Document A00801 Special Provisions Summary

This document comprises the special provisions for a bridge replacement project issued by the Massachusetts Department of Transportation (MassDOT) Highway Division for Federal Aid Project No. HIP(NGB)-003S(987)X in Somerville, Massachusetts. The project involves the complete replacement of Bridge No. S-17-016, which carries Webster Avenue over the MBTA/CSX railroad, originally constructed in 1911. The scope of work includes demolition of the existing steel floor girder superstructure and timber/reinforced concrete deck, construction of a new single-span steel plate girder bridge with reinforced concrete deck founded on micropiles, roadway reconstruction, utility relocations for Eversource Gas and Electric, Verizon, and City of Somerville Fire and Water departments, coordination with MBTA for Positive Train Control (PTC) wire relocation, drainage modifications, pavement markings, landscaping, and all incidental work necessary for completion. The proposed bridge will feature a 77'-10" span between bearing centerlines with a total project length of 556 feet, incorporating two 10'-6" travel lanes, shoulders, an 8'-6" sidewalk on the west side, and an 18'-6" sidewalk with a separated 10'-0" bike lane on the east side. Labor participation goals are established at 15.3% for minorities and 6.9% for women across all job categories for both contractors and subcontractors. Work is restricted to standard 8-hour days, Monday through Friday, with holiday work restrictions detailed for major arterial roadways, and all work must comply with the 2026 Standard Specifications for Highways and Bridges and applicable amendments to the Manual on Uniform Traffic Control Devices.

The contract includes comprehensive requirements for insurance, including Railroad Protective Liability Insurance of not less than $5,000,000 per occurrence and $10,000,000 aggregate, Umbrella Liability Coverage of $10,000,000 per occurrence, Automobile Liability Insurance of $1,000,000 combined single limit, and Asbestos Liability Insurance. The MBTA and applicable railroads (CSX and Keolis Commuter Services) must be named as additional insureds with original policies mailed to specified addresses. The contractor must provide evidence of compliance with truck safety device requirements per 540 CMR 4.00 and demonstrate ongoing compliance within seven days of certifying additional vehicles. All work must comply with Buy America requirements for iron, steel, and manufactured products, with exceptions only when material costs do not exceed 0.1% of total contract cost or $2,500, whichever is greater. The contractor is responsible for comprehensive utility coordination with advance notice requirements, pre-construction utility surveys within 30 calendar days of commencing work, and notification of any conflicts at least seven calendar days after a recognized delay. Geotechnical monitoring and instrumentation for micropile installation is required under Item 100.95, with detailed specifications for deformation monitoring points, crack monitors, tiltmeters, tape extensometers, and seismographs, all to be installed and maintained at the contractor's expense with weekly data reporting to MassDOT and the MBTA. Environmental compliance includes asbestos testing and removal requirements, contaminated soil assessment prior to off-site disposal, and adherence to soil stockpiling directives. The contract includes provisions for Value Engineering Change Proposals with a minimum savings threshold of $250,000 or three months of contract duration, subject to MassDOT approval and cost-sharing arrangements. Additional requirements address MWRA water infrastructure protection with a 48-inch water main present along Webster Avenue requiring a protective plan submitted for MWRA review, MBTA coordination for Commuter Rail operations with minimum six-week advance notice for planned rail shutdowns and substitute bus transportation coordination, traffic control compliance with holiday work restrictions specific to the project location, and general requirements for demolition and work involving painted steel with comprehensive lead paint removal and environmental protection protocols.

View the file

Other files

File Type Posted
A00813-611940.pdf PDF
611940 Bid Items List.txt TXT text file
A00808-611940.pdf PDF
A00811-611940.pdf PDF
A00814-611940.pdf PDF
A00802-611940.pdf PDF
A00875-611940.pdf PDF
611940 - Notice to Contractors.pdf PDF
A00844-611940.pdf PDF
A00815-611940.pdf PDF
611940 - Plan Holders List 9-22-2026.pdf PDF
A00812-611940.pdf PDF
A00820-611940.pdf PDF
SOMERVILLE-611940-136645-A-1.pdf PDF
Show all 14

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

Massachusetts Department Of Transportation Highway Division Proposal No. 611940-136645

A00801 - 1

DOCUMENT A00801

SPECIAL PROVISIONS

SOMERVILLE

Federal Aid Project No. HIP(NGB)-003S(987)X

Bridge Replacement, S-17-016, Webster Avenue over MBTA/BMRR

Labor participation goals for this Project shall be 15.3% for minorities and 6.9% for women for each job category. The goals are applicable to both Contractor’s and Subcontractor’s on-site construction workforce. Refer to Document 00820 for details.

SCOPE OF WORK

All work under this Contract shall be done in conformance with the 2026 Standard Specifications for Highways and Bridges, the Supplemental Specifications contained in this book, the Construction Standard Details in effect as of July 2026, the 1990 Standard Drawings for Signs and Supports, the 2015 Overhead Signal Structure and Foundation Standard Drawings, the 11th Edition of the Manual on Uniform Traffic Control Devices (MUTCD) and the January 2026 Massachusetts Amendments to the MUTCD, the 1968 Standard Drawings for Traffic Signals and Highway Lighting, the latest edition of The American Standard for Nursery Stock, the Plans and these Special Provisions.

The work done under this Contract consists of furnishing all necessary labor, materials, equipment and services to replace Bridge No. S-17-016, which carries Webster Avenue over the MBTA/CSX in the City of Somerville, Massachusetts. The bridge was built in 1911 and is comprised of steel floor girders, floor beams, and stringers that support a timber and reinforced concrete deck. The proposed replacement bridge will be a single-span steel plate girder structure with reinforced concrete deck.

The existing superstructure and portions of the existing substructure are to be removed. Proposed abutments, founded on micropiles, will be constructed in front and on top of the existing abutments. The proposed superstructure will be comprised of steel plate girders, a reinforced concrete deck, paved roadway, and CP-MTL3 bridge barriers. The proposed bridge alignment will be slightly modified to move the intersection of Newton Street with Webster Ave off the bridge and into approaches. This allows for a slight narrowing of the existing bridge footprint. The vertical clearance of the proposed bridge is slightly raised to match the low chord of the adjacent Prospect Street Bridge.

The structure will be replaced in a single stage due to the difficulty of staging the demolition of the existing floor girder bridge superstructure. A vehicular and pedestrian detour will be implemented to facilitate construction. The proposed curb-to-curb width over the bridge of 24’-0” allows for two 10’-6” travel lanes, a 2’-0” shoulder on the west side and a 1’-0” shoulder on the east side. An 8-6” sidewalk is located on the west side and an 18’-6” sidewalk with separated 10’- 0” bike lane on the east side. CP-MTL3 bridge rails are also proposed and will connect with existing sidewalks at all four corners of the bridge. The proposed bridge span is 77’-10” between centerline of bearings with a total project length of 556 feet.

A00801 - 2

SCOPE OF WORK (Continued)

Additional work to be completed includes a splayed wingwall at the northwest corner, temporary Verizon and City of Somerville Fire Department utility relocations, and permanent Eversource Gas and Electric, Verizon and City of Somerville Fire, and City of Somerville Water utility relocations. There is an Eversource electric substation at the northeast corner of the bridge and the existing substructure shall be used to retain the existing grades in this area. The adjacent MWRA utility bridge is not proposed to be affected by this project and the Contractor shall take care not to damage this structure. Various utilities are located within the project limits that must be relocated to facilitate construction. The Contractor shall, as part of this work, coordinate with all utility owners before and during construction. The work will also include coordination with MBTA/Keolis to relocate overhead MBTA PTC wires into proposed conduits below grade.

The work includes bridge construction, roadway reconstruction, drainage modifications, pavement markings, landscaping, utility relocations, and other incidental items necessary to complete the required work. All work shall be performed in accordance with all environmental permits included in this contract document.

CONTRACTOR QUESTIONS AND ADDENDUM ACKNOWLEDGEMENTS

Prospective bidders are required to submit all questions to the Construction Contracts Engineer by 3:00 P.M. on the Tuesday of the previous week before the scheduled bid opening date. Any questions received after this time will not be considered for review by the Department.

Contractors should email questions and addendum acknowledgements to the following email address massdotspecifications@dot.state.ma.us The MassDOT proposal number and municipality is to be placed in the subject line.

SUBSECTION 7.05 INSURANCE REQUIREMENTS

The insurance requirements set forth in this subsection are in addition to the requirements of the Standard Specifications.

7.05.B: Public Liability Insurance 4.

Asbestos Liability Insurance shall be obtained for this project.

ASBESTOS TESTING

The existing structure has not best tested for asbestos but the removal of underground Verizon, Eversource, and other conduit in the way of the Contract Work and removed or abandoned be tested for Asbestos under ITEM 182.1 – INSPECTION AND TESTING FOR ASBESTOS and removed per ITEM 182.2 – REMOVAL OF ASBESTOS.

A00801 - 3

RAILROAD INSURANCE REQUIREMENTS

The insurance requirements set forth in this section are in addition to the requirements of the Standard Specifications.

Railroad Operations Directorate: Section F:

1. The Contractor shall furnish, with respect to the operations of the Contractor or any of the

Contractor's Subcontractors performing within the Railroad right-of-way, broad form Railroad Protective Liability Insurance covering all work performed under this Contract in the amount of not less than $5,000,000 per occurrence, $10,000,000 aggregate combined bodily injury and property damage. The Contractor shall carry Worker's Compensation Insurance, including Employers Liability Insurance as provided by Massachusetts General Laws, Chapter 152, as amended, covering all work performed by him under the Contract. The Contractor shall carry Umbrella Liability Coverage with limits of not less than $10,000,000 per occurrence, covering all work performed by him under this Contract. Automobile Liability Insurance: The Contractor shall provide Automobile Liability Insurance to include the use of all vehicles;

owned, leased, hired and non-owned, with limits not less than $1,000,000 combined single limit covering all work performed under the Contract.

2. Such insurance shall be written on an occurrence basis.

3. The MBTA and applicable railroads shall be the named insureds on such insurance. Additional named insured are listed below. Original policies and certificates shall be made out to the MBTA and applicable railroads and mailed to:

MBTA: Treasurer-Controller Keolis: General Counsel

MBTA Keolis Commuter Services, LLC 10 Park Plaza 470 Atlantic Avenue Boston, MA 02116 Boston, MA 02210 Tel. (617) 222-3064

CSX: General Manager

CSX

1 Bell Crossing Road RD. #2, Box 145 Selkirk, NY 12158-9618 Tel. (518) 767-6111

4. The Contractor shall furnish to the MBTA and railroad companies a signed original of the

Railroad Protective Liability Policy prior to entry upon the railroad right-of-way.

5. Such policies shall provide 30 days notice to each named insured by the insurance company before any change or cancellation of the policies.

6. Such Railroad Protective Insurance policies may be provided in forms commonly referred to as AAR/AASHTO or ISO/RIMA but not Oregon.

Questions regarding insurance should be directed to the MBTA’s Risk Manager at 617-222-3064.

The Contractor shall be aware of the latest MBTA insurance limits / requirements. See the following link for more information: https://www.mbtarealty.com/licenses.html

A00801 - 4

NONCONFORMING COMPRESSIVE STRENGTH OF CEMENT CONCRETE

Concrete with compressive strength test results failing to attain the limits specified in Table 901.64-3 of 901.64.B: Acceptance Testing shall be evaluated for structural adequacy and serviceability at the Contractors’ expense. The Department will review all production records, the concrete test records, petrographic analysis report, field notes, and the placement records for the concrete in question. If the Engineer determines the material is found to be adequate to remain in place, payment shall be adjusted in accordance with the following formula:

𝑃 ൌ

2ሺ𝑓𝑐 െ 𝑓′𝑐ሻሺ𝑈𝑃ሻሺ𝑄ሻ

𝑓′𝑐

Where:

𝑃 ൌ 𝑝𝑎𝑦 𝑎𝑑𝑗𝑢𝑠𝑡𝑚𝑒𝑛𝑡 𝑓𝑜𝑟 𝑠𝑢𝑏𝑠𝑡𝑎𝑛𝑑𝑎𝑟𝑑 𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝑓′𝑐 ൌ 𝑠𝑝𝑒𝑐𝑖𝑓𝑖𝑒𝑑 𝑚𝑖𝑛𝑖𝑚𝑢𝑚 𝑐𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑖𝑣𝑒 𝑠𝑡𝑟𝑒𝑛𝑔𝑡ℎ 𝑎𝑡 28 𝑑𝑎𝑦𝑠 𝑓𝑐 ൌ 𝑠𝑢𝑏𝑠𝑡𝑎𝑛𝑑𝑎𝑟𝑑 𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝑐𝑦𝑙𝑖𝑛𝑑𝑒𝑟 𝑐𝑜𝑚𝑝𝑟𝑒𝑠𝑠𝑖𝑣𝑒 𝑠𝑡𝑟𝑒𝑛𝑔𝑡ℎ 𝑎𝑡 56 𝑑𝑎𝑦𝑠 𝑄 ൌ 𝑞𝑢𝑎𝑛𝑡𝑖𝑡𝑦 𝑜𝑓 𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝑟𝑒𝑝𝑟𝑒𝑠𝑒𝑛𝑡𝑒𝑑 𝑏𝑦 𝑡ℎ𝑒 𝑎𝑐𝑐𝑒𝑝𝑡𝑎𝑛𝑐𝑒 𝑐𝑦𝑙𝑖𝑛𝑑𝑒𝑟𝑠 𝑡𝑒𝑠𝑡𝑒𝑑

𝑈𝑃 ൌ 𝑢𝑛𝑖𝑡 𝑐𝑜𝑛𝑡𝑟𝑎𝑐𝑡 𝑝𝑟𝑖𝑐𝑒 𝑜𝑟 𝑡ℎ𝑒 𝑙𝑢𝑚𝑝 𝑠𝑢𝑚 𝑏𝑟𝑒𝑎𝑘𝑑𝑜𝑤𝑛 𝑝𝑟𝑖𝑐𝑒 𝑝𝑒𝑟 𝑐𝑢𝑏𝑖𝑐 𝑦𝑎𝑟𝑑

𝑓𝑜𝑟 𝑡ℎ𝑒 𝑐𝑙𝑎𝑠𝑠 𝑜𝑓 𝑐𝑜𝑛𝑐𝑟𝑒𝑡𝑒 𝑖𝑛𝑣𝑜𝑙𝑣𝑒𝑑 𝑐𝑜𝑚𝑝𝑙𝑒𝑡𝑒 𝑖𝑛 𝑝𝑙𝑎𝑐𝑒

A00801 - 5

WORK SCHEDULE

All proposed work hours shall conform to Subsection 7.09 and be subject to the written approval of the Engineer. Work is restricted to a normal 8-hour day, 5-day week, with the Prime Contractor and all Subcontractors working on the same shift. No work shall be done on Saturdays, Sundays, holidays, or the day before or after a holiday without prior approval of the Engineer.

Allowable work hours for specific locations will be determined by the District Highway Director or his/her representative. On high volume and/or high-speed roadways, work may be restricted to non-peak hours or night work as directed by the Engineer to avoid peak traffic volumes in order to maintain safety and productivity.

Work may not proceed beyond the normal 8-hour day unless prior approval is obtained from the Engineer for that day. Approval of working overtime will only be given when special conditions exist that warrant working overtime as determined by the Engineer.

The Contractor may schedule night shifts longer than 8-hours with approval of the Engineer. No additional compensation will be made for work scheduled during nighttime hours.

HOLIDAY WORK RESTRICTIONS

(Supplementing Subsection 7.09)

The District Highway Director (DHD) may authorize work to continue during these specified time periods if it is determined by the District that the work will not negatively impact the traveling public. DHD may allow work in those areas on a case by case basis and where work is behind barrier and will not impact traffic

Below are the holiday work restrictions:

New Years Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the day before until the normal start of business on the next subsequent business day. No work on local roadways on the holiday without permission by the DHD and the local police chief.

Martin Luther King's Birthday (Federal Holiday) No work restrictions due to traffic concerns, however work on local roadways requires permission by the DHD and local police chief.

President's Day (Federal Holiday) No work restrictions due to traffic concerns, however work on local roadways requires permission by the DHD and local police chief.

Evacuation Day (Suffolk County State Holiday) No work restrictions due to traffic concerns.

A00801 - 6

HOLIDAY WORK RESTRICTIONS (Continued)

Patriot's Day (State Holiday) Work restrictions will be in place for Districts 3 and 6 along the entire Boston Marathon route and any other locations that the DHD in those districts determine are warranted so as to not to impact the marathon. All other districts work restrictions will be as per DHD.

Mother’s Day No work on Western Turnpike and Metropolitan Highway System from 5:00 AM on the Friday before, until the normal start of business on the following day.

Memorial Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the Friday before, until the normal start of business on the following day.

Bunker Hill Day (Suffolk County State Holiday) No work restrictions due to traffic concerns.

Juneteenth No work restrictions due to traffic concerns, however work on local roadways requires permission by the DHD and local police chief.

Independence Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the day before until the normal start of business on the next subsequent business day. No work on local roadways on the holiday without permission by the DHD and the local police chief.

Labor Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the Friday before, until the normal start of business on the following day.

Columbus Day (Federal Holiday) No work on major arterials from 5:00 AM on the Friday before, until the normal start of business on the following day

Veterans' Day (Federal Holiday) No work restrictions due to traffic concerns.

Thanksgiving Day (Federal Holiday) No work on major arterials from 5:00 AM two days before until the normal start of business on the following Monday.

Christmas Day (Federal Holiday) No work on major arterial roadways from 5:00 AM on the day before until the normal start of business on the next subsequent business day.

A00801 - 7

TRUCK SAFETY DEVICES

(Supplementing Subsection 7.04: Motor Vehicles)

All motor vehicles subject to Section 7 of Chapter 90 to be operated under this Contract shall be equipped with safety devices as provided therein and in 540 CMR 4.00.

The Contractor shall certify to the Registry of Motor Vehicles, in a manner prescribed by the Registrar, that all applicable vehicles are equipped with Lateral Protective Devices, Convex Mirrors, Cross Over Mirror(s) and Back Up Cameras in accordance with the requirements of 540

CMR 4.00.

The Contractor shall provide evidence satisfactory to the Department to demonstrate compliance with the above certification requirement for all applicable vehicles operated under this Contract by the Contractor and its subcontractors and vendors in a manner set forth by the Department.

Thereafter, the Contractor shall have an affirmative obligation to continue to provide such evidence of compliance on an ongoing basis and no later than 7 days after certification with the Registry of Motor Vehicles of any additional vehicles operated under this Contract by the Contractor and its subcontractors and vendors.

Non-compliance with respect to a vehicle that is subject to 540 CMR 4.00 may subject the Contractor to statutory fines as established in M.G.L. c. 90, § 7 and/or contractual remedies up to and including termination of the Contract.

A00801 - 8

BIDDERS LIST

Pursuant to the provisions of 49 CFR Part 26.11 all official bidders will be required to report the names, addresses and telephone numbers of all firms that submitted bids or quotes in connection with this project. Failure to comply with a written request for this information within 15 business days may result in a recommendation to the Prequalification Committee that prequalification status be suspended until the information is received.

The Department will survey all firms that have submitted bids or quotes during the previous year prior to setting the annual goal and shall request that each firm report its age and gross receipts for the year.

EQUIVALENT SINGLE AXLE LOADS (ESALS)

The estimated traffic level to be used for SUPERPAVE HMA mixture designs for this contract, expressed in Equivalent Single Axle Loads (ESALs) for the design travel lane over a 20-year period, is 0.7 Million (18-kip (80-kn) ESALs.

A00801 - 9

SUBSECTION 8.14 UTILITY COORDINATION, DOCUMENTATION, AND

MONITORING RESPONSIBILITIES

A. GENERAL

In accordance with the provisions of Section 8.00 Prosecution and Progress, utility coordination is a critical aspect to this Contract. This section defines the responsibility of the Contractor and MassDOT, with regard to the initial utility relocation plan and changes that occur as the prosecution of the Work progresses. The Engineer, with assistance from the Contractor shall coordinate with Utility companies that are impacted by the Contractor’s operations. To support this effort, the Contractor shall provide routine and accurate schedule updates, provide notification of delays, and provide documentation of the steps taken to resolve any conflicts for the temporary and/or permanent relocations of the impacted utilities. The Contractor shall provide copies to the Engineer of the Contractor communication with the Utility companies, including but not limited to:

Providing advanced notice, for all utility-related meetings initiated by the Contractor.

Providing meeting minutes for all utility-related meetings that the Contractor attends.

Providing all test pit records.

Request for Early Utility work requirements of this section (see below).

Notification letters for any proposed changes to Utility start dates and/or sequencing.

Written notification to the Engineer of all apparent utility delays within seven (7) Calendar

Days after a recognized delay to actual work in the field – either caused by a Utility or the Contractor.

Any communication, initiated by the Contractor, associated with additional Right-of-Way needs in support of utility work.

Submission of completed Utility Completion Forms.

B. PROJECT UTILITY COORDINATION (PUC) FORM

The utility schedule and sequence information provided in the Project Utility Coordination Form (if applicable) is the best available information at the time of the bid and has been considered in setting the contract duration. The Contractor shall use all of this information in developing the bid price and the Baseline Schedule Submission, inclusive of the individual utility durations sequencing requirements, and any work that has been noted as potentially concurrent utility installations.

C. INITIATION OF UTILITY WORK

The Engineer will issue all initial notice-to-proceed dates to each Utility company based on either the:

1) Contractor’s accepted Baseline Schedule

2) An approved Early Utility Request in the form of an Early Utility sub-net schedule (in accordance with the requirements of this Subsection)

3) An approved Proposal Schedule

C.1 - BASELINE SCHEDULE – UTILITY BASIS

The Contractor shall provide a Baseline Schedule submission in accordance with the requirements of Subsection 8.02 and inclusive of all of the information provided in the PUC Form that has been issued in the Contract documents. This is to include the utility durations, sequencing of work, allowable concurrent work, and all applicable considerations that have been depicted on the PUC Form.

A00801 - 10

SUBSECTION 8.14 (Continued)

C.2 – EARLY UTILITY REQUEST – (aka SUBNET SCHEDULE) PRIOR TO THE BASELINE All early utility work is defined as any anticipated/required utility relocations that need to occur prior to the Baseline Schedule acceptance. In all cases of proposed early utility relocation, the Contractor shall present all known information at the pre-construction conference in the form of a ‘sub-net’ schedule showing when each early utility activity needs to be issued a notice-to-proceed. The Contractor shall provide advance notification of this intent to request early utility work in writing at or prior to the Pre-Construction meeting. Prior to officially requesting approval for early utility work, the Contractor shall also coordinate with MassDOT and all utility companies (private, state or municipal) which may be impacted by the Contract. If this request is acceptable to the Utilities and to MassDOT, the Engineer will issue a notice-to-proceed to the affected Utilities, based on these accepted dates.

C.3 – PROPOSAL SCHEDULE - CHANGES TO THE PUC FORM

If the Contractor intends to submit a schedule (in accordance with MassDOT Standard Specifications, Division I, Subsection 8.02) that contains durations or sequencing that vary from those provided in the Project Utility Coordination (PUC) Form, the Contactor must submit this as an intended change, in the form of a Proposal Schedule and in accordance with MassDOT Standard Specifications, Division I, Subsection 8.02. These proposed changes are subject to the approval of the Engineer and the impacted utilities, in the form of this Proposal Schedule and a proposed revision to the PUC form. The Contractor shall not proceed with any changes of this type without written authorization from the Engineer, that references the approved Proposal Schedule and PUC form changes. The submission of the Baseline Schedule should not include any of these types of proposed utility changes and should not delay the submission of the Baseline Schedule. As a prerequisite to the Proposal Schedule submission, and in advance of the utility notification(s) period, the Contractor shall coordinate the proposed utility changes with the Engineer and the utility companies, to develop a mutually agreed upon schedule, prior to the start of construction.

D. UTILITY DELAYS

The Contractor shall notify the Engineer upon becoming aware that a Utility owner is not advancing the work in accordance with the approved utility schedule. Such notice shall be provided to the Engineer no later than seven (7) calendar days after the occurrence of the event that the Contractor believes to be a utility delay. After such notice, the Engineer and the Contractor shall continue to diligently seek the Utility Owner’s cooperation in performing their scope of Work.

In order to demonstrate that a critical path delay has been caused by a third-party Utility, the Contractor must demonstrate, through the requirements of the monthly Progress Schedule submissions and the supporting contract records associated with Subsection 8.02, 8.10 and 8.14, that the delays were beyond the control of the Contractor.

A00801 - 11

SUBSECTION 8.14 (Continued)

All documentation provided in this section is subject to the review and verification of the Engineer and, if required, the Utility Owner. In accordance with MassDOT Specifications, Division I, Subsection 8.10, a Time Extension will be granted for a delay caused by a Utility, only if the actual duration of the utility work is in excess of that shown on the Project Utility Coordination Form, and only if;

1) proper Notification of Delay was provided to MassDOT in accordance with the time requirements that are specified in this Section

2) the utility delay is a critical path impact to the Baseline Schedule (or most recently approved Progress Schedule)

E. LOCATION OF UTILITIES

The locations of existing utilities are shown on the Contract drawings as an approximation only.

The Contractor shall perform a pre-construction utility survey, including any required test pits, to determine the location of all known utilities no later than thirty (30) calendar days before commencing physical site work in the affected area.

F. POST UTILITY SURVEY – NOTIFICATION

Following completion of a utility survey of existing locations, the Contractor will be responsible to notify the Engineer of any known conflicts associated with the actual location of utilities prior to the start of the work. The Engineer and the Contractor will coordinate with any utility whose assets are to be affected by the Work of this Contract. A partial list of utility contact information is provided in the Project Utility Coordination Form.

G. MEETINGS AND COOPERATION WITH UTILITY OWNERS

The Contractor shall notify the Engineer in advance of any meeting they initiate with a Utility Owner’s representative to allow MassDOT to participate in the meeting if needed.

Prior to the Pre-Construction Meeting, the Contractor should meet with all Utility Owners who will be required to perform utility relocations within the first 6 months of the project, to update the affected utilities of the Project Utility Coordination Form and all other applicable Contract requirements that impact the Utilities. The Contractor shall copy the Engineer on any correspondence between the Utility Owner and the Contractor.

H. FORCE ACCOUNT / UTILITY MONITORING REQUIREMENTS

The Engineer will be responsible for recording daily Utility work force reports. The start, suspension, re-start, and completion dates of each of the Utilities, within each phase of the utility relocation work, will be monitored and agreed to by the Engineer and the Contractor as the work progresses.

I. ACCESS AND INSPECTION

The Contractor shall be responsible for allowing Utility owners access to their own utilities to perform the relocations and/or inspections. The Contractor shall schedule their work accordingly so as not to delay or prevent each utility from maintaining their relocation schedule.

A00801 - 12

COMPLIANCE WITH THE NATIONAL DEFENSE AUTHORIZATION ACT

(Supplementing Subsection 7.01)

On all projects, the “Prohibition on Certain Telecommunications and Video Surveillance Services or Equipment” Regulation (2 CFR 200.216) prohibits the Contractor from using or furnishing the following telecommunications equipment or services:

Telecommunications equipment produced by Huawei Technologies Company or ZTE Corporation (or any subsidiary or affiliate of such entities).

For the purpose of public safety, security of government facilities, physical security surveillance of critical infrastructure, and other national security purposes, video surveillance and telecommunications equipment produced by Hytera Communications Corporation, Hangzhou Hikvision Digital Technology Company, or Dahua Technology Company (or any subsidiary or affiliate of such entities).

Telecommunications or video surveillance services provided by such entities or using such equipment.

Telecommunications or video surveillance equipment or services produced or provided by an entity that the Secretary of Defense, in consultation with the Director of the National Intelligence or the Director of the Federal Bureau of Investigation, reasonably believes to be an entity owned or controlled by, or otherwise connected to, the government of a covered foreign country.

This prohibition applies to all products manufactured by the aforementioned companies, including any individual components or parts.

By submitting a bid on a project, the Contractor certifies that all work will be in compliance with the terms of 2 CFR 200.216. The Contractor shall submit a COC indicating compliance with the above provisions for all telecommunications equipment or services included in the Contract.

Payment for the item in which the materials are incorporated may be withheld until these COCs are received. Any cost involved in furnishing the certificate(s) shall be borne by the Contractor.

A00801 - 13

BUILD AMERICA BUY AMERICA PREFERENCE

On Federally-aid projects the Buy America (23.CFR § 635.410) and Build America, Buy America Act. requires the following,

(1) all iron and steel used in the project are produced in the United States--this means all manufacturing processes, from the initial melting stage through the application of coatings, must occur in the United States. Foreign steel and iron can be used if the cost of the materials does not exceed 0.1% of the total Contract cost or $2,500, whichever is greater.

The action of applying a coating to a covered material (i.e., steel and iron) is deemed a manufacturing process subject to Buy America. Coating includes epoxy coating, galvanizing, painting and any other coating that protects or enhances the value of a material subject to requirements of Build America, Buy America. Steel used for temporary support of excavation, including H piles, soldier piles, and sheeting when the steel is required to be left in place is subject to requirements of Build America, Buy America. Temporary steel, shall remain in place when it falls within the influence zone of the soil supporting any structure or railroad tracks.

(2) all manufactured products used in the project are produced in the United States—this means the manufactured product was manufactured in the United States and

(3) all construction materials are manufactured in the United States—this means that all manufacturing processes for the construction material occurred in the United States.

“Construction materials” includes an article, material, or supply—other than an item of primarily iron or steel; a manufactured product; cement and cementitious materials;

aggregates such as stone, sand, or gravel; or aggregate binding agents or additives—that is or consists primarily of:

• non-ferrous metals,

• plastic and polymer-based products (including polyvinylchloride, composite building materials, and polymers used in fiber optic cables),

• glass (including optic glass),

• lumber; or

• drywall.

The Buy America preference only applies to articles, materials, and supplies that are consumed in, incorporated into, or affixed to an infrastructure project. As such, it does not apply to tools, equipment, and supplies, such as temporary scaffolding, brought to the construction site and removed at or before the completion of the infrastructure project. Nor does a Buy America preference apply to equipment and furnishings, such as movable chairs, desks, and portable computer equipment, that are used at or within the finished infrastructure project but are not an integral part of the structure or permanently affixed to the infrastructure project.

All articles, materials, and supplies should be classified as an iron or steel product, a manufactured product, or another product as specified by law or in 2 CFR part 184 (such other products specified by law or in 2 CFR part 184 include “excluded materials” and “construction materials”); an article, material, or supply must not be considered to fall into multiple categories.

A00801 - 14

MASSACHUSETTS WATER RESOURCES AUTHORITY (MWRA) – 8m PERMITS

The Contractor shall note that MWRA water lines are present along portions of Webster Avenue and Newton Street. MWRA 8m Permit Application has been submitted and approved. See Document A00825 and copy of MWRA 8m Permit #3668

The Contract shall follow 8m permit terms and conditions.

The Contractor shall note that a 48-inch MWRA water main is present along Webster Ave and adjacent to the proposed work.

Per MWRA requirements, the water pipelines must be protected at all times. No construction equipment or materials including cranes, backhoes and other vehicles may be parked, set up, stationed or stored on top of the MWRA’s water or sewer mains. All proposed construction operations shall not impart live and dead loads that would adversely impact and of the water or sewer mains.

MWRA infrastructure within the project limits, including manholes and gate boxes, must remain unobstructed.

The Contractor shall be responsible for complying with the requirements of the conditions within the 8m Permits, as required by the MWRA.

The Contractor shall also exercise great care when constructing foundations, fence foundations, drainage or signal utilities or dull depth pavement near or over all mains located with the project limits.

Prior to construction, the Contractor shall prepare a Plan (i.e. Pipe Protection Plan) for review by MWRA. The plan shall include a description and location of the work, the proposed measures to field locate and protect water and sanitary infrastructures that may be impacted by construction, and mitigation measures to avoid and prevent any adverse impacts to the existing infrastructure. The additional work required to protect any water main within the project limits, and prepare the Plan, will be incidental to the overall contract.

The MWRA requires a construction plan along with an analysis of the MWRA’s water main pipeline (prepared by a professional engineer licensed in the State of Massachusetts). The pipeline analysis shall take into consideration the construction equipment, which would be used over the MWRA’s water main pipeline in instances where the existing roadway surface will be completely excavated away removing the protection of the HS-20 surface loading barrier. This Plan and supporting calculations will need to be submitted to the MWRA for review. This includes open cross-country areas where no HS 20 Roadway Loading exists.

A00801 - 15

ENVIRONMENTAL PERMITTING

The proposed work does not occur in jurisdictional wetland resources subject to section 401 or section 404 of the Clean Water Act; therefore, the project does not require a Water Quality Certification from the Massachusetts Department of Environmental Protection or authorization from the US Army Corps of Engineers. The proposed work qualifies for the bridge exemption authorized in the 2014 Transportation Bond Bill and is therefore not subject to the Massachusetts Wetlands Protection Act, the Massachusetts Public Waterfront Act (Chapter 91), or the Massachusetts Environmental Policy Act. If field conditions and/or Contractor-proposed erection, demolition, staging, or other procedures require work to occur in or otherwise impact water or wetland resource areas, the Contractor is advised that no associated work can occur until all required environmental permits have been obtained allowing such work. The Contractor must notify the District Highway Director and Resident Engineer in writing at least 60 days prior to desire commencement of the proposed activity. All environmental submittals, including any Contract with Local, State, or Federal environmental agencies, must be coordinated with the District Environmental Engineer. The Contractor is expected to fully cooperate with requests for information and provide same in a timely manner. The Contractor is further advised that the Department will not entertain a delay claim due to the time required to obtain the environmental permits.

EMERALD ASH BORER ADVISORY

To the extent possible, all trees and brush shall be disposed on site, typically chipped and spread in place. When trees or brush must be removed, such as in urban, or otherwise populated areas, Contractor shall identify proposed location for disposal and provide written notification to the Engineer for approval. Disposal shall be in city or town of project, or at minimum, within county, of construction operations.

CONTAMINATED SOIL

Soil to be removed from the project area shall not be assumed to be uncontaminated and must be evaluated prior to off-site management for potential contamination with hazardous materials.

No soil may be disposed of off-site without proper assessment by the contractor and approval from the Resident Engineer (RE), District Environmental Engineer (DEE), or the project designee.

SOIL STOCKPILING DIRECTIVE P-22-001

Any stockpiling of soil must be performed in compliance with Policy Directive P-22-001, Off- Site Stockpiling of Soil from MassDOT Construction Projects. This directive limits the allowable locations for off-site stockpiling of soil generated during MassDOT projects and includes various requirements that must be satisfied by the contractor prior to off-site stockpiling. The Contractor is responsible for identifying a suitable stockpile location.

A00801 - 16

NOTICE TO OWNERS OF UTILITIES

The contractor shall investigate to determine the existence of other utilities that may be affected by the Contractor’s operations.

Written notice shall be given by the Contractor to all public service corporations or officials owning or having charge of publicly or privately owned utilities of his/her intention to commence operations affecting such utilities at least one week in advance of the commencement of such operations and the Contractor shall at that time file a copy of such notice with the Engineer.

The following are names of owners and representatives of the principal utilities that may be affected. Completeness of this list is not guaranteed by MassDOT.

District Utility and Constructability Engineer:

MassDOT Highway Division, District 4 519 Appleton Street Arlington, MA 02476 Contact: Ray Stinson District Utility Constructability Engineer 857-368-4135 info.duce4@dot.state.ma.us

Electric:

Eversource Electric “A” 1165 Massachusetts Avenue Dorchester, MA 02125 Contact: Ned Sadowksi 617-541-5714 Ned.sadowski@eversource.com

Gas:

Eversource Gas 157 Cordaville Road, 3113 Southborough, MA 01772 Contact: Jeffrey Evans-Mongeon 508-305-6970 Jeffrey.evans-mongeon@eversource.com

National Grid Gas 40 Sylvan Road Waltham, MA 02451 Contact: Melissa Owens 781-907-2845 Melissa.Owens@nationalgrid.com

A00801 - 17

NOTICE TO OWNERS OF UTILITIES (Continued)

Enbridge Gas 8 Wilson Way Westwood, MA 02090 Contact: Kathy Aruda 508-938-7728 Kathleen.aruda@enbridge.com

Water:

Somerville DPW – Water & Sewer 17 Franey Road Somerville, MA 02145 Contact: Neil Viner 617-625-6600 nviner@somervillema.gov

MWRA Water 2 Griffin Way Chelsea, MA 02150 Contact: Ralph Francesconi 617-461-3573 Ralph.francesconi@mwra.com

Sewer:

Somerville DPW – Water & Sewer 17 Franey Road Somerville, MA 02145 Contact: Jay Hayden 617-625-6600 jhayden@somervillema.gov

MWRA Waste Water 2 Griffin Way Chelsea, MA 02150 Contact: Kevin McKenna 617-305-5956 Kevin.McKenna@mwra.com

DPW:

Somerville DPW-Engineering 1 Franey Road Somerville, MA 02145 Contact: Steven MacEachern 617-625-6600 x5400 SMacEachern@somervillema.gov

A00801 - 18

NOTICE TO OWNERS OF UTILITIES (Continued)

Railroad:

MBTA Document Control Group 500 Arborway Boston, MA 02130 Contact: Sylvia Welsh archives@mbta.com

CSX Transportation 2000 West Cabot Blvd – Suite 130 Langhorne, PA 19047 Contact: Michael Sliper Michael_Sliper@csx.com

Fire Alarm:

Somerville Electrical Lights & Lines 1 Franey Road Somerville, MA 02145 Contact: Mark Lawhorne 617-625-6600 mlawhorne@somervillema.gov

Other:

Astound 956 Massachusetts Avenue Arlington, MA 02476 Contact: Alex Ortiz 781-316-8878 Alex.ortiz@astound.com

Comcast Cable Corporation 92 Glenn St.

Lawrence, MA 01843 860-304-3909 Contact: Michael Cook michael_cook7@comcast.com

Verizon 385 Myles Standish Blvd.

Taunton, MA 02780 Contact: Paul Diamantopoulos 978-323-0282 paul.e.diamantopoulos@verizon.com

A00801 - 19

NOTICE TO OWNERS OF UTILITIES (Continued)

MCI-Verizon Business P.O. Box 600 Charlton, MA 01507 Contact: Stephen Parretti 508-248-1305 Stephen.parretti@verizon.com

Eversource Fiber 247 Station Drive, Mail Stop: SUM SE 320 Westwood, MA 02090 Contact: Bechir Khoury 781-441-3864 Bechir.khoury@eversource.com

Lightpath 100 Quannapowitt Pkwy Wakefield, MA 01880 Contact: Jeff Harrington 617-999-5371 Jeff.harrington@lightpathfiber.com

Zayo Group 2 Royce Lane Westfield, MA 01886 Contact: Richard Moran 978-844-7525 Richard.moran@zayo.com

FirstLight 359 Corporate Drive Portsmouth, NH 03801 Contact: Heather Araujo 207-432-2045 FirstLight_MA@firstlight.net

Lumen 1025 Eldorado Blvd.

Broomfield, CO 80021 Contact: Renoy Thomas 516-712-3041 relocations@lumen.com

Verizon Wireless Small Cell 20 Alexander Drive Wallington, CT 06492 Contact: Lizz Glidden Elizabeth.glidden@verizonwireless.com

A00801 - 20

NATIONAL GRID EMERGENCY TELEPHONE NUMBERS

GAS:

Emergency: 1-800-233-5325 New Service: 1- 877-696-4743 Customer Support: 1-800-732-3400

ELECTRIC:

Outage/ Emergency: 1-800-465-1212 New Service: 1-800-375-7405 Customer Support: 1-800-322-3223

EVERSOURCE EMERGENCY TELEPHONE NUMBERS

GAS:

Outage/ Emergency: 800-592-2000 New Service: 866-678-2744 Customer Support: 800-592-2000

ELECTRIC:

Outage/ Emergency: 800-592-2000 or 844-726-7562 New Service: 1-888-633-3797 (1-888-need pwr) Customer Support: 1-800-340-9822

A00801 - 21

TRAFFIC OFFICERS AND RAILROAD FLAGGING SERVICE

(Supplementing Subsection 7.11)

Under the provisions of Chapter 634 of the Acts of 1971, the railroad (excluding MBTA) shall furnish, without cost, the necessary flag protection on the railroad right-of-way which may be required for the performance of the work. For MBTA railroad, MassDOT will pay the Contractor for flagging costs in accordance with the procedure described in Subsection 7.11.

For non-Chapter 634 bridges MassDOT will pay the Contractor for flagging costs in accordance with the procedure described in Subsection 7.11.

The Contractor, however, is responsible for all costs incurred in restoring tracks that have been disturbed by the Contractor’s operations. Contractor shall comply with the requirements of the Railroad Special Provisions.

MBTA FLAGGING

The Contractor shall provide a minimum two week notice for flagging support for MBTA bridges and railroads. This applies only to bridges and railroads operated by Keolis Commuter Services (KCS). This two-week notice does not apply to emergency work, only to routine or scheduled work activities. The contact person for advance request for flagging services is Rich Arnold, MBTA Railroad Operations Department, Phone number (617)-222-3635, email address:

rarnold@mbta.com.

MBTA COMMUTER RAIL

Keolis Commuter Service (KCS) operates the commuter rail for the MBTA. All references to MBCR in the provisions will mean Keolis Commuter Service (KCS).

A00801 - 22

MBTA RAILROAD COORDINATION / ACCESS TO MBTA PROPERTY

The Contractor shall be required to coordinate the work of this Contract with the MBTA and Keolis Commuter Services Co. (“KCS”) through the MassDOT Resident Engineer and MassDOT designated Field Staff. A majority of the prerequisites for the Contractor to perform work on or adjacent to MBTA transit lines may be found in the “MBTA Special Instructions” provided herein.

The Contractor shall be required to comply with the all applicable requirements of the latest edition of the MBTA Special Instructions available at the time of Contract Award.

The Contractor will have to perform construction related activities on, over, under, within or adjacent to railroad property owned or controlled by the MBTA. Any work that will affect Commuter Rail operations, involve work on, over, under, within or adjacent to the commuter rail right of way must be coordinated with MBTA Railroad Operations and KCS and shall comply with the latest version of the MBTA Railroad Operations Directorate.

An owner or Contractor who wishes permission to enter upon or perform work over, on, under or adjacent to MBTA property shall submit to the offices of the MBTA’s designated representative, a request in writing prior to the owner or the Contractor’s planned commencement of any of the above stated activities; and is required to enter into a license agreement with the MBTA (www.mbtarealty.com/licenses) to access the property.

MBTA COORDINATION – SUBSTITUTE BUSING

Substitute bus transportation will be required for weekend MBTA Commuter Rail shutdowns. The Contractor must coordinate with MBTA Operations Department for provision of bus service. The Contractor shall contact MBTA Operations Dept. a minimum of 6 weeks prior to any planned rail shutdown. The MBTA will be responsible for planning, procuring, and administering the necessary substitute bus transportation services and operations based on the Contractor’s approved work schedule.

Prime Contact: Secondary Contact:

Eric Ciborowski Delrico Gomes 32 Cobble Hill Road 32 Cobble Hill Road Somerville, MA 02143 Somerville, MA 02143 617-634-2567 857-366-0404 ECIBOROWSKI@MBTA.com DGOMES@MBTA.COM

The Contractor shall be required to attend the MBTA Weekly Track Outage Schedule Coordination Meetings held Wednesdays at 10:00 am at 32 Cobble Hill Road in the small classroom located in the training area at the rear of the building.

MBTA Bus Diversion – For Webster Ave Bridge

It’s anticipated that Commuter rail service between Porter Station and North Station will be routed by MBTA to use the Red Line. No Bus Diversion Costs are anticipated. The Contractor however is expected to do most work under the small nightly available non-revenue hours. MassDOT anticipates full closure may be required for demolition and PTC relocation work.

A00801 - 23

MBTA AND RTA BUS STOP AND SERVICE IMPACTS

(Supplementing Subsection 7.10)

The Contractor is hereby advised that existing MBTA or other regional transit authority (RTA) bus stops are located within the project limits. When work is expected to impact existing MBTA or RTA bus stops (including, but not limited to, any bus stop closures, or temporary bus stop relocations) or other impacts to bus operations, the Contractor shall notify MBTA Bus Operations or the applicable RTA a minimum of four weeks in advance using the contact information below.

The Contractor shall also include temporary impacts to bus stops in the Detour Plans included in their Transportation Management Plan (TMP), with particular attention paid to ensuring accessible routes and accessible boarding and alighting areas are provided to any temporary bus stops as defined in PROWAG R309 and other applicable accessibility regulations. The Contractor shall include DOTHighwayDesign@dot.state.ma.us, massdotworkzonereview@dot.state.ma.us, and the appropriate District Traffic Section on any Detour plan submission including temporary bus stop impacts.

MBTA – Bus Operations busstops@mbta.com

BAT – Kelly Forrester, Mgr. of Transit Ops kforrester@ridebat.com

(508) 638-5939

BRTA – Robert Malnati, Administrator robert.malnati@berkshirerta.com

(413) 499-2782 ext. 2874

CATA – Felicia Webb, Administrator webbf@canntran.com

(978) 283-1886

CCRTA – John F. Kennedy, Administrator tcahir@capecodrta.org

(508) 775-8504

FRTA – Tina Cote, Administrator tina@frta.org

(413) 774-2262 ext. 104

GATRA – Mary Ellen A. Defrias, Administrator msousa@gatra.org

(508) 226-1102

LRTA – Dave Bradley, Administrator lowellrta@aol.com

(978) 459-0164

MART – Bruno Fisher, Administrator bruno.fisher@mrta.us

(978) 345-7711 ext. 2263

MWRTA – James Nee, Administrator info@mwrta.com

(978) 345-7711 ext. 2263

MeVa – Noah Berger, Administrator nberger@mevatransit.com

(978) 469-6878 ext. 130

NRTA – Gary Roberts, Administrator nrta@nantucket-ma.gov

(978) 469-6878 ext. 130

PVTA – Sandra Sheehan, Administrator ssheehan@pvta.com

(413) 732-6248

SRTA – Erik Rousseau, Administrator erousseau@srtabus.com

(508) 997-6767

VTA – Angela Grant, Administrator info@vineyardtransit.com

(508) 693-9440 ext. 110

WRTA – Joshua Rickman, Administrator admin@therta.com

(508) 693-9440 ext. 110

A00801 - 24

WORK REQUIRED IN COORDINATION WITH MBTA

The Contractor shall be reimbursed for costs associated with Railroad Flagging

Work performed by Keolis and billed to the Contractor is shown on plans and consists of relocation of the Positive Train Control (PTC) cable in two locations and modification associated with the project. Such PTC-related work shall be reimbursed under Specialty Services, plus ten percent (10%).

Work associated with track, signal, power, or communication systems is not envisioned in this Contract.

The Contractor shall also be reimbursed, without additional compensation, for payments made to bus companies for bus diversion services, or to the Massachusetts Bay Transportation Authority (MBTA) Bus Operations for costs necessary to implement detours, under Railroad Diversion.

SUPPLEMENTAL REQUIREMENTS FOR NON-BID ITEMS

(Supplementing Subsection 3.04)

The Contractor will be paid for additional artisans, equipment rental, materials, engineering services and specialty services required to perform the work plus (10%) percent, plus actual increased bond premium.

The Contractor shall be required to furnish certified paid receipts for additional artisans, equipment rental, materials, engineering services and specialty services that are required to perform the work prior to payment by the Department. Increased bond premium for additional artisans, equipment rental, materials, engineering services and specialty services will be paid after a certified paid receipt is submitted showing payment of the increased bond.

A00801 - 25

SUBSECTION 8.02 SCHEDULE OF OPERATIONS

Replace this subsection with the following:

An integrated cost and schedule controls program shall be implemented by the Contractor to track and document the progress of the Work from Notice to Proceed (NTP) through the Contractor Field Completion (CFC) Milestone. The Contractor’s schedules will be used by the Engineer to monitor project progress, plan the level-of-effort required by the Department’s work force and consultants and as a critical decision-making tool. Accordingly, the Contractor shall ensure that it complies fully with the requirements specified herein and that its schedules are both accurate and updated as required by the specification throughout the life of the project. Detailed requirements are provided in Division II, Section 722 Construction Scheduling.

A00801 - 26

PIGEON WASTE

The Contractor shall remove and dispose of the pigeon waste and any other debris accumulated on the steel members and bridge seats in areas where work is being performed. Pigeon waste and debris material contaminants will require special handling and disposal in accordance with all Federal, state, and local requirements. No separate payment will be made for removal and disposal of pigeon waste. Cost shall be incidental to the contract pay items.

GENERAL REQUIREMENTS FOR DEMOLITION AND

WORK INVOLVING PAINTED STEEL

(02/06/2020)

Demolition and work involving painted steel shall conform to the requirements of Subsection 961 of the Standard Specifications.

Work Involving Painted Steel.

Hazardous materials shall be removed in the immediate area of any intended welding, heating, saw cutting or burning of steel. Hazardous material removal is required to allow the demolition of structural steel, railings, drainage systems, utility supports, steel lamp posts, etc.

The contractor shall assume that the coatings on the steel contain lead (Pb), unless otherwise determined by testing. The contractor shall certify in writing to the Engineer the results of all testing, and shall also certify that any lead (Pb) coated steel removed from the project was not reused or buried, but was sent to a scrap metal recycling facility.

Implement and maintain programs and procedures, which comply with the requirements of this specification and all applicable standards and regulations. Comply with all applicable regulations even if the regulation is not specifically referenced herein. If a state or local regulation is more restrictive than the regulation of this specification, follow the more restrictive requirements.

This requirement is intended only for the demolition and preparation prior to repair and does not include provisions for recoating of steel.

Environmental

A…