SOW Att. 5 - 219-265 VAMC Parking Garage-Test Pile Installation Report 11-21-2019.pdf
PDF 216 KB Posted
- Attached to
- C1DZ--Project 636-508 - VHA A-E Design Expansion of Parking Garage - Omaha, Nebraska Amendment 1
- Solicitation number
- 36C77625R0027
About this file
This is an APG Compression Test Installation Record and Compression Test Layout from Berkel & Company Contractors, Inc. for pile installation at the VAMC Parking Garage project in Omaha, NE (Job #19-265). The document details the installation records for multiple test piles (R1-R8, CT1-CT3, LT1-LT3) installed between November 20-21, 2019. The piles were 16" in diameter with most having a drill length of 114' (except R1 at 121'), installed to a tip elevation of 1102'. The records track detailed installation data including drilling start/end times, grouting parameters (grout pump strokes, volumes, percentages), and steel reinforcement details. A layout drawing shows the positioning of the test piles in a grid pattern with 14' spacing between piles. The document notes there were depth errors with the Pile Installation Recorder (PIR) system during the test pile program, particularly affecting pile R-1's drilling depth.
View the file
Other files
Show all 16
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Project: Office Rep.: Auger Diameter
Pile Name: Superintendent: Grout Pump Number
Date: Operator: Grout Pump Factor
Job #: Inspector: Surf. Elev.:
Cutoff Elev.:
Pile: R-1 R-2 R-3 R-4 R-5 R-6 R-7 R-8 CT-1 CT-2 CT-3 LT-1 LT-2 LT-3
Date:
Start Drilling:
End Drilling:
Start Grouting:
End Grouting:
Drill Length:
Tip Elev.:
Steel:
Diameter:
Pump #:
C=Cork * A=Air:
Grout Return:
Grout %:
Grout Volume(ft
Total Strokes:
0 - 5
5 - 10
10 - 15
15 - 20
20 - 25
25 - 30
30 - 35
35 - 40
40 - 45
45 - 50
50 - 55
55 - 60
60 - 65
65 - 70
70 - 75
75 - 80
80 - 85
85 - 90
90 - 95
95 - 100
100 - 105
105 - 110
110 - 115
115 - 121
Initial Strokes
Notes from Sean Lemke (Berkel Field Engineer):
Depth error on computer causing R-1 to be drilled to 121' * Depth not working on PIR (Pile Installation Recorder) and will be in working service for production
No PIR recordings were taken for installation of test pile program due to depth issue causing fault throughout the system
Berkel Field Notes by Sean Lemke
11/21/2019 11/20/2019 11/20/2019 11/21/2019 11/21/2019 11/21/2019 11/21/2019 11/21/2019 11/21/2019
95 95 95 95 95 95 95 95 95
19-265
3:47 PM 3:17 PM 2:40 PM 2:04 PM 9:00 AM
VAMC Parking Garage
C-(1-3), L(1-3)
11/21/2019
11/20/2019 11/20/2019 11/20/2019 11/20/2019 11/21/2019
4:11 PM 3:33 PM 2:57 PM 2:21 PM 9:14 AM
4:03 PM 3:33 PM 2:57 PM 2:21 PM 9:14 AM
4:25 PM 3:40 PM 3:03 PM 2:28 PM 9:20 AM
121' 114' 114' 114' 114'
1102' 1102' 1102' 1102' 1102'
1.75" 1.75" 1.75" 1.75" 1.75"/cage
A C C C A
16" 16" 16" 16" 16"
95 95 95 95 95
32' 14' 7' 10' 15'
140% 130% 127% 120% 135%
236.67 207.27 202.86 191.1 214.62
161 141 138 130 146
3 4 5 5 4
5 5 10 16 5
5 6 5 5 5
5 6 5 4 5
6 7 6 4 5
3 6 5 4 6
8 5 4 3 5
6 6 7 4 5
8 7 8 5 6
8 6 7 3 6
7 5 5 4 5
7 7 6 4 6
7 5 6 5 6
7 5 5 4 5
7 5 5 5 6
7 6 6 4 6
6 6 5 5 6
6 6 5 5 6
6 4 4 4 5
6 5 5 8 6
7 7 5 7 7
6 5 5 6 10
6 5 4 6 8
12 12 10 10 12
10:02 AM
8:40 AM 5:28 PM 4:59 PM 10:52 AM 10:19 AM
8:21 AM 5:14 PM 4:44 PM 10:37 AM
5:28 PM 4:59 PM 10:52 AM 10:19 AM
8:46 AM 5:45 PM 5:07 PM 10:58 AM 10:25 AM
8:40 AM
1.75"/cage #11/cage #11/cage
16" 16" 16" 16" 16"
114' 114' 114' 114' 114'
1102' 1102' 1102' 1102' 1102'
1.75"/cage 1.75"/cage
A A A A C
10' 15' 5' 15' 12'
122% 130% 133% 130% 119%
194.04 207.27 211.68 207.27 189.63
132 141 144 141 129
5 10 4 4 4
5 8 5 5 5
7 5 4 4 4
6 5 5 6 5
5 5 5 6 6
5 5 6 5 5
5 5 6 5 4
5 5 5 6 6
6 5 6 6 5
5 6 6 6 6
5 4 5 6 5
5 5 6 6 5
6 6 5 6 5
5 6 6 6 5
5 5 6 6 6
5 6 6 6 4
6 6 7 6 5
7 6 7 7 6
5 5 7 6 5
5 5 7 5 5
Tyler McElvain
Fred Imgarten
Clifton Wade
Andy Thiele
5 6 6 6 5
4 4 6 5 5
4 6 6 5 6
9:44 AM 12:54 PM 12:19 PM 11:49 AM
9:49 AM 1:02 PM 12:25 PM 11:54 AM
9:29 AM 12:34 PM 12:04 PM 11:14 AM
9:44 AM 12:54 PM 12:19 PM 11:49 AM
#11/cage #11/cage #11/cage #11/cage
16" 16" 16" 16"
114' 114' 114' 114'
1102' 1102' 1102' 1102'
127% 121% 124% 126%
201.39 192.57 196.98 199.92
A C 95 C
10' 7' 15' 17'
6 10 5 5
8 4 4 4
137 131 134 136
5 4 4 4
5 5 5 5
5 5 5 5
5 5 5 6
5 5 6 5
5 5 5 6
5 5 6 5
5 5 5 6
5 6 6 5
5 6 5 5
5 5 6 6
5 5 5 5
6 5 5 6
6 5 6 5
6 5 5 6
5 5 5 5
6 6 6 6
3 3 4 4
6 5 6 5
6 5 7 7
BERKEL & COMPANY CONTRACTORS, INC
APG COMPRESSION TEST INSTALLATION RECORD
11 12 15
1216'
1102'
11 12 12 12 12 12
16"
1.47
7 6 6 5
BERKEL & COMPANY CONTRACTORS, INC
Compression Test Layout
Project: Pile Type:
Pile Name: Diameter:
Date: Length:
Pile: Pile: Pile: Pile:
Diameter: Diameter: Diameter: Diameter:
Length: Length: Length: Length:
Pile: Pile: Pile:
Diameter: Diameter: Diameter:
Length: Length: Length:
Pile: Pile: Pile: Pile:
Diameter: Diameter: Diameter: Diameter:
Length: Length: Length: Length:
Pile: Pile: Pile:
Diameter: Diameter: Diameter:
Length: Length: Length:
14' 14' 14'
16"
114'
R-1
16"
121'
16"
114'
16"
114'
10'
10'
114'
CT-1
16"
114'
LT-1 LT-3
R-5
16"
114'
LT-2
R-6
16"
114'
R-7
16"
114'
R-8
16"
CT-2
16"
114'
CT-3
16"
114'
10'
VAMC Parking Garage
R-4
16"
114'
R-2
16"
114'
R-3
16"
114'
C-(1-3), L(1-3)
11/21/2019
APG
16"
114'
North Arrow
BERKEL & COMPANY CONTRACTORS, INC.
PILING INSTALLATION RECORD
Job No. Sheet No. 1 Rig No.: 1 Date:
Job Name: Location Omaha, NE Pump Cal : 1.47 Weather:
1 R4 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 130 159.17 1.47 191.1 1.68 120%
2 R3 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 138 159.17 1.47 202.86 1.78 127%
3 R2 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 141 159.17 1.47 207.27 1.82 130%
4 R1 16 1216.00' 1216.00' 1102.00' 121.00' 121.00' 161 168.95 1.47 236.67 1.96 140%
5 R8 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 144 159.17 1.47 211.68 1.86 133%
6 R7 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 144 159.17 1.47 211.68 1.86 133%
6 691.00' 691.00' 131%
0 0.00' 0.00'
6 691.00' 691.00'
Appv'd BERKEL & COMPANY CONTRACTORS, Inc.
General Contractors
By By: Fred Imgarten
GRAND
TOTAL
TOTAL
TODAY
TOTAL
PREV.
19-265
PILE
NO.
GROUND
SURFACE
ELEVATION
PILE
CUTOFF
ELEVATION
PILE
DIA.
VAMC Parking Garage
11/20/2019
% GRT
VOL OVER
THEO
GROUT PUMP
CAL.
ACTUAL
GROUT VOL
THIS PILE
GROUT TAKE
C. FT. P/L.FT.
PILE TIP ELEV.
PILE
PAY LENGTH
THEO.
GROUT VOL
THIS PILE
PILE
DRILL LENGTH
GROUT PUMP
STROKES
Rainy/Cool
BERKEL & COMPANY CONTRACTORS, INC.
PILING INSTALLATION RECORD
Job No. Sheet No. 1 Rig No.: 1 Date:
Job Name: Location Omaha, NE Pump Cal : 1.47 Weather:
1 R6 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 132 159.17 1.47 194.04 1.70 122%
2 R5 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 146 159.17 1.47 214.62 1.88 135%
3 C3 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 137 159.17 1.47 201.39 1.77 127%
4 C2WC 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 129 159.17 1.47 189.63 1.66 119%
5 C1 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 141 159.17 1.47 207.27 1.82 130%
6 L3WC 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 136 159.17 1.47 199.92 1.75 126%
7 L2 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 134 159.17 1.47 196.98 1.73 124%
8 L!WC 16 1216.00' 1216.00' 1102.00' 114.00' 114.00' 131 159.17 1.47 192.57 1.69 121%
8 912.00' 912.00' 125%
6 691.00' 691.00'
14 1603.00' 1603.00'
Appv'd BERKEL & COMPANY CONTRACTORS, Inc.
General Contractors
By By: Fred Imgarten
Sunny
GRAND
TOTAL
TOTAL
TODAY
TOTAL
PREV.
PILE
DIA.
PILE
NO.
VAMC Parking Garage
PILE
PAY LENGTH
PILE
DRILL LENGTH
GROUT PUMP
STROKES
PILE
CUTOFF
ELEVATION
PILE TIP ELEV.
% GRT
VOL OVER
THEO
GROUT TAKE
C. FT. P/L.FT.
THEO.
GROUT VOL
THIS PILE
18-058
GROUND
SURFACE
ELEVATION
ACTUAL
GROUT VOL
THIS PILE
11/21/2019
GROUT PUMP
CAL.
File details come from the government source that posted it. Updated .