BLDG 772 Camera Layout.pdf

PDF 2 MB Posted

Attached to
74 FGS Camera Replacement
Solicitation number
FA483025Q0051
Issued by

About this file

The provided file is a detailed floor plan and camera location diagram for a video surveillance system installation project at Building 772 for the 74th Fighter Generation Squadron at Moody Air Force Base. The document shows a comprehensive layout of 8 interior camera locations, with current and proposed new positioning for each camera. The first page provides an overhead floor plan with camera placement marked as X points, indicating specific surveillance coverage areas across various rooms including support offices, break rooms, and administrative spaces. Subsequent pages detail the precise current and proposed new locations for each of the 8 cameras, showing their movement within the ceiling grid of the facility.

The accompanying federal contract opportunity solicitation (FA483025Q0051) seeks a commercial video surveillance system with specific technical requirements: 8 interior cameras (6 in main support room, 2 in back support room) with 4K recording quality and zoom capability, a 27-inch 4K resolution monitor, 2TB storage, and full system installation within 60 days of contract award. The system must provide 60 days of continuous recording, be centrally monitored from the Support NCOIC Office, and comply with Buy America Act and TAA compliance standards. A mandatory site visit is scheduled for Monday, April 28, 2025 at 1:00 PM EST, with base pass submissions required by Friday, April 25, 2025. Questions are due by Thursday, May 1, 2025 at 9:00 AM EST, with a notable caveat that funds are not currently available and the government reserves the right to cancel the solicitation.

View the file

Other files

File Type Posted
74 FGS Cameras - Site Visit QA Final.pdf PDF
REVISED - Combo-Synopsis.pdf PDF
REVISED - SOO 74th Survellience System V4.pdf PDF
SOO 74 FGS Cameras.pdf PDF
74FGS.BaseMap.pdf PDF
74 FGS Cameras Combo-Synopsis.pdf PDF
NEW Base Pass Template.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SUPPORT

SUPPORT

OFFICE

SUPPORT

BREAK ROOM

BOILER/ELECTRICAL

ROOM COMMANDER

FIRST

SEARGENT

SPECIALIST

OFFICE

Production

APG

OFFICE

TRAINING

OFFICE

VAULT

SUPPORT

STORAGE

ROOM

DEBRIEF

FGS DO/ Sortie Gen LT

Sortie Support SMSgt

Lacta tion room

Conference room

CHIEF

Section CommanderCSS

Sortie Gen

SMSGT

X = Cameras CCTV and Monitor will be in Support Section Chiefs’ office.

= Camera’s View = Monitor Station = Obstruction < 3 FT Tall = Obstruction > 5 FT Tall

#1

#2

#3

#4

#5

#6 #7

#8

Camera Location

Current

• Camera #1

Approx.. New Location

• Camera #2

• Camera #3

• Camera #4

• Camera #5

• Camera #6

• Camera #7

• Camera #8

Slide Number 1
Camera Location
Camera Location
Camera Location
Camera Location
Camera Location
Camera Location
Camera Location
Camera Location

File details come from the government source that posted it. Updated .