SOW Attach 2_Contractor Production Report Form.doc
DOC document 63 KB Posted
- Attached to
- Temporary Modular Facility (With Lease) Federal contract opportunity
- Solicitation number
- N6449820R5000
About this file
This document contains a contractor production report template and details of a federal contract opportunity for a temporary modular facility with lease. The production report template requires contractors to provide daily reports on weather, work performed, safety inspections and meetings, man-hours and equipment used for various schedule activities. It also requests information about any accidents, hazardous material releases or received equipment.
The federal contract opportunity is issued by the Naval Sea Systems Command for a temporary modular facility with lease. Offerors must submit any clarifying questions by 10 calendar days after issuance. The solicitation number is N6449820R5000 and it seeks proposals for a temporary modular facility.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Amendment 0003.pdf | ||
| Amendment 0002.pdf | ||
| N6449820R5000 Amended Solicitation.pdf | ||
| N6449820R5000 Amended Solicitation.pdf | ||
| Amendment 0001.pdf | ||
| SOW Attach 5__Contractor Lift Plan Form.pdf | ||
| SOW Attach 8_Subsurface Information_rev02_12 Feb 2020.pdf | ||
| SOW Attach 3_AHA Form.docx | DOCX document | |
| SOW Attach 1_SiteMap PNBC.pdf | ||
| SOW Attach 6 Figure 1 Temporary Modular Facility Site Plan REV03022020b 11x17.pdf | ||
| Solicitation N6449820R5000.pdf | ||
| SOW Attach 4_Mobile Equipment Check List.pdf | ||
| SOW Attach 7_Figure 3 Temporary Modular Facility Suggested Floorplan REV03022020 11x17.pdf | ||
| Brand Name Justification Bldg 662 Temp Facility.pdf |
Show all 14
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
CONTRACTOR PRODUCTION REPORT
(ATTACH ADDITIONAL SHEETS IF NECESSARY)
DATE
| CONTRACT NO |
| TITLE AND LOCATION |
REPORT NO
Building 633 – Flood Prevention Repairs
CONTRACTOR
SUPERINTENDENT
AM WEATHER
PM WEATHER
| MAX TEMP (F) |
| MIN TEMP (F) |
WORK PERFORMED TODAY
Schedule
Activity No.
| WORK LOCATION AND DESCRIPTION |
| EMPLOYER |
| NUMBER |
| TRADE |
| HRS |
JOB
SAFETY
WAS A JOB SAFETY MEETING HELD THIS DATE?
FORMCHECKBOX
YES
FORMCHECKBOX
NO
TOTAL WORK HOURS ON JOB SITE,
THIS DATE, INCL CON'T SHEETS
WERE THERE ANY LOST TIME ACCIDENTS THIS DATE?
(If YES attach copy of completed OSHA report)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
CUMULATIVE TOTAL OF WORK
HOURS FROM PREVIOUS REPORT
WAS CRANE/MANLIFT/TRENCHING/SCAFFOLD/HV ELEC/HIGH WORK/ HAZMAT WORK DONE?
(If YES attach statement or checklist showing inspection performed.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
TOTAL WORK HOURS FROM
START OF CONSTRUCTION
WAS HAZARDOUS MATERIAL/WASTE RELEASED INTO THE ENVIRONMENT?
(If YES attach description of incident and proposed action.)
FORMCHECKBOX
YES
FORMCHECKBOX
NO
Schedule
Activity No.
| LIST SAFETY ACTIONS TAKEN TODAY/SAFETY INSPECTIONS CONDUCTED |
| FORMCHECKBOX |
SAFETY REQUIREMENTS HAVE BEEN MET.
EQUIPMENT/MATERIAL RECEIVED TODAY TO BE INCORPORATED IN JOB (INDICATE SCHEDULE ACTIVITY NUMBER)
Schedule
Activity No.
| Submittal # |
| Description of Equipment/Material Received |
CONSTRUCTION AND PLANT EQUIPMENT ON JOB SITE TODAY. INDICATE HOURS USED AND SCHEDULE ACTIVITY NUMBER.
Schedule
Activity No.
| Owner |
| Description of Construction Equipment Used Today (incl Make and Model) |
| Hours Used |
Schedule
Activity No.
REMARKS
| CONTRACTOR/SUPERINTENDENT |
| DATE |
SOW ATTACHMENT 2
SHEET 1 OF 1
File details come from the government source that posted it. Updated .