SOW Attachment 01 - VHA Required Div 01 Spec Sections.docx
DOCX document 21 KB Posted
- Solicitation number
- 36C77623R0032
About this file
This pre-solicitation notice seeks statements of qualifications from architecture and engineering firms for design services related to network infrastructure upgrades at the George E. Wahlen VA Medical Center in Salt Lake City, Utah. Firms must submit SF330 forms by January 31, 2023 demonstrating experience with IT systems design, construction scheduling, sustainable practices, and familiarity with VA requirements. The project aims to replace an existing data center and requires disciplines including architecture, mechanical, electrical, and security engineering. The design must be complete within 210 days of award. The construction cost estimate is $8.75 million and this is a 100% set-aside for service-disabled veteran-owned small businesses. Statements of qualifications will be evaluated based on specialized experience, past performance, capacity, knowledge of the project location, and experience with construction-period services. The highest rated firm may receive a site visit and negotiations, with award going to the firm providing services at a fair and reasonable price.
View the file
Other files
Show all 22
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements
File details come from the government source that posted it. Updated .