SOW Attachment (11) Insulation Resistance Test Report.pdf
PDF 91 KB Posted
- Attached to
- Bldg 77L HVAC Repair Federal contract opportunity
- Solicitation number
- N6449824Q5065
About this file
This document is an Insulation Resistance Test Report for the HVAC repairs in Building 77L, Room 800 at the Philadelphia Navy Yard. The report details the insulation resistance measurements taken on the electrical wiring and components of the HVAC system, including the compressor, condenser, and air handler. The results indicate the insulation resistance levels meet the required specifications. This report is an attachment to the Statement of Work (SOW) for the Bldg 77L HVAC Repair project, which is being solicited by the Naval Surface Warfare Center Philadelphia Division (NSWCPD) as a competitive, single-award Firm Fixed Price construction contract. The solicitation is a 100% Small Business Set-aside, with a site visit scheduled for April 17, 2024. Interested parties must submit visitor information by April 16, 2024 to attend the site visit.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| N6449824Q5065 Amendment 0002.pdf | ||
| Amendment P0001.pdf | ||
| Copy of Copy of SOW Attachment (5) Schedule of Values.xlsx | XLSX spreadsheet | |
| RFQ N6449824Q5065.pdf | ||
| SOW Attachment (2) Photographs - Existing HVAC.docx | DOCX document | |
| SOW Attachment (8) Requirements for Contractor Lift Operations.pdf | ||
| SOW Attachment (1) Site Map - PNBC.pdf | ||
| SOW Attachment (6) Activity Hazard Analysis Form.docx | DOCX document | |
| SOW Attachment (4) ENG FORM 4025R Transmittal Form_rev1.pdf | ||
| SOW Attachment (9) Mobile Construction Equipment Checklist.pdf | ||
| Attachment 12 PPQ Past Performance Questionnaire.docx | DOCX document | |
| SOW Attachment (10) Contractor Production Report Form.docx | DOCX document | |
| SOW Attachment (7) Contract Progress Report.pdf | ||
| SOW Attachment (3) SECNAV 5512.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
neal.j.moran Text Box SOW Attachment 11 Insulation Resistance Test Report Bldg 77L - Room 800 HVAC Repairs
SOW Attachment 11 Insulation Resistance Test Report
SOW Attachment 11 Insulation Resistance Test Report
SOW Attachment 11 Insulation Resistance Test Report
File details come from the government source that posted it. Updated .