SolicitationAttachment2Waterlines_1232SA26Q0991.pdf
PDF 930 KB Posted
- Solicitation number
- 1232SA26Q0991
About this file
This document is a site plan/facility layout diagram for the USDA-ARS-HERU (Agricultural Research Service - High Desert Ecology Research Unit) Office and Shop Buildings Complex, updated by KCK as of August 6, 2018. The plan depicts a comprehensive campus layout with multiple buildings and infrastructure elements positioned across the facility.
The layout includes the following major structures: an Office building (ARS-25), West Shop (ARS-11), East Shop (ARS-12), Model Building (ARS-32), Quonset building (ARS-4), Wood Shed (ARS-3), Storage Building (ARS-5), and a Pump House (ARS-31). The plan incorporates utility infrastructure including water lines, gas lines, air lines, sewer lines, 4-inch drain lines, electrical overhead and underground systems, and telephone underground systems, all clearly delineated in the legend. Dimensions are provided for key distances throughout the facility, such as 167 feet, 175 feet, 162 feet, 112 feet, and 77 feet between various structures and boundaries. The facility includes parking areas, storage areas, and multiple access points. A scale in feet is provided at the bottom right of the plan for reference, with measurements ranging from 0 to 150 feet.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
167'
175'
45' 15'
75'
65'
48'
34' 40' 77'
112' 77'
A
B C
D
E
File details come from the government source that posted it. Updated .