SOW Attachment (1) Contract Drawings.pdf
PDF 3 MB Posted
- Attached to
- NSWCPD BLDG 4 AHU 3 Repairs (21-N E-084)
- Solicitation number
- N6449821Q0257
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
NAVAL SURFACE WARFARE CENTER
PHILADELPHIA DIVISION
PHILADELPHIA NAVY YARD ANNEX
PHILADELPHIA, PENNSYLVANIA
BUILDING 4
AIR HANDLING UNIT (AHU) 3 REPAIRS
VICINITY PLAN LOCATION PLAN
G-001
7.
.2
7.
.2
N .T
.S
CO
VE
R
SH
EE
T
SECURITY BADGING OFFICE
CONTRACT ADMINISTRATION AND
OVERSIGHT OFFICES
PROJECT SITE
15 4 3 2
A
B
C
D
5 14 3 2
PROJECT NORTH
DR
AW
N B
Y:
N
AV
AL
S U
RF
AC
E W
AR
FA
RE
C
EN
TE
R
PH
IL
AD
EL
PH
IA
, P
A N
SW
C
P D
IN
FR
A
ST
R U
C
TU
R E
A C
Q U
IS
IT
IO
N
S U
P P
O R
T
DE
SI
GN
ED
B
Y:
DW
G N
AM
E:
SH
EE
T
SI
ZE
CO
DE
SA
VE
D
AT
E:
SC
AL
E:
PL
O
T
DA
TE
N O
TE
S:
of 06
BU
IL
DI
N
G
FL
O
O R
BU
IL
DI
N G
AH
U -3
R
EP
AI
RS
AR
CH
D (2
4-in
. x
4-in
REVISION TABLE
SYM DESCRIPTION DATE APPR
PREFINAL DRAWING 7/22/21
RM
S
RJ
S
SO
W
A
TT
A C
H M
EN
T
(1
MEP-001
7.
.2
7.
.2
N .T
.S
M
EC
HA
N
IC
AL
G
EN
ER
AL
N O
TE
S
SY
M
BO
LS
MECHANICAL ABBREVIATIONS GENERAL MECHANICAL NOTES
1. GENERAL NOTES ARE DISCIPLINE SPECIFIC, AND APPLY TO EVERY DRAWING IN THAT DISCIPLINE. GENERAL SHEET NOTES APPLY TO WORK
SHOWN ON A DRAWING. SHEET KEY NOTES NOTES APPLY TO INDIVIDUAL SITUATIONS AND EQUIPMENT.
2. WORK MUST BE PERFORMED IN ACCORDANCE WITH FEDERAL, STATE AND LOCAL CODES AND STANDARDS ENFORCED BY THE LOCAL
REGULATING AUTHORITIES.
3. COMPLETELY EXAMINE THE SITE AND OBSERVE THE CONDITIONS UNDER WHICH THE WORK WILL BE INSTALLED. NO ALLOWANCES WILL BE MADE FOR ERRORS OR OMISSIONS RESULTING FROM THE CONTRACTOR'S FAILURE TO COMPLETELY EXAMINE THE SITE.
4. INSTALL NEW WORK SUCH THAT CLEARANCES ARE PROVIDED AS REQUIRED BY THE MANUFACTURER TO ALLOW FULL ACCESSIBILITY FOR
OPERATION AND ROUTINE MAINTENANCE OF COMPONENTS.
5. CONTRACTOR SHALL COMPLETELY RESEAL ALL NEW OPENINGS AND PENETRATIONS IN THE AIR HANDLING UNIT ENCLOSURE AT THE COMPLETION
OF WORK IN ACCORDANCE WITH ASHRAE STANDARDS.
6. COMPLY WITH SMACNA "HVAC DUCT CONSTRUCTION AND STANDARDS" AND OTHER APPLICABLE STANDARDS INCLUDED IN THE SPECIFICATIONS
FOR THE CONSTRUCTION AND SUPPORT OF DUCT ACCESS DOORS, UNLESS OTHERWISE NOTED.
7. MAKE PROPER CONNECTION TO FIXTURES AND EQUIPMENT. DRAWINGS ARE SCHEMATIC AND BRANCH MAINS, ELBOWS,AND CONNECTIONS ARE
NOT ALL SHOWN.
8. COORDINATE INSTALLATION OF PIPING AND EQUIPMENT WITH MECHANICAL AND ELECTRICAL DISCIPLINES, AS WELL AS OTHER PLUMBING WORK.
9. DIMENSIONS ARE IN INCHES UNLESS OTHERWISE NOTED.
10. INSTALL VALVES SUCH THAT THEY ARE ACCESSIBLE.
11. DETAILS WITHOUT SPECIFIC REFERENCES TO A LOCATION MUST BE APPLIED TO THE GENERAL INSTALLATION OF MECHANICAL WORK.
12. BAS DDC TERMINATIONS WILL BE PROVIDED BY THE GOVERNMENT AT THE DDC CABINET. PROVIDE FOUR (4) FEET OF EXCESS CABLE AT THE
CABINET FOR GOVERNMENT TERMINATIONS.
13. PNEUMATIC ACTUATOR CONTROLS OPERATE BETWEEN 3-15 PSI.
14. INSTALL ALL MATERIAL AND EQUIPMENT IN ACCORDANCE WITH THE MANUFACTURER'S WRITTEN INSTRUCTIONS. PROVIDE ALL MATERIAL NOT FURNISHED BY THE MANUFACTURER BUT NECESSARY FOR A COMPLETE INSTALLATION AT NO ADDITIONAL COST TO THE GOVERNMENT.
15. ALL WORK SHALL CONFORM THE SAFETY REQUIREMENTS DEFINED IN THE UNITED STATES ARMY CORP OF ENGINEERS EM 385-1-1 HEALTH AND
SAFETY REQUIREMENTS MANUAL.
16. NO WORK MAY BEGIN ON A SYSTEM UNTIL ALL PRE-WORK SUBMITTALS ARE APPROVED AND MATERIAL IS ONSITE..
17. CONTRACTOR SHALL SEQUENCE WORK SUCH THAT DOWNTIME ON THE AHU IS MINIMIZED.
18. AHU IS WINTERIZED BETWEEN 15 OCTOBER AND 15 APRIL OF EACH CALENDAR YEAR. FINAL ACCEPTANCE OF CHILLED WATER COILS CANNOT
OCCUR DURING THIS PERIOD.
19. PROVIDE NEW INSULATION ON ALL NEW PIPING, VALVES, AND FITTINGS OR WHERE INSULATION IS REMOVED TO SUPPORT ADJACENT WORK.
20. CONTRACTOR SHALL SCHEDULE AND SEQUENCE WORK SUCH THAT THE DURATION THE UNIT IS INOPERABLE IS MINIMIZED TO THE MAXIMUM
EXTENT PRACTICAL.
MECHANICAL SYMBOLS
15 4 3 2
A
B
C
D
5 14 3 2
PROJECT NORTH
DR
AW
N B
Y:
N
AV
AL
S U
RF
AC
E W
AR
FA
RE
C
EN
TE
R
PH
IL
AD
EL
PH
IA
, P
A N
SW
C
P D
IN
FR
A
ST
R U
C
TU
R E
A C
Q U
IS
IT
IO
N
S U
P P
O R
T
DE
SI
GN
ED
B
Y:
DW
G N
AM
E:
SH
EE
T
SI
ZE
CO
DE
SA
VE
D
AT
E:
SC
AL
E:
PL
O
T
DA
TE
N O
TE
S:
of 06
BU
IL
DI
N
G
FL
O
O R
BU
IL
DI
N G
AH
U -3
R
EP
AI
RS
AR
CH
D (2
4-in
. x
4-in
REVISION TABLE
SYM DESCRIPTION DATE APPR
PREFINAL DRAWING 7/22/21
RM
S
RJ
S
UNION
3-WAY CONTROL VALVE
TW
THERMOMETER
THERMAL WELL
PRESSURE GAUGE
WITH SHUT-OFF COCK
AIR VENT WITH PLUG
DRAIN VALVE WITH
HOSE COUPLING
MOTORM
AFF ABOVE FINISHED FLOOR
AHU AIR HANDLING UNIT
ASHRAE AMERICAN SOCIETY OF HEATING, REFRIGERATING
AND AIR-CONDITIONING ENGINEERS
BAS BUILDING AUTOMATION SYSTEM
BTU BRITISH THERMAL UNIT
CFM CUBIC FEET PER MINUTE
CHWS CHILLED WATER SUPPLY
D.B. DRY BULB
DDC DIRECT DIGITAL CONTROLLER
EX EXISTING
°F DEGREES FAHRENHEIT
FPM FEET PER MINUTE
FT FOOT OR FEET
GPM GALLONS PER MINUTE
HOA HAND/OFF/AUTO SWITCH OR INDICATOR
HP HORSEPOWER
MBH THOUSAND BTUS PER HOUR
MEP MECHANICAL-ELECTRICAL-PLUMBING
PSI POUNDS PER SQUARE INCH
RF RETURN FAN
RPM REVOLUTIONS PER MINUTE
SF SUPPLY FAN
SYS SYSTEM
VFD VARIABLE FREQUENCY DRIVE
W.B. WET BULB
WG WATER GAUGE
MEP-101
7.
.2
7.
.2
N .T
.S
M
EC
HA
N
IC
AL
G
EN
ER
AL
N O
TE
S
SY
M
BO
LS
GENERAL MECHANICAL NOTES
1. PHOTOGRAPHS OF SELECT EXISTING CONDITIONS ARE PROVIDED ON DRAWING MEP-901.
2. EQUIPMENT AND PIPING SHOWN ON THIS SHEET IS SHOWN TO CONVEY GENERAL LAYOUT OF THE SPACE RELATIVE TO OTHER MAJOR HVAC EQUIPMENT. DRAWING IS NOT PROVIDED TO CONVEY ACTUAL DIMENSIONS NOR IS IT PROVIDED AS A COMPREHENSIVE LAYOUT OF FEATURES
AND OBSTRUCTIONS IN THE VICINITY OF THE WORK SITE.
3. DUCTWORK NOT SHOWN FOR CLARITY.
4. SUPPLY AND RETURN PIPING FOR CHILLED WATER AND GLYCOL LOOPS ARE SIMPLIFIED ON THIS DRAWING AND DO NOT SHOW ALL BRANCH LINES, FITTINGS, VALVES, GAUGES, AND COMPONENTS. REFER TO DRAWING MEP-501 FOR MORE DETAILS ON PIPING CONFIGURATION.
5. TURN OVER EXISTING FAN MOTORS AND PNEUMATIC VALVE ACTUATORS TO GOVERNMENT.
15 4 3 2
A
B
C
D
5 14 3 2
PROJECT NORTH
DR
AW
N B
Y:
N
AV
AL
S U
RF
AC
E W
AR
FA
RE
C
EN
TE
R
PH
IL
AD
EL
PH
IA
, P
A N
SW
C
P D
IN
FR
A
ST
R U
C
TU
R E
A C
Q U
IS
IT
IO
N
S U
P P
O R
T
DE
SI
GN
ED
B
Y:
DW
G N
AM
E:
SH
EE
T
SI
ZE
CO
DE
SA
VE
D
AT
E:
SC
AL
E:
PL
O
T
DA
TE
N O
TE
S:
of 06
BU
IL
DI
N
G
FL
O
O R
BU
IL
DI
N G
AH
U -3
R
EP
AI
RS
AR
CH
D (2
4-in
. x
4-in
REVISION TABLE
SYM DESCRIPTION DATE APPR
PREFINAL DRAWING 7/22/21
RM
S
RJ
S
SCALE: 1/4" = 1'-0"A4 FOURTH FLOOR PLAN
AHU-2AHU-3
AHU-7
AHU-6
CH
ILL
ER
CH
ILL
ER
CH
ILL
ER
RF-3
AHU-1 AHU-2AH
U-
AH
U-
AHU-7
AHU-4 CT-2CT-1
AHU-6
CH
ILL
ER
CH
ILL
ER
CH
ILL
ER
RF-3
M
M
KEY PLAN
SF-3
AHU-3 DDC
5 6
1. AIR HANDLING UNIT (AHU) 3 BRANCH SUPPLY AND RETURN PIPING CONTINUES TO MAINS FOR CHILLED WATER AND HOT GLYCOL LOOPS. PIPING IS INSULATED WITH A JACKETED 1-INCH THICK FIBERGLASS INSULATION.
2. PROVIDE A NEW 3-INCH THREE-WAY MIXING VALVE WITH PNEUMATIC ACTUATOR FOR CHILLED WATER LOOP FEED TO AHU-3.
VALVE COEFFICIENT OF VOLUME SHALL BE 75 +/- 5 PERCENT. PROVIDE ACTUATORS WITH ALL NECESSARY PNEUMATIC TUBING, CONDUIT, AND CONTROL WIRING BACK TO THE AHU-3 DDC CABINET. PROVIDE 4-FEET OF EXCESS LENGTH OF CONTROL WIRING AT THE CONTROL CABINET. GOVERNMENT TO TERMINATE WIRING IN DDC CABINET. ADDITIONALLY, PROVIDE 3-INCH FULL PORT BALL-TYPE ISOLATION VALVE, 0-100 PSI PRESSURE GAUGE, AND 0-120°F THERMOMETER ON BOTH THE SUPPLY AND RETURN PIPING. PROVIDE PRESSURE GAUGES WITH NEW BALL VALVES. FULLY REPLACE AND SEAL ALL
INSULATION REMOVED TO SUPPORT THIS WORK.
3. PROVIDE A NEW 1-1/4 INCH THREE-WAY MIXING VALVE WITH PNEUMATIC ACTUATOR FOR GLYCOL LOOP FEED TO AHU-3.
VALVE COEFFICIENT OF VOLUME SHALL BE 95 +/- 5 PERCENT. PROVIDE ACTUATORS WITH ALL NECESSARY PNEUMATIC TUBING, CONDUIT, AND CONTROL WIRING BACK TO THE AHU-3 DDC CABINET. PROVIDE 4-FEET OF EXCESS LENGTH OF CONTROL WIRING AT THE CONTROL CABINET. GOVERNMENT TO TERMINATE WIRING IN DDC CABINET. ADDITIONALLY, PROVIDE 1-1/2 INCH FULL PORT BALL-TYPE ISOLATION VALVE, 0-100 PSI PRESSURE GAUGE, AND 0-120°F THERMOMETER ON BOTH THE SUPPLY AND RETURN PIPING. PROVIDE PRESSURE GAUGES WITH NEW BALL VALVES. FULLY REPLACE AND SEAL
ALL INSULATION REMOVED TO SUPPORT THIS WORK.
4. REMOVE EXISTING DISCONNECT SWITCH AND UNISTRUT MOUNT ENTIRELY. REPLACE WITH A VARIABLE FREQUENCY DRIVE WITH INTEGRATED DISCONNECT SWITCH AND THREE-CONTACTOR BYPASS. PROVIDE A NEW UNI-STRUT MOUNT WITHIN FIVE
(5) FEET OF THE EXISTING DISCONNECT FOR THE VARIABLE FREQUENCY DRIVE TO MAINTAIN REQUIRED CLEARANCES. REFER TO DRAWING MEP-501 FOR MOUNT DETAILS AND COORDINATE EXACT LOCATION WITH GOVERNMENT. PROVIDE RIGID METALLIC CONDUIT, FITTINGS, FASTENERS, JUNCTION BOX, AND CONDUCTORS AS REQUIRED TO RELOCATE POWER FEED.
CONTRACTOR MAY RE-USE UNISTRUT COMPONENTS PROVIDED COMPONENTS ARE NOT DAMAGED AND ARE NOT CORRODED.
5. REMOVE EXISTING FAN MOTOR AND REPLACE WITH VFD RATED MOTOR. SEE DRAWING MEP-501 FOR DETAILS ON THE MOTOR SCHEDULE. PROVIDE MOTOR WITH NEW SET OF SHEAVES SIZED TO MATCH THE EXISTING SHEAVES AND PROVIDE WITH TWO SETS OF DRIVE BELTS (ONE SPARE SET). REPLACE BOTH BEARINGS ON 2-1/2 INCH FAN SHAFT COUPLED TO EACH MOTOR.
6. REMOVE EXISTING VORTEX DAMPERS FROM SUPPLY FAN INTAKES. REMOVE PNEUMATIC CONTROLS BACK TO SOURCE AND
CAP ANY OPEN PORTS. TURN OVER PNEUMATIC ACTUATORS TO GOVERNMENT.
7. PROVIDE NEW CHILLED WATER AND HOT GLYCOL COILS WITH PRESSURE RELIEF FREEZE PROTECTION. PROVIDE
PREFABRICATED ACCESS DOORS TO SERVICE RELIEF VALVES.
8. CLEAN FAN BLOWER WHEEL AND BALANCE FAN. TYPICAL FOR SUPPLY AND RETURN FAN.
9. EXISTING BAS DDC CABINET.
NEW WORK KEY NOTES:
CH
W
S
CH
W R
GS
GR
MEP-102
7.
.2
7.
.2
1 4"
'-0
M
EC
HA
N
IC
AL
E
XI
ST
IN
G
CO
N
DI
TI
O N
S
PH
O
TO
GR
AP
H
KE
Y
PL
AN
15 4 3 2
A
B
C
D
5 14 3 2
PROJECT NORTH
DR
AW
N B
Y:
N
AV
AL
S U
RF
AC
E W
AR
FA
RE
C
EN
TE
R
PH
IL
AD
EL
PH
IA
, P
A N
SW
C
P D
IN
FR
A
ST
R U
C
TU
R E
A C
Q U
IS
IT
IO
N
S U
P P
O R
T
DE
SI
GN
ED
B
Y:
DW
G N
AM
E:
SH
EE
T
SI
ZE
CO
DE
SA
VE
D
AT
E:
SC
AL
E:
PL
O
T
DA
TE
N O
TE
S:
of 06
BU
IL
DI
N
G
FL
O
O R
BU
IL
DI
N G
AH
U -3
R
EP
AI
RS
AR
CH
D (2
4-in
. x
4-in
REVISION TABLE
SYM DESCRIPTION DATE APPR
PREFINAL DRAWING 7/22/21
RM
S
RJ
S
SCALE: 1/4" = 1'-0"A1 AHU-3 PHOTOGRAPH KEY PLAN
AHU-2AH
U-
AHU-7
AHU-6
CH
ILL
ER
RF-3
C5C2
C4
C3
B4
B5B2
B3
MEP-901
A5
A4
A3
MEP-901MEP-901
MEP-901
MEP-901
MEP-901
MEP-901
MEP-901MEP-901
MEP-901
3/4" DRAIN W/GATE VALVE
& HOSE COUPLING (EX)
& HOSE COUPLING (EX)
3/4" DRAIN W/GATE VALVE
GLYCOL PIPING (EX)
CHWS & HOT
BALL VALVE
PRESSURE GAGE
W/ BALL VALVE
HOT GLYCOL OR
COOLING COILS
REDUCER (EX)
CHWR & HOT GLYCOL
PIPING (EX)
3-WAY CONTROL VALVE
CALIBRATED
BALANCING VALVE (EX)
UNION (EX)
THERMOMETER WITH
SEPARABLE SOCKET
AIR VENT - 3/4" GATE
VALVE WITH CAP (EX)
W/ PNEUMATIC ACTUATOR
MEP-501
8.
2.
8.
2.
N .T
.S
M
EC
HA
N
IC
AL
D
ET
AI
LS
GENERAL SHEET NOTES
1. CONTRACTOR SHALL PROVIDE ALL PIPING, FITTINGS, AND MODIFICATIONS OF EXISTING PIPING AND FITTINGS AS NECESSARY TO FACILITATE
INSTALLATION OF NEW WORK.
2. INSULATE ALL NEW PIPING WITH 1-INCH THICK FIBERGLASS INSULATION WITH VAPOR RETARDANT JACKET. SEAL AGAINST ADJACENT INSULATION TO MAINTAIN A CONTINUOUS VAPOR BARRIER. WHERE INSULATION IS REMOVED FROM EXISTING PIPING TO REMAIN, PROVIDE NEW
INSULATION SYSTEM. DO NOT RE-USE INSULATION.
3. DETAILS PROVIDED ON THIS SHEET ARE DIAGRAMMATIC ONLY. THE DETAILS ARE NOT TO SCALE, DO NOT REFLECT THE ACTUAL GEOMETRIC CONFIGURATION OF THE PIPING SYSTEM, AND DO NOT DEPICT ALL ADJACENT OBSTRUCTIONS. CONTRACTOR SHALL OBTAIN AND/OR VERIFY ALL
DIMENSIONS AND COMPONENTS.
15 4 3 2
A
B
C
D
5 14 3 2
PROJECT NORTH
DR
AW
N B
Y:
N
AV
AL
S U
RF
AC
E W
AR
FA
RE
C
EN
TE
R
PH
IL
AD
EL
PH
IA
, P
A N
SW
C
P D
IN
FR
A
ST
R U
C
TU
R E
A C
Q U
IS
IT
IO
N
S U
P P
O R
T
DE
SI
GN
ED
B
Y:
DW
G N
AM
E:
SH
EE
T
SI
ZE
CO
DE
SA
VE
D
AT
E:
SC
AL
E:
PL
O
T
DA
TE
N O
TE
S:
of 06
BU
IL
DI
N
G
FL
O
O R
BU
IL
DI
N G
AH
U -3
R
EP
AI
RS
AR
CH
D (2
4-in
. x
4-in
REVISION TABLE
SYM DESCRIPTION DATE APPR
PREFINAL DRAWING 7/22/21
RM
S
RJ
S
SCALE: N.T.S.A5 AIR HANDLING UNIT COIL & PIPING
CFM THRU
COIL
FACE VEL.
(FPM)
AIR
FRICTION IN.
WG.
AIR ENT.
TEMP (°F)
AIR LEAVING
TEMP (°F)
TOTAL
SENSIBLE
HEAT RATIO
TOTAL LOAD
(MBH) MIN. ROWS FINS PER
FOOT
WATER
FLOW (GPM)
WATER P.D.
(FT. H20)UNIT ENT. WATER
TEMP (°F)
D.B. W.B. D.B. W.B.
CHILLED
WATER
COIL
PREHEAT
COIL
22,575 456 0.27 80.0 67.0 57.3 55.0 0.76 657.8 4 86 109.5 9.8 44
26,930 456 0.06 58.5 77.8 - 501.2 - - 27.3 0.4 180
COIL HEAT EXCHANGER SCHEDULE
TOTAL AIR
FLOWRATE
(CFM)
OUTSIDE AIR
FLOWRATE
(CFM)
EXT. STATIC
PRESSURE
IN. WG.
TOTAL STATIC
PRESSURE IN.
WG.
FAN
SPEED
(RPM)
MINIMUM
HP VOLTSUNIT
SUPPLY
FAN
RETURN
FAN
30,700 5250
26,930 -
EXISTING FAN SCHEDULE
BREAKER CONTROL
TRANSFORMER AGA STAT
CONTACTOR
C
CONTACTOR
2S
FUSE
HOLDER
CONTACTOR
1S
CONTACTOR
R
TRANSFORMER
CURRENT
TRANSFORMER
HOA/LIGHT
X2
1A
3A
NC
1. REMOVE COMPONENT. RECONNECT AND/OR SPLICE WIRING AS NECESSARY TO PROVIDE POWER TO SUPPLY
FAN MOTOR. CONTRACTOR MAY REUTILIZE EXISTING WIRING.
2. REMOVE COMPONENT AND WIRING BACK TO SOURCE.
3. EXISTING COMPONENT TO-REMAIN.
KEYED NOTES:
SCALE:A2 AHU-3 MOTOR CONTROL CENTER - SUPPLY FAN
3 2
NOTES:
1. SLOPE DRAIN PAN AND COILS SUFFICIENTLY SUCH THAT REFRIGERANT AND CONDENSATE DRAIN TO DRAIN PIPE AND COIL DRAIN VALVE, RESPECTIVELY.
2. DRAIN AND ISOLATE SYSTEM AS REQUIRED TO SUPPORT WORK. REFILL SYSTEM AT COMPLETION OF WORK.
OUTLET
VELOCITY
(FPM)
PHASE
0.8 1.6 1806 1010 20 480 3
- 0.8 0.8 1699 502 10 480 3
1. PROVIDE THERMAL EXCHANGE COILS. TYPICAL FOR GLYCOL AND CHILLED WATER SYSTEMS. EACH SYSTEM CONSIST OF TWO THERMAL EXCHANGE COILS STACKED VERTICALLY. CHILLED WATER COILS ARE INSTALLED IN PARALLEL WITH ONE ANOTHER; HOT GLYCOL COILS ARE INSTALLED IN PARALLEL WITH ONE ANOTHER. EACH COIL ASSEMBLY (TWO TOTAL FOR EACH SYSTEM - CHILLED WATER AND GLYCOL SYSTEMS) IS APPROXIMATELY 112-INCHES WIDE BY 72-INCHES HIGH. PROVIDE COILS WITH PLUGGED VALVE AIR VENTS.
2. PROVIDE NEW THREE-WAY CONTROL VALVE WITH PNEUMATIC ACTUATOR. TYPICAL FOR GLYCOL AND CHILLED WATER LOOPS.
3. PROVIDE NEW 0-120°F THERMOMETER AND 0-100 PSI PRESSURE GAUGE. TYPICAL FOR GLYCOL AND CHILLED WATER LOOPS.
4. PROVIDE FULL PORT BALL VALVE. VALVE IS 1-1/2 INCH ON GLYCOL SYSTEM AND 3-INCH ON CHILLED WATER SYS.
5. PROVIDE FREEZE PROTECTION PRESSURE RELIEF VALVES ON CHILLED WATER COILS. PROVIDE ACCESS TO VALVES. ACCESS OPENING
SHALL PROVIDE SUFFICIENT CLEARANCE FOR INSPECTION AND MAINTENANCE OF FREEZE PROTECTION VALVES AND SHALL BE IN ACCORDANCE WITH MANUFACTURER RECOMMENDED CLEARANCES. OPENING SHALL BE FACTORY FABRICATED ACCESS DOORS THAT UTILIZE QUARTER TURN FASTENERS OR CAM LOCKS AND SHALL BE GASKETED AND/OR SEALED FOR AN AIRTIGHT SEAL (NOT SHOWN AS
RELIEF VALVES ARE TYPICALLY ON SIDE OPPOSITE OF COIL MANIFOLD).
KEYED NOTES:
COMMUNICATION
CABLING TO DDC
CABINET
POWER CONDUCTORS
FROM EXISTING DISCONNECT
TO BE REMOVED
POWER CONDUCTORS
TO SUPPLY OR RETURN FAN
MOTOR
SCALE:A4 VFD UNITSTRUT MOUNTING DETAIL
NOTES:
1. MOUNT NEW VFD ON A UNISTRUT MOUNTING RACK. RACK SHALL INCLUDE CROSS BRACING,
HARDWARE, FASTENERS, AND A BASE PLATE ANCHORED INTO THE EXISTING CONCRETE SLAB.
MOUNT VFD AT A HEIGHT SUCH THAT PROGRAMMING INTERFACE IS APPROXIMATELY 48-INCHES AFF.
2. CONDUIT RUN SHALL UTILIZE RIGID METALLIC CONDUIT AND FITTINGS. FINAL CONNECTION TO
MOTOR SHALL USE FLEXIBLE CONDUIT.
3. COORDINATE EXACT SITING OF MOUNTING RACK WITH GOVERNMENT.
4. BRACE TOP OF RACK TO AN EXISTING ADJACENT STRUCTURE.
5. PROVIDE ELECTRICAL METALLIC CONDUIT FOR DDC CABLE FOR VERTICAL RUN FROM VFD TO ROOF
MECHANICAL SYSTEM SUPPORTS ABOVE. CONTRACTOR MAY TRANSITION TO CABLE WITHOUT
CONDUIT UPON REACHING SUPER STRUCTURE ABOVE PROVIDED CABLING IS SUPPORTED EVERY 5
FEET ON CENTER USING J-HOOKS OR EQUIVALENT CABLE SUPPORT SYSTEM.
6. CONTRACTOR MAY UTILIZE EXISTING MATERIALS FROM EXISTING ELECTRICAL DISCONNECT SWITCH UNISTRUT MOUNT PROVIDED MATERIAL AND HARDWARE IS NOT DAMAGED AND IS NOT CORRODED.
1,5
UNISTRUT
MOUNT
VFD WITH INTEGRATED
DISCONNECT
BASE PLATE WITH
ANCHORED FASTENERS
SUPPLY
FAN MOTOR
RETURN
FAN MOTOR
25 460
1760 28.8 CONTINUOUS 284T 1.15 YES
230/460 1745 25.2/12.6 CONTINUOUS 215TC 1.15 YES
UNIT MOTOR HP VOLTAGE MOTOR RPM AMPERAGE DUTY
RATING FRAME SIZE VFD RATED?SERVICE
FACTOR
FAN MOTOR SCHEDULE
PERFORM VIBRATION ANALYSIS ON NEW MOTORS FOLLOWING INSTALLATION. PERFORM ANALYSIS AT THREE SEPARATE VFD FREQUENCY SETPOINTS. PERFORM ANALYSIS AT 0° ON CASING, 90° ON CASING, AND IN-LINE WITH MOTOR SHAFT. REPORT RESULTS IN INCH-SEC AT THE PEAK VIBRATION FREQUENCY. CORRECT MOTOR INSTALLATION WHEN VIBRATION VELOCITY (PEAK) EXCEEDS 0.15
INCH-SEC.
FIN HEIGHT
(INCHES)
FIN LENGTH
(INCHES)
NUMBER OF
COILS
36 112 2
36 112 2
NOTE: DIMENSIONS PROVIDED ARE APPROXIMATE. CONTRACTOR SHALL VERIFY ALL DIMENSIONS PRIOR TO SELECTING COILS.
NOTES
1. FANS TO REMAIN.
2. REMOVE DUST AND DEBRIS FROM FAN BLADES AND CLEAN BLADES WITH A
CLEANING PRODUCT FORMULATED WITH ANTIMICROBIAL AGENTS.
3. BALANCE FANS SUBSEQUENT TO CLEANING.
NOTES
7.
.2
7.
.2
N .T
.S
M
EC
HA
N
IC
AL
E
XI
ST
IN
G
CO
N
DI
TI
O
N S
PH
O
TO
GR
AP
HS
15 4 3 2
A
B
C
D
5 14 3 2
PROJECT NORTH
DR
AW
N B
Y:
N
AV
AL
S U
RF
AC
E W
AR
FA
RE
C
EN
TE
R
PH
IL
AD
EL
PH
IA
, P
A N
SW
C
P D
IN
FR
A
ST
R U
C
TU
R E
A C
Q U
IS
IT
IO
N
S U
P P
O R
T
DE
SI
GN
ED
B
Y:
DW
G N
AM
E:
SH
EE
T
SI
ZE
CO
DE
SA
VE
D
AT
E:
SC
AL
E:
PL
O
T
DA
TE
N O
TE
S:
of 06
BU
IL
DI
N
G
FL
O
O R
BU
IL
DI
N G
AH
U -3
R
EP
AI
RS
AR
CH
D (2
4-in
. x
4-in
REVISION TABLE
SYM DESCRIPTION DATE APPR
PREFINAL DRAWING 7/22/21
RM
S
RJ
S
C5 AHU-3 PHOTOGRAPH 1 C4 AHU-3 PHOTOGRAPH 2 C3 AHU-3 PHOTOGRAPH 3 C2 AHU-3 PHOTOGRAPH 4
B2 AHU-3 PHOTOGRAPH 8B3 AHU-3 PHOTOGRAPH 7B4 AHU-3 PHOTOGRAPH 6B5 AHU-3 PHOTOGRAPH 5
1. AIR HANDLING UNIT (AHU) 3.
2. ACCESS HATCH TO SUPPLY FAN AND DOWNSTREAM SIDE OF THE HEATING AND COOLING COIL. OPENING IS APPROXIMATELY 20-INCHES HIGH BY
24-INCHES WIDE.
3. SUPPLY AND RETURN PIPING FOR CHILLED AND HOT WATER SYSTEM. PIPING IS PROVIDED WITH A 1-INCH INSULATING JACKET. PHOTOGRAPH SHOWS PORTIONS OF THE MONITORING EQUIPMENT INCLUDING, BUT NOT LIMITED TO, PRESSURE GAUGES AND THERMOMETERS.
4. ACCESS PANEL TO FILTER COMPARTMENT AND UPSTREAM SIDE OF HEATING AND COOLING COIL. NOTE THAT THE COILS ARE OBSTRUCTED BY DAMPER
VANES ON THE UPSTREAM FACE.
5. SUPPLY AIR FAN MOTOR, ELECTRICAL DISCONNECT, AND BELT DRIVE ASSEMBLY. DRIVE ASSEMBLY CONSISTS OF A SAFETY GUARD, PULLEY BELT, TWO SHEAVES, AND ASSOCIATED SHAFTS WITH BEARINGS. NOTE THAT POWER IS TO RELOCATE TO NORTH FACE OF AHU (PICTURE LEFT).
6. RETURN AIR SHEAVE AND DRIVE BELTS (TWO) WITH SAFETY GUARD REMOVED.
7. RETURN AIR FAN HOUSING, MOTOR, AND DRIVE ASSEMBLY. DRIVE ASSEMBLY CONSISTS OF A SAFETY GUARD, PULLEY BELT, TWO SHEAVES, AND
ASSOCIATED SHAFTS WITH BEARINGS.
8. GLYCOL LOOP THREE-WAY MIXING VALVE WITH PNEUMATIC ACTUATOR. CHILLED WATER LOOP MIXING VALVE NOT PICTURED.
9. STACKED THERMAL EXCHANGE COILS. DIMENSIONS OF COMBINED COIL ASSEMBLY ARE APPROXIMATELY 72-INCHES HIGH BY 112-INCHES WIDE.
TYPICAL FOR BOTH HOT GLYCOL AND CHILLED WATER COILS.
10. DRAIN PAN AND HOSING.TYPICAL FOR EACH COIL.
11. VORTEX DAMPERS ON SUPPLY FAN WITH PNEUMATIC CONTROLS.
12. THERMAL EXCHANGE COIL MANIFOLD. TYPICAL FOR EACH COIL.
PHOTOGRAPH KEY NOTES:
8 7
ALL PHOTOGRAPHS ARE APPROVED FOR PUBLIC RELEASE; DISTRIBUTION UNLIMITED.
A3 AHU-3 PHOTOGRAPH 11A4 AHU-3 PHOTOGRAPH 10A5 AHU-3 PHOTOGRAPH 9
File details come from the government source that posted it. Updated .