SOW Attachment 01 VHA Required Div 01 Spec Sections.pdf

PDF 115 KB Posted

Attached to
C1DA--EHRM Training and Support Space Design - Erie VAMC Federal contract opportunity
Solicitation number
36C77623R0041
Issued by
Department of Veterans Affairs Technology Acquisition Center Austin

About this file

This pre-solicitation notice seeks SF330 submissions for architect-engineering services for an EHRM training and support space project at the Erie VA Medical Center in Erie, Pennsylvania. The project requires design and construction period services for upgrades including network infrastructure, data cabling, HVAC, and physical security. SF330s are due by May 12, 2023 and must demonstrate experience in specialized areas such as fiber optics, electrical distribution, building systems, and construction infection control protocols. The selection criteria evaluate professional qualifications, specialized experience, capacity, past performance, knowledge of the locality, and experience in construction period services. The notice provides submission requirements and states the procurement is a 100% SDVOSB set-aside. The anticipated period of performance is 222 calendar days for design completion and option items will be exercised for construction support services after award.

View the file

Other files for this federal contract opportunity

Show all 15

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

VHA Required Division 01 – General Requirement Specification Sections

* Note that these have been identified as required Division 01 specifications for this EHRM project. It is the responsibility of the A-E to determine if there are other specifications to include.

01 00 00 – General Requirements

01 32 16.01 - Architectural and Engineering CPM Schedules

01 32 16.15 – Project Schedules (Small Projects – Design/Bid/Build)

01 33 23 - Shop Drawings, Product Data, and Samples

01 35 26 – Safety Requirements

01 42 19 – Reference Standards

01 45 00 - Quality Control

01 45 29 – Testing Laboratory Services

01 57 19 - Temporary Environmental Controls

01 74 19 – Construction Waste Management

01 81 13 – Sustainable Construction Requirements

01 91 00 - General Commissioning Requirements