT

DEVELOPED BY:

DATA CENTER AND INFRASTRUCTURE ENGINEERING

DATA CENTER ENGINEERING

SOLUTION DELIVERY

OFFICE OF INFORMATION & TECHNOLOGY

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

REVISION SHEET

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 2 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

REVISION SHEET

Enterprise Data Center

Engineering

REV. DESCRIPTION DATE BY

.1 Draft – DCIE Internal Use Only 03/24/21 DCIE

1.0 First Release Version 04/13/20 DCIE

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

LEGEND

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 3 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

LEGEND

Enterprise Data Center

Engineering

LEGEND NOTES

ELECTRICAL

AIR CONDITIONER THERMOSTAT

FLOOR TO CEILING HEIGHT:

1. TELECOMMUNICATION ROOMS INCLUDING NETWORK

SUPPORT CENTERS: MAXIMUM EXTENT POSSIBLE

2. DATA CENTERS EXCLUDING EXTRA SMALL NETWORK SUPPORT

CENTERS: MINIMUM 16 FT SLAB TO DECK ABOVE

MECHANICAL

FLOOR COMPOSITION:

1. STATIC DISSIPATING FLOOR TILE OR COATING

2. CONCRETE SLAB 5" THICKNESS AT GROUND

3. STEEL DECK AND FILL FOR FLOORS ABOVE GROUND

4. AVOID ACCESS FLOOR PLENUMS FOR AIR DISTRIBUTION

PURPOSES

WALLS: FULL HEIGHT TO DECK ABOVE FOR ALL TELECOMMUNICATION

SPACES

CEILINGS: NO SUSPENDED CEILINGS ALLOWED

DATA CENTER SIZE ALLOCATION PER CHART BELOW:

CONTACT DATA CENTER AND INFRASTRUCTURE ENGINEERING

(VAITESEDATACENTERENGINEERING2@VA.GOV) TO DETERMINE WHAT

SIZE DATA CENTER IS REQUIRED FOR YOUR FACILITY.

SECONDARY BONDING BUSBAR PLACEMENT DETERMINED BY

OTHERS

PRIMARY BONDING BUSBAR PLACEMENT DETERMINED BY

OTHERS

MINIMUM QTY TWO 110 V 20 A CONVENIENCE POWER

OUTLETS PER WALL; PLACEMENT DETERMINED BY OTHERS 1

30 AMP 208 VOLT THREE-PHASE TWIST LOCK RECEPTACLE (L21-

30R); 8.5 FT AFF {WYE (5-WIRE)} COORDINATE INSTALLATION

LOCATION WITH TELECOMMUNICATIONS CONTRACTOR

20 AMP 208 VOLT THREE-PHASE TWIST LOCK RECEPTACLE (L21-

20R); 8.5 FT AFF {WYE (5-WIRE)} COORDINATE INSTALLATION

LOCATION WITH TELECOMMUNICATIONS CONTRACTOR

SERVICE PANEL FOR B-SIDE POWER, GENERATOR BACKED IF

POSSIBLE. SHALL BE EQUIPPED WITH POWER METER;

PLACEMENT PER OTHERS

SERVICE PANEL FOR A-SIDE POWER, GENERATOR BACKED IF

THE FACILITY HAS GENERATION CAPABILITIES. SHALL BE

EQUIPPED WITH POWER METER; PLACEMENT PER OTHERS

1. LED LIGHTING PLACED IN AISLES DIRECTLY IN FRONT OF

AND BEHIND CABINET ROWS

2. LIGHTING OPERATED BY MOTION SENSOR PER CABINET

ROW OR SECTION

3. 500 LUMENS IN THE HORIZONTAL PLANE AND 200

LUMENS IN THE VERTICAL PLANE REQUIRED MEASURED AT

3 FT AFF IN FRONT OF AND BEHIND EQUIPMENT CABINETS

POWER BUS BAR (VOLTAGE AND AMPERAGE TO SUPPORT

ADEQUATE SINGLE & DOUBLE BREAKER 208V, 20 AMP, L21-20R

BUSWAY TAPS PER SERVER ROW) FED FROM A-SIDE SOURCE

POWER BUS BAR (VOLTAGE AND AMPERAGE TO SUPPORT

ADEQUATE SINGLE & DOUBLE BREAKER 208V, 20 AMP, L21-20R

BUSWAY TAPS PER SERVER ROW) FED FROM B-SIDE SOURCE

POWER BUS BAR (VOLTAGE AND AMPERAGE SUFFICIENT TO

SUPPORT ADEQUATE SINGLE BREAKER 208V, 20 AMP, L21-20R

BUSWAY TAPS PER NETWORK ROW) FED FROM A-SIDE SOURCE

POWER BUS BAR (VOLTAGE AND AMPERAGE SUFFICIENT TO

SUPPORT ADEQUATE 208V, 20 AMP, L21-20R BUSWAY TAPS

PER NETWORK ROW) FED FROM B-SIDE SOURCE

BLUE CABLE PATH FOR A-SIDE UPS12

YELLOW CABLE PATH FOR B-SIDE UPS13

LIGHTING:

TELECOMMUNICATIONS

40" NETWORK CABINET WITH HORIZONTAL CABLE CUTOUTS

AND APPROPRIATE CABLE MANAGEMENT ACCESSORIES,

SUPPORTING 5KW REDUNDANT

1 SERVICE PROVIDER ENTRANCE POINT

SERVICE BACKBONE - ENTRANCE ROOM-MAIN COMPUTER

ROOM (MCR) WITH DUAL REDUNDANT PATHWAYS

MAIN CROSS CONNECT (CAMPUS/BUILDING DISTRIBUTOR) –

BACKBONE CABLING (MCR-TELECOMMUNCIATIONS ROOMS)

ENTRANCE ROOM INTERCONNECT

HORIZONTAL DISTRIBUTION TO WORK AREA OUTLETS

(WAO)

ADDITIONAL CABINETS OR TELECOMMUNICATIONS RACKS

TO MEET REQUIREMENTS.

7 HORIZONTAL DISTRIBUTION AREA (HDA) – SIDE A

8 HORIZONTAL DISTRIBUTION AREA – SIDE B

9 MAIN DISTRIBUTION AREA (MDA) – SIDE A

10 MAIN DISTRIBUTION AREA – SIDE B

STANDARD-DENSITY (SD) CABINET SUPPORTING 5KW

REDUNDANT

HIGH-DENSITY (HD) CABINET SUPPORTING 10KW

REDUNDANT. 12+ SUPPORTS ~15KW

WIRE MESH CABLE TRAY MINIMUM OF 4" X 12" WITH SECOND

LEVEL OF FIBER CHANNEL PATHWAY (4" X 4")

15 BLUE CABLE TRAY PATH FOR CABLES TO THE A-SIDE MDA/HDA

YELLOW CABLE TRAY PATH FOR CABLES TO THE B-SIDE MDA/

HDA

17 NETWORK CHANNEL RACK

ELECTRICAL

TYP

DETAIL NUMBER

TYPICAL THROUGHOUT THIS

SHEET

BONDING BUSBAR

ARCHITECTURAL

TELECOMMUNICATIONS

DETAIL NUMBER#

TYP

TYP

DETAIL NUMBER

DETAIL NUMBER

TYPICAL THROUGHOUT THIS SHEET

MECHANICAL

COLD AISLE CONTAINMENT PVC CURTAIN

WIRE MESH CABLE TRAY SIZE COMMENSURATE

WITH REQUIREMENTS

SLEEVE WITH BUSHING FIRESTOP AND INNERDUCT FOR

FIBER

CONDUIT WITH BUSHING FIRESTOP AND INNERDUCT FOR

FIBER

SLEEVE OR CONDUIT WITH BUSHING FIRESTOP AND

INNERDUCT FOR FIBER

TELECOMMUNICATIONS CHANNEL RACK, 19" RAILS, #12-24

TAPPED EIA HOLE PATTERN, 30" DEEP CHANNEL MINIMUM,

7' HIGH, 45RU, WHITE

VERTICAL CABLE MANAGER WITH DOOR, 6" WIDE

MINIMUM (SIZED TO MEET REQUIREMENT)

SERVER CABINET, 45U, 24" X 48" (NOMINAL), SQUARE

PUNCHED RAIL, SINGLE PERFORATED FRONT DOOR, SOLID

REAR DOOR (VERTICAL EXHAUST DUCT [VED]

IMPLEMENTATION), DOUBLE PERFORATED REAR DOOR (NO

VED), TWO-POINT KEYED LOCKS, WHITE, SOLID SIDE PANELS

OR

TELECOMMUNICATIONS CABINET, 7' HIGH, 45U, 40" X

48" (NOMINAL), SQUARE PUNCHED RAIL, SINGLE

PERFORATED FRONT DOOR, SOLID REAR DOOR

(VERTICAL EXHAUST DUCT [VED] IMPLEMENTATION),

DOUBLE PERFORATED REAR DOOR (NO VED), TWO-

POINT KEYED LOCKS, WHITE, SOLID SIDE PANELS

OR WIRE MESH CABLE TRAY SIZE COMMENSURATE WITH

REQUIREMENTS

RETURN AIR DUCT

COMPUTER ROOM AIR CONDITIONER (CRAC) (SEE

COMPUTATIONAL FLUID DYNAMICS REQUIRED FOR SIZING)

REQUIRED CLEARANCE AROUND CRACS (SIZE VARIES

DEPENDING UPON CRAC MANUFACTURER)

ELECTRICAL SERVICE PANEL

OVERHEAD POWER DROP CORD WITH L21-20 RECEPTACLE

POWER BUSWAY TAP WITH SINGLE BREAKER 3' DROP

CORD WITH L21-20R FOR STANDARD-DENSITY CABINETS

POWER BUSWAY TAP WITH DUAL BREAKERS AND QTY

TWO 3' DROP CORDS WITH L21-20R FOR HIGH-DENSITY

CABINETS

TYPICAL UNSWITCHED 110 VOLT, 20 AMP DUPLEX

CONVENIENCE OUTLET

AC

SPLIT PACKAGE AIR CONDITIONER OR EQUIVALENT 24/7

SUPPLY AIR TO REJECT 12,000 BTU/H (3.5 KW) PER

TELECOMMUNICATIONS RACK

AC ADDITIONAL SPLIT PACKAGE AIR CONDITIONER AS

REQUIRED

4' BY 8' AC GRADE ¾” TRADE SIZE PLYWOOD BACKBOARD

PAINTED HIGH-GLOSS WHITE WITH TWO COATS OF FIRE

RESISTANT PAINT FOR SERVICE PROVIDER / SECURITY /

VIDEO / ET CETERA

STANDARD 25% OPEN PERFORATED FLOOR TILE

C R

A C

MODULAR UPS CABINET (POWER MODULES, BATTERIES,

POWER PANELS)

MODULAR UPS CABINET (POWER MODULES, BATTERIES,

POWER PANELS)

LED LIGHTINGLED LIGHTING

POWER BUSWAY WITH METERED HEADEND FOR B SIDE

POWER DISTRIBUTION

POWER BUSWAY WITH METERED HEADEND FOR A SIDE

POWER DISTRIBUTION

CC FIXED CAMERA, PAN/TILT/ZOOM, PASSIVE INFRARED

CAMERA - DUAL TECHNOLOGY

PIV ENABLED TWO-FACTOR AUTHENTICATION KEYPAD

M

CEILING MOUNTED MOTION SENSOR (LOCATIONS AS

REQUIRED FOR FULL ROOM COVERAGE)

MOTION SENSOR LIGHT SWITCH

POWER JUNCTION BOX FOR 60A CONNECTIONJ

TT

CHANGES TO DESIGN WILL REQUIRE A NEW COMPUTATIONAL

FLUID DYNAMICS (CFD) ANALYSIS TO BE PERFORMED

FLOORPLANS ARE NOT TO SCALE

DOCUMENTS ARE NOT TO BE USED FOR CONSTRUCTION

ARCHITECTURAL

3 FT WIDE, 8 FT HIGH DOOR, FIRE RESISTANT TO ¾ HOUR

OR MORE PER AUTHORITY HAVING JURISDICTION (AHJ)

6 FT WIDE, 8 FT HIGH DOOR, NO CENTER MULLION, FIRE

RESISTANT TO ¾ HOUR OR MORE PER AHJ

OVERHEAD POWER DROP CORD WITH L21-30 RECEPTACLE

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

PROPOSED MCR CAMPUS

LOCATION

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 4 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

PROPOSED MCR CAMPUS

LOCATION

Enterprise Data Center

Engineering

PROPOSED CAMPUS CONSOLIDATED DATA CENTER LOCATION

PROPOSED DATA CENTER SITE

DIMENSIONS OF COMBINED CURRENT STRUCTURES(T1 & T2)

RESPECTING AS-IS SETBACKS ARE 60' X 160' OR 9600 FT2 (MOL)

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

PROPOSED OIT BLDG

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 5 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

PROPOSED OIT BLDG

Enterprise Data Center

Engineering

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

PROPOSED FLOORPLAN

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 6 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

PROPOSED FLOORPLAN

Enterprise Data Center

Engineering28

0"

60'-0"

CRAH

HIGH DENSITY ROLL-IN

SECTION

CRAHCRAH

CRAH

PROPOSED FLOOR PLAN FOR DATA CENTER FLOOR1

9 10 7

12+12 1212 1212+

12+

12+ 121212

12+12+ 121212

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

PROPOSED MCR

ELEVATIONS

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 7 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

PROPOSED MCR ELEVATIONS

Enterprise Data Center

Engineering

SIDE ELEVATION ENCLOSURE

NTS

FLOOR TO ENCLOSURE TOP

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

.0 ft

.0 ft

FLOOR TO BOTTOM OF CABLE TRAY

FLOOR TO BOTTOM OF BUSWAY

ENCLOSURE

.3 ft

.3 ft

REAR ELEVATION ENCLOSURES

NTS

NOTE: HEIGHTS ANNOTATED ARE NOTIONAL.

ACTUAL ELEVATIONS TO BE DETERMINED BY

OTHERS

.0 ft

.0 ft

VERTICAL EXHAUST DUCT

UTP CABLE TRAY WITH DROP OUT KIT

.0 ft

.0 ft

.5 ft

.5 ft

AMPS VOLTS

L1

L2

L3

N KW

.5 ft

.5 ft

R

BLK

GND

R

BLK

GND

R

BLK

GND

R

BLK

GND

RETURN AIR DUCT TO CRACS SIZED TO SUPPORT HEAT REJECTION IN

ACCORDANCE WITH COMPUTATIONAL FLUID DYNAMICS (CFD) ANALYSIS

(3'W X 2.5'H)

FIBER CABLE TRAY

BUSWAY TAP

BUSBAR

VERTICAL EXHAUST DUCT

FIBER PATHWAY

BUSWAY HEADEND

WIRE MESH CABLE TRAY

FLOOR TO BOTTOM OF RETURN DUCT

FLOOR TO TOP OF RETURN DUCT

RETURN AIR DUCT

FLOOR TO SLAB ABOVE

NO SUSPENDED CEILING

MINIMUM 12' REQUIRED

RECOMMENDED 16'

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

ISOMETRIC FLOORPLAN

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 8 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

ISOMETRIC FLOORPLAN

Enterprise Data Center

ISOMETRIC FLOOR PLAN1

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

CFD INLET TEMPS AT FULL

OPERATION

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 9 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

CFD INLET TEMPS AT FULL

OPERATION

Enterprise Data Center

Engineering

1 1 INLET TEMPERATURES AT FULL HEAT REJECTION OPERATION INLET TEMPERATURES AT ~N HEAT REJECTION OPERATION

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

COMPUTATIONAL FLUID

DYNAMICS STUDY

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 10 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

COMPUTATIONAL FLUID

DYNAMICS STUDY

Enterprise Data Center

Engineering

Pressure-velocity field showing how the cooling units supply different areas in the modeled facility and potential limitations on airflow in areas or zones that can impact critical load density at ~48 inches AFF.

Airflow streamer views showing how airflows operate and the temperatures in various parts of the model, showing airflow separation, bypass, and recirculation graphics.

TOTAL HEATLOAD AND AIRFLOW

XY plane temperature billboard showing the general distribution of temperatures at the modeled operating conditions.

XZ plane temperature billboard showing a vertical distribution of temperatures, showing differentials between hot and cold aisles

Pressure-velocity field showing velocity within the hot-air containment plenum at full data center operating capacity.

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

PATHWAYS

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 11 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

PATHWAYS

Enterprise Data Center

Engineering28

0"

60'-0"

CRAH

HIGH DENSITY ROLL-IN

SECTION

CRAHCRAH

CRAH

GENERIC FLOOR PLAN FOR LARGE DATA CENTERS – DATA CABLE TRAYS1

5 RU PATHWAY RACK

SIDE A HDA

78 10

SIDE B HDA

ALL BENDS MUST BE SWEEPING 45 DEGREE BENDS.

EIGHT TRADE SIZE FOUR CONDUITS/SLEEVES FROM ENTRANCE. PROVIDE

WALL-MOUNTED LADDER FROM FLOOR TO CABLE TRAY TO SUPPORT MEDIA

EIGHT TRADE SIZE FOUR CONDUITS/SLEEVES FROM ENTRANCE. PROVIDE

WALL-MOUNTED LADDER FROM FLOOR TO CABLE TRAY TO SUPPORT MEDIA

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

ED & HD

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 12 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

ED & HD

Enterprise Data Center

Engineering

STANDARD DENSITY EQUIPMENT DISTRIBUTOR ELEVATION FOR CABINETS

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

1st LEVEL BACKBONE

12 DUPLEX LC FIBER CONNECTIONS PER SIDE

48 CAT 6A TO SAME MDA

RU44

RU43

RU42

RU41

48-PORT 1RU “B” SIDE PATCH PANEL FOR 10 GbE

48-PORT 1RU “A” SIDE PATCH PANEL

FOR 10 GbE

FIBER DISTRIBUTION FOR 10+ GbE

ANGLED BLANKING PANEL

ANGLED BLANKING PANEL

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

PROPOSED HDA ELEVATIONS FOR ALL THREE ROWS

HD FIBER DISTRIBUTION FROM THE

ED IN EACH CABINET IN THE ROW

HD UTP DISTRIBUTION FROM THE

ED IN EACH CABINET IN THE ROW

SIDE “A” SIDE “B”

22 RU FOR LAN ELEMENTS

AND LEAF OR ACCESS LAYER

SWITCHES

PATHWAY RACK ELEVATION

RU45

1 1

2 2

3 3

4 4

5 5

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON48-PORT 1RU “B” SIDE PATCH PANEL

FOR 10 GbE

48-PORT 1RU “A” SIDE PATCH PANEL

FOR 10 GbE

FIBER DISTRIBUTION FOR 10+ GbE

“A” SIDE

12 DUPEX LC (QTY TWO 12-STRAND

MPO / MPO CABLE, QTY TWO MPO/

LC CASSETTES UNIVERSAL POLARITY)

“B” SIDE

12 DUPEX LC (QTY TWO 12-STRAND

MPO / MPO CABLE, QTY TWO MPO/

LC CASSETTES UNIVERSAL POLARITY)

“A” SIDE

12 DUPEX LC (QTY TWO 12-STRAND

MPO / MPO CABLE, QTY TWO MPO/

LC CASSETTES UNIVERSAL POLARITY)

“B” SIDE

12 DUPEX LC (QTY TWO 12-STRAND

MPO / MPO CABLE, QTY TWO MPO/

LC CASSETTES UNIVERSAL POLARITY)

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

RK1BxxRK1Axx

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

MDA A

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 13 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

MDA A

Enterprise Data Center

Engineering

EIGHT (8) RACK MDA. FOUR (4) RACKS PER SIDE. 1

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

“A” SIDE UTP BACKBONE

PATCH PANELS

FOR 10 GbE

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

24 RU FOR LAN ELEMENTS,

SPINE AND AGGREGATION

LAYER SWITCHES, AND OOB

“A” SIDE FO BACKBONE

FOR 10+ GbE

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

RKxAxx RKxAxx RKxAxx RKxAxx

HORIZONTAL DISTRIBUTION

FOR FIVE (5) PATHWAY RACKS

IN ROLL-IN AREA

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

CAMPUS FIBER BACKBONE

~2400 STRANDS

144 PER FDC

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

MDA B

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 14 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

MDA B

Enterprise Data Center

Engineering

EIGHT (8) RACK MDA. FOUR (4) RACKS PER SIDE. 1

24 RU FOR LAN ELEMENTS,

SPINEAND AGGREGATION

LAYER SWITCHES, AND OOB

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

1 1

2 2

3 3

4 4

5 5

6 6

7 7

8 8

9 9

10 10

11 11

12 12

13 13

14 14

15 15

16 16

17 17

18 18

19 19

20 20

21 21

22 22

23 23

24 24

25 25

26 26

27 27

28 28

29 29

30 30

31 31

32 32

33 33

34 34

35 35

36 36

37 37

38 38

39 39

40 40

41 41

42 42

43 43

44 44

45 45

RKxBxxRKxBxxRKxBxxRKxBxx

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON “B” SIDE UTP BACKBONE

PATCH PANELS

FOR 10 GbE

“B” SIDE FO BACKBONE

FOR 10+ GbE

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

13 14 15 16 17 18 19 20 21 22 23 24

37 38 39 40 41 42 43 44 45 46 47 48

1 2 3 4 5 6 7 8 9 10 11 12

25 26 27 28 29 30 31 32 33 34 35 36 LEVITON

HORIZONTAL DISTRIBUTION

FOR FIVE (5) PATHWAY RACKS

IN ROLL-IN AREA

CAMPUS FIBER BACKBONE

~2400 STRANDS

144 PER FDC

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

CABLE TRAY CAPACITY

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 15 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

CABLE TRAY CAPACITY

Enterprise Data Center

Engineering

PROPOSED CABLE TRAY:

CABLOFIL CF150/450

6" DEEP X 18" WIDE (A)

WHITE POWERCOAT

TRAY INSERT

MAX. CAPACITY:

536 CATEGORY 6a UTP (0.35 OD)

MAXIMUM PLANNED UTP CABLE FILL:

480 CABLES AT .30 OD CMP

MAXIMUM ANTICIPATED MAX LOAD:

18.5 LBS PER FOOT

LOAD IN LBS FT PER SPAN:

5:175.9

6: 155*

7: 113.9

8: 98.3

* RECOMMENDED MAX UNSUPPORTED

SPAN

PROPOSED UTP MEDIA:

LEVITON ATLAS-X1 TRUNKS

CATEGORY 6A PLENUM

SIX CABLES PER BUNDLE

QTY 16 TRUNKS PER CABINET

COMPENENT MEDIA:

BERK-TEK LANMARK 10G2

.30 OD

NOMINAL WEIGHT: 38 LB/KFT

ASSOCIATED PATCH PANEL:

LEVITON 49256-D48 ANGLED QUICKPORT

48 POSITION

TWO (2) RACK UNITS PER PANEL

PROPOSED FO MEDIA:

PANDUIT QUICKNET OM5 SIGNATURE

OM5 50/125 MULTIMODE

12 FIBERS ASSEMBLY

SINGLE MPO INTERFACE PER SIDE

OFNP LIME GREEN

POLARITY METHOD – B

15.9lbs/kft

OD .18 INCHES

ASSOCIATED CASSETTES (ED):

LEVITON 12-FIBER MTP-LC CASSETTE

UNIVERSAL

ASSOCIATED CASSETTES (HD):

BASE-12 12-FIBER MTP-LC (.50 db)

UNIVERSAL

FIBER DISTRIBUTION CABINET:

LEVITON ANGLED OPT-X

144 FIBER

ONE (1) RACK UNIT

CABLE TRAY CAPACITY PLANNING1

UTP PHYSICAL CHARACTERISTICS FOR CP3

FO PHYSICAL CHARACTERISTICS FOR CP5

PROPOSED CABLE TRAY:

CABLOFIL CF 105/100

4" DEEP X 4" WIDE (A)

TRAY INSERT

WHITE POWERCOAT

MAX. CAPACITY:

209 (0.22 OD)

MAXIMUM PLANNED CABLE FILL:

40 CABLES

CABLE TRAY FOR FO45 RU PATHWAY RACK2

RECOMMENDED A-SIDE

JACK COLOR: BLUE

RECOMMENDED B-SIDE JACK

COLOR: YELLOW

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

FIBER DISTRIBUTION PANEL

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 16 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

FIBER DISTRIBUTION PANEL

Enterprise Data Center

Engineering

LEVITON Opt-X® UHDX 1RU Angled Panel

RECOMMENDED (OE) UTP PATCH PANEL:

LEVITON e2XHD-BLK HIGH-DENSITY

ANGLED

48 POSITION

ONE RACK UNIT PER PANEL

WITH REAR CABLE MANAGER

AND ANGLED PANEL COVERS

UTP PATCH PANEL

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

FO POLARITY

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 17 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

FO POLARITY

Enterprise Data Center

Engineering

ED

12 STRAND MPT TO LC

UNIVERSAL POLARITY CAS.

HDA (A OR B)

12 STRAND MPT TO LC

UNIVERSAL POLARITY CAS.

MDA

12 STRAND MPT TO LC

UNIVERSAL POLARITY CAS.

12-STRAND TRUNKS (QTY 4)

POLARITY: B

12-STRAND TRUNKS (QTY 4)

POLARITY: B

FIBER TRUNK POLARITY AND SCHEMATIC

FIBER NETWORK POLARITY DESIGN

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

BUSWAY POWER

DISTRIBUTION

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 18 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

BUSWAY POWER

DISTRIBUTION

Enterprise Data Center

Engineering

R

BLK

GND

R

BLK

GND

R

BLK

GND

R

BLK

GND

R

BLK

GND

R

BLK

GND

R

BLK

GND

R

BLK

GND

R

BLK

GND

R

BLK

GND

R

BLK

GND

R

BLK

GND

POWER FEED UNIT

WITH CURRENT MONITOR TO

SUPPORT ~225 AMPS FOR EACH

SERVER ROW. POWER

CALCULATIONS TO BE PERFORMED

BY OTHERS.

TYPICAL POWER BUSWAY COMPONENTS FOR SERVER ROWS

POWER BUSWAY TAP WITH DUAL BREAKER WITH

TWO 3' DROP CORDS (WITH STRAIN RELIEF) WITH

L21-20R FOR HIGH-DENSITY CABINETS. TWO PER

BUSWAY. 12+ CABINETS MAY REQUIRE A

COMBINATION OF TAPS.

CHANNEL

ALARM

1 2 3 4 CTRL

RS-485

RS-232

POWER BUSWAY TAP WITH SINGLE BREAKER 3'

DROP CORD (WITH STRAIN RELIEF)

WITH L21-20R FOR STANDARD-DENSITY CABINETS.

10 PER BUSWAY.

208V 3 PHASE POWER BUS BAR

208 VOLT PDU FOR EQUIPMENT POWER – TO BE ENERGIZED BY ZONE PDU2

REQUIRES ONE (1)

L21-20R

20A 120/ 208V

Y

CHATSWORTH ECONNECT PDU; VERTICAL; MONITORED; L21-20 PLUG; THREE PHASE; 120/208V INPUT;

20A; (30) C13 (6) C19 OUTLETS; 208V OUTPUT; 3 X 2P 20A HYDRAULIC MAGNETIC BREAKERS; LCD;

ETHERNET, USB, AND ENVIRONMENTAL SENSOR PORTS; IP AND SERIAL MONITORING; IP CONSOLIDATION

(PDU LINKING); TOOL-LESS MOUNTING; 70.5"H (1791 MM) X 2.2"W (56 MM) X 2.2"D (56 MM)

CHATSWORTH

P R O D U C T

Temp/Humidity Out

In / IOIOIO10/100

Reset

Warning

OK

Critical

C B

C B

C B

C B

1 C B

1C B

1C B

C B

C B

C B

C B

2C B

OFF

O

ON

I

CB2

OFF

O

ON

I

CB1

OFF

O

ON

I

CB3

RACK/ENCLOSURE

RACKED

EQUIPMENT PDU

B1

B2

PDU

A1

A2

PS

PS

POWER SCHEMATIC FOR POWER RACK- LEVEL REDUNDANCY

BUS A BUS B

RACK/ENCLOSURE

RACKED

EQUIPMENT

PDU

B1

PDU

A1

PS

PS

BUS A BUS B

HIGH DENSITY – TWO

L21-20 DROPS PER

BUSWAY

STANDARD DENSITY –

ONE L21-20 DROP PER

BUSWAY

THIS DESIGN PROVIDES DIVERSE POWER INPUTS FOR ACTIVE EQUIPMENT BY

SPLITTING THE SOURCE POWER ACROSS TWO BUSES. EACH SERVER CABINET

WILL CONTAIN A MINIMUM OF TWO EQUIPMENT-FACING PDUs – EACH WILL BE

ENERGIZED BY SEPARATE BUSES.

RACK/ENCLOSURE

RACKED

EQUIPMENT PDU

B1

B2

B3

PDU

A1

A2

A3

PS

PS

BUS A BUS B

ULTRA HIGH DENSITY –

TWO L21-20 DROPS PER

BUSWAY

ONE L21-20 DROP PER

BUSWAY

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

TYPICAL SERVER CABINET

DETAIL

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 19 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

TYPICAL SERVER CABINET

DETAIL

Enterprise Data Center

Engineering

TYPICAL ENCLOSURE SPECIFICATION

NTS

TYPICAL ENCLOSURE TOP WITH VERTICAL EXHUAST DUCT

NTS

TYPICAL ENCLOSURE TOP WITH VERTICAL EXHUAST DUCT

NTS

CP3093645 F-Series G2 TeraFrame Cabinet with accessories installed

Configuration includes the following components:

Item Number Description (Qty)

FF1N-111C-E62 F-Series TeraFrame Cabinet System, 23.6" (600mm) W x 43.30" (1100mm) D x 45U H, Square-Punched Rails, Perforated Metal Front Door, Two Point Swing Handle Latch, Single Solid Metal Rear Door, Two Point Swing

Handle Latch, Vertical Exhaust Duct System 34-60" (864-1524mm), 2 Solid Side Panels, Glacier White (1)

024-735000-E97 Frame, F-Series TeraFrame Cabinet, Gen 2 ,23.6"(600mm)Wx43.3"(1100mm)Dx45U H,Glacier White (1)

024-735009-005 Mounting Rail Kit, Square Punched For F-Series TeraFrame Cabinet Gen 2 Cabinets 23.6"(600mm)Wx45U

H,Plated (2)

024-734450-E05 Front Door, Perforated Metal, 23.6 (600mm) W x 45U H, Glacier White (1)

024-734547-C21 Door Latch Kit, Front, Swing Handle, Two Point, Perf or Solid Metal, Keyed Lock, 45U H, Black (1)

024-735054-E05 Door, Solid Rear, F-Series TeraFrame Cabinet, Gen 2 ,23.6"(600mm)Wx45U H,Glacier White (1)

024-734513-C05 Door Latch Kit, Rear, Swing Handle, Two Point, Keyed Lock, 45U, Black (1)

024-735016-E12 Vertical Exhaust Duct System, F-Series TeraFrame Cabinet, Gen 2 ,600mm Wide, 34"-60"

High,1100D,Glacier White (1)

024-735060-E97 Side Panel, F-Series TeraFrame Cabinet, Gen 2 , 43.3"(1100mm)Dx45U H,Glacier White (2)

024-735059-002 Common Parts Kit, F-Series TeraFrame Cabinet, Gen 2 (1)

024-735077-002 F-Series TeraFrame Cabinet Cabinet with Caster Packaging, 600-700mm X 1025-1200mm D X 36-45U H (1)

024-734434-C01 Bracket Kit, 66" Power Strip, Black (1)

024-734587-001 F-Series TeraFrame Cabinet Floor Clamp Kit, 4 Pc,Clear Zinc (1)

UL Listing This F-Series TeraFrame Cabinet and any included accessories are UL Listed under the NWIN category per the UL60950 Standard, UL file number E227626. Note, the UL Listing only applies to cabinets manufactured in the United States.

34521-E05 Air Dam Kit, 23.6 (600mm) W x 45U H, Glacier White, UL Listed (1)

34421-C01 Vertical Cable Manager w/ Short Fingers, 23.6 (600mm) W, 45U H, Black, UL Listed (2)

35051-C01 Caster Kit, F-Series TeraFrame Cabinet, Black (1)

35079-E02 TeraFrame Narrow Baying Brackets, Pair, TeraFrame To TeraFrame, G2 , All Heights, Glacier White (1)

35081-003 TeraFrame Seal Kit, 0 or 1 Side Panel, TeraFrame Cabs using Narrow Baying Brackets (1)

35085-E12 TeraFrame Bottom Panel, G2 , 600 mm W x 1100 mm D,White (1)

35700-705 Vertical Power Strip Mounting Brackets (4)

(VENDOR TO PROVIDE 45 RU OF PLENAFILL BLANKING PANEL PER ENCLOSURE)

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

TYPICAL

TELECOMMUNICATION RACK

DETAIL

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 20 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

TYPICAL

TELECOMMUNICATION RACK

DETAIL

Enterprise Data Center

Engineering

6" WIDE VERTICAL CABLE MANAGEMENT

P/N: OR-MM20VMD706 (OR EQUIVALENT)

MM20 VERTICAL CABLE MANAGEMENT "CAGE", WITH DOOR,

6.45" X 10.26" X 76.94" WHITE

CAPACITY: 350 CATEGORY 6 PATCH CORDS OR 245 CATEGORY

6A PATCH CORDS

LARGER VCM AUTHORIZED IN ACCORDANCE WITH CABLING

REQUIREMENT

6 in

TYPICAL RACK DIMENSIONS AND

SPECIFICATIONS

P/N: OR-MM2073038-W (OR EQUIVALENT)

MIGHTY MO 20 CABLE MANAGEMENT RACK

30" CHANNEL DEPTH, 7' HIGH, WHITE FINISH OR EQUIVALENT

DIMENSIONS:

USABLE HEIGHT: 45RU

DEPTH (US): 30

HEIGHT (US): 7'

WIDTH (US): 23.75"

STATIC LOAD CAPACITY: 2000 LBS

SQUARE HOLE

FRONT AND REAR HEAVY DUTY PERFORATED SECURITY DOOR (OR-

MM20724PDHD-W) (OPTIONAL)

SECURITY DOOR FRONT

MOUNTING HARDWARE (OR-

MM2024DMFHD-W)4

SECURITY DOOR REAR

MOUNTING HARDWARE (OR-

MM2024DMRHD-W)2

PDU MOUNTING BRACKET

KIT (TWO KITS PER RACK)

P/N: OR-MM20PDUMB1D2W-

W3

NOTE:

TELECOMMUNICATION CHANNEL RACKS ARE REQUIRED IN ALL

TELECOMMUNICATION ROOMS. TELECOMMUNICATION

CHANNEL RACKS OR TELECOMMUNICATION CABINETS MAY BE

USED IN THE HORIZONTAL AND MAIN DISTRIBUTION AREAS.

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

TYPICAL NETWORK CABINET

DETAIL

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 21 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

TYPICAL NETWORK CABINET

DETAIL

Enterprise Data Center

Engineering

TYPICAL RACK CONFIGURATION – CHATSWORTH NF8N-115C-E52-1

FRONT VIEW DIMENSIONS

ISOMETRIC VIEW WITH DOORS AND VERTICAL EXHAUST DUCT (VED)

40"

.4

19"

.1

U

35.9"

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

TYPICAL NETWORK CABINET

ACCESSORIES

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 22 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

TYPICAL NETWORK CABINET

ACCESSORIES

Enterprise Data Center

Engineering

PDU BRACKET

CABLE LASHING MANAGER

TELESCOPING CABLE MANAGER

TOP SLOT CAPACITY FILL CHART

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

NETWORK CABINET SIDE

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 23 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

NETWORK CABINET SIDE

Enterprise Data Center

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

TELECOMMUNICATIONS

BONDING

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 24 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

TELECOMMUNICATIONS

BONDING

Enterprise Data Center

Engineering

12"

4"

ANSI/EIA/TIA COMPLIANT

BUSBAR

CHATSWORTH P/N: 40158-012

ALL BONDING SHALL BE DONE IN ACCORDANCE WITH ANSI/TIA/EIA 607-C , NFPA 70, AND IN COMPLIANCE WITH

LOCAL CODES.

EQUIPMENT BONDING CONDUCTORS (EBC) ARE TO BE BONDED TO THE RACK BONDING BUSBAR (RBB) AND THE

BOND POINT ON EACH LAN SWITCH AS ILLUSTRATED IN DETAILS SIX AND SEVEN BELOW. ALL EQUIPMENT

SHALL BE GROUNDED PER MANUFACTURER’S INSTRUCTIONS.

CABLE TRAY BONDING CONDUCTORS WILL BE INSTALLED AT EACH CABLE TRAY PATHWAY JOINT IN THE MAIN

COMPUTER ROOM. SEE DETAIL 1 ON THIS SHEET

ONE RACK BONDING BUSBAR (RBB) TO BE INSTALLED IN EACH TELECOMMUNICATIONS RACK/CABINET IN THE

MAIN COMPUTER ROOM (MCR) AND IN THE TELECOMMUNICATIONS ROOMS (TR). RBB WILL BE BONDED TO

THE TELECOMMUNICATIONS EQUIPMENT BONDING CONDUCTOR (TEBC) AND WILL BOND THE TEBC TO THE

SECONDARY BONDING BUSBAR (SBB). SEE DETAIL 2 ON THIS SHEET.

SECONDARY BONDING BUSBAR (SBB) WILL BE INSTALLED IN THE MCR. SBB WILL BE CONNECTED TO THE

PRIMARY BONDING BUSBAR (PBB). .

NOTES:

DIRECTLY BONDED TO

RBB

GROUNDING PAD

UNDER LIP

TWO-HOLE

COMPRESSION LUG

GROUNDING

PAD

UBC

SCREWS (M4)

20"

4"

ANSI/EIA/TIA COMPLIANT

BUSBAR

CHATSWORTH P/N: 40153-

020 OR EQUIVALENT.

MINIMUM DIMENSION: .25"

THICK, 4" WIDE, 20" LONG.

LENGTH MAY BE DETERMINED

BY INSTALLER. MUST BE

LISTED BY A NRTL.

COMPRESSION

TWO -HOLE

GROUND LUG

TELECOMMUNICATIONS MAIN

BONDING CONDUCTOR TO

GROUND ON MAIN ELECTRICAL

DISTRIBUTION PANEL

TELECOMMUNICATION

S BONDING

CONDUCTOR TO TGB

LOCATED IN TR

THIS EQUIPMENT MUST BE GROUNDED. NEVER DEFEAT THE GROUND CONDUCTOR

OR OPERATE THE EQUIPMENT IN THE ABSENCE OF A SUITABLY INSTALLED GROUND

CONDUCTOR. THIS DEVICE WILL BE BONDED TO THE RBB IN THE SAME RACK. EACH

DEVICE WILL HAVE A DEDICATED UNIT BONDING CONDUCTOR (UBC). THE UBC WILL

NOT BE SHARED.

THIS EQUIPMENT MUST

BE GROUNDED. NEVER

DEFEAT THE GROUND

CONDUCTOR OR

OPERATE THE

EQUIPMENT IN THE

ABSENCE OF A SUITABLY

INSTALLED GROUND

CONDUCTOR. THIS

DEVICE WILL BE BONDED

TO THE RBB IN THE SAME

RACK. EACH DEVICE WILL

HAVE A DEDICATED UNIT

BONDING CONDUCTOR

(UBC). THE UBC WILL

NOT BE SHARED.

JOINING REQUIREMENTS

JOINING REQUIREMENTS

RACK BONDING REQUIREMENTS

RACK BONDING REQUIREMENTS

TELECOMMUNICATIONS SECONDARY BONDING BUSBAR (SBB)

TELECOMMUNICATIONS SECONDARY BONDING BUSBAR (SBB)

COMPRESSION

TWO -HOLE

GROUND LUG

TELECOMMUNICATIONS PRIMARY BONDING BUSBAR (PBB)

TELECOMMUNICATIONS PRIMARY BONDING BUSBAR (PBB)

CISCO 3850 AND 9300 BONDING

CISCO 3850 AND 9300 BONDING

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

Telecommunication Entrance

Rooms

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 25 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

Telecommunication

Entrance Rooms

Enterprise Data Center

Engineering

TT

AC

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

TYP

AC

NOTE:

THERE SHALL BE A MINIMUM OF ONE ENTRANCE ROOM PER BUILDING.

A TELECOMMUNICATIONS ROOM OR EQUIPMENT ROOM (DATA CENTER) CAN SERVE AS AN ENTRANCE ROOM

GROSS FLOOR SPACE

SERVED (FT2)

ENTRANCE FACILITY SIZE

ALLOCATION

<200,000 FT2

<400,000 FT2

<500,000 FT2

<600,000 FT2

<800,000 FT2

<1,000,000 FT2

10'X10'

12'X13'

12'X15.5'

12'X18.5'

12'X22.5'

12'X27.5'

GROSS FLOOR SPACE

SERVED (FT2)

ENTRANCE FACILITY SIZE

ALLOCATION

<200,000 FT2

<400,000 FT2

<500,000 FT2

<600,000 FT2

<800,000 FT2

<1,000,000 FT2

10'X10'

12'X13'

12'X15.5'

12'X18.5'

12'X22.5'

12'X27.5'

GROSS FLOOR SPACE

SERVED (FT2)

WALL LENGTH FOR

ENTRANCE FACILITY

TERMINATION

<10,000 FT2

<20,000 FT2

<40,000 FT2

<50,000 FT2

<60,000 FT2

<80,000 FT2

<100,000 FT2

39"

42"

68"

90"

96"

120"

144"

GROSS FLOOR SPACE

SERVED (FT2)

WALL LENGTH FOR

ENTRANCE FACILITY

TERMINATION

<10,000 FT2

<20,000 FT2

<40,000 FT2

<50,000 FT2

<60,000 FT2

<80,000 FT2

<100,000 FT2

39"

42"

68"

90"

96"

120"

144"

WALL SPACE REQUIREMENT

REQUIRED TERMINATION WALL SPACE FOR AN ENTRANCE

ROOM IN A TR OR ER PER THE CHART BELOW:

FLOOR SPACE REQUIREMENT

ADDITIONAL FLOOR SPACE SHOULD BE PROVIDED FOR

FACILITIES WITH GROSS SQUARE FOOTAGE PER THE

CHART BELOW:

HEALTH CARE FACILITY ENTRANCE ROOMS SHALL BE

170 SQ FT

GENERIC FLOOR PLAN FOR ENTRANCE ROOM (ONE SERVICE PROVIDER)

GENERIC FLOOR PLAN FOR ENTRANCE ROOM (TWO SERVICE PROVIDERS)

GENERIC FLOOR PLAN FOR HEALTHCARE ENTRANCE ROOM

TELECOMMUNICATION ENTRANCE ROOM NOTES

Department of Veterans Affairs

IT Operations and Services

Solution Delivery

DATE

ISSUE:

DESCRIPTIONMARK

FILE: SLC_DCIE_21-9_MCR Design v1.vsdx

DRAWN BY: Michael Julian, RCDD

CHECKED BY:

DOC VERSION No:

PROJECT No:

SHEET TITLE

Telecommunications Rooms

PRINT DATE: Apr 13, 2021

ISSUE DATE: Apr 13,2021

SHEET: 26 OF 28

Kelly Bates, DCIE

Kevin Gzelka, CTDC

1.0

OIT DESIGN GUIDE

TEMPLATES

N/A

A

B

C

D

2 3 4

1 2 3 4

A

B

C

D

Telecommunications Rooms

Enterprise Data Center

Engineering

AC AC

33 4455

TYP

TYP

TYP

5 4

TYP

TYP

TYP

TT

TYP

TYP

TYP

TT

NOTE:

THERE SHALL BE A MINIMUM OF ONE TELECOMMUNICATIONS ROOM (TR) PER FLOOR.

THE EQUIPMENT ROOM CAN SERVE AS A TR. ADDITIONAL ROOMS SHOULD BE PROVIDED WHEN:

A) THE FLOOR AREA TO BE SERVED EXCEEDS 1000 M2 (10 000 FT2);

OR

B) THE HORIZONTAL DISTRIBUTION DISTANCE TO THE WORK AREA EXCEEDS 90 M (295 FT).

FLOOR SPACE REQUIREMENT:

1. MINIMUM OF 80 SQ FT FOR A 1 RACK TR

2. ADD AN ADDITIONAL 20 SQ FT PER ADDITIONAL RACK

3. MINIMUM OF 170 SQ FT FOR A HEALTH CARE FACILITY TR

GENERIC FLOOR PLAN FOR HEALTH CARE FACILITY TELECOMMUNICATIONS ROOMS 2

GENERIC FLOOR PLAN FOR TELECOMMUNICATIONS ROOMS (TWO RACK REQUIREMENT)

(TELECOMMUNICATIONS SPACE SUPPORTING NETWORK DISTRIBUTION TO WORK AREA

OUTLETS)

GENERIC FLOOR PLAN FOR TELECOMMUNICATIONS ROOMS (ONE RACK REQUIREMENT)

(TELECOMMUNICATIONS SPACE SUPPORTING NETWORK DISTRIBUTION TO WORK AREA

OUTLETS )

TELECOMMUNICATION ROOM NOTES

SLC_DCIE_21-9_MCR Design v1.vsdx
COVER
REVISION SHEET
LEGEND
PROPOSED MCR CAMPUS LOCATION
PROPOSED OIT BLDG
PROPOSED FLOORPLAN
PROPOSED MCR ELEVATIONS
ISOMETRIC FLOORPLAN
CFD INLET TEMPS AT FULL OPERATION
COMPUTATIONAL FLUID DYNAMICS STUDY
PATHWAYS
ED & HD
MDA A
MDA B
CABLE TRAY CAPACITY
FIBER DISTRIBUTION PANEL
FO POLARITY
BUSWAY POWER DISTRIBUTION
TYPICAL SERVER CABINET DETAIL
TYPICAL TELECOMMUNICATION RACK DETAIL
TYPICAL NETWORK CABINET DETAIL
TYPICAL NETWORK CABINET ACCESSORIES
NETWORK CABINET SIDE
TELECOMMUNICATIONS BONDING
Telecommunication Entrance Rooms
Telecommunications Rooms

File details come from the government source that posted it. Updated .