SOW Appendix A Submittal form.doc
DOC document 85 KB Posted
- Attached to
- Multiple Award Electrical IDIQ Construction effort Federal contract opportunity
- Solicitation number
- 6973GH-23-R-00152
About this file
This document appears to be a submittal form and example submittal schedule for a construction project. It includes templates for contractors to transmit shop drawings, equipment data, material samples, or manufacturer certificates of compliance for review according to specification sections and paragraph numbers. The example submittal schedule lists individual submittal items by specification and paragraph number, description, and proposed and actual review dates for a city construction project. No products, services, or contract details are provided in this template and example schedule.
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| Solicitation 6973GH-23-R-00152 Mod 0001.pdf | ||
| Past Performance Survey.doc | DOC document | |
| Wage Determination OK20230049 06092023.pdf | ||
| SOW Table of Contents 05312023.doc | DOC document | |
| SOW Appendix D Installed Equipment Data sheet.xlsx | XLSX spreadsheet | |
| FINAL SOW Electrical CON.pdf | ||
| SOW Appendix C AMKFM-224001 Division 27 Revision 16.pdf | ||
| Solicitation 6973GH-23-R-00152-.pdf | ||
| SOW Appendix E Construction waste management.xls | XLS spreadsheet | |
| SF25A Payment Bond.pdf | ||
| SF25 Performance Bond.pdf | ||
| SOW Appendix F EXCAVATION PERMIT v1.pdf | ||
| SOW Appendix B Substitution form.doc | DOC document | |
| Past Performance Information Form.doc | DOC document | |
| Contractors Release.pdf | ||
| Past Performance Survey.doc | DOC document | |
| Client Auth. Letter.doc | DOC document |
Show all 17
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
TRANSMITTAL OF SHOP DRAWINGS, EQUIPMENT DATA, MATERIAL SAMPLES, OR MANUFACTURER'S CERTIFICATES OF COMPLIANCE
| DATE |
| SPEC. SECTION |
SUBMISSION NO.
REVIEWAL REQUEST FOR THE FOLLOWING ITEMS - THIS SECTION WILL BE INITIATED BY THE CONTRACTOR
| TO: |
| FROM: |
| CONTRACT NO./PROJECT NAME |
| CHECK ONE: |
THIS IS A NEW SUBMITTAL
THIS IS A RESUBMITTAL OF
ITEM
NO
DESCRIPTION OF SUBMITTED ITEM(S)
(Type, Size, Model Number, Etc.)
| TYPE OF SUBMITTAL (Mfg/Contr. Catalog Data; Shop Dwg; Sample; Etc.) |
| NO |
OF COPIES
| CONTRACT REFERENCE DOCUEMENT |
| IS SUBSTITUTION REQUESTED? |
| SPEC. PARA. NO. |
| DWG SHEET NO. |
| (CHECK ONE) |
If Yes, Request Form Must Be Provided
YES
NO
REMARKS:
(Name of Contractor) FORM CS154/93
SHEET OF
I certify that the above submitted items have been reviewed in detail and are correct and in conformance with the Contract Documents and can be installed in the allocated spaces, except as other wise stated.
NAME AND SIGNATURE OF CONTRACTOR
DATE
EXAMPLE OF SUBMITTAL SCHEDULE
Page No. 1
08/31/92
OWNER
CITY, STATE
PROJECT TITLE
WEEKLY SUBMITTAL REPORT
DOCNO
SPEC TITLE
SPEC.
PARA NO
DESCRIPTION OF SUBMITTED ITEM
DATE
DATE TO
REVIEWER
01005.002
GENERAL PROVISIONS
01005 2.57
PROGRESS CHARTS
06/09/92 07/09/92
NET
01005.003
GENERAL PROVISIONS
01005 1.07.B
SCHEDULE OF VALUES
06/03/92 06/03/92
NET
01005.003A
GENERAL PROVISIONS
01005 1.07.B
SCHEDULE OF VALUES
06/08/92 06/10/92
NET
01005.045
GENERAL PROVISIONS
01005 1.01
EMERGENCY VEHICLE ACCESS
PLAN / FIRE LANE
07/21/92 07/22/92
NET
01005.2R1
GENERAL PROVISIONS
01005 2.57
PROGRESS CHARTS - REVISED
07/24/92 08/07/92
NET
01006.004
SPECIAL PROVISIONS
01006 1.13
SCHEDULE FOR SUBMITTALS
06/15/92 06/15/02
AAN
01621.030
ENVIRONMENT
PROTECTION
01621
EPA PLAN
06/29/92 07/10/92 R
01621.30R1
ENVIRONMENT
PROTECTION
01621
EPA PLAN
06/29/92 07/10/92
NET
File details come from the government source that posted it. Updated .