EHRM Questions and Responces 2.docx
DOCX document 14 KB Posted
- Attached to
- N059--660-21-704 EHRM Next Gen Wi-fi
- Solicitation number
- 36C25924Q0173
About this file
This federal solicitation requests proposals for installation services to support a wireless network upgrade at a Veterans Affairs medical center. The scope of work involves installing approximately 59 access points, 750 linear feet of conduit, 6,000 linear feet of cable, and four patch panels across medical center buildings. Safety requirements include designating qualified site safety and health officers. Proposals are due within 90 calendar days of the issuance of a notice to proceed. The selected contractor must adhere to VA standards and complete all work during regular business hours to minimize disruptions.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| 36C25924Q0173 0003.docx | DOCX document | |
| 36C25924Q0173 0002.docx | DOCX document | |
| EHRM Questions and Responses.docx | DOCX document | |
| Site Visit Meeting Doc.docx | DOCX document | |
| SOW 660-21-704 EHRM NextGen WiFi Upgrades 2024 01 31.docx | DOCX document | |
| EHRM Next Gen Wifi Site Visit Pre Offer Sign In 2024 01 31.pdf | ||
| 36C25924Q0173 0001.docx | DOCX document | |
| SOW Attachment 04 - Specifications.docx | DOCX document | |
| SOW Attachment 01 - List of Access Point Locations and Site Prep Requirements.xlsx | XLSX spreadsheet | |
| SOW Attachment 02 - NextGen WiFi Access Point Location Drawings.pdf | ||
| Past Performance Questionnaire.docx | DOCX document | |
| 36C25924Q0173.docx | DOCX document | |
| S22- 852.219-75 LOS Certification.docx | DOCX document | |
| SOW Attachment 03 - VA OEHRM Site Infrastructure and End User.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
EHRM Questions 2
1. Does conduit have to run back to IT rooms for listed Aps on SOW attachment 1 how is conduit length determined?
If the pathway to the designated IT room allows access to a cable tray, conduit may be discontinued at that point and the cable tray may be used.
2. Are the black Wi-Fi symbols the ones that need to be installed?
Attachment 1: List of Access Point Locations and Site Prep Requirements lists all AP installation locations required for this project.
3. Preferred manufacturer for cable?
Cable must meet specifications. Preferred manufacturer is not specified.
4. What Access Point Manufacturer so we can determine what bracket we need.
See response to question #1 in Amendment 002 posted on 2/7/24.
5. Is HEPA Cart required ?
Infection control requirements will vary throughout the project areas. The contractor should be prepared to follow Infection Control Risk Assessment (ICRA) guidelines up to and including Class IV.