This Statement of Work (SOW) details a contract for the Indian Health Service Oklahoma City Area Office at the Pawnee Indian Health Center to upgrade its access control system. The project involves replacing existing M2150 door access control boards with M4000 HSE (Homeland Security Edition) boards, installing Pro HSE Symmetry software version 9.8 on a virtual server, and integrating two PIV card readers. The contractor will be responsible for installing 11 M4000 HSE boards, 42 new HID door readers, and providing maintenance and support for the entire AMAG Symmetry system.
The contract is structured as a twelve-month base year with four twelve-month option years, with an installation deadline of 60 days from the award date. The solicitation (RFQ #246-25-Q-0071) requires vendors to be authorized AMAG resellers with the ability to respond to service calls within two business days and provide repair parts within five business days. Evaluation criteria include technical capabilities, past performance, and pricing, with the government awarding a firm fixed-price purchase order to the most advantageous offer. Quotes are due by August 8, 2025, and must be submitted electronically to Jeffrey Earnest at jeffrey.earnest@ihs.gov.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Pawnee AMAG Bid-SheetR2.xlsx | XLSX spreadsheet | |
| Pawnee AMAG Bid-SheetR2.xlsx | XLSX spreadsheet | |
| Commercial Item Clauses Services with BAA 04.08.25.docx | DOCX document | |
| SF1449-21.pdf | ||
| ok51.txt | TXT text file |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Department of Health and Human Services Indian Health Service Oklahoma City Area Office 701 Market Dr.
Oklahoma City, OK 73114
Statement of Work (SOW) AMAG SYMMETRY HSE Maintenance and Support
1. PURPOSE OF THE PROJECT
The Oklahoma City Area Office (OCA), Indian Health Services (IHS) has a requirement for Pawnee Indian Health Center 1201 Heritage Circle, Pawnee OK 74058. to provide AMAG symmetry software version pro HSE (Homeland Security Edition) and HSE control boards for our door access system. Along with providing Maintenance and support contract for the entire AMAG system.
2. DETAILED DESCRIPTION OF THE TECHNICAL REQUIREMENTS
2.1. The contractor shall remove all door access control boards M2150 DBC and BC style boards and replace them with M4000 HSE (Homeland Security Edition) along with enclosure boxes.
2.2. The contractor shall install Pro HSE (Homeland Security Edition) symmetry software to a virtual server at Pawnee Indian Health Center (this can be done during normal business hours ahead of installing the M4000 boards).
2.3. The contractor shall provide two (2) PIV readers to be integrated to the symmetry system to read new PIV cards and import the data off the PIV card to populate with-in Symmetry system.
2.4. The contractor shall provide a maintenance support services for all AMAG Symmetry software, and hardware associated with AMAG symmetry HSE (Homeland Security Edition).
2.4.1. The contractor shall provide two different pricing sheets for maintenance and Support, first pricing will be for full Maintenance and support including labor, parts, remote support, and AMAG software support agreement for equipment, wiring associated to the AMAG system for base year plus four (4) options years. The second pricing model shall be for AMAG software support agreement and remote software support and reprogramming of M4000 if a board needs to be replaced.
3. PERIOD OF PERFORMANCE
The installation date of the components shall be no later than 60 days from the award date. The Maintenance and Support of the contract will be a twelve (12) month base year with four (4) twelve (12) month option years contract.
4. LEVEL OF EFFORT
4.1. The contractor shall install Pro HSE version 9.8 software/Licensing (Homeland Security Edition) symmetry software with two (2) client license to a virtual server at Pawnee Indian Health Center (this can be done during normal business hours ahead of installing the M4000 HSE boards).
4.2. The contractor shall provide and install two (2) PIV card readers smart card encoders and software to two (2) different computer workstations (IHS will provide the computers) for reading new PIV cards to upload information into AMAG Symmetry software for new employees.
4.3. The contractor shall remove all M2150 boards. The contractor shall remove these M2150 boards in a manner to be re-used and give them to the Contracting Officer Representative for Pawnee Indian Health Center.
4.4. The Contractor shall install, and connect all wires associated with the controllers at Pawnee Indian Health Center, eleven (11) M4000 HSE boards, new enclosures, and configure in Symmetry system, this will be done during regular business hours. The installation of the software to the server can be done doing normal business hours before the installation of M4000 boards.
4.5. The contractor shall leave one (1) M4000-DBB board as a spare along one (1) M4000-DEC4 board
4.6. The Contractor shall remove all old HID door readers and turn them into the Contracting Officer Representative. The contractor shall install forty-two (42) new HID door readers model #40KHTKS-03-004XMB wall switch, keypad, SIGNO PIV, Terminal strip, Black body, Silver trim, PROX enabled, 128 Bit reversed MSB, ASCII keypad, OSDPv2. The contractor shall provide two (2) new HID model 40KHTKS-03-004XMB readers as spares to the Contractor Officer Representative.
4.7. The Contractor shall provide service calls during normal business hours from 8:00 am to 5:00 pm and shall respond later two (2) business days from receipt of phone call of an issue.
4.8. The Contractor shall provide all parts and labor associated with any issues with the AMAG Symmetry HSE system (if this is the option chosen based on pricing)
4.9. The contractor shall be responsible for all travel cost and associated expenses to and from Pawnee Indian Health Center.
4.10. The contractor shall provide parts to fix issues during the service call with-in five (5) business days, if this cannot be achieved a temporary solution must be achieved to not to have any down time with-in the AMAG Symmetry system. (based on if this is the pricing model chosen)
4.11. Training: Contractor shall provide training on functionality and loading new employee PIV cards into the new PRO HSE AMAG Symmetry software to four Oklahoma City Area Office employees.
5. SPECIAL REQUIREMENTS
5.1. In accordance with HHSAR 304.1301 HHS follows National Institute of Standards and Technology (NIST) Federal Information Processing Standards (FIPS) Publication (PUB) Number 201-2, Personal Identity Verification (PIV) of Federal Employees and Contractors, and OMB implementation guidance for personal identity verification, for all affected contractor and subcontractor personnel when contract performance requires contractors to have routine physical access to a federally-controlled facility and/or routine physical and logical access to a federally-controlled information system.
5.2. The USPHS Oklahoma City Area Office is a tobacco/smoke free environment (buildings and grounds). No tobacco/smoking use will be tolerated during service.
5.3. Security Requirements: Contractor personnel will be required to contact the government designated point of contact upon arrival when reporting for service calls or delivery supplies. The contractor shall be responsible for the security of all organizational information. Current rules and regulations applicable to the premises, where the work shall be performed shall apply to the contractor and its employees while working on the premises. These regulations include but are not limited to, escort by Oklahoma City Area Office official, presenting valid identification, smoking restriction and any safety procedures.
5.4. The contractor shall not disclose or cause to disseminate any information concerning operations of Oklahoma City Area Office. Such action(s) could result in violation of the contract and possible legal actions.
5.5. All inquiries, comments, or complaints arising from any matter observed, experienced or learned of as a result of or in connection with the performance of the contract, the resolution of which may require the dissemination of official information, shall be directed to the government’s designated representative.
6. DELIVERABLES AND REPORTING REQUIREMENTS
6.1. Delivery: The contractor will coordinate the delivery, installation and training date with the designated government employee. The government will provide the contractor with building access for this sole purpose. The designated government employee will work with the pertinent government agency(ies) to secure the needed access. No deliveries can be made after 4:15pm. Driver needs a valid ID.
6.2. Contractor Point of Contact: The contractor shall furnish one designated point of contact (POC) to the government’s designated representative for coordination of supplies, delivery, and/or maintenance. The POC will be empowered to make daily decisions to ensure that the contract implementation and day-to-day maintenance meets the terms and conditions of this contract.
6.3. Contractor’s Phone Numbers: The contractor shall provide a toll-free telephone number for service calls, which must be answered during at least eight working hours, between 8:00 am and 4:30 pm, Monday through Friday.
6.4. Personnel Qualifications:
Contractor shall be an AMAG Symmetry dealer and experienced with AMAG symmetry maintenance and support.
7. GOVERNMENT FURNISHED PROPERTY, FACILITIES AND SERVICES
The Government shall supply virtual server to install the Pro HSE (Homeland Security Edition) of AMAG symmetry software be installed on.
8. CONTRACTOR FURNISHED PROPERTY, FACILITIES AND SERVICES
Required personnel, materials, supplies and equipment: The contractor shall furnish all personnel, materials, supplies and equipment required to perform work under the contract.
9. CHANGES TO THE STATEMENT OF WORK (SOW)
Any changes to this SOW shall be authorized and approved only through written correspondence from the Contracting Officer. Costs incurred by the contractor through the actions of parties other than the Contracting Officer shall be borne by the contractor.
10. DELIVERABLES/PERFORMANCE MATRIX
| Performance Matrix |
| Performance Standard |
| AQL |
| Installation date |
| Contractor shall install components no later than 60 days from award |
| 95% |
| Response Time |
| Contractor responds to service call with-in two (2) business days |
| 100% |
| Parts |
| Contractor shall provide parts to fix issues with-in five (5) business days |
| 95% |
Department Supervisor Signature:_________________________
Chief Operating Officer Signature:_________________________ image1.png image2.png