This is a Statement of Work for the replacement of 32 exhaust fans at the USDA-ARS Southern Horticulture Research Unit in Poplarville, Mississippi, located at 810 Hwy 26W, Poplarville, MS 39470.
The project objective requires removal of existing exhaust fans and wiring, followed by installation of heavy-duty, totally enclosed, maintenance-free, energy-efficient units with 16-gauge galvanized housing, shutters, and 6-wing galvanized blades. The specific equipment includes nine Model 366S34 units, nine Model 366S34-2 units, seven Model 246S34BD units, and seven Model 246S34BD-2 units, all galvanized exhaust fans designed for agricultural and industrial use. The contractor must provide all equipment, materials, labor, and hardware. Contractors must be registered in the System for Award Management (SAM) prior to quote submission and are strongly encouraged to conduct a site visit with a government representative to verify locations, dimensions, and conditions before bidding. A Site Safety Specific Plan/Accident Prevention Plan, including local doctor office and hospital information, must be submitted to the Contracting Officer within 14 days of contract award. The project completion deadline is 60 days from the Notice to Proceed, with work hours limited to Monday through Friday, 7:00 A.M. to 4:00 P.M., excluding government holidays. Material submittals, including shop drawings and specifications, must be provided to the Engineer Project Manager and Contracting Specialist in electronic or three written copies. The contractor must maintain a foreman on-site, keep the work area clean, manage debris removal, provide restroom facilities and dumpster, remove all demolished materials off-site, schedule inspections at least 10 days in advance, and repair any damage to government property caused by contractor activities. Contact information includes Ray Morris (Local Point of Contact) at ray.morris@usda.gov, 601-916-7282, and J. Kevin Magee, PE (Engineer Project Manager) at kevin.magee@usda.gov, (662) 686-5289.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Statement of Work
Replace 32 Exhaust Fans
Southern Horticulture Lab
USDA-ARS
Poplarville, Mississippi
Prepared by:
Ray Morris
Table of Contents
Location Map Page 3
Statement of Work Page 4
Pictures Page 5
Contractor Responsibility Page 9
Project Schedule/Contacts Page 10
Location Map
Statement of Work: Replacing 32 exhaust fans (B42) at USDA ARS Southern Horticulture Research Unit at Poplarville, MS. This project is located at 810 Hwy 26W, Poplarville, MS 39470.
Project Objective: Project goal is to Remove existing exhaust fans (32) and wiring. Install heavy duty totally enclosed, maintenance free, energy efficient motors,16-gauge galvanized housing, shutters, and 6 wing galvanized blades. New (9) Model 366S34,(9) Model 366S34-2 ,(7), Model 246S34BD, (7) Model
246S34BD-2 galvanized exhaust fan designed for agricultural and industrial use. Horticulture Research Unit in Poplarville, MS.
Contractor must be registered in System for Award Management, (SAM), prior to submitting a quote. Registration can be obtained through: http://www.sam.gov
Site Visit: Contractors are encouraged to visit the site and be escorted by a government representative to confirm locations, dimensions, and conditions of the project before a quote is submitted. The site visit shall be for the purpose of observing firsthand any conditions relevant to the completion of this project. No consideration will be given to claims based on lack of knowledge of existing conditions, except where contract documents make definite provisions for adjustment in cost or extension due to existing conditions not readily foreseeable. This project is located at USDA-ARS in Poplarville, MS.
Safety: The contractor will submit a Site Safety Specific Plan/Accident Prevention Plan in industry recognizable format to the Contracting Officer within 14 days of contract award. The Plan shall include phone numbers and maps to the local Dr. Office and nearest Hospital.
Base : Provide all equipment, materials, labor and hardware.
http://www.sam.gov/
Pictures:
Figure 1 Building 38
MS Excel format with formulas working.
Contractor Responsibility:
1. Contractor will verify all dimensions and site conditions prior to beginning work.
2. Contractor will perform the work as listed in the above outlined Base.
3. Contractors shall keep work area clean daily and take measures to control debris while work is being performed.
4. Contractors are required to manage the project and consult with the Government prior to beginning all work phases. And, to work in a manner that minimizes the impact of the work on Government operations, research, and functions.
5. All work must be performed in such a manner as to not adversely affect daily operations of the facility, its workers, and the onsite facility operations.
6. Contractor must always have a Foreman on the job while working on this project.
7. Contractors will provide their own restroom facility and dumpster.
8. Contractor will remove all demolished material and debris from the worksite and dispose off-site.
Material / Submittals:
The Contractor shall supply all materials necessary to successfully complete the project and deliver a functioning system as required. Submittals on all material incorporated into the work, including shop drawings and specifications, used on this project shall be submitted to the EPM and Contracting Specialist as noted in this document. Electronic submittals are acceptable otherwise three written submittals are required.
Execution of Work:
Contractor will verify all dimensions and site conditions prior to beginning work. Contractor will schedule the work between working hours as listed below. Contractors are required to provide labor, specified material, equipment, and other tools required to perform the job fully and completely. No Government equipment will be available for use by the contractor. The contractor shall always be responsible for protecting his work and ensuring the safety of his crew and ARS employees. Upon completion of the project, the contractor shall remove from the premises all accumulated materials and rubbish caused by the project. Premises shall be left in a clean, orderly, and acceptable condition.
Damage to Property:
Any damage to the Government buildings, utilities, etc. caused as the result of the contractor’s activities shall be repaired or replaced to the satisfaction of the Government.
Inspection and Acceptance:
A government representative shall inspect and approve the work performed on this project. The Contractor shall schedule inspection a minimum of 10 days in advance, in writing, to the Contracting Officer.
Project Schedule:
The completion of this project shall not exceed 60 days from date of Notice to Proceed. A request for time extension must be submitted to the Contracting Specialist in writing. Each request must include specific and detailed reasons in support of the schedule alteration.
Work Hours:
Contractor’s work hours shall be Monday through Friday, seven (7) A.M. to four (4) P.M. with the exception of Government holidays. Any changes to work schedule shall be submitted to Contacting Officer for written approval prior to schedule change.
Project Contacts:
LOCAL POINT OF CONTACT (POC):
Ray Morris Email: ray.morris@usda.gov
USDA, ARS SRL
810 Hwy 26 W Poplarville, MS 39470 Phone: 601-916-7282
ENGINEER PROJECT MANAGER
J. Kevin Magee, PE Email: kevin.magee@usda.gov USDA, ARS, SEA Facilities EPM 141 Experiment Station Road Stoneville, MS 38776 Phone: (662) 686-5289 mailto:ray.morris@usda.gov mailto:kevin.magee@usda.gov