This document lists required Division 01 specification sections for a demolition project for the Department of Veterans Affairs Veterans Health Administration Veterans Integrated Service Network 1. The specification sections cover general requirements, project schedules, shop drawings and samples, safety requirements, quality control, testing laboratory services, temporary environmental controls, construction waste management, and general commissioning requirements. A related federal contract opportunity is also provided for solicitation number 36C24123R0147 to demolish buildings B222, 33, and 34.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| SF330 RFI Answers.docx | DOCX document | |
| 36C24123R0147_1.docx | DOCX document | |
| 36C24123R0147 0001_1.docx | DOCX document | |
| Special Notice Request For Qualifications SF330 Updated.docx | DOCX document | |
| SOW Attachment 07 - Prevention of Healthcare Associated Legionella Disease.pdf | ||
| SOW Attachment 03 - PIV Request Form.pdf | ||
| SOW.docx | DOCX document | |
| SOW Attachment 06 - Sensitive Infrastructure Data Classification.pdf | ||
| SOW Attachment 05 - Program Guide.docx | DOCX document | |
| SOW Attachment 02 - Seasonal Influenza with Vaccines.pdf | ||
| SOW Attachment 01 - Togus Campus Map.pdf | ||
| Special Notice Request For Qualifications SF330.docx | DOCX document | |
| 36C24123R0147.docx | DOCX document |
Show all 13
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
VHA Required Division 01 – General Requirement Specification Sections
* Note that these have been identified as required Division 01 specifications for this project. It is the responsibility of the contractor to determine if there are other specifications to include.
01 00 00 – General Requirements 01 32 16.01 - Architectural and Engineering CPM Schedules 01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build) 01 33 23 - Shop Drawings, Product Data, and Samples 01 35 26 – Safety Requirements 01 42 19 – Reference Standards 01 45 00 - Quality Control 01 45 29 – Testing Laboratory Services 01 57 19 - Temporary Environmental Controls 01 74 19 – Construction Waste Management 01 81 13 – Sustainable Construction Requirements 01 91 00 - General Commissioning Requirements