This document provides specifications for telecommunications infrastructure work. It outlines requirements for materials including fiber optic and copper cable, jacks, frames, termination equipment, and related items. It also addresses installation standards for cable installation, bonding, grounding, splicing, labeling, testing and inspection. Detailed product information and part numbers are provided for equipment such as racks, patch panels, media converters, distributed antenna systems, and related connectivity components. Performance specifications are defined for fiber testing.

View the file

Other files for this federal contract opportunity

Other files attached to Multiple Award Electrical IDIQ Construction effort, newest first.
File Type Posted
Solicitation 6973GH-23-R-00152 Mod 0001.pdf PDF
Past Performance Survey.doc DOC document
Wage Determination OK20230049 06092023.pdf PDF
SOW Table of Contents 05312023.doc DOC document
SOW Appendix D Installed Equipment Data sheet.xlsx XLSX spreadsheet
Contractors Release.pdf PDF
SOW Appendix A Submittal form.doc DOC document
Past Performance Survey.doc DOC document
Client Auth. Letter.doc DOC document
SF25 Performance Bond.pdf PDF
SOW Appendix F EXCAVATION PERMIT v1.pdf PDF
SOW Appendix B Substitution form.doc DOC document
Past Performance Information Form.doc DOC document
FINAL SOW Electrical CON.pdf PDF
Solicitation 6973GH-23-R-00152-.pdf PDF
SOW Appendix E Construction waste management.xls XLS spreadsheet
SF25A Payment Bond.pdf PDF
Show all 17

On GovTribe

Work with this file on GovTribe

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

AMC

Quality Management System

QPM #

AMKFM-224001

Revision

Title: Division 27 Telecommunications Date: 11/01/2022 Page 1 of 62

Process Owner: Cheryl Hixon Approved By: Danny Thomas

UNCONTROLLED COPY WHEN DOWNLOADED

Check the Master List to Verify That This is the Correct Revision Before Use

Date Printed:

Revision 16 11/1/2022

DIVISION

Telecommunications Standards for the

Mike Monroney Aeronautical Center

Approval: ________________________________________________ Title: Danny Thomas, Unit Manager, Telecommunications Unit, AMK-224

Process owner: ___________________________________________ Title: Cheryl Hixon, Telecommunications Specialist, AMK-224

Title: Division 27 Telecommunications Date:11/01/2022 Page 2 of 62

Revision 16 11/01/2022

Revision History

Rev Description of Change Effective Date

Update position configuration and equipment list. 08/01/2012

8 Update equipment list, jack labeling, routing symbols, document name and file name.

02/03/2014

9 Updated Sections 2, 3, 4, 5 & 9 01/18/2016

Updated document number and reference document numbers

10 Added Single Mode Fiber 06/13/2016

11 Added Media Converter Equipment 11/23/2016

12 Update Sections 2.2.1.4.3 and 4.1.5.3 07/23/2017

13 Update Section 1.6.3, 2.2.1.5.1, 2.2.1.6.1, 2.2.1.6.2, 3.1, 5.1.2,

7.14 and 9.1.1.1.9

05/24/2018

14 Removed outdated references 01/11/2019

15 Updated routing symbol from AMK-222A to AMK-224 throughout entire document Updated DAS Equipment List 2.2.1.6.2 Removed 1.8.7 Installer certification

06/14/2021

07/01/221

16 Updated Sections 2.2.1.4.3, 2.2.1.5.1, 4.1.5.3, 4.1.5.4 11/01/2022

Title: Division 27 Telecommunications Date:11/01/2022 Page 3 of 62

TABLE OF CONTENTS

DIVISION 27 – TELECOMMUNICATIONS Page

GENERAL PROVISIONS FOR TELECOMMUNICATIONS SPECIFICATIONS

1. PART: GENERAL 4

1.1 SECURITY 4

1.2 RELATED DOCUMENTS 4

1.3 REFERENCE SPECIFICATIONS, STANDARDS AND CODES 4-5

1.4 COORDINATION 5-6

1.5 DESCRIPTION OF SYSTEMS 6

1.6 SUBMITTALS 6-7

1.7 RECORD DRAWINGS 7-8

1.8 QUALITY ASSURANCE 8

1.9 TELECOMMUNICATIONS SUBCONTRACTOR QUALIFICATIONS 9

1.10 COORDINATION WITH OTHER TRADES 9

1.11 WARRANTY 9-10

1.12 DESCRIPTION OF WORK 10

1.13 SUBMITTALS 10

2. PART: PRODUCTS 11

2.1 GENERAL 11

2.2 MATERIALS 11-17

3. PART: EXECUTION 17

3.1 INSTALLATION 17-19

3.2 EXAMINATION OF SURFACE CONDITIONS 19

3.3 TESTING 19-21

3.4 PROTECTION OF SYSTEMS AND EQUIPMENT 21-22

3.5 WORK PERFORMANCE 22

3.6 ACCESS TO EQUIPMENT 22-23

3.7 CABLE TERMINATION AND DRESS 23

3.8 UPS POWER 23

3.9 CLEANING 24

3.10 COMPLETION 24

3.11 TESTING AND VERIFICATION 24-26

4. TELECOMMUNICATIONS JACK LABELING STANDARD 26-31

5. TELECOMMUNICATIONS JACK CABLING STANDARD 32-33

6. COPPER/FIBER SPLICING STANDARD 33-49

7. MMAC COMMUNICATIONS GENERAL SPECIFICAITONS 49-59

8. COPPER FEEDER LABELING SCHEME 60-61

9. TELECOMMUNICATIONS IN SYSTEMS FURNITURE 61-62

Title: Division 27 Telecommunications Date:11/01/2022 Page 4 of 62

DIVISION 27 – TELECOMMUNICATIONS

SECTION 27000 – GENERAL PROVISIONS FOR TELECOMMUNICATIONS SPECIFICATIONS

CONSTRUCTION STANDARD

1. PART: GENERAL

1.1. SECURITY

Telecommunications Security – For reasons of security and separation of function, independent networks of other agencies, tenant organizations, private companies, etc. located within the Mike Monroney Aeronautical Center shall have independent network cable totally isolated from any FAA infrastructure (to include data, analog or voice). At the least, isolated conduit and separate positions at the user location are required. Other requirements may include separate closets. It is a requirement for the independent network cable and jack to have colors different than that in use by the FAA network/voice cables and other independent existing networks. Therefore, coordination with the Telecommunications Unit (AMK-224) is required in planning of all network connectivity for all organizations, agencies, tenant organizations, or private companies occupying space at the Mike Monroney Aeronautical Center.

1.2. RELATED DOCUMENTS

1.2.1. Drawings and general provisions, including General and Supplementary Conditions and General Requirements (if any), are hereby made a part of this Section. Refer to paragraph titled “Telecommunications Subcontractor Qualifications” in this section for requirements for Telecommunications Subcontractors. Throughout this and related Sections, “Subcontractor” shall not be limited to the singular and masculine and shall refer to one, or more than one, Telecommunications Subcontractor(s).

1.3. REFERENCE SPECIFICATIONS, STANDARDS AND CODES

1.3.1. Comply with the referenced codes and standards within this document. Where conflicts occur, the more stringent shall apply.

1.3.2. Work shall meet or exceed the standards and procedures of the following:

American National Standards Institute (ANSI) Telecommunications Industries Association (TIA) Electronic Industries Association (EIA)

Title: Division 27 Telecommunications Date:11/01/2022 Page 5 of 62

National Electrical Manufacturers Association (NEMA) National Electrical Safety Code (NESC) Institute of Electrical & Electronics Engineers (IEEE) Underwriters Laboratories (UL) National Fire Protection Association (NFPA) American Standards Association (ASA) Federal Communications Commission (FCC) Occupational Safety and Health Administration (OSHA) American Society of Testing Material (ASTM) National Electric Code (NEC) Americans with Disabilities Act (ADA)

In the event of conflicts, the more stringent provisions shall apply.

1.3.3. Construction Project Manager (CPM): As defined for Sections referring to telecommunications work only; the CPM shall be the design analyst employed by the FAA for the purpose of observing the work of the Telecommunications Subcontractor.

1.3.4. All Indefinite Delivery Requirements (IDR) contract work shall be turn-key.

Telecommunications technicians shall perform all telecommunications work to include testing telecommunications cables prior to pull (fiber), pulling telecommunications cables (copper and fiber), testing telecommunications cables after pull (copper and fiber), termination of telecommunications cables (copper and fiber) and final testing. Test results and as-built drawing to include telecommunications position numbers shall be provided to AMP-400. AMP-400 will provide test results and as-built drawings to include telecommunications position numbers to AMK-224 for approval and acceptance, prior to personnel occupying renovated or newly constructed area.

1.4. COORDINATION

1.4.1. When articles, materials, operations or methods related to execution of telecommunications work are noted, specified, or described in the specifications of, are indicated or reasonably implied on drawings and schedules, execute work as required or appropriate to provide complete and proper function, operation and installation.

1.4.2. The drawings utilize symbols and schematic diagrams to indicate items of work. These symbols and diagrams will not typically identify dimensions, nor will they identify inclusion of specific accessories, appurtenances, and related items necessary and appropriate for a complete and proper installation and operation. The Telecommunications Subcontractor shall install work complete and ready for proper operation, including related items not specifically identified, shown, indicated or specified. The work shall be installed in accordance with the intent diagrammatically expressed on

Title: Division 27 Telecommunications Date:11/01/2022 Page 6 of 62 the drawings, and in conformity with the dimensions indicated on architectural drawings and on shop drawings approved by the Telecommunications Unit, Telecommunications Infrastructure Planning Team (TIPT). When abbreviations appear on the drawings or specifications in upper- or lower-case letters, with or without periods, the resultant work shall be as stated above.

1.4.3. The drawings include details for various items, which are specific with regard to the dimensions and positioning of the work. These details are intended only for the purpose of establishing general feasibility. They do not obviate field coordination for the indicated work. Work shall not proceed until actual field conditions and requirements are verified by the Telecommunications Subcontractor.

1.4.4. The drawings are diagrammatic and indicate the general arrangement of systems and equipment unless indicated otherwise by dimensions.

1.5. DESCRIPTION OF SYSTEMS

1.5.1. Furnish and install materials for the Telecommunications Infrastructure systems as specified herein and as shown on the drawings. Upon completion, the systems shall be functioning systems in compliance with performance requirements specified.

1.5.2. The cabling specified and shown on the drawings is for complete, performance based, workable systems. Deviations from the cabling shown due to a particular manufacturer’s requirements shall be made only with the written approval of the FAA and at no additional cost to the FAA.

1.6. SUBMITTALS

1.6.1. Submittals shall be made as one complete package. Submittals for equipment shall be provided to AMK-224 for review prior to purchase/installation.

1.6.2. Submittals for individual systems and equipment assemblies, which consist of more than one item or component, shall be made for the system or assembly as a whole. Partial submittals will not be considered, reviewed or stored, and such submittals will not be returned except at the request and expense of the Contractor.

1.6.3. Generate shop drawings on AutoCAD. Modify reviewed and accepted shop drawings to include revisions based upon completion of work. Submit shop drawings with record drawings in hard copy and an electronic copy. Electronic copies are to be written to a USB device if they cannot be provided through a shared drive.

Title: Division 27 Telecommunications Date:11/01/2022 Page 7 of 62

1.6.4. Shop drawings shall include equipment racks, patch panels, termination blocks, connection details, rack mounting details and any other details not included in the construction drawings.

1.7. RECORD DRAWINGS

1.7.1. Provide Record Drawings for requirements regarding Project Record Documents. “As-Built” record documentation for telecommunications work shall include:

System function diagrams Manufacturers’ description literature for equipment Connection and programming schedules as appropriate Equipment material list including quantities Spare parts list with quantities Details not on original Contract Documents Test Results Warranties Release of Liens

1.7.2. Operation and Maintenance Manual:

1.7.2.1.The Telecommunications Subcontractor shall submit manuals that will contain manufacturers’ brochures of items installed by the Telecommunications Subcontractor.

1.7.2.2.The manual shall be subdivided into separate sections with tab dividers to identify subsystems of the integrated system. Reference appropriate specification sections.

1.7.2.3.Provide the following additional information for each electronic system. Information shall be edited for projects where applicable.

• Operations manuals for components and for system as a whole.

• Maintenance Manuals for components and for system as a whole.

• Point-to-point diagrams, cabling diagrams, construction details and cable labeling details.

• List of spare parts, materials and suppliers of components.

• Provide name, address and telephone number for each supplier.

• Emergency instructions for operational and maintenance requirements.

• Delivery time frame for replacement of component parts from suppliers.

• Recommend inspection schedule and procedures for components and for system as a whole.

Title: Division 27 Telecommunications Date:11/01/2022 Page 8 of 62

• Complete “Reviewed” shop drawings and product data for components and system as a whole.

• Troubleshooting procedures for each system and for each major system component.

1.8. QUALITY ASSURANCE

1.8.1. Equipment and materials required for installation under these specifications shall be the current model and new (less than one year from date of manufacture), unused and without blemish or defects.

1.8.2. Manufacturers of equipment and materials, pertinent to these items shall have been engaged in the manufacture of said equipment a minimum of three years.

1.8.3. Provide a written quality assurance plan for approval by the FAA including testing, plan for pre-testing and for final testing and certification of pre-testing and commissioning prior to final testing.

Ensure compliance with Contract Documents. Include back-check as part of testing plans.

1.8.4. Manufacturers: Firms regularly engaged in the manufacture of cable and devices of the types and capacities required, whose products have been in satisfactory use in similar service for not less than 3 years.

1.8.5. EIA/TIA Compliance: Comply with applicable portions of Telecommunications Industry

Association/Electrical Industry Association standards pertaining to cable, wire, and connectors.

1.8.6. UL Labels: Provide cable, wire, and connectors, which have been approved, listed and labeled by Underwriters Laboratories.

Title: Division 27 Telecommunications Date:11/01/2022 Page 9 of 62

1.9. TELECOMMUNICATIONS SUBCONTRACTOR QUALIFICATIONS

1.9.1. General: The telecommunications subcontractor shall have total responsibility for the coordination and installation of the work shown and described in the telecommunications drawings and specifications. The telecommunications subcontractor shall be a company specializing in the design, fabrication, and installation of integrated telecommunications systems.

1.9.2. Telecommunications systems specified shall be engineered, assembled and installed under the direction of a pre-qualified telecommunications subcontractor. Pre-qualification requirements shall include submittal by the telecommunications subcontractor to the architect of the following:

1.9.2.1.List of previous projects of this scope and nature, including names and sizes of projects, description of work, time of completion, and name of contact persons for reference.

1.9.2.2.Installers shall certify that they are manufacturer-authorized for work to be performed.

1.10. COORDINATION WITH OTHER TRADES

1.10.1. The telecommunications subcontractor shall coordinate telecommunications work with that of other sections as required ensuring that the entire telecommunications work will be carried out in an orderly, complete and coordinated fashion.

1.11. WARRANTY

1.11.1. Warranty work is to be free from defects. Repair or replace defective materials or workmanship, as well as damage to the work of other trades resulting from same, as directed by the FAA for the duration of the stipulated warranty period.

1.11.2. The primary suppliers of telecommunications hardware and software shall warranty, through the telecommunications subcontractor, in writing, phases of systems (including but not limited to, software, hardware, and peripheral equipment) against defective materials, design and workmanship. Upon receipt of notice from the FAA of failure of the system, or parts thereof, the telecommunications subcontractor, with the assistance of the supplier, shall promptly restore the defective component to provide an acceptable system at no cost to the FAA. The telecommunications subcontractor shall warranty the performance of the system for its intended

Title: Division 27 Telecommunications Date:11/01/2022 Page 10 of 62 use for a period of 1 year from the date of final acceptance and shall “pass-through” and shall activate the manufacturers’ warranties to the FAA for the full extent and period of the manufacturer’s warranty.

1.11.3. The warranty period shall commence upon final acceptance of the work by the FAA.

Acceptance tests and procedures shall be developed by the telecommunications subcontractor in accordance with the provisions of this specification and accepted by the FAA. The telecommunications subcontractor shall test the installed systems in accordance with the accepted test procedures.

1.11.4. Acceptance by a manufacturer of an order for equipment for this contract signifies acceptance of specified warranty requirements.

1.11.5. During the warranty period, there shall be no charges to the FAA for service calls (mileage, labor, travel, expenses, etc.) for warranty related work.

1.12. DESCRIPTION OF WORK

1.12.1. The extent of telephone and data work is indicated by drawings and schedules, and by the requirements of this section.

1.12.2. The types of components required for the project include the following:

Riser Cable – Fiber and Copper Station Cable Jacks and Mounting Frames Termination Equipment – Fiber and Copper Product Data: Cable, jacks, termination equipment and accessories All above equipment is contractor furnished and installed on all IDIQ projects.

1.13. SUBMITTALS

1.13.1. The FAA Telecommunications Unit TIPT must approve any proposed substitutions for the specified telecommunications cable. Proposed substitutions are to be coordinated through AMP- 400.

Title: Division 27 Telecommunications Date:11/01/2022 Page 11 of 62

2. PART: PRODUCTS

2.1. GENERAL

2.1.1. For each system, provide all wire, cable, jacks, termination accessories and other components as required to form a complete system of the types indicated or specified.

2.2. MATERIALS

2.2.1. Manufactured Products:

2.2.1.1.Material and equipment furnished shall be of current production by manufacturers regularly engaged in the manufacture of such items, for which replacement parts are available.

2.2.1.2.When more than one unit of the same class of equipment or material is required, such units shall be the products of a single manufacturer.

2.2.1.3.Equipment Assemblies and Components:

2.2.1.3.1. Components of an assembled unit need not be products of the same manufacturer but must meet TIA/EIA Category 6 criteria as a complete link system.

2.2.1.3.2. Manufacturers of equipment assemblies, which include components made by others, shall assume complete responsibility for the final assembled unit.

2.2.1.3.3. Components shall be compatible with each other and with the total assembly for the intended service.

2.2.1.3.4. Moving parts or elements of equipment of the unit normally requiring lubrication shall have means provided for such lubrication and shall be adequately lubricated at the factory prior to delivery.

2.2.1.3.5. Factory cabling shall be identified on the equipment being furnished and on cabling diagrams.

2.2.1.4.Cable:

Title: Division 27 Telecommunications Date:11/01/2022 Page 12 of 62

2.2.1.4.1. Fiber Optic Riser Cable:

50 Micron Indoor or Outdoor Fiber Riser Rated Cable (as determined, whether plenum or non-plenum cable is required) or approved equal (number of strands to be supplied by AMK-224).

Multimode and single mode (number of multimode and single mode to be supplied by

AMK-224).

2.2.1.4.2. Copper Telecommunications Riser Cable:

24 AWG, Level 3, Anixter # CMR-02004EAA (number of pair to be supplied by

AMK-224)

2.2.1.4.3. Station Cable

2 cables to each position, level 6, 24 gauge, 4 pair, for two RJ-45 LAN connections (orange jacks).

2.2.1.5.Telephone and Data Receptacles:

2.2.1.5.1. Provide each telephone and data outlet with the following components (proposed substitutions must be submitted to AMK-224 for review prior to purchase/installation):

Description Comcode Number

2 ea. – RJ-45 Connector (Orange)

MGS400BH-112

2 ea. – Blank 107067860 1 ea. – Frame 106622277

2.2.1.6.Telephone and Network Equipment:

2.2.1.6.1. Figure two ports for every position reflected on the project.

2.2.1.6.2. Provide and install the following equipment as required (report any substitution prior to purchase/installation to AMK-224):

Title: Division 27 Telecommunications Date:11/01/2022 Page 13 of 62

Description Comcode/Part Number Unit Original Distributed Antenna System Cellular Equipment Andrew Cellmax-D-CPUSF 20008570 EA Trilogy 50ohm N Female Connector NFP01250 EA 2’ RG-142 N Male to N Male CXTA42A-2 EA 2F Zipcord Riser SC-APC to SC-APC 6’ 666602G5120006F EA 1U Pretium Connector Fiber Housing 500001652 EA Microlab 2 Way Splitter (698-2700mhz) D2-69FN EA Universal Plug & Play Module (SCAPC) 500001738 EA N Female Connector for ½” TRG-NFP01250 EA ½ Plenum Coax AP6012 J 50 FT

The One Distributed Antenna System Cellular Equipment System Controller SC-450 EA Power Attenuation Unit w/6 Broadband Attenuators WB-PAU-6 EA PAU-6 to RIU Cables Kit, 6 QMA to QMA AK-PAU-6-RIU-CABLES EA

1-HEU, 2-RIX, 1-PSM-AC, 1-HCM HEU-2-00-1-A-H EA

1-HEU, 2-RIX, 1-PSM-AC, 1-ACM HEU-2-00-2-A-A EA

RIM Radio Interface Module – CELL RIM-C85 EA RIM Radio Interface Module – PCS RIM-P19 EA RIM Radio Interface Module AWS RIM-A17 EA RIM Radio Interface Module LTC RIM-L70 EA

1-OIU, 2-OIX, 1-PSM-AC, 1-ACM OIU-2-00-2-A-A EA

Optical Interface Unit (OIU) Chassis 1-OIU, 2-OIX, 1-PSM-

AC, 1-ACM

OIU-2-00-1-A-A EA

OIM Optical Interface Module OIM EA ERFC60 Extender RF Cable 24 INCH ERFC24 EA

HEU, OIU, CABLE MANAGEMENT TRAY & DOOR SLEEVE CBLTRAY EA

Corning Remote Access Unit (RAU) Supporting 5 bands: LTE 700, ESMR 800/Cell 850, PCS1900 & AWS + AWS3 1700

RAU5XUS EA

ICU, 1 EDGE Module, 1 PSM-1 ICU-12-M-12-AF-0-1 EA ICU, One Pretium EDGE Modules, 2 PSM-I ICU-12-M-12-AF-0-2 EA ICU 2 EDGE Module, 1 PSM-1 ICU-24-M-12-AF-0-2 EA Interconnect Unit (ICU) Housing ICU-1U EA V-Pol Omni Antenna 698 2700MHz (Antenna) TRU Omni R727 EA LMR400 N-Male to QMA Male, 15 FT (Connector) CXTA40WR-XX EA LC/APC Edge Module ECM-UM12-18-896 EA Pretium EDGE* Solutions Housing 1 Rack Unit Holds 12 EDGE-O1U-SP EA ONE Composite Tether, 6F/4Cu, 16AWG, Plenum Cable Non Armored

HR1818H4CO6U820200F EA

(Based on required length)

Title: Division 27 Telecommunications Date:11/01/2022 Page 14 of 62

ActiFi™ DAS Cables for Indoor Plenum, 6 F, 4 Cu Conductor, 16AWG

006UT8-41H01M20 EA

MiniXtend Cables with Binderless FastAccess Technology, 144 SM, 10K Feet Spool

144ZM4-T4F22A20 EA

Fiber Optic Cleaning Tool, MTP® Connectors 2104466-01 EA Common Interface Modules (HEU & OIU) Extender RF Cable, 16 in

ERFC16 EA

Common Interface Modules (HEU & OIU) Extender RF Cable, 34 in

ERFC34 EA

Common Interface Modules (HEU & OIU) Extender RF Cable, 40 in

ERFC40 EA

Common Interface Modules (HEU & OIU) Extender RF Cable, 59 in

ERFC59 EA

Fiber Optic Cleaning Fluid FCC-CLEANER-FIBER EA Fiber Link Main Module FMM EA Fiber Link Remote Module FRM EA ONE, Composite Tether, 6F/4Cu, 16AWG, Plenum, Non- Armored 170'

HR1818H4C06U820170F-PK PK

Corning ONE Composite Tether - length 320' HR1818H4C06U820320F-PK PK Corning ONE Composite Tether - length 623' HR1818H4C06U820630F-PK PK Headend Unit (HEU) Chassis IHU-2-11-2-A-A EA Spider Fan-Out Kit Insert, 3.0 mm, 900 µm, 6 fibers, yellow INS-06F-900-3-Y EA Local AC/DC Converter 100W LPS-48V-100W EA Splice Tray, Heat-shrink Fusion Splices, Clear cover, 0.2 in, 12 F

M67-048-C EA

Interconnect Unit (ICU) Power Supply Module PSM-I EA Power Supply Unit with no PSM-I installed. Can accommodate up to 6 total PSM-I

PSU6-1U EA

Remote Antenna Unit for 700LTE/Cell/PCS/AWG RAU-C85P19L70A17 EA Headend Unit (HEU) Modules Corning ONE Radio Interface Module, ESMR 800MHz

RIM-E80 EA

VFL Adapter, High-Performance Installation Tool, LC VFL-A125 EA VFL Adapter, High-Performance Installation Tool, SC/ST® compatible

VFL-A250 EA

Title: Division 27 Telecommunications Date:11/01/2022 Page 15 of 62

100 PR Building Entrance Protector 107894925 EA 110-C5 103801254 Pack 15 Foot BL CAT6 Patch Cord EV06-15-BL EA 15 Foot GY CAT6 Patch Cord EV06-15-GY EA 15 Foot YL CAT6 Patch Cord EV06-15-YL EA 188 w/Legs 104405113 EA 19" Rack 46353-503 EA 1U Rack Mountable Fiber Box CCH-01U EA 24 Port Patchmax CAT6 760102251 EA 25 Foot BL CAT6 Patch Cord EV06-25-BL EA 25 Foot GY CAT6 Patch Cord EV06-25-GY EA 25 Foot YL CAT6 Patch Cord EV06-25-YL EA 2U Rack Mountable Fiber Box CCH-02U EA 300 Pair Block w/Legs 107059917 EA 36MM/36SM fiber w/12 Fibers Per Tube 3 Meet Div. 27 Specifications FT 36 X 36, SM 50 Micron um armored loose tube outdoor Meet Div. 27 Specifications FT 144 SM Fiber w/12 Fibers Per Tube Meet Div. 27 Specifications FT 48 Port Patchmax CAT6 760128207 EA 5 Foot BL CAT6 Patch Cord EV06-05-BL EA 5 Foot GY CAT6 Patch Cord EV06-05-GY EA 5 Foot YL CAT6 Patch Cord EV06-05-YL EA 1 Meter LC/LC LED Fiber Patch Cable, 10G OM3, Duplex, 1.8mm PVC Aqua

EVOFF-LL-LO-01M EA

2 Meter LC/LC LED Fiber Patch Cable, 10G OM3, Duplex, 1.8mm PVC Aqua

EVOF-LL-LO-02M EA

3 Meter LC/LC LED Fiber Patch Cable, 10G OM3, Duplex, 1.8mm PVC Aqua

EVOF-LL-LO-03M EA

5 Meter LC/LC LED Fiber Patch Cable, 10G OM3, Duplex, 1.8mm PVC Aqua

EVOF-LL-LO-05M EA

10 Meter LC/LC LED Fiber Patch Cable, 10G OM3, Duplex, 1.8mm PVC Aqua

EVOF-LL-LO-10M EA

1 Meter LC/LC LED Fiber Patch Cable, MM-62.5/125, Duplex, 1.8mm PVC Orange

EVOF-LL-MD-01M EA

2 Meter LC/LC LED Fiber Patch Cable, MM-62.5/125, Duplex, EVOF-LL-MD-02M EA

3 Meter LC/LC LED Fiber Patch Cable, MM-62.5/125, Duplex, EVOF-LL-MD-03M EA

5 Meter LC/LC LED Fiber Patch Cable, MM-62.5/125, Duplex, EVOF-LL-MD-05M EA

10 Meter LC/LC LED Fiber Patch Cable, MM-62.5/125, Duplex, 1.8mm PVC Orange

EVOF-LL-MD-10M EA

Title: Division 27 Telecommunications Date:11/01/2022 Page 16 of 62

1 Meter LC/LC LED Fiber Patch Cable, SM-9/125, Duplex, 1.8mm PVC Yellow

EVOF-LL-SD-01M EA

2 Meter LC/LC LED Fiber Patch Cable, SM-9/125, Duplex, EVOF-LL-SD-02M EA

3 Meter LC/LC LED Fiber Patch Cable, SM-9/125, Duplex, EVOF-LL-SD-03M EA

5 Meter LC/LC LED Fiber Patch Cable, SM-9/125, Duplex, EVOF-LL-SD-05M EA

10 Meter LC/LC LED Fiber Patch Cable, SM-9/125, Duplex, EVOF-LL-SD-10M EA

Cable Runway Ladder Rack 9' x 11.5" x 12' CPI 10250-712 EA Avaya 6 Port Face Plate 108168592 Pack Berk-Tek CAT6 Four Pair Station Cable Non-Plenum 10136339 FT Blue Label 106657174 Pack Bulkhead Flange Adapter 38195 EA Butt Splice Kit CPI 11301-001 EA But Splice Kit UL Classified Gold 16301-001 EA Cable Management Racks 11729-703 Black EA Cable Mount TMEH-58-C0 Pack Cable Runway End Caps CPI 10642-001 Pack Cable Runway J-Bolt Kit, Runway to Wall Support Bracket CPI 11308-001 EA Cable Runway Junction Splice Kit Gold CPI 16302-001 EA Cable Runway Ladder Rack 9' x 11.5" x 12' CPI 10250-712 EA Cable Runway Mounting Plate 12" w/Angle Support Kit CPI 11421-712 EA Endplate 8003542 EA Fiber Cable Management CJP-02U EA Fiber Fan-Out Kit FAN-BT25-12 EA Fiber Rack Mountable Enclosure CCH-04U EA Grounding Kit for 7' Rack CPI 41026-001 EA J-Bolt Kit CPI 11308-001 EA Jumper Trough Block 107831141 EA LC Fiber Panel CCH-CP12-E4 EA LC MM Fiber Connectors 95-050-99 EA LC SM Fiber Connectors 95-200-99 EA LC SM Fiber Panel CCH-CP12-A9 EA MIC (FDDI) to ST Dual Fiber Jumpers, 50 Micron, MM 3 Meters

Siecor EA

Quad Frame 106622277 EA Rack to Runway Mounting Plate CPI 10595-712 EA Rack to Runway Mounting Plate for 9" to 12" CPI 10595-112 EA SC to ST Dual Fiber Jumper, 62.5/125, MM 3 Meters Siecor EA ST Connectors 95-100-01R EA

Title: Division 27 Telecommunications Date:11/01/2022 Page 17 of 62

Media Converter Equipment 19-Slot Chassis for ION Slide-in Modules Rack mountable chassis

ION219-A EA

6-Slot Chassis for ION Slide-in Modules Rack mountable chassis

ION106-A EA

AC Power Supply Module for the ION 6-Slot Chassis Redundant AC power supply for ION 6-Slot Chassis, 100 to 240 VAC input (2 per chassis)

IONPS6-A EA

Redundant AC Power Supply for 19-Slot ION Chassis, 100 to 240 VAC input (2 per chassis)

IONPS-A EA

ION T1/E1 Network Interface Device Module T1/E1 over Fiber Twisted Pair (RJ-48) [1.5 km/0.9 mi.] to 1310nm single mode (SC) [20 km/12.4 mi.] Link Budget: 16.0 dB

C6010-1014 EA

ION Face Plate ION FACEPLATE TO COVER EMPTY

SLOTS (REQUIRED)

IONFP

Redundant AC Power Supply for 19 Slot ION Chassis IONPS-A-R1 EA 100 Base TX (RJ-45) (100 m/328 ft.) to 100 Base FX 1310 nm single mode (LC) (20 km/12.4 mi) Link Budget: 17.3 dB

C2110-1019 EA

10/100 Base TX (RJ-45) (100m/328 ft.) to 100 Base FX 1300 nm multimode (LC) (2 km/1.2 mi.) Link Budget: 11.0 dB

C2210-1039 EA

3. PART: EXECUTION

3.1. INSTALLATION

3.1.1. Telecommunications outside duct bank shall be concrete encased and buried a minimum of 36” below the ground surface. Concrete shall have a minimum strength of 3,000 psi at 28 days.

Marker tape shall be plastic, vinyl, or Mylar, 6 inches wide, and shall be orange to denote telecommunications duct bank, and labeled to indicate the type of circuit buried below. Any deviation to be approved by AMK224 Telecommunications Infrastructure Planning Team (TIPT).

3.1.2. Install telephone and data products in accordance with the manufacturer’s written instructions, the applicable requirements of TIA/EIA, and in accordance with recognized industry practices to ensure that products serve the intended function.

3.1.3. All telephone and data cables shall be installed in conduit per blueprint requirements. The established minimum conduit size is 1”.

3.1.3.1.1. Cable Fill Ratio Table

Title: Division 27 Telecommunications Date:11/01/2022 Page 18 of 62

Conduit

EMT

Capacity

Area - 40% fill

# of Cables for a 40% Fill

RGS

Capacity

Area - 40% fill

# of Cables for a 40% Fill

PVC

Capacity

Area - 40% fill

# of Cables for a 40% Fill

Trade Size (SQ IN) CAT 6 (SQ IN) CAT 6 (SQ IN) CAT 6

1" 0.346 8 0.355 8 0.333 8 1 1/4" 0.598 14 0.61 14 0.581 14 1 1/2" 0.814 19 0.829 20 0.794 19

2" 1.342 32 1.363 32 1.316 31 2 1/2" 2.343 55 1.946 46 1.878 44

3" 3.538 84 3.000 71 2.907 69 3 1/2" 4.618 109 4.004 95 3.895 92

4" 5.901 140 5.153 122 5.022 119 Cat 6 Diameter .232 in

3.1.3.2.Bond riser cables to the ground bar at both ends.

3.1.3.3.Terminate all pairs and fiber strands of riser cables.

3.1.3.4.Contractor shall mount racks in telephone rooms and equipment in the racks as specified in the MMAC Telecommunications Generic Specifications Section. Configuration and turn-up shall be accomplished by FAA, AMK-224.

3.1.3.5.Installation of all termination equipment and other work in telephone equipment room shall be accomplished under the direction of an FAA AMK-224 representative. Bundle cables and secure with Velcro hook & loop, and provide ladder rack as required to neatly train all cables.

Label all cables in accordance with FAA standard nomenclature using approved labeling material as specified in the Jack Labeling Section.

3.1.3.6.Fiber Optic splices shall not be allowed unless specifically called for on the drawings or preapproved by AMK-224. Where fiber optic splices are specifically called for, provide fusion splices. Maximum allowable splice attenuation for single-mode or multi-mode fiber shall be 0.05 dBs. Submit printout documentation showing the dB loss in the splice of each strand.

Title: Division 27 Telecommunications Date:11/01/2022 Page 19 of 62

3.1.3.7.Junction Boxes shall be 18”x18”x10”. If the stated size box cannot be installed due to space restrictions, contact AMP-400. AMP-400 will consult with the Voice/Data Communications team of the Telecommunications Unit at 954-3651 to submit request for substitution with the next appropriate size junction box.

3.1.3.8. Turns in conduit shall be wide sweep turns with no bend in conduit greater than 90° or an aggregate of bends in excess of 180° between pull points or pull boxes. For runs that total more than 100 feet in length, pull points or pull boxes shall be inserted so that no segment between points/boxes exceeds the 100-foot limit. Any turn greater than 90° will require installation of a junction box. If a junction box is required, contact AMP-400. AMP-400 will contact Voice/Data Communications team of the Telecommunications Unit at 954-3651 for determination of junction box size requirement. Conduit shall be bonded to ground on one or both ends.

3.2. EXAMINATION OF SURFACE CONDITIONS

3.2.1. Prior to the start of work, the telecommunications subcontractor shall carefully inspect the installed work of other trades and verify that such work is complete to the point where installation may properly commence. Start of work indicates acceptance of conditions.

3.2.2. Install equipment in accordance with applicable codes and regulations, the original design and the referenced standards.

3.2.3. In the event of discrepancy, immediately notify the AMP-400 Project Manager.

3.2.4. Do not proceed with installation until unsatisfactory conditions and discrepancies have been fully resolved.

3.3. TESTING

3.3.1. Fiber Optic Cable Testing:

3.3.1.1.Contractor shall perform an Optical Time Domain Reflector (OTDR) test to verify integrity of the cable when received from the manufacturer (test cable on the reel) and again to ensure the cable was not damaged during the installation.

3.3.1.2.Contractor shall perform an end-to-end attenuation test to verify proper termination of each fiber.

Title: Division 27 Telecommunications Date:11/01/2022 Page 20 of 62

3.3.1.2.1.1. Contractor shall submit each test to AMP-400 for acceptance and approval by the FAA. AMP-400 shall provide test results to AMK-224 for review and approval.

Contractor shall replace any defective or noncompliant cable at no additional cost to the FAA.

3.3.2. OTDR Testing:

3.3.2.1.Upon delivery of the cable to the jobsite, and prior to installation, test each strand of cable with Optical Time Domain Reflectometer (OTDR) with multi-mode and single-mode modules. Provide printouts to document that all fiber optic strands meet specified criteria before installation.

3.3.2.2.After cable placement, perform a second OTDR test to verify the cable was not damaged during installation; also verify distances of cable runs and system integrity. Enter all results into the system documentation.

3.3.2.3.After strands are terminated, perform an OTDR end-to-end test from each end to prove the terminations. Enter all results into the system documentation.

3.3.2.4.Single mode fiber will be tested at 1310 nm and 1550 nm. Multi-mode fiber will be tested at 850 nm and 1300 nm.

3.3.3. Performance Specifications:

3.3.3.1.All fiber shall be SX laser optimized. SX laser optimized cable shall meet the following minimum specifications:

Maximum Attenuation:

<=2.4 dB at 850 nm <=0.7 dB at 1300 nm

Single Mode Specification:

1.0 dB at 1310 nm

1.0 dB at 1550 nm

Minimum Bandwidth:

200 MHz.km at 850 nm 500 MHz.km at 1300 nm

Title: Division 27 Telecommunications Date:11/01/2022 Page 21 of 62

Glass Geometry Core Diameter 50.0 =/- 2.5um Cladding Diameter 125.0 =/- 2.0um Core-Clad Concentricity <= 1.5um Cladding Non-Circularity <= 1.0% Core Non-circularity <= 5%

3.3.3.2.Copper Riser Cable Testing:

3.3.3.2.1. Riser Cable Testing:

3.3.3.2.1.1.End –To-End Polarity Testing: A minimum of 99% pair functional connectivity shall be verified by end-to-end polarity testing. Polarity test shall verify correct tip, ring and pair.

3.3.3.2.1.2.TDR Test: Perform a Time Domain Reflectivity test to verify splices and correct gauge of wire throughout the run.

3.3.3.2.1.3.Documentation: Provide complete documentation of each test performed and printout of TDR test.

3.3.3.2.1.4.Contractor shall submit each test to AMP-400 for acceptance and approval by the

FAA. AMP-400 shall provide test results to AMK-224 for review and approval.

Contractor shall replace any defective or noncompliant cable at no additional cost to the FAA.

3.4. PROTECTION OF SYSTEMS AND EQUIPMENT

3.4.1.1.Asbestos Survey: Prior to the disturbance of any building materials, construction personnel must know the results of an asbestos survey.

3.4.1.2.Lead Survey: Prior to the disturbance of any building materials, construction personnel must know the results of a lead survey.

3.4.1.3.Protect materials and equipment from damage during storage at the site and throughout the construction period. Equipment and materials shall be protected during shipment and storage against physical damage, dirt, theft, moisture, extreme temperature and rain.

Title: Division 27 Telecommunications Date:11/01/2022 Page 22 of 62

3.4.1.4.Damage from rain, dirt, sun and ground water shall be prevented by storing the equipment on elevated supports and covering them on sides with securely fastened protective rigid or flexible waterproof coverings.

3.4.1.5.During installation, equipment shall be protected against entry of foreign matter on the inside and be vacuum cleaned both inside and outside before testing, operating or painting.

3.4.1.6.As determined by AMK-224, damaged equipment shall be fully repaired or shall be removed and replaced with new equipment to fully comply with requirements of the documentation provided. Decisions of AMK-224 shall be final.

3.4.1.7.Painted surfaces shall be protected with removable heavy Kraft paper, sheet vinyl or equal, installed at the factory and removed prior to final inspection. Damaged paint on equipment and materials shall be repainted with painting equipment and finished with same quality of paint and workmanship as used by the manufacturer.

3.5. WORK PERFORMANCE

3.5.1. Coordinate location of equipment and conduit with other trades to minimize interference.

3.5.2. Holes through concrete and masonry in new and existing structures shall be cut with a diamond core drill or concrete saw upon approval of the structural engineer of record for the base building.

Pneumatic hammer, impact electric, hand or manual hammer type drill shall not be allowed, except where permitted by the AMP-400 Project Manager as required by limited working space.

3.5.2.1.Holes shall be located so as not to affect structural sections such as ribs or beams.

3.5.2.2.Holes shall be laid out in advance. The AMP-400 Project Manager shall be advised prior to drilling through structural sections, for determination of proper layout.

3.5.2.3.Structural Penetrations: Where conduit, wire ways and other raceways pass through fire partitions, fire walls or walls and floors, provide FAA approved effective barrier against the spread of fire, smoke and gases.

3.6. ACCESS TO EQUIPMENT

3.6.1. Equipment shall be installed in location and manner that will allow convenient access for maintenance and inspection.

Title: Division 27 Telecommunications Date:11/01/2022 Page 23 of 62

3.6.2. Working spaces shall not be less than specified in the National Electrical Code for voltages specified.

3.6.3. Where the AMP-400 Project Manager determines that the telecommunications subcontractor has installed equipment not conveniently accessible for operation and maintenance, equipment shall be removed and reinstalled, one time only, as directed by the AMP-400 Project Manager, at no additional cost to the FAA. “Conveniently accessible” is defined as being capable of being reached without the use of ladders or without climbing or crawling under or over obstacles such as motors, pumps, belt guards, transformers, piping and duct work.

3.7. CABLE TERMINATION AND DRESS

3.7.1. Installation of signal, video, and communication and control conductors shall adhere to the following:

3.7.2. Cables shall be dressed, labeled and hook & loop wrap in cabinets, racks and/or at cross connect backboard to present a neat, logical and orderly installation. At the discretion of the telecommunications subcontractor, cable duct with removable covers may be installed in equipment cabinets and control consoles to facilitate satisfying this requirement.

3.7.3. Cables shall be secured to equipment cabinet backboards, console members or to other system components using cable clamps and hook & loop wraps. The telecommunications subcontractor shall furnish and install cable support posts to facilitate system installation.

3.7.4. Cables and conductors shall be terminated with cable termination connectors compatible with the specific termination.

3.7.5. Metallic cables and conductors entering the facility from a point exterior to the building shall be equipped with lightning protection. Protector shall be located at the nearest point of cable entry in the building.

3.8. UPS POWER

3.8.1. All electrical circuits supplying power to system components as part of telecommunications work shall be connected to existing UPS power. If UPS is not available, advise AMP-400 to contact AMK-224 at (405) 954-3651.

Title: Division 27 Telecommunications Date:11/01/2022 Page 24 of 62

3.9. CLEANING

3.9.1. During construction, and prior to FAA acceptance of the building, remove from the premises and dispose of packing material and debris caused by telecommunications work.

3.9.2. Remove dust and debris from interiors and exteriors of electrical equipment. Clean accessible current carrying elements prior to being energized.

3.10. COMPLETION

3.10.1. Upon completion of the work, remove excess debris, materials, equipment, apparatus, tools and similar items. Leave the premises clean, neat and orderly.

3.10.2. Systems shall be complete and operational, and controls shall be set and calibrated.

3.10.3. Testing, start-up, and cleaning work shall be complete.

3.10.4. Special tools for proper operation and maintenance of equipment provided under this specification shall be delivered to the FAA.

3.10.5. All punch list items must be corrected prior to acceptance of project.

3.11. TESTING AND VERIFICATION

3.11.1. The telecommunications subcontractor shall verify that requirements of this specification are met. Verification shall be through a combination of analyses, inspections, demonstrations and tests, as described below.

3.11.2. Verification by Inspection: Verification by inspection includes examination of items and comparison of pertinent characteristics against the qualitative or quantitative standard set forth in the specifications. Inspection may require moving or partially disassembling the item to accomplish the verification, included as part of the work at no additional cost to the FAA.

3.11.3. Verification by Test and Demonstration: The telecommunications subcontractor shall verify by formal demonstrations or tests that the requirements of this specification have been met. The telecommunications subcontractor shall demonstrate that the telecommunications systems components and subsystems meet specification requirements in the “as-installed” operating environment during the “System Operation Test.” While no formal environmental testing is required, the telecommunications subcontractor shall measure and record temperature, humidity

Title: Division 27 Telecommunications Date:11/01/2022 Page 25 of 62 and other environmental parameters and the environmental conditions, which were encountered during the “System Operation Test.”

3.11.4. Perform commissioning and pretest prior to enclosure of walls.

3.11.5. Perform system operation tests after full enclosure of walls.

3.11.6. System Operation Tests Conducted Upon Completion Of Work: Upon completion of the telecommunications subcontractor’s work, subject the system to functional and operational tests.

When required, corrections determined by initial test results, have been completed, fully retest the system. The FAA shall be notified in writing not less than seven days in advance of the date of proposed final testing and inspection. The advance notice shall include certification that the installation is complete and operable, and that the telecommunications subcontractor has satisfactorily performed the final tests specified herein. The acceptance testing and final inspection shall be accomplished in the presence of the FAA and the AMP-400 Project Manager. At least ten days prior to scheduled system completion, the telecommunications subcontractor shall submit, for approval by the FAA a test plan to completely test telecommunications systems. The telecommunications subcontractor shall include in test plan, for acceptance by the FAA (AMK-224 and the AMP-400 Project Manager), a complete and detailed final acceptance test check-off list (“punch list). The list shall be a complete representation of specified functions and conditions, including contingency, priority and abnormal modes of operation. The arrangements of the list shall be such as to provide an orderly method of tabulating checks of system features, response and operation. The punch list shall include a designated space adjacent to each test procedure where the FAA can initial to indicate compliance with each test procedure. At the time of final acceptance testing, required tests shall be repeated and defects corrected until the system is found to be acceptable to AMK-224 and AMP. The telecommunications subcontractor shall maintain a log of test activities and results. Both electronic and printed copies of this log including copies of the signed-off punch list shall be submitted to the FAA within seven days of the testing. Final tests shall include, but not limited to, the following:

3.11.7. Test all category cables in accordance with current TIA/EIA specifications for that category of cabling with a test device meeting or exceeding level IIe accuracy.

3.11.8. Bi-directional attenuation (loss) test for each multimode fiber strand at 850nm and 1300nm wavelengths and each single mode fiber strand at 1310nm and 1550nm. Conduct tests in accordance with ANSI/TIA/EIA-526-14-A, Method B for multimode fibers, and ANSI/TIA/EIA-526-7, Method A.1 for single mode fibers and with test instrument manufacturers printed instructions. Demonstrate that measured link loss does not exceed the “worst case” allowable loss which is the sum of: the connectors loss (based on the number of mated connector pairs at the ANSI/TIA/EIA-568-A maximum allowable loss of 0.75dB per

Title: Division 27 Telecommunications Date:11/01/2022 Page 26 of 62 mated pair) and the optical fiber loss (based on the maximum allowable loss of 3.5 dB/km @ 850nm and 1.5 dB/km @ 1300nm for multimode fiber and 1.0 dB/km @ 1310nm and 1.0 dB/km @ 1550nm for indoor single mode fiber and 0.5 dB/km @ 1310nm and 0.5 dB/km @ 1550nm for outdoor single mode fiber).

3.11.9. Visual inspection of cabling for proper routing bends radii cable management and security.

3.11.10. Verification that required submittals have been provided and have been accepted.

3.11.11. The telecommunications subcontractor shall carefully plan and coordinate the final acceptance tests so that tests can be satisfactorily completed. The telecommunications subcontractor shall provide necessary instruments, labor and materials required for tests, including the equipment manufacturer’s technical representative and qualified technicians in sufficient numbers to perform the tests within a reasonable time period. The AMP-400 and AMK-224 office reserve the right to be present during testing.

3.11.12. After telecommunications systems have been installed and tested, the completed test plan shall be signed by the telecommunications subcontractor and submitted for approval.

4. TELECOMMUNICATIONS JACK LABELING STANDARD

4.1.1. Abstract:

4.1.1.1.This standards statement documents the practice for labeling telecommunications jacks during the installation process. Telecommunications jacks shall be installed in accordance with the Telecommunications Jack Cabling Standard. This standard requires that a unique position number be designated for each telecommunications jack. Additionally, this standard requires that the telephone closet that hosts the telecommunications jack will be identified in the position number of the telecommunications jack.

4.1.2. Standard:

4.1.2.1.The labeling standards define the labeling at the jack location as well as in the telephone closet. In all cases the labels at the jack and in the closet will be made with high contrast permanent material, which may be removed and replaced in the field.

Title: Division 27 Telecommunications Date:11/01/2022 Page 27 of 62

4.1.3. At The Jack:

4.1.3.1.This standard defines a position as a location housing jacks whether it is a “tombstone,” surface plug, power pole or a “Walker” box. A jack is the wiring device installed in a position, which allows for connection of the telecommunications device. The labeling number will be six characters in the format of:

CCCPPP

4.1.3.2.The syntax of the label is:

<Closet Number><Position Number>

4.1.4. At The Closet:

4.1.4.1.This standard defines the nomenclature as a location designated on a designation strip on a Patch Panel. The labeling number will be seven characters in the format of:

CCCPPPF

4.1.4.2.The syntax of the label is:

><Closet Number><Position Number><Duplication Flag> Further Definitions:

Labeling Syntax

Permitted Character

Permitted Value

Description

Closet Room Number

Alpha/Numeric 001-999 A-Z

The room number of the serving closet as it will be labeled at contract completion. * (In cases where the closet number is larger than 3 characters, the closet number shall be trimmed to the useful three digits as determined by AMK-224, i.e. BC04G>C04 127B>127

Sequence Number

Numeric 001-999 This is a unique number for the position, which usually is the sequence number of when the jack was installed.

Duplication Flag

Alpha A-D If the descriptive is duplicated in an installation (i.e.

multiple analog numbers at the same position.)

4.1.5. Example In Closet:

4.1.5.1.LAN and analog circuits are installed to work out of closet 110. This is the 121st position installed in this closet. The jack number would be: 110121 (With the analog number posted by the jack when activated by a telephone work order.)

Title: Division 27 Telecommunications Date:11/01/2022 Page 28 of 62

4.1.5.2.In the closet, the LAN jack would be labeled on the supporting Patch Panel as 110121 (Figure A).

Patch Panel Detail A Figure A

4.1.5.3. Jack number is centered at the top of the jack. At the position with the jacks, on a quad plate, the upper two jack positions are LAN jacks with orange jacks. Lower two jack positions are blank for future requirements. If it is an analog line, the analog number will be indicated on the jack when an analog telecommunications work order is complete (Figure B).

Quad Detail Figure B

110121

Title: Division 27 Telecommunications Date:11/01/2022 Page 29 of 62

4.1.5.4.Figure C (Tombstone Detail) and Figure D (Power Pole Detail) below, extend the jack labeling to the “Tombstone” and “Power Pole” configuration. The “Walker Box” will use the “Quad” (Figure B) jack layout. Other configurations may be approved by AMK-224.

Tombstone Detail

Figure C

Title: Division 27 Telecommunications Date:11/01/2022 Page 30 of 62

Power Pole Detail

Figure D

4.1.6. Situation 2:

4.1.6.1.A new work order is issued for an additional LAN connection at the position installed in

Situation 2. Its jack number would be L110121B (C, D, E, etc.). Re-label previous LAN connection from L to L-A.

4.1.6.2.In the closet, the old jack on the Patch Panel is re-designated as 110121A.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .