Summary of Addendum No. 1 to Somerville Bridge Replacement Project
This is an addendum document issued by the Massachusetts Department of Transportation (MassDOT) Highway Division for the Webster Avenue Bridge Replacement project over the MBTA and BMRR in Somerville (Federal Aid Project No. HIP(NGB)-003S(987)X, Bridge No. S-17-016). Addendum No. 1, dated October 1, 2026, transmits revisions to contract documents including updated pages from Documents 00010 and B00420, insertion of a new 10-page Document A00825 (MWRA 8M Permit), and revised pages 4-20 of Document B00420 (Proposal). The proposal opening date is scheduled for Tuesday, October 6, 2026, at 2:00 p.m. The addendum includes a Questions and Responses section addressing four bidder inquiries, with responses to three questions (regarding Eversource Electric work completion, Eversource Gas task sequencing, Somerville Fire Alarm cable specifications, and lighting pole specifications) deferred to future addenda. The proposal includes over 60,900 total quantity units across excavation, drainage, utilities, pavement, bridge structure, and site work items, with a Schedule of Operations fixed price of $82,500.
The revised proposal document (B00420) establishes unit bid pricing for individual line items including reinforced concrete excavation, bridge excavation, trenching, gravel borrow, fine grading, hazardous material disposal, pipe installation, curb work, guardrail, fencing, sidewalk, seeding, electrical conduit, fire alarm cable, lighting, signage, traffic management, and bridge structure components. The attached MWRA 8M Permit (Document A00825, Permit #3668 dated February 20, 2026) grants MassDOT permission to use MWRA-controlled land for bridge deck and roadway replacement work at Webster Avenue in Somerville, subject to extensive terms and conditions including 72-hour advance notice requirements, minimum clearance specifications for water main crossings, professional engineering oversight, protective sheeting requirements, MWRA inspector presence during construction, and as-built drawing submissions. The permit is non-assignable and subject to revocation at the MWRA's discretion, with the permittee responsible for all damage to MWRA infrastructure and property.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| A00813-611940.pdf | ||
| 611940 Bid Items List.txt | TXT text file | |
| A00801-611940.pdf | ||
| A00808-611940.pdf | ||
| A00811-611940.pdf | ||
| A00814-611940.pdf | ||
| A00802-611940.pdf | ||
| A00875-611940.pdf | ||
| 611940 - Notice to Contractors.pdf | ||
| A00844-611940.pdf | ||
| A00815-611940.pdf | ||
| 611940 - Plan Holders List 9-22-2026.pdf | ||
| A00812-611940.pdf | ||
| A00820-611940.pdf |
Show all 14
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Ten Park Plaza, Suite 4160, Boston, MA 02116 Tel: 857-368-4636, TTY: 857-368-0655 www.mass.gov/massdot
Proposal No. 611940-136645 October 1, 2026
ADDENDUM NO. 1
To Prospective Bidders and Others on:
SOMERVILLE
Federal Aid Project No. HIP(NGB)-003S(987)X
Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
THIS PROPOSAL TO BE OPENED AND READ: TUESDAY, OCTOBER 6, 2026 at 2:00 P.M.
Transmitting changes to the Contract Documents as follows:
QUESTIONS AND RESPONSES: One page.
DOCUMENT 00010: Revised page 2.
DOCUMENT A00825: Inserted new document (10 pages).
DOCUMENT B00420: Revised pages 4 through 20.
Take note of the above, substitute the revised pages for the originals, insert the new document in the proper order, and acknowledge Addendum No. 1 in your Expedite Proposal file before submitting your bid.
Very truly yours, Eric M. Cardone, P.E.
Construction Contracts Engineer
EMC/mac cc Alwin Ramirez, Project Manager
THIS PAGE INTENTIONALLY LEFT BLANK
Proposal No. 611940-136645
SOMERVILLE
Federal Aid Project No. HIP(NGB)-003S(987)X
Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
Questions and Responses Addendum No. 1, October 1, 2026
MAS Building & Bridge, Inc., email dated Wednesday, September 30, 2026
Question 1) Please confirm whether Task 2A listed in the PUC Form – “Eversource Electric –
Cut and Cap 2-13.8 kV Lines and R&R 3x3 Lighting, UP R&R, and 2 – Light Poles R&R” – for the Prospect Street Bridge has already been completed.
If not, please provide a date for when this work is expected to be completed.
Response 1) This response will be provided in a future addendum.
Question 2) Please confirm whether Task 5A – Eversource Gas: Isolate & Abandon Existing
12” CI Main on the Bridge can be performed independently of Task 5B – 2” Winter Bypass, regardless of whether the winter bypass has been installed. Our understanding is that the 2” winter bypass must be installed and in service from October 1 through April 30. Please confirm.
Response 2) This response will be provided in a future addendum.
Question 3) Please confirm the number and size of conduits, as well as the cable information, for the Somerville Fire Alarm Cable under Task 3A of the PUC Form.
Response 3) This response will be provided in a future addendum.
Question 4) Please provide the model, type, color, and lumen output for the luminaire associated with Item 821.01 – Light Pole Complete.
Response 4) This response will be provided in a future addendum.
Massachusetts Department Of Transportation Highway Division
00010 - 2
TABLE OF CONTENTS (Continued)
DOCUMENT 00870
STANDARD FEDERAL EQUAL EMPLOYMENT OPPORTUNITY
CONSTRUCTION CONTRACT SPECIFICATIONS .............................................................. 00870-1 through 8
DOCUMENT 00880
MINIMUM WAGES FOR FEDERAL AND FEDERALLY
ASSISTED CONTRACTS ......................................................................................................... 00880-1 through 6
DOCUMENT A00801
SPECIAL PROVISIONS .................................................................................................... A00801-1 through 204
DOCUMENT A00802
DETAIL SHEETS ................................................................................................................. A00802-1 through 22
DOCUMENT A00808
PROJECT UTILITY COORDINATION FORM .................................................................... A00808-1 through 8
DOCUMENT A00811
WATERING LOG FOR MASSDOT PLANTINGS ............................................................... A00811-1 through 2
DOCUMENT A00812
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
FLAGGING REQUEST FORM ............................................................................................. A00812-1 through 4
DOCUMENT A00813
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
SPECIAL INSTRUCTIONS ................................................................................................. A00813-1 through 16
DOCUMENT A00814
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
CONSTRUCTION SAFETY ................................................................................................ A00814-1 through 14
DOCUMENT A00815
MASSACHUSETTS BAY TRANSPORTATION AUTHORITY
RAILROAD OPERATIONS DIRECTORATE .................................................................. A00815-1 through 134
DOCUMENT A00820
REQUEST FOR RELEASE OF MASSDOT AUTOCAD FILES FORM .............................. A00820-1 through 2
① DOCUMENT A00825
MWRA 8M PERMIT ............................................................................................................ A00825-1 through 10
DOCUMENT A00844
US FISH AND WILDLIFE SERVICE
NLAA CONCURRENCE VERIFICATION LETTER ......................................................... A00844-1 through 12
DOCUMENT A00875
POLICY DIRECTIVE P-22-001 AND POLICY DIRECTIVE P-22-002 .............................. A00875-1 through 8
DOCUMENT B00420
PROPOSAL............................................................................................................................ B00420-1 through 20
*** END OF DOCUMENT ***
① Addendum No. 1, October 1, 2026
Addendum No. 1, October 1, 2026
A00825 - 1
DOCUMENT A00825
MWRA 8M PERMIT
Addendum No. 1, October 1, 2026
A00825 - 2
MASSACHUSETTS WATER RESOURCES AUTHORITY
PERMIT
20-Feb-26
Mass DOT (Project File #611940)
10 Park Plaza
Boston, MA 02166
Pursuant to Section 8 (m) of Chapter 372 of the Acts of 1984 you are hereby granted permission to use a certain portion of land presently under the jurisdiction and control of the Massachusetts
Water Resources Authority for the purpose set forth below.
The land is described as follows:
Section 4, Low Service Pipe Line - Webster Avenue (Newton St) - Somerville, Massachusetts
You may use the land for the purpose of:
Replacement of Bridge Deck and Roadway Full Depth Work in Accordance with Plans Titled:
Mass DOT Project File No. 611940 Webster Avenue Over MBTA BMRR Bridge No. S17016
(ATX) - Webster Avenue (Newton St) in Somerville, Massachusetts - Prepared by CHA - Date:
1/20/2026
8(m) Permit #3668
Proposal No. 611940-136645 Addendum No. 1, October 1, 2026
A00825 - 3
Approved as to Form: Approved
Massachusetts Water Resources Authority Massachusetts Water Resources Authority
Law Division Deputy Chief OO, PP&P
This Permit is subject to the 8(m) Permit Terms and Conditions, and the 8(m) Permit
Special Terms and Conditions, if any, attached hereto and made a part hereof. Permittee agrees that it shall be bound by, and shall comply with, said Terms and Conditions.
Permittee: ____________________________ / __Michael O'Dowd, MassDOT
Signature Print Name
This Permit shall have no effect until such time as the Authority issues the fully executed original of this Permit.
Massachusetts Water Resources Authority
2 Griffin Way
Chelsea, MA 02150
Attn: Water Operations - Permitting Department
8(m) 26-3668
February 20, 2026
A00825 - 4
8(m) PERMIT TERMS AND CONDITIONS
1. Permittee shall be responsible to stay apprised of and comply with all applicable federal, state and local laws, rules, and orders including, but not limited to, guidelines and requirements for construction sites, and all supplements, amendments and/or changes thereto and notices thereof.
Prior to commencing work pursuant to this Permit, Permittee shall have obtained all other required permits, written approval(s) and necessary authorizations to perform the work. Failure to comply with the terms stated herein shall render this Permit null and void by the Authority, and Permittee shall bear all responsibility, liability, damages and costs arising from the Permittee’s noncompliance.
2. Permittee’s use of the permitted land shall at no time interfere with the Authority’s activities or operations on the permitted land. The Authority has the right to review and approve all of the Permittee’s work including such plans and specifications, as the Authority deems necessary. Any proposed future work beyond the scope of this Permit shall have the prior written approval of the Authority.
3. To the fullest extent permitted by law, the Permittee shall indemnify, defend with counsel acceptable to the Authority, keep and save harmless the Authority and its board members, officers, representatives, contractors, agents, employees, successors, and assigns, in both their individual and official capacities, against all suits, claims, liabilities, damages, losses (including but not limited to loss of use resulting therefrom) and expenses, including but not limited to attorney's fees, caused by, arising out of or resulting from any work or activity under this Permit and/or act, omission, breach or default of the Permittee or of any contractor, subcontractor of vendor of the Permittee or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder.
4. The granting of this Permit shall in no way interfere with the rights of the Authority to exercise its existing rights in or over the permitted land. Permittee acknowledges that the Authority, within its sole discretion, may enter upon the permitted land at any time in order to carry out inspections, maintenance, repairs, replacements, or other activities.
5. The Authority may revoke this Permit at any time. The sale or disposition of the permitted land by its owner will cause this Permit to terminate without further notice. Permittee shall give the Authority at least 72 hours notice before commencing the operations as pursuant herein. This Permit shall not be assigned or transferred.
6. No blasting, drilling or other activity that could in any way affect the integrity or operability of the Authority’s property or use of the permitted land shall be permitted without express prior written approval of the Authority.
7. The Permittee shall remove, at its own expense, within six months of the date of written notice from the Authority, any or all conduits and appurtenances installed by the Permittee under this Permit if, in the Authority’s sole discretion, such removal is necessary for the operation, maintenance or replacement of the Authority’s infrastructure.
8. To the fullest extent permitted by law, and in consideration of the issuance of this Permit, Permittee hereby releases the Authority and its board members, officers, representatives, contractors, agents, employees, successors, and assigns, in both their individual and official capacities, from all suits, claims, liabilities, damages, losses (including but not limited to loss of use resulting therefrom) and expenses, including but not limited to attorney's fees, caused by, arising out of or resulting from any work or activity under this Permit and/or act, omission, breach or default of the Permittee or of any
A00825 - 5 contractor, subcontractor of vendor of the Permittee or anyone directly or indirectly employed by any of them or anyone for whose acts any of them may be liable, regardless of whether or not it is caused in part by a party indemnified hereunder. This release includes, but is not limited to, all suits, claims, liabilities, damages (including, but not limited to, direct, indirect, and consequential damages, economic loss, and loss of profits) and losses which are attributable to bodily injury, sickness, disease or death, or to injury to or destruction of tangible property, including the loss of use resulting therefrom, together with all attorneys’ fees, costs and expenses.
9. The Permittee shall conduct design, construction, and excavation in accordance with all federal, state and local safety regulations, including but not limited to, federal OSHA regulations (29 CFR 1926) and Massachusetts Department of Public Safety regulations (520 CMR 14.00). During construction, Permittee shall take appropriate sheeting and shoring measures to protect the integrity of the Authority’s water and/or sewer mains. Permittee shall submit design plans stamped by a professional engineer licensed in Massachusetts to the Authority for approval prior to the start of construction.
10. The Permittee shall adjust any or all Authority frames and covers to grade within the limits of work in accordance with the plans referenced in this Permit. The Authority will provide the Permittee with new replacement Authority frames and covers that have been deemed unusable by the Authority.
11. If the Permittee is proposing to take borings and/or place test pits within the permitted land, the Permittee shall mark the proposed boring and test pit locations on the ground using paint and/or stakes and submit engineering documents to the Authority showing the proposed boring and test pit locations. Authority staff will review all boring and test pit locations at the site. Upon written clearance of the proposed boring and test pit locations by Authority staff and subject to Permittee providing the Authority with seventy-two (72) hours prior notice, Permittee may commence work at the site.
The Permittee shall be responsible for the locations of proposed borings and test pits regardless of any act or omission of the Authority. The Permittee shall be responsible for repairing and/or replacing, at the Authority’s election, the Authority’s property or infrastructure, which is damaged as a result of the Permittee’s, its contractors, agents, representatives, employees, and/or invitees activities pursuant to this Permit. The Permittee’s obligations under this paragraph shall include payment to the Authority for all costs to repair all such damage caused to the Authority’s property.
A00825 - 6
EXHIBIT A
MWRA WATER OPERATIONS SPECIAL TERMS AND CONDITIONS
1. Prior to entry, Permittee or its designee shall provide at least seventy two (72) -hours prior notice to the MWRA’s Inspection Department, by calling (617) 305-5833, located at 2 Griffin Way, Chelsea, MA 02150.
2. A minimum vertical clearance of eighteen (18) inches shall be maintained between the
MWRA’s water mains and other utility crossings unless otherwise noted. However, water/gas and other utility service crossings with a pipe size diameter of two (2) inches or less maybe permitted to cross above the MWRA’s pipeline at a reduced clearance subject to MWRA’s review. (Except for special provisions, i.e. capped or plugged pipes, thrust blocks and or bends, which would require a greater clearance and separation).
3. A minimum of three (3) feet to five (5) feet horizontal clearance is required between adjacent utilities and the side (spring line) of any MWRA water main. (Except for special provisions, i.e. capped or plugged pipes, thrust blocks, and/or pipe bends, which would require a greater clearance separation).
4. Crossings of MWRA water mains shall be located a minimum horizontal distance of at least four (4) feet from any joints of the MWRA’s water mains.
5. Proposed pipe/utility crossings of the MWRA’s water mains shall cross at a ninety (90) degree angle to minimize interference.
6. For distances over four (4) feet of the MWRA’s water mains, which are to be undermined, the method and type of pipe support plan shall be submitted and stamped by a Professional Engineer (P.E.) licensed in Massachusetts for prior approval by the MWRA.
7. For distances under four (4) feet from the MWRA’s water mains, which are to be undermined, the on-site MWRA inspector shall review and approve the proposed support of the water main. Under no circumstances shall the MWRA’s water main be left in an unsupported, undermined position overnight.
8. During construction, appropriate sheeting measures must be taken to protect the integrity of the MWRA’s water mains. The sheeting design must be reviewed by the MWRA prior to the start of the construction. The design shall be stamped by a Professional Engineer, licensed in Massachusetts. The use of a Trench Box is not permitted in this application.
9. Suitable compaction methods shall be employed in restoring the beds of the MWRA’s water mains and backfilling around the MWRA’s water mains shall be placed in maximum six (6) inch lifts and compacted by hand vibratory compactors.
10. The MWRA’s water mains shall be protected at all times during construction. The MWRA may require a professional engineer licensed in the State of Massachusetts to submit a construction plan and or pipeline analysis that is to be attached to this Permit.
11. Screened gravel shall be uniformly graded with maximum size of a particle between 3/8 inch and 3/4 inch. Screened gravel shall consist of clean, hard and durable particles free from an excess of soft, elongated and disintegrated pieces or other objectionable material.
A00825 - 7
Crushed rock of suitable size and grading maybe used in place of screened gravel at the option of the MWRA Inspector.
12. For test pit excavations or unearthing of the MWRA’s water mains the Permittee shall excavate the last two (2) feet, before the top of pipe, by hand or use a vacuum boring method and backfill with approved material within an fee interest, easement or roadway area.
13. The Permittee is responsible to adjust any or all MWRA frames and covers to grade within their limits of work in accordance with the plans referenced in this Permit.
The MWRA will provide the Permittee with new replacement MWRA frames and covers (at no expense to the Permittee) for any existing frames and covers that have been deemed unusable by MWRA personnel.
14. All MWRA manhole openings that were covered during the binder course installation shall be made accessible within forty eight (48) hours. MWRA manhole frame and covers shall not be removed for grinding and or pulverizing. Pulverizing is not allowed over MWRA manhole structures.
15. The Permittee shall provide a logistics construction schedule in writing, along with emergency contact information whenever MWRA valves (manhole covers) or facilities are covered or obstructed.
16. MWRA Inspection personnel must be on site whenever excavation, construction, hoisting or rigging occurs around an MWRA water main.
17. No construction equipment including cranes, backhoes, or material may be parked, stationed, set up, or stored on top of the MWRA's water mains or infrastructure.
18. Replacement (shutdown) of the MWRA’s water mains shall be coordinated with the
MWRA. Four (4) weeks-advanced notice in writing is required for shutdowns.
19. The Permittee or its designee shall contact the MWRA three (3) weeks in advance of when an MWRA water main valve must be operated. Only MWRA personnel will operate MWRA valves. The Permittee or its designee shall not operate any MWRA water main valves. MWRA Valve Operations are limited during peak demand periods and may not be available between the dates of May 15th and September 15th of each calendar year.
20. The Permittee will be responsible to protect and correct any damage(s) to the MWRA’s property, water main pipelines and/or any related infrastructure at no cost to the MWRA.
21. As-built drawings shall be furnished to the MWRA upon the completion of the work authorized by this Permit. A Professional Massachusetts Registered Land Surveyor or Engineer shall stamp as-built drawings.
22. MWRA Detail Records “field sketches” shall be updated (with accurate field ties) by the Permittee and shall be furnished to the MWRA upon the completion of the work authorized by this Permit.
23. The Permittee understands and agrees that the MWRA and its successors and assigns are not responsible for any damage and/or claims for damages to the Permittee’s structures, conduits, facilities and/or property permitted pursuant to this permit as a result of the
A00825 - 8
MWRA’s operation, maintenance, repair, and/or replacement of MWRA’s infrastructure, or as a result of the failure of an MWRA water main, and that the Permittee shall be solely responsible for replacing and/or repairing said structures and for any costs related thereto, as a result of MWRA’s activities, including but not limited to, the operation, maintenance, repair, and/or replacement of MWRA’s infrastructure, or as a result of the failure of an MWRA water main. Further, the Permittee shall hold the MWRA and its successors and assigns harmless from any damages and/or claims for damage to the Permittee’s structures, conduits, facilities and/or property permitted pursuant to this permit as a result of the MWRA’s operation, maintenance, repair, and/or replacement of MWRA property, or as a result of the failure of an MWRA water main.
24. This Permit addresses only MWRA-owned and operated infrastructure. The Permittee is required to obtain all needed separate approvals from Cities, Towns, State Agencies or other entities.
25. The work authorized by this Permit and location of installed facilities and appurtenances shall not deviate from the construction plan that is referenced in this Permit. No field changes are allowed without prior review and written approval by the MWRA 8(m) Permit Project Manager. An MWRA on-site inspector shall review all field changes and coordinate with the Permittee regarding submitting a change of work plan to the MWRA for review and comment. If MWRA field inspection indicates changes undertaken without approval, the Permittee may be issued a cease and desist order and be required to correct/reconstruct any completed work.
26. The MWRA requires a construction plan along with an analysis of the MWRA’s water main pipeline (prepared by a professional engineer licensed in the State of Massachusetts). The pipeline analysis shall take into consideration the construction equipment, which would be used over the MWRA’s water main pipeline in instances where the existing roadway surface will be completely excavated away removing the protection of the HS-20 surface loading barrier. This Plan and supporting calculations will need to be submitted to the MWRA for review. This includes open cross-country areas where no HS 20 Roadway Loading exists.
27. The MWRA requires the submittal of “Cut Sheets and or Shop Drawings” for review of all newly proposed materials that will come under the ownership of the MWRA.
28. Where pipe jacking is required for work that is in close proximity to the MWRA’s water mains, submittals prepared by a professional engineer and reviewed by the MWRA are required.
29. Permittee shall not expose the spring line or undermine the MWRA’s water main pipeline. The Permittee or its designee shall cease excavation operations and secure the open trench by backfilling the open trench to secure the MWRA’s water main pipeline whenever the spring line is expose
30. In instances where the layout of the MWRA water mains are to be accurate and precise beyond the MWRA’s regular mark out services the Permittee, at the direction of the MWRA, shall have a professional land surveyor licensed in Massachusetts mark out MWRA water mains using field survey instruments.
31. Disinfection of MWRA pipelines includes the entire isolated length of MWRA’s pipeline(s). Disinfection is the responsibility of the applicant including independent lab testing procedures in accordance with MWRA standards.
A00825 - 9
A00825 - 10
Project # 611940 Contract # 136645
Location : SOMERVILLE
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
127.1 500 REINFORCED CONCRETE EXCAVATION
AT _________________________
PER CUBIC YARD
140. 1,160 BRIDGE EXCAVATION
AT _________________________
PER CUBIC YARD
141.1 360 TEST PIT FOR EXPLORATION
AT _________________________
PER CUBIC YARD
142. 60 CLASS B TRENCH EXCAVATION
AT _________________________
PER CUBIC YARD
144. 20 CLASS B ROCK EXCAVATION
AT _________________________
PER CUBIC YARD
151. 780 GRAVEL BORROW
AT _________________________
PER CUBIC YARD
151.2 195 GRAVEL BORROW FOR BACKFILLING STRUCTURES AND
PIPES
AT _________________________
PER CUBIC YARD
156. 5 CRUSHED STONE
AT _________________________
PER TON
160.3 2 CONTROLLED LOW-STRENGTH MATERIAL (> 300 PSI)
AT _________________________
PER CUBIC YARD
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 3
① Addendum No. 1, October 1, 2026
①
B00420 - 4
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
170. 3,200 FINE GRADING AND COMPACTING - SUBGRADE AREA
AT _________________________
PER SQUARE YARD
180.01 1 ENVIRONMENTAL HEALTH AND SAFETY PROGRAM
AT _________________________
LUMP SUM
180.02 160 PERSONAL PROTECTION LEVEL C UPGRADE
AT _________________________
PER HOUR
180.03 160 LICENSED SITE PROFESSIONAL SERVICES
AT _________________________
PER HOUR
181.11 2,100 DISPOSAL OF UNREGULATED SOIL
AT _________________________
PER TON
181.12 400 DISPOSAL OF REGULATED SOIL - IN-STATE FACILITY
AT _________________________
PER TON
181.13 400 DISPOSAL OF REGULATED SOIL - OUT-OF-STATE FACILITY
AT _________________________
PER TON
181.14 150 DISPOSAL OF HAZARDOUS WASTE
AT _________________________
PER TON
182.1 1 INSPECTION AND TESTING FOR ASBESTOS
AT _________________________
LUMP SUM
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 4
Addendum No. 1, October 1, 2026
B00420 - 5
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
182.2 500 REMOVAL OF ASBESTOS
AT _________________________
PER FOOT
184.1 4 DISPOSAL OF TREATED WOOD PRODUCTS
AT _________________________
PER TON
188.2 1 DISPOSAL OF PCB BALLASTS
AT _________________________
LUMP SUM
201. 1 CATCH BASIN
AT _________________________
EACH
202. 1 MANHOLE
AT _________________________
EACH
204. 3 GUTTER INLET
AT _________________________
EACH
211. 1 SPECIAL SANITARY SEWER MANHOLE
AT _________________________
EACH
220. 5 DRAINAGE STRUCTURE ADJUSTED
AT _________________________
EACH
220.6 2 SANITARY STRUCTURE REBUILT
AT _________________________
PER FOOT
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 5
Addendum No. 1, October 1, 2026
B00420 - 6
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
220.7 7 SANITARY STRUCTURE ADJUSTED
AT _________________________
EACH
220.8 4 SANITARY STRUCTURE REMODELED
AT _________________________
EACH
222.3 7 FRAME AND GRATE (OR COVER) MUNICIPAL STANDARD
AT _________________________
EACH
223.2 3 FRAME AND GRATE (OR COVER) REMOVED AND
DISCARDED
AT _________________________
EACH
227.3 5 REMOVAL OF DRAINAGE STRUCTURE SEDIMENT
AT _________________________
PER CUBIC YARD
227.31 50 REMOVAL OF DRAINAGE PIPE SEDIMENT
AT _________________________
PER FOOT
230.1 1,240 PRE AND POST CONSTRUCTION INSPECTION OF SEWER
AT _________________________
PER FOOT
238.12 80 12 INCH DUCTILE IRON PIPE
AT _________________________
PER FOOT
241.12 70 12 INCH REINFORCED CONCRETE PIPE CLASS III
AT _________________________
PER FOOT
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 6
① Addendum No. 1, October 1, 2026
①
B00420 - 7
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
303.12 140 12 INCH DUCTILE IRON WATER PIPE (MECHANICAL JOINT)
AT _________________________
PER FOOT
309. 900 DUCTILE IRON FITTINGS FOR WATER PIPE
AT _________________________
PER POUND
350.12 2 12 INCH GATE AND GATE BOX
AT _________________________
EACH
358. 15 GATE BOX ADJUSTED
AT _________________________
EACH
371.12 2 12 INCH COUPLING
AT _________________________
EACH
376. 2 HYDRANT
AT _________________________
EACH
402. 180 DENSE GRADED CRUSHED STONE FOR SUB-BASE
AT _________________________
PER CUBIC YARD
415.3 1,400 PAVEMENT MICRO MILLING
AT _________________________
PER SQUARE YARD
443. 8 WATER FOR ROADWAY DUST CONTROL
AT _________________________
PER 1000 GALLONS
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 7
Addendum No. 1, October 1, 2026
B00420 - 8
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
450.31 230 SUPERPAVE INTERMEDIATE COURSE - 12.5 (SIC -12.5)
AT _________________________
PER TON
450.42 410 SUPERPAVE BASE COURSE - 37.5 (SBC - 37.5)
AT _________________________
PER TON
450.601 231 SUPERPAVE BRIDGE SURFACE COURSE - 9.5 POLYMER
(SSC-B - 9.5 - P)
AT _________________________
PER TON
450.701 21 SUPERPAVE BRIDGE PROTECTIVE COURSE - 9.5 POLYMER
(SPC-B - 9.5 - P)
AT _________________________
PER TON
451. 10 HMA FOR PATCHING
AT _________________________
PER TON
452. 370 ASPHALT EMULSION FOR TACK COAT
AT _________________________
PER GALLON
453. 2,550 HMA JOINT ADHESIVE
AT _________________________
PER FOOT
458.71 145 LIGHTWEIGHT FOAMED GLASS AGGREGATE
AT _________________________
PER CUBIC YARD
472. 10 TEMPORARY ASPHALT PATCHING
AT _________________________
PER TON
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 8
Addendum No. 1, October 1, 2026
B00420 - 9
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
504. 280 GRANITE CURB TYPE VA4 - STRAIGHT
AT _________________________
PER FOOT
504.1 295 GRANITE CURB TYPE VA4 - CURVED
AT _________________________
PER FOOT
504.2 2 GRANITE CURB TYPE VA4 - SPLAYED END
AT _________________________
EACH
509. 60 GRANITE TRANSITION CURB FOR PEDESTRIAN CURB
RAMPS - STRAIGHT
AT _________________________
PER FOOT
509.1 10 GRANITE TRANSITION CURB FOR PEDESTRIAN CURB
RAMPS - CURVED
AT _________________________
PER FOOT
514. 2 GRANITE CURB INLET - STRAIGHT
AT _________________________
EACH
516. 9 GRANITE CURB CORNER TYPE A
AT _________________________
EACH
580. 670 CURB REMOVED AND RESET
AT _________________________
PER FOOT
594. 370 CURB REMOVED AND DISCARDED
AT _________________________
PER FOOT
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 9
Addendum No. 1, October 1, 2026
B00420 - 10
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
620.12 75 GUARDRAIL, TL-2 (SINGLE FACED)
AT _________________________
PER FOOT
627.1 1 TRAILING ANCHORAGE
AT _________________________
EACH
627.82 3 GUARDRAIL TANGENT END TREATMENT, TL-2
AT _________________________
EACH
628.24 2 TRANSITION TO BRIDGE RAIL
AT _________________________
EACH
628.312 1 PERMANENT IMPACT ATTENUATOR, REDIRECTIVE, TL-2
AT _________________________
EACH
630.2 240 HIGHWAY GUARD REMOVED AND DISCARDED
AT _________________________
PER FOOT
644.172 40 72 INCH CHAIN LINK FENCE (SPRING TENSION WIRE) VINYL
COATED (LINE POST OPTION)
AT _________________________
PER FOOT
644.196 200 96 INCH CHAIN LINK FENCE (SPRING TENSION WIRE) VINYL
COATED (LINE POST OPTION)
AT _________________________
PER FOOT
645.048 170 48 INCH CHAIN LINK FENCE (PIPE TOP RAIL) (LINE POST
OPTION)
AT _________________________
PER FOOT
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 10
Addendum No. 1, October 1, 2026
B00420 - 11
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
650.048 20 48 INCH CHAIN LINK GATE WITH GATE POSTS
AT _________________________
PER FOOT
657. 350 TEMPORARY FENCE
AT _________________________
PER FOOT
669.1 600 FENCE REMOVED AND DISCARDED
AT _________________________
PER FOOT
669.2 3 FENCE GATE REMOVED AND DISCARDED
AT _________________________
EACH
697.1 11 SILT SACK
AT _________________________
EACH
698.3 80 GEOTEXTILE FABRIC FOR SEPARATION
AT _________________________
PER SQUARE YARD
701. 600 CEMENT CONCRETE SIDEWALK
AT _________________________
PER SQUARE YARD
701.1 150 CEMENT CONCRETE SIDEWALK AT DRIVEWAYS
AT _________________________
PER SQUARE YARD
701.2 80 CEMENT CONCRETE PEDESTRIAN CURB RAMP
AT _________________________
PER SQUARE YARD
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 11
Addendum No. 1, October 1, 2026
B00420 - 12
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
701.22 180 DETECTABLE GUIDE STRIP
AT _________________________
PER FOOT
702. 120 HOT MIX ASPHALT SIDEWALK OR DRIVEWAY
AT _________________________
PER TON
722.1 1 SCHEDULE OF OPERATIONS (TYPE A) - FIXED PRICE
$82,500
AT Eighty Two Thousand Five Hundred Dollars
LUMP SUM
$82,500.00 $82,500.00
740. 32 ENGINEER'S FIELD OFFICE AND EQUIPMENT (TYPE A)
AT _________________________
PER MONTH
748. 1 MOBILIZATION
AT _________________________
LUMP SUM
751.1 280 LOAM FOR LAWNS
AT _________________________
PER CUBIC YARD
765. 200 SEEDING
AT _________________________
PER SQUARE YARD
765.415 1 NATIVE SHORT GRASSLAND MIX
AT _________________________
PER POUND
765.635 200 NATIVE SEEDING AND ESTABLISHMENT
AT _________________________
PER SQUARE YARD
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 12
①
① Addendum No. 1, October 1, 2026
①
B00420 - 13
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
767.121 200 SEDIMENT CONTROL BARRIER
AT _________________________
PER FOOT
769. 100 PAVEMENT MILLING MULCH UNDER GUARD RAIL
AT _________________________
PER FOOT
804.3 20 3 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -(UL)
AT _________________________
PER FOOT
804.4 160 4 INCH ELECTRICAL CONDUIT TYPE NM - PLASTIC -(UL)
AT _________________________
PER FOOT
805.41 90 4 INCH TELEPHONE CONDUIT TYPE NM (6 BANK - FRE)
AT _________________________
PER FOOT
805.51 180 5 INCH ELECTRICAL CONDUIT TYPE NM - FIBERGLASS
AT _________________________
PER FOOT
810.1 80 5 INCH UNDERGROUND CONCRETE ENCASED CONDUIT
(EVERSOURCE) (9 BANK)
AT _________________________
PER FOOT
810.2 160 4 INCH UNDERGROUND CONCRETE ENCASED CONDUIT
(VERIZON) (6 BANK)
AT _________________________
PER FOOT
810.3 110 5 INCH UNDERGROUND CONCRETE ENCASED CONDUIT
(EVERSOURCE) (6 BANK)
AT _________________________
PER FOOT
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 13
Addendum No. 1, October 1, 2026
B00420 - 14
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
810.4 360 PTC OVERHEAD WIRE RELOCATION
AT _________________________
PER FOOT
811.35 3 PULL BOX ADJUSTED
AT _________________________
EACH
811.36 3 ELECTRIC MANHOLE ADJUSTED
AT _________________________
EACH
811.37 2 ELECTRIC HANDHOLE ADJUSTED
AT _________________________
EACH
813.591 410 FIRE ALARM CABLE (COPPER)
AT _________________________
PER FOOT
813.592 240 FIRE ALARM CABLE (COPPER) REMOVED AND RESET
AT _________________________
PER FOOT
816.91 1 TEMPORARY TRAFFIC SIGNAL RECONSTRUCTION
LOCATION NO. 1
AT _________________________
LUMP SUM
817.10 2 SIGNAL POST AND BASE STANDARD - 8 FOOT
AT _________________________
EACH
819.855 2 APS PUSHBUTTON
AT _________________________
EACH
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 14
Addendum No. 1, October 1, 2026
B00420 - 15
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
821.01 2 LIGHTING POLE COMPLETE - SOMERVILLE STANDARD
AT _________________________
EACH
821.09 3 UTILITY POLE - WOOD
AT _________________________
EACH
823.71 2 HIGHWAY LIGHTING POLE AND LUMINAIRE REMOVED AND
STACKED
AT _________________________
EACH
826.52 1 FIRE ALARM BOX REMOVED AND STACKED
AT _________________________
EACH
826.54 1 FIRE ALARM BOX
AT _________________________
EACH
832. 75 WARNING-REGULATORY AND ROUTE MARKER - ALUMINUM
PANEL (TYPE A)
AT _________________________
PER SQUARE FOOT
833.7 3 DELINEATION FOR GUARD RAIL TERMINI
AT _________________________
EACH
847.1 13 SIGN SUP (N/GUIDE)+RTE MKR W/1 BRKWAY POST
ASSEMBLY - STEEL
AT _________________________
EACH
850.41 1,000 ROADWAY FLAGGER
AT _________________________
PER HOUR
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 15
Addendum No. 1, October 1, 2026
B00420 - 16
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
852. 930 SAFETY SIGNING FOR TRAFFIC MANAGEMENT
AT _________________________
PER SQUARE FOOT
853.1 20 PORTABLE BREAKAWAY BARRICADE TYPE III
AT _________________________
EACH
853.2 250 TEMPORARY BARRIER (TL-2)
AT _________________________
PER FOOT
853.8 700 TEMPORARY ILLUMINATION FOR WORK ZONE
AT _________________________
PER DAY
854.016 3,800 TEMPORARY PAVING MARKINGS - 6 INCH (PAINTED)
AT _________________________
PER FOOT
854.036 1,600 TEMPORARY PAVING MARKINGS - 6 INCH (TAPE)
AT _________________________
PER FOOT
854.1 500 PAVEMENT MARKING REMOVAL
AT _________________________
PER SQUARE FOOT
856.060 60 ARROW BOARD (TYPE B)
AT _________________________
PER DAY
856.12 1,080 PORTABLE CHANGEABLE MESSAGE SIGN
AT _________________________
PER DAY
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 16
Addendum No. 1, October 1, 2026
B00420 - 17
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
859. 1,120 REFLECTORIZED DRUM
AT _________________________
PER DAY
859.1 280 REFLECTORIZED DRUMS WITH SEQUENTIAL FLASHING
WARNING LIGHTS
AT _________________________
PER DAY
864.04 100 PAVEMENT ARROWS AND LEGENDS REFLECTORIZED
WHITE (THERMOPLASTIC)
AT _________________________
PER SQUARE FOOT
864.12 3 SYMBOLS (PF)
AT _________________________
EACH
864.13 3 ARROWS (PF)
AT _________________________
EACH
864.41 1,550 GREEN COLORIZED PAVEMENT MARKINGS
AT _________________________
PER SQUARE FOOT
866.106 1,525 6 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)
AT _________________________
PER FOOT
866.112 650 12 INCH REFLECTORIZED WHITE LINE (THERMOPLASTIC)
AT _________________________
PER FOOT
867.106 1,575 6 INCH REFLECTORIZED YELLOW LINE (THERMOPLASTIC)
AT _________________________
PER FOOT
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 17
Addendum No. 1, October 1, 2026
B00420 - 18
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
874. 6 STREET NAME SIGN
AT _________________________
EACH
874.2 11 TRAFFIC SIGN REMOVED AND RESET
AT _________________________
EACH
874.41 18 TRAFFIC SIGN REMOVED AND DISCARDED
AT _________________________
EACH
874.8 2 TRAFFIC SIGN - EXCLUDING COST OF SIGN
AT _________________________
EACH
945.10 9,390 DRILLED MICROPILES
AT _________________________
PER FOOT
945.20 690 CORING THROUGH ABUTMENTS
AT _________________________
PER FOOT
948.60 1 MICROPILE VERIFICATION LOAD TEST
AT _________________________
EACH
948.61 3 MICROPILE PROOF LOAD TEST
AT _________________________
EACH
953.1 1 TEMPORARY SUPPORT OF EXCAVATION OF BRIDGE NO.
S-17-016
AT _________________________
LUMP SUM
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 18
Addendum No. 1, October 1, 2026
B00420 - 19
Description : Bridge Replacement, S-17-016 (3GF), Webster Avenue over MBTA and BMRR
ITEM # QUANTITY ITEM WITH UNIT BID PRICE
WRITTEN IN WORDS
UNIT PRICE AMOUNT
964.11 6,650 ANTI-GRAFFITI COATING
AT _________________________
PER SQUARE FOOT
986. 30 MODIFIED ROCKFILL
AT _________________________
PER TON
992.33 1 TEMPORARY UTILITY SUPPORT STRUCTURE
AT _________________________
LUMP SUM
994.01 1 TEMPORARY PROTECTIVE SHIELDING BRIDGE NO. S-17-
016 (3GF)
AT _________________________
LUMP SUM
995.01 1 BRIDGE STRUCTURE, BRIDGE NO. S-17-016 (ATX)
AT _________________________
LUMP SUM
Total Qty: 60,926.1
CMS104 - Report Run Date: 10/1/2026 6:44 AM Page 19
① Addendum No. 1, October 1, 2026
①
B00420 - 20
| 1 611940 Cover Letter A-1 |
| 2 611940 Questions-Responses A-1 |
| 00010 TOC - 7-16-26 A-1 |
| A00825-1 A-1 |
| A00825-2 8(m) 3668_Somerville_Webster Avenue A-1 |
| REQUIREMENTS Water Operations Law October 2024.pdf |
| EXHIBIT A |
B00420-2 A-1
| 2026-10-01T14:58:18-0400 | |
| Eric M. Cardone |
File details come from the government source that posted it. Updated .