SOW_7A11823_WSP_Rev1.docx
DOCX document 31 KB Posted
- Attached to
- WSP Herley Switch Federal contract opportunity
- Solicitation number
- 20220121
View the file
Other files for this federal contract opportunity
| File | Type | Posted |
|---|---|---|
| gr_7a11822_-.PDF | ||
| gr_7a11823_-.PDF | ||
| SOW_7A11822_WSP_Rev1.docx | DOCX document |
On GovTribe
Work with this file on GovTribe
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
AJW-L910 RADAR PRODUCT DIVISION
1/18/22
PROCUREMENT OF WSP SP3T SWITCH
STATEMENT OF WORK
Procurement of WSP Single-Pole, Triple-Throw Switch P/N 7A11823H01
1. BACKGROUND
Radar Product Division, AJW-L910, currently provides logistics support to 37 operational Weather System Processor (WSP) sites. The single-pole, triple-throw (SP3T) switch, resides in the weather channel between the airport surveillance radar (ASR-9) and the WSP. SP3T switches control the flow of RF to the dedicated WSP Receiver. The SP3T is obsolete and a commercial, off the shelf replacement is not available. The Federal Aviation Administration (FAA) has determined it necessary to replenish the existing stock of the WSP SP3T switch to maintain the long term support of the National Airspace System (NAS).
This Statement of Work describes the procurement of the Microwave Waveguide SP3T Switch 7A11823H01, NSN 5985-01-484-1800.
2. CONTRACTING OFFICER’S REPRESENTATIVE (COR):
The COR is formally designated this responsibility by the Contracting Officer to provide direction and Government oversight to the contractor on matters related to this contract. The TCOR is:
Kevin Palmer AJW-L910, Radar Technical and Program Support Branch Phone # 405-954-8083 Email address: kevin.c.palmer@faa.gov
3. SCOPE OF WORK
The contractor must furnish all labor, facilities, equipment, and materials to produce the WSP SP3T Switch for the FAA as outlined in each section that follow.
4. REQUIREMENTS
4.1 Design, Construction, and Testing
The contractor shall design, construct, and test the SP3T switch P/N 7A11823H01 in accordance with (IAW) Source Control Drawing (SCD) 7A11823.
4.2 First Article Unit Delivery
Contractor must deliver two verification units with complete test data package illustrating conformance to SCD 7A11823. Delivery shall occur no later than (NLT) 180 days at receipt of order (ARO).
4.3 Verification Unit Analysis
Upon receipt of first article units, FAA shall perform analysis to verify and ensure product conformance to requirements in SCD 693R455 (mechanical, workmanship, finish, marking). Operational performance shall be evaluated via bench testing and in-system testing in accordance of MCP 1127. Bench tests will adhere to the procedures in PDS22933. System tests shall consist of installing the switch into the WSP waveguide and verifying performance IAW SCD 7A11823. FAA will have 180 days to accept or reject first article.
4.4 Production Units
The FAA may qualify one or more vendors as an approved source of production units upon successful unit acceptance. Delivery of production units shall occur NLT 90 days ARO
5. PREPARATION FOR DELIVERY
5.1 Preservation, packaging and packing
Preservation, packaging and packing shall be IAW Provision 61.