Attachment 1 to PWS Performance Requirements Summary Table (PRST)
Standard
PWS
Paragraph
Required Service (Task)
Action Minimum Frequency
Acceptable Performance Levels
Methods of Surveillance
Notes
1.1.2 Develop & Comply with Work Schedule
Develop & Comply
Daily 100% Random COR must approve all changes
1.1.3 Develop & Comply with Work Plan
Develop & Comply Daily 100% Random COR must approve all changes
1.1.4 Submit Samples of New Materials
Provide Samples As Required 100% 100%
1.2.1 Develop & Maintain Effective Project Mgt.
Provide Management
As Required 100% Random
1.3 Develop & Comply with a Comprehensive Quality Control Plan
Develop & Comply Daily 100% Random COR must approve all changes
1.8.1 Report Hazardous Materials
Provide
MSDS/SDS
As Required 100% 100%
1.8.2 Green Procurement
Use Preferred Products
As Available 100% Random
1.8.6 Environmental/Safety
Comply with
ESOHMS
Daily 100% 100%
Provide Labor, Admin. Spt., Supervision, Matl., Services
Provide Reqd.
Items
As Required 100% Random
5.1 Administration Building Interior
Breakdown/ Removal
As Required 95% Random
Interior
Repair/Prepare As Required 95% Random
Interior
Paint/Install As Required 95% Random
Attachment 1 to PWS Performance Requirements Summary Table (PRST)
Standard
PWS
Paragraph
Required Service (Task)
Action Minimum Frequency
Acceptable Performance Levels
Methods of Surveillance
Notes
5.2 Breakroom/Lab/Records Building Interior
Breakdown/
Breakroom/Lab/Records Building Interior
Building Interior
5.3
Exterior
Breakdown/
Exterior
Exterior
5.4
Building Exterior
Breakdown/
Building Exterior
Building Exterior
Note 1) The Government will evaluate the Contractor’s performance by appointing a Contracting Officer’s Representative (COR) to monitor the Contractor’s performance and ensure services are received and acceptable in accordance with the Performance Work Statement. The methods of surveillance used by the Government will be either 100% Inspection or Random Inspection for this contract as listed in the Performance Requirements Summary Table (PRST) of this PWS. The Contractor shall provide all labor, administrative support, transportation, supervision, coordination and control of all Sub-Contractors, equipment, materials, parts, supplies and services associated with the performance of this contract at the Acceptable Performance Levels (APL) established in the Performance Requirements Summary Table (PRST) of this PWS. The COR will utilize the Quality Assurance Surveillance Plan (QASP) developed (by the Government) for this PWS to document the level of services provided by the Contractor. See Attachment 2 to this PWS for a copy of the QASP. The COR will at a minimum: 1) review the Contractor’s sign in sheet on a monthly basis in order to verify that the Contractor is correctly logging in his/her time on site, 2) randomly inspect work performed by the Contractor on a weekly basis in order to ensure that the Contractor is achieving the required level of performance and 3) prepare a “Government Inspection Report” within fourteen (14) days after the end of each month that identifies areas inspected and all discrepancies noted. See Attachment 3 to this PWS for a copy of the “Government Inspection Report”. DLA Strategic Materials will use the ratings documented in the “Government Inspection Report” as the basis for determining actual Contractor performance. A “pass” rating will be assigned to each task inspected that met or exceeded the established Acceptable Performance Level (APL) for each “Standards of Performance” requirement evaluated. A “N/A” rating will be assigned when no work was required to be performed on a specific task. DLA Strategic Materials will not levy any monetary deductions against the Contractor for “pass” and “N/A” ratings documented in the “Government Inspection Report”. A “fail” rating will be assigned to each task inspected that fell below the established Acceptable Performance Level (APL) for each “Standards of Performance” requirement evaluated. When a “fail” rating is assigned, all observed deficiencies must be documented on a “Government Inspection Report”. DLA Strategic Materials may (at the governments discretion) levy monetary deductions against the Contractor for “fail” ratings documented in the “Government Inspection Report” as listed in the Performance Requirements Summary Table (PRST) of this PWS for each “Standards of Performance” requirement evaluated.