Replace Existing Main Water Line and Backflow Preventor - OHARNG Lebanon
Solicitation number
SRC0000029214
Issued by
Warren County, Ohio

About this file

The document is a Statement of Work (SOW) from the State of Ohio Adjutant General's Department for a water infrastructure replacement project at the Ohio Army National Guard (OHARNG) Armory located in Lebanon, Ohio. The project involves completely replacing the existing main water line, spanning approximately 320 linear feet from the water meter to the armory's mechanical room, and installing a new 3-inch Type L copper pipe water line. Additional scope includes removing and replacing the existing backflow preventer, disconnecting and disposing of the water softener system, and restoring the excavation site with topsoil and grass seed.

The contractor will be responsible for securing all necessary permits, utilizing a certified plumber for installations, ensuring compliance with federal, state, and local codes, and meeting industry standards. The project requires the contractor to provide their own water, power, and exterior facilities, remove all project-generated rubbish, and submit waste disposal tickets upon completion. Site visits can be arranged by contacting Mr. Juan Siles between 7:00 a.m. and 3:00 p.m., Monday through Friday, at (614) 989-9695 or via email at Juan.l.siles.nfg@army.mil. The document does not specify budget details, funding sources, or contract award dates.

View the file

Other files

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATE OF OHIO

Adjutant General’s Department

2825 West Dublin Granville Road Columbus, Ohio 43235

STATEMENT OF WORK

SW I SCOPE

Furnish all labor and materials to perform work in strict accordance with specifications for the project. Replace Existing Main Water Line and Backflow Preventor.

SW II SITE OF WORK

Work will take place at The Adjutant General’s Department, Ohio Army National

Guard (OHARNG) Armory, 113 East Taylor Street, Lebanon, OH 43036.

SW III WORK TO BE ACCOMPLISHED

Work to be completed includes, but is not limited to the following items:

1. Contractor shall provide all labor, materials, equipment, and utilities and complete the following.

A. Demo:

1) Excavate and remove existing main water line/pipe, from existing water meter to where it enters the armory’s foundation. The distance from existing water meter to the armory’s entrance point is approximately 320 linear feet.

Existing water meter is located at the Northeast Corner of the owner’s property. Water line enters the Armory at the Southeast corner of the Armory.

(See owner’s representative for the specific locations of the existing water line).

2) Disconnect and remove the existing backflow preventer, with all its operational components, and dispose. The backflow preventer is located in the armory’s mechanical room. (See owner’s representative for the specific location of the backflow preventer).

3) Disconnect, remove and dispose of the existing water softener and its operational components. Contractor shall cap the supply water pipes 6 inches below their existing shut-off valves. The existing water softener is located in the mechanical room. (See owner’s representative for the specific location of the water softener system).

B. Installation:

1) Install a new 3-inch Type L copper pipe water line, approximately 320 linear feet, from the existing water meter to the armory’s mechanical room.

Contractor should use the existing excavated trench, which expose the existing water line. This new pipe shall extend into the mechanical room and will be tied into the existing water distribution pipes. (See owner’s representative for the specific location of mechanical room).

2) Install a new backflow preventer, similar to the existing unit. As part of this system, install two new isolations shot off ball valves, at opposite ends of new backflow. New backflow system shall be attached/fasten to the existing water distribution lines. At the conclusion of the project, the contractor shall test the new backflow and report/send the test result to the local water governing administrative department. (See owner’s representative for the specific location of the new backflow preventor).

3) Contractor shall backfill the exposed trench with the industry standard aggregate and finish with topsoil. Contractor shall apply new grass seed and water exposed area. Contractor may use the owner’s water to water new grass seed.

2. Contractor is responsible to ensure that all new plumbing installations and connections are performed by a certified plumber, and in accordance with all federal, state, local city codes and must meet industry standards. All new plumbing systems shall be installed in accordance with their manufacturer’s directions, and recommendations.

3. Contractor is responsible to remove all rubbish generated during this service/project and submit waste disposal tickets to the owner’s representative at the conclusion of the project. (Owner will provide a blank waste disposal form at the Pre-Bid meeting).

4. Contractor is responsible to provide their own water, power, and exterior restroom facilities for the duration of this project.

SW IV COORDINATING INSTRUCTIONS

1. Contractor is responsible to secure any and all licenses and/or permits, which may be needed for the successful completion of this project.

2. Contractor is responsible for the locating all underground utilities, which can include but not limited to, electrical, water, gas, communication, etc. In the event a utility is interrupted, the owner’s project manager must be contacted verbally, no later than one hour of the incident, and followed up in writing no more than twenty-four hours.

SW V SITE VISITATION

Site visits may be arranged by contacting Mr. Juan Siles, Monday through Friday between 7:00 a.m. and 3:00 p.m. at phone (614) 989-9695 or by e-mail at Juan.l.siles.nfg@army.mil mailto:Juan.l.siles.nfg@army.mil