This document outlines a statement of work for a federal contract opportunity to provide infrastructure upgrades for a wireless network at a Department of Veterans Affairs medical center. The contractor will be responsible for installing approximately 59 access points, 750 linear feet of conduit, 6,000 linear feet of cabling, and four patch panels. The work must be completed within 90 calendar days of receiving the notice to proceed and will involve installing conduits, raceways, horizontal and vertical penetrations, and fire stopping according to the project drawings, specifications and applicable building codes. The contractor must designate safety officers and adhere to all VA standards and specifications regarding health, safety, and data security.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924Q0173 0003.docx | DOCX document | |
| EHRM Questions and Responces 2.docx | DOCX document | |
| 36C25924Q0173 0002.docx | DOCX document | |
| EHRM Questions and Responses.docx | DOCX document | |
| Site Visit Meeting Doc.docx | DOCX document | |
| SOW 660-21-704 EHRM NextGen WiFi Upgrades 2024 01 31.docx | DOCX document | |
| EHRM Next Gen Wifi Site Visit Pre Offer Sign In 2024 01 31.pdf | ||
| 36C25924Q0173 0001.docx | DOCX document | |
| SOW Attachment 04 - Specifications.docx | DOCX document | |
| SOW Attachment 02 - NextGen WiFi Access Point Location Drawings.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| 36C25924Q0173.docx | DOCX document | |
| S22- 852.219-75 LOS Certification.docx | DOCX document | |
| SOW Attachment 03 - VA OEHRM Site Infrastructure and End User.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
OVERALL
| Building | Floor | Number of APs | AP Names | Justifications/ Remarks | Provide Panel | |
| for Termination | Install Wall | |||||
| Bracket for AP | Install Protective |
Guard for AP
| 1 | Ground | 5 | AP48 - AP52 | The APs were not installed due to no conduit; left for site to install. | YES | ||
| 1 | 1 | 2 | AP73 and AP85 | The APs were not installed due to no conduit; left for site to install. | YES | ||
| 1 | 2 | 1 | AP77 | The AP was not installed due to no conduit; left for site to install. | Yes | ||
| 1 | 2 | 1 | AP78 | The AP is offline due to being in an occupied patient room; left for site to install. | |||
| 1 | 3 | 2 | AP41 and AP47 | The APs are offline due to being in an occupied patient room; left for site to install. | |||
| 2 | 1 | 1 | AP46 | The AP was not installed as cable was pulled and left coiled outside of the room; left for site to install. | |||
| 2 | 1 | 1 | AP48 | The AP was not installed due to no conduit; left for site to install. | Yes | ||
| 2 | 2 | 3 | AP16, AP44 and AP45 | The APs were not installed due to no conduit; left for site to install. | |||
| 3 | Ground | 1 | AP17 | The AP was not able to be installed in the proposed location due to no conduit; left for site to install. | |||
| 3 | Ground | 2 | AP26 and AP28 | The APs were not installed due to no conduit; left for site to install. | YES | YES | |
| 3 | 1 | 3 | AP29, AP30 and AP37 | The APs were not installed due to no conduit; left for site to install. | |||
| 3 | 2 | 1 | AP07 | The AP was not able to be installed in the proposed location due to no conduit; left for site to install. | YES | ||
| 5 | Ground | 7 | AP05 - AP11 | The APs were not installed due to no conduit; left for site to install. | YES | ||
| 6_7 | 1 | 9 | AP65 - AP73 | The APs were not installed due to no conduit; left for site to install. | |||
| 8 | Ground | 3 | AP05 - AP07 | The APs were not installed due to vertical penetrations needed; left for site to install. | |||
| 8 | 1 | 6 | AP19 - AP24 | The APs were not installed due to vertical penetrations needed; left for site to install. | YES | YES | |
| 14 | Basement | 5 | AP25 - AP29 | The APs were not installed due to no conduit; left for site to install | Yes | YES | |
| 37 | 1 | 1 | AP01 | The AP was not installed due to no conduit; left for site to install. | |||
| 49 | 1 | 2 | AP01 and AP02 | The APs were not installed due to construction; left for site to install. | |||
| 49 | 2 | 3 | AP01 - AP03 | The APs were not installed due to construction; left for site to install. |