SOW Att. 2 - VHA Required Div 01 Specification Sections.pdf

PDF 77 KB Posted

Attached to
C1DZ--Project 636-508 - VHA A-E Design Expansion of Parking Garage - Omaha, Nebraska Amendment 1
Solicitation number
36C77625R0027
Issued by

About this file

This is a Table of Contents showing Division 01 - General Requirements sections from VHA Master Specifications. The document lists various specification sections related to general project requirements including schedules, quality control, safety, environmental controls, sustainability requirements, and commissioning. Key sections include architectural/engineering CPM schedules, project schedules for small design/bid/build projects, shop drawings and samples requirements, testing services, waste management, and sustainability certification requirements including GREEN GLOBES certification. The document appears to be formatted as a standard construction specification with section numbers, titles and associated dates ranging from 2017-2023.

View the file

Other files

Show all 16

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

DEPARThSNT OF VETERANS AFFAIRS

VNA MASTER SPECIFICATIONS

TABLE OF CONTENTS

Section 00 01 10

LiL. —-I- -

01 00 pç)

Cl

16.01

:6 c: : ic.:7

01 42 19 01 45 00 01 4-5 29 fl_t-_i_zC1D r__.b•u.flc1

DIVISION 01 - GENERAL REQUIRENTS

General Requirements Architectural and Engineering CR-I Schedules ‘,_._ I- O,—,n,-1l M-.-2ns Cn, D.—,--jpt

Project Schedules (Snail Projects — Design/Bid/Build ‘I__i ..•.-. n._2’_2 n__i..’

T7

She1 1ajtir DiiDai PrSijC-t.2

Shop Drawings, Product Data, and Samples Safety Requirements Reference Standards Quality Control Testing Laboratory Services Special Inscecizions Je:nporary Environcenta lConcroTh Thmnorary Interior Signage Construction Waste anagernen:

‘_4 — c Si

11—21 03—20

DS—22

l4 zz

36 10

02—2 3 10—2 2

11—20 02—21 11—18

36—21 o:—n r:7_1

0 4—22 10—17 flA 4)

SECTION NO DIVISION AND SECTION TITLES DATE

D IVI S IC O—-SPECI-At—SECflCNS inn rrrrnntr rL’rr- - —

Lit t± Ij O.tLW outveyn

I-

01 74 19 01 1 13 flu 01 1-fl n__i

5) U_I-

‘_‘t Si_I r

-I-u_i

13.21

01 91 00

Sustainable Construction Requirements C,. 4.—.—,5-_- 124—.. fl_,-1—1-c2 i_i — 2 n___I._..1_—____I__212I—..

“___j ‘-S-I

-ni-i —

I C’t’fl

•2 LiLaLiaLryL.tLtLLLaLLLitI LSCSjLA.LLCAILC II .0

.3:-2 ha;; C;z-s:cucti-&n- ]__.‘--__ ‘_‘

‘TA

I, J

-7

::a:th--ee—— n.____.___:_______2u4._..

flfl]i_’. ztt-Centers .2L4L.c_4_I!iciLiJ._It’_ys._4rrrrSis.wIInc9s_I]I-IuSiurcr

-y

LCC-D / 4 A—

Sustainability Certification Requirements - GREEN

GLOBES

General Commissioning Requirements i:;J-”r

ZIJIVISIOrI Ui — ±NL LOr1lJJ.T1UN fi A fl_i

L. j fl4 fit

-9-4—23-

01—21

04—22

00 01 10-1

File details come from the government source that posted it. Updated .