Attachment 22 - Past Performance Questionnaire.docx

DOCX document 18 KB Posted

Attached to
C1BG--660-21-707 EHRM Design Package SLC (VA-22-00028648)
Solicitation number
36C77623R0032
Issued by

About this file

This document is a pre-solicitation notice for architectural and engineering services to design electrical, HVAC, and IT infrastructure upgrades at the George E. Wahlen VA Medical Center in Salt Lake City, Utah. The project involves constructing a new data center to replace existing spaces and includes upgrades to networking, cabling, electrical systems, backup power, and building automation. Responses in the form of SF330 qualifications packages are due by 4:00 PM Eastern Time on Tuesday, 2023. The selection will evaluate firms on their specialized experience designing similar healthcare IT and facility infrastructure projects, technical qualifications of staff, past performance, and capacity to complete the design within 210 calendar days of award. The contract is set aside for Service-Disabled Veteran-Owned Small Businesses and has an estimated construction value of $8,754,000. The Department of Veterans Affairs Technology Acquisition Center in Austin, Texas issued the pre-solicitation notice.

View the file

Other files

File Type Posted
SOW Attachment 11- Appendix B Contract Clause.pdf PDF
Attachment 20 AE Design SOW - EHRM Infrastructure Upgrades -Tier 2.pdf PDF
SOW Attachment 03-1 HEFP SEP Design Alert 1-8.pdf PDF
SOW Attachment 19 - Construction Cost Estimate Template.xlsx XLSX spreadsheet
36C77623R0032.docx DOCX document
SOW Attachment 17 - Electrical Design Manual.pdf PDF
Attachment 21 - Wage Determination SL County.gov.pdf PDF
SOW Attachment 12 - Appendix C Contract Clause.pdf PDF
SOW Attachment 02 - VA OEHRM Site Infrastructure Requirements 2.0.pdf PDF
SOW Attachment 07 - Seasonal Influenza with Vaccines.pdf PDF
SOW Attachment 16 - Infrastructure Standard for Telecommunication Spaces.pdf PDF
SOW Attachment 13 - 01 32 16.01 EHRM Arch and Eng CPM Schedule Spec.pdf PDF
SOW Attachment 05 - 01 32 16.01 EHRM A-E CPM Schedules - NOA.docx DOCX document
SOW Attachment 08 - VHA Directive 1061.pdf PDF
SOW Attachment 01 - VHA Required Div 01 Spec Sections.docx DOCX document
SOW Attachment 09 - X-Matrix Summary - Site Assessment.xlsx XLSX spreadsheet
SOW Attachment 15 - Salt Lake City MCR Design.pdf PDF
SOW Attachment 10 - VHA COVID-19 Supplemental Contract Requirements 12-14-21.pdf PDF
SOW Attachment 14 - Salt Lake City Campus Map.pdf PDF
SOW Attachment 04 - Sensitive Infrastructure Data Classification Memo.pdf PDF
SOW Attachment 18 - Physical Security and Resiliency Design Manual.pdf PDF
SOW Attachment 06 - PG 18-15 A-E Submission Reqs Vol C - EHRM.docx DOCX document
Show all 22

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

ATTACHMENT 4 - PAST PERFORMANCE QUESTIONNAIRE

1. Contractor Information

Firm Name:

Address:

Phone Number:

Point of Contact:

Contact Phone Number:

DUNs Number:

2. Work Performed as: |_| Prime Contractor |_| Sub Contractor |_| Joint Venture |_| Other

Percent of project work performed:

If subcontractor, who was the prime (Name/Phone #):

3. Contract Information Contract Number:

Delivery/Task Order Number (if applicable):

Contract Type: |_| Firm Fixed Price |_| Cost Reimbursement |_| Other (Please specify):

Contract Title:

Contract Location:

Project Description:

Complexity of Work |_| High |_| Med |_| Routine Award Date (mm/dd/yy):

Contract Completion Date (mm/dd/yy):

Actual Completion Date (mm/dd/yy):

Explain Differences:

Original Contract Price (Award Amount):

Final Contract Price (to include all modifications, if applicable):

Explain Differences:

Rating: Please evaluate the past performance using only the following ratings without variation. DO NOT RATE ON A “+” OR “-“ SCALE. If a “+” or “-“ is used, the rating without the "+" or "-" will be applied. In addition to the ratings, please provide a short narrative in the appropriate block or in the remarks section of this form.

“O”
Outstanding
The Offeror’s performance met contractual requirements and exceeded many requirements to the Client’s benefit. The contractual performance was accomplished with few minor problems for which corrective actions taken by the offeror were highly effective.
“A”
Above Average
The Offeror’s performance met contractual requirements and exceeded some requirements to the Client’s benefit. The contractual performance was accomplished with some minor problems for which corrective actions taken by the offeror were effective.
“S”
Satisfactory
The Offeror’s performance met contractual requirements. The contractual performance contained some minor problems for which corrective actions taken by the offeror were satisfactory.
“M”
Marginal
Performance did not meet some contractual requirements. Performance indicated that there are some potential risks associated with the quality products, timeliness of service, and contract performance.
“U”
Unacceptable
Performance did not meet contractual requirements. The contractual performance reflected a serious problem for which the offeror has yet to identify corrective actions or the offeror’s proposed actions appear only marginally effective or were not fully implemented.

Please rate and provide any supporting information/comments for the following:

1. The quality of the working relationship with the client (the tenant and/ or owner).
O A S M U
2. The professionalism and integrity with which offeror conducted business.
O A S M U

3. The responsiveness to the client’s needs and expectations.

O A S M U

4. The Offeror’s ability to successfully management and perform the project.
O A S M U
5. The offeror’s level of communication.
O A S M U
6. The quality control of the project.
O A S M U

7. Any Value added to the project as the result of cost savings, favorable financing, positive asset management, etc.

Yes No

8. Would you award another contact to the party being evaluated? If no, please explain.
Yes No
9. The delivery of the project within the budget and on schedule.
O A S M U

10. Other relevant aspects in the management of a project development for the client.

11. Overall rating for this firm:
O A S M U

Signature of Evaluator

Date

File details come from the government source that posted it. Updated .