This Statement of Objectives (SOO) details a video surveillance system procurement for the 74th Fighter Generation Squadron at Moody Air Force Base, Building 772. The project requires a closed-network CCTV system with eight interior cameras (six in the main support room, two in the support back room), featuring 4K recording quality, turret-style design, and zoom capabilities. Additional system requirements include a 27-inch 4K resolution monitor, 2 TB storage, comprehensive cabling and mounting hardware, and the ability to maintain 60 days of continuous recording at a central control point in the Support NCOIC Office.
The vendor must complete full system installation within 60 days of contract award, conduct installation Monday-Friday between 7:30 am and 5:00 pm EST under support personnel supervision, and provide training for two government personnel. The system must comply with the Buy America Act and be TAA compliant. A site visit is scheduled for Monday, April 28, 2025 at 1:00 PM EST, with base pass forms due by Friday, April 25, 2025. Questions are due by Thursday, May 1, 2025 at 9:00 AM EST. The solicitation notes that funds are not currently available, and the government reserves the right to cancel the solicitation.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
STATEMENT OF OBJECTIVES
74th Fighter Generation Squadron
Moody AFB CRF Bldg. 772 Video Surveillance System
1.0 SCOPE
The 74th Fighter Generation Squadron (74th FGS) requires a surveillance system installed in Building 772. The vendor shall provide all necessary parts, equipment, and software, including installation and training. The system must be fully installed within 60 days of contract award.
2.0 MINIMUM REQUIREMENTS
2.1 The facility requires a closed-network CCTV or security surveillance system for observation. Cameras shall not be connected to the Air Force (AF) network.
2.2 Cameras: Eight (8) interior cameras are required:
• Six (6) cameras in the main support room.
• Two (2) cameras in the support back room.
• Monitor: One (1) monitor is required for system monitoring.
• System Components: The vendor shall provide all necessary components, including but not limited to:
Cameras (8):
• 4K Recording Quality (with zoom capability)
• Turret Style
Monitor (1):
• 27-inch screen
• 4K Resolution
• 60 Hz
Recording Software & Hardware:
• 2 TB Storage
• Conduit
• Cabling
• Mounting Hardware
• Power Supplies
All other ancillary equipment required for a complete and functional system.
2.3 The system shall provide adequate storage for 60 days of continuous recording. Storage will be maintained at the central control point (see 2.4).
2.4 All cameras shall be connected to a central control/monitor located in the Support NCOIC Office, Building 772.
2.5 The vendor shall provide all necessary racks, cabling, servers, and other equipment, including those items identified in the solicitation.
2.6 The system shall provide complete coverage of the highlighted areas in the attached floor plans.
2.7 All system components (hardware and software) shall be compatible with and authorized for use in the facility.
All equipment shall comply with the Buy America Act and be TAA compliant.
2.8 The vendor shall bring all cameras and support equipment to the work center during installation to minimize shipping frustrations. Cameras will be inspected by the section lead to confirm the camera type, but no further inspection will be required as no security risks exist.
3.0 INSTALLATION
3.1 The vendor shall install all parts and equipment.
3.2 Building 772 has existing infrastructure. A layout of recommended camera locations is in the attached floor plan. Building modifications will not be required.
3.3 The vendor shall dispose of all previous camera and supporting equipment (Hardware, Conduit, ETC).
Additionally, the contractor shall provide their own dumpster for disposal as one will not be provided.
3.4 Installation shall be conducted Monday – Friday, 7:30 am – 5:00 pm EST, under the supervision of support personnel.
3.5 Payment will be made following the completion of equipment install and the installation has been approved by the customer.
4.0 TRAINING
4.1 The vendor shall provide training to two government personnel on the use of the new system, a training guide that the trained personnel can use to facilitate future training, a 3-year warranty, and troubleshooting assistance (equivalent to support provided to commercial customers purchasing a similar system).
ATTACHMENTS:
• Floor Plan Bldg. 772 with recommended locations and facing direction for cameras and intercom system.
STATEMENT OF OBJECTIVES