This Statement of Objectives (SOO) details a video surveillance system procurement for the 74th Fighter Generation Squadron at Moody Air Force Base, Building 772. The project requires an eight-camera closed-network CCTV system with specific technical specifications, including 4K recording quality, turret-style cameras with zoom and night vision capabilities, a 27-inch 4K monitor, and storage sufficient for 60 days of continuous recording. The vendor must provide all necessary equipment, installation, and training within 60 days of contract award, with installation conducted on military duty days (Monday-Friday, 7:30 am - 5:00 pm EST) under support personnel supervision.

Key requirements include a base station with no internet access, minimum 15-minute power backup, 8+ camera hookup slots for future expansion, and compatibility with Buy America Act and TAA compliance standards. The system will be centrally monitored in the Support NCOIC Office, with cameras covering specified areas in the building. The vendor must also provide training for two government personnel, a training guide, a 2-year warranty, and troubleshooting assistance. Payment will be made following installation completion and customer verification. The solicitation number is FA483025Q0051, issued by the 23rd Contracting Squadron at Moody AFB, Georgia.

View the file

Other files

File Type Posted
74 FGS Cameras - Site Visit QA Final.pdf PDF
REVISED - Combo-Synopsis.pdf PDF
NEW Base Pass Template.pdf PDF
SOO 74 FGS Cameras.pdf PDF
BLDG 772 Camera Layout.pdf PDF
74FGS.BaseMap.pdf PDF
74 FGS Cameras Combo-Synopsis.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

STATEMENT OF OBJECTIVES

74th Fighter Generation Squadron

Moody AFB CRF Bldg. 772 Video Surveillance System

1.0 SCOPE

The 74th Fighter Generation Squadron (74th FGS) requires a surveillance system installed in Building 772. The vendor shall provide all necessary parts, equipment, and software, including installation and training. The system must be fully installed within 60 days of contract award.

2.0 MINIMUM REQUIREMENTS

2.1 The facility requires a closed-network CCTV or security surveillance system for observation. Cameras shall not be connected to the Air Force (AF) network.

2.2 Cameras: Eight (8) interior cameras are required:

Six (6) cameras in the main support room.

Two (2) cameras in the support back room.

Monitor: One (1) monitor and one base station is required for system monitoring.

System Components: The vendor shall provide all necessary components, including but not limited to:

Cameras (8):

4K Recording Quality (with zoom and night vision capability)

Turret Style

Monitor (1):

27-inch screen

4K Resolution

60 Hz

Recording Software & Hardware:

HDD (Big enough to support continuous recording at 4k for 60 days 24/7)

Base Station (no internet access required)

Cabling

Mounting Hardware (including J hooks for cabling)

Power Supplies

8+ Camera hookup slots (for possibly adding more cameras in the future)

Minimum 15-minute power backup.

Any software required on monitoring station.

All other ancillary equipment required for a complete and functional system.

2.3 The system shall provide adequate storage for 60 days of continuous recording. Storage will be maintained at the central control point (see 2.4).

2.4 All cameras shall be connected to a central control/monitor located in the Support NCOIC Office, Building 772.

2.5 The vendor shall provide all necessary monitors, recorder, cabling, servers, and other equipment, including those items identified in the solicitation.

2.6 The system shall provide complete coverage of the highlighted areas in the attached floor plans.

2.7 All system components (hardware and software) shall be compatible with and authorized for use in the facility.

All equipment shall comply with the Buy America Act and be TAA compliant.

2.8 The vendor shall bring all cameras and support equipment to the work center during installation to minimize shipping frustrations. Cameras will be inspected by the section lead to confirm the camera type, but no further inspection will be required as no security risks exist.

3.0 INSTALLATION

3.1 The vendor shall cleanly install all parts, cables and equipment. (cables tied, neat and organized)

3.2 Building 772 has an existing infrastructure. A layout of recommended camera locations is in the attached floor plan. Building modifications will not be required.

3.3 The 74th Support will keep all previously installed, old equipment and cameras for necessary repurpose.

3.4 Installation shall be conducted on military duty days Monday – Friday, 7:30 am – 5:00 pm EST, under the supervision of support personnel. There will be no installation procedures conducted during the weekend.

3.5 Support Personnel will be available for questions and assist with the alignment of the cameras if needed.

3.6 Payment will be made following the completion of equipment installation and will be approved/verified by the customer.

4.0 TRAINING

4.1 The vendor shall provide training to two government personnel on the use of the new system, a training guide that the trained personnel can use to facilitate future training, a 2-year warranty, and troubleshooting assistance (equivalent to support provided to commercial customers purchasing a similar system).

ATTACHMENTS:

Floor Plan Bldg. 772 with recommended locations and facing direction for cameras.

File details come from the government source that posted it. Updated .