SOLICITATION W91QVN22R0006.docx
DOCX document 281 KB Posted
- Solicitation number
- W91QVN22R0006
About this file
This is a solicitation for operation and maintenance services at a communication center and facility located at USAG Humphreys and CP TANGO in Korea. The solicitation requires work management, preventive maintenance, minor and unscheduled repairs, quality control, and reporting over a one-year base period and four one-year options. Services include HVAC, electrical, mechanical, architectural, and fire suppression systems work. The contractor must have licenses in facilities management, electrical and mechanical repair, and experience in administrative building maintenance. Key personnel such as site managers require HVAC licenses. The solicitation will be evaluated based on business registration and licenses, key personnel qualifications, prior experience, technical approach, quality control plan, past performance, and price. Awards may be made to other than the lowest price offer. The response due date is August 18, 2022.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
W91QVN22R0006
SEE ADDENDUM
(No Collect Calls)
W91QVN22R0006
18-Jul-2022
b. TELEPHONE NUMBER 315-755-0633
8. OFFER DUE DATE/LOCAL TIME
01:00 PM 18 Aug 2022
5. SOLICITATION NUMBER
6. SOLICITATION ISSUE DATE
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
STANDARD FORM 1449 (REV. 2/2012)
Prescribed by GSA – FAR (48 CFR) 53.212
(TYPE OR PRINT)
(SIGNATURE OF CONTRACTING OFFICER)
ADDENDA
X
ARE
26. TOTAL AWARD AMOUNT (For Govt. Use Only) 23.
CODE
10. THIS ACQUISITION IS
SUCH ADDRESS IN OFFER
17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT
BELOW IS CHECKED
TELEPHONE NO.
W91QVN
9. ISSUED BY
18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a. UNLESS BLOCK
7. FOR SOLICITATION
INFORMATION CALL:
a. NAME
MS. YI, HYE KYONG
2. CONTRACT NO.
3. AWARD/EFFECTIVE DATE
4. ORDER NUMBER
(TYPE OR PRINT)
30b. NAME AND TITLE OF SIGNER 30c. DATE SIGNED 31b. NAME OF CONTRACTING OFFICER 30a. SIGNATURE OF OFFEROR/CONTRACTOR 31a.UNITED STATES OF AMERICA 27a. SOLICITATION INCORPORATES BY REFERENCE FAR 52.212-1. 52.212-4. FAR 52.212-3. 52.212-5 ARE ATTACHED.
X
25. ACCOUNTING AND APPROPRIATION DATA
1. REQUISITION NUMBER
20.
ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS SPECIFIED.
PAGE 1 OF
OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
ARE NOT ATTACHED
27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED.
ADDENDA
ARE
ARE NOT ATTACHED
(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE
SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:
YOUR OFFER ON SOLICITATION
28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN
% FOR:
SET ASIDE:
UNRESTRICTED OR
X
SMALL BUSINESS
17a.CONTRACTOR/
CODE
FACILITY
OFFEROR
CODE
411TH CSB, KOREA - SERVICE TEAM
POC: MS. YI, HYE KYONG
TEL:0503-355-0633
HYEKYONG.YI6.LN@MAIL.MIL
APO AP 96271
UNITED STATES
18a. PAYMENT WILL BE MADE BY
CODE
RATED ORDER UNDER
DPAS (15 CFR 700)
13a. THIS CONTRACT IS A 13b. RATING
CODE
15. DELIVER TO
CODE
WT4KBR
16. ADMINISTERED BY
12. DISCOUNT TERMS
11. DELIVERY FOR FOB DESTINA-
TION UNLESS BLOCK IS
MARKED
SEE SCHEDULE
14. METHOD OF SOLICITATION
RFQ
IFB
RFP
X
DIRECTORATE OF PUBLIC WORKS
MR. YI, SAM YONG
DPW, USAG HUMPHREYS UNIT # 15228
APO AP 96271-5228
UNITED STATES
TEL: 756-3340 FAX:
FAX:
TEL:
315-755-0633
SERVICE-DISABLED
VETERAN-OWNED
SMALL BUSINESS
8(A)
HUBZONE SMALL
BUSINESS
SIZE STANDARD:
$12,000,000
NAICS:
811213 X
OFFER DATED
29. AWARD OF CONTRACT: REF.
DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND ON ANY
COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH AND
EMAIL:
TEL:
31c. DATE SIGNED
SEE SCHEDULE
SCHEDULE OF SUPPLIES/ SERVICES
ITEM NO.
QUANTITY
UNIT
UNIT PRICE
AMOUNT
24.
22.
21.
19.
WOMEN-OWNED SMALL BUSINESS (WOSB)
ELIGIBLE UNDER THE WOMEN-OWNED
SMALL BUSINESS PROGRAM
EDWOSB
32g. E-MAIL OF AUTHORIZED GOVERNMENT REPRESENTATIVE
SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL ITEMS
(CONTINUED)
PAGE 2 OF
ACCEPTED, AND CONFORMS TO THE CONTRACT, EXCEPT AS NOTED: ______________________________________________________ 32a. QUANTITY IN COLUMN 21 HAS BEEN
RECEIVED
INSPECTED
32b. SIGNATURE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32c. DATE 32d. PRINTED NAME AND TITLE OF AUTHORIZED GOVERNMENT
REPRESENTATIVE
32e. MAILING ADDRESS OF AUTHORIZED GOVERNMENT REPRESENTATIVE 32f. TELEPHONE NUMBER OF AUTHORIZED GOVERNMENT REPRESENTATIVE
37. CHECK NUMBER
FINAL
PARTIAL
COMPLETE
36. PAYMENT
35. AMOUNT VERIFIED
CORRECT FOR
34. VOUCHER NUMBER
FINAL
33. SHIP NUMBER
PARTIAL
38. S/R ACCOUNT NUMBER
39. S/R VOUCHER NUMBER
40. PAID BY
41a. I CERTIFY THIS ACCOUNT IS CORRECT AND PROPER FOR PAYMENT 41b. SIGNATURE AND TITLE OF CERTIFYING OFFICER 41c. DATE 42a. RECEIVED BY (Print) 42b. RECEIVED AT (Location) 42c. DATE REC'D
(YY/MM/DD)
42d. TOTAL CONTAINERS
STANDARD FORM 1449 (REV. 2/2012) BACK
Prescribed by GSA – FAR (48 CFR) 53.212
AUTHORIZED FOR LOCAL REPRODUCTION
PREVIOUS EDITION IS NOT USABLE
SEE SCHEDULE
20.
SCHEDULE OF SUPPLIES/ SERVICES
21.
QUANTITY
UNIT
22.
23.
UNIT PRICE
24.
AMOUNT
19.
ITEM NO.
Section SF 1449 - CONTINUATION SHEET
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Work Management
FFP
The Contractor shall perform the Work Management in accordance with (IAW) Para. 5.3 of PWS.
MFR PART NR: z
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AA
| 9 |
| Months |
Work Management
The Contractor shall perform the Work Management IAW Para. 5.3 of PWS.
(1 Mar 2023 – 30 Nov 2023)
FOB: Destination
PSC CD: Z127
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0001AB
| 1 |
| Each |
Phase-In
The contractor shall provide personnel, management, resources, transportation and other relevant services to perform the new contract IAW Para. 1.6.12. of the PWS.
(1 Dec 2022 – 28 Feb 2023)
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Preventive Maintenance and Minor Repair
The Contractor shall perform the monthly Preventive Maintenance (PM) and minor repair services that has cost including labor and part/material of KRW1,500,000 or less per one repair IAW Para. 5.4 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AA
| 9 |
| Months |
PM of HVAC Work
The Contractor shall perform the HVAC work at Camp Humphreys IAW Para. 5.4.6 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AB
| 9 |
| Months |
PM of Electrical Work
The Contractor shall perform the Electrical Work at Camp Humphreys IAW Para. 5.4.7 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AC
| 9 |
| Months |
PM of Mechanical Work
The Contractor shall perform the Mechanical Work at Camp Humphreys IAW Para. 5.4.8 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AD
| 9 |
| Months |
PM of Architectural Work
The Contractor shall perform the Architectural Work at Camp Humphreys IAW Para. 5.4.9 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AE
| 9 |
| Months |
PM of Parking Structure and Exterior
Site Work. The Contractor shall perform the Parking Structure and Exterior Site Work at Camp Humphreys IAW Para. 5.4.10 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
0002AF
| 9 |
| Months |
PM of CP TANGO
The Contractor shall perform the PM for CP TANGO IAW Para. 5.4.11 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 300 |
| Job |
Unscheduled Maintenance and Repair
The Contractor shall perform the Unscheduled Maintenance and Repair service IAW Para. 5.5 of PWS. The contractor shall provide repair part, material, equipment and labor cost for unscheduled maintenance. A Firm Fixed Price (FFP) Task Order will be issued after completion of negotiation for each task. Total estimated amount is KRW870,000,000 as needed basis. The Contractor shall not submit a price or amount for this CLIN.
ESTIMATED
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
SERVICE CONTRACT REPORTING (SCR)
IAW DFARS 252.204-7023, the Contractor shall submit data using the SAM.gov website.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
Estimated Cost for War Hazard Losses is
ZERO (0).
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Work Management |
FFP
The Contractor shall perform the Work Management in accordance with (IAW) Para. 5.3 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Preventive Maintenance and Minor Repair |
The Contractor shall perform the monthly Preventive Maintenance (PM) and minor repair services that has cost including labor and part/material of KRW1,500,000 or less per one repair IAW Para. 5.4 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AA
| 12 |
| Months |
| OPTION |
| PM of HVAC Work |
FFP
The Contractor shall perform the HVAC work at Camp Humphreys IAW Para. 5.4.6 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AB
| 12 |
| Months |
| OPTION |
| PM of Electrical Work |
FFP
The Contractor shall perform the Electrical Work at Camp Humphreys IAW Para. 5.4.7 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AC
| 12 |
| Months |
| OPTION |
| PM of Mechanical Work |
FFP
The Contractor shall perform the Mechanical Work at Camp Humphreys IAW Para. 5.4.8 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AD
| 12 |
| Months |
| OPTION |
| PM of Architectural Work |
FFP
The Contractor shall perform the Architectural Work at Camp Humphreys IAW Para. 5.4.9 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AE
| 12 |
| Months |
| OPTION |
| PM of Parking Structure and Exterior |
FFP
Site Work. The Contractor shall perform the Parking Structure and Exterior Site Work at Camp Humphreys IAW Para. 5.4.10 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
1002AF
| 12 |
| Months |
| OPTION |
| PM of CP TANGO |
FFP
The Contractor shall perform the PM for CP TANGO IAW Para. 5.4.11 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 300 |
| Job |
| OPTION |
| Unscheduled Maintenance and Repair |
FFP
The Contractor shall perform the Unscheduled Maintenance and Repair service IAW Para. 5.5 of PWS. The contractor shall provide repair part, material, equipment and labor cost for unscheduled maintenance. A Firm Fixed Price (FFP) Task Order will be issued after completion of negotiation for each task. Total estimated amount is KRW952,000,000 as needed basis. The Contractor shall not submit a price or amount for this CLIN.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| SERVICE CONTRACT REPORTING (SCR) |
FFP
IAW DFARS 252.204-7023, the Contractor shall submit data using the SAM.gov website.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Estimated Cost for War Hazard Losses is |
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Work Management |
FFP
The Contractor shall perform the Work Management in accordance with (IAW) Para. 5.3 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Preventive Maintenance and Minor Repair |
The Contractor shall perform the monthly Preventive Maintenance (PM) and minor repair services that has cost including labor and part/material of KRW1,500,000 or less per one repair IAW Para. 5.4 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AA
| 12 |
| Months |
| OPTION |
| PM of HVAC Work |
FFP
The Contractor shall perform the HVAC work at Camp Humphreys IAW Para. 5.4.6 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AB
| 12 |
| Months |
| OPTION |
| PM of Electrical Work |
FFP
The Contractor shall perform the Electrical Work at Camp Humphreys IAW Para. 5.4.7 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AC
| 12 |
| Months |
| OPTION |
| PM of Mechanical Work |
FFP
The Contractor shall perform the Mechanical Work at Camp Humphreys IAW Para. 5.4.8 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AD
| 12 |
| Months |
| OPTION |
| PM of Architectural Work |
FFP
The Contractor shall perform the Architectural Work at Camp Humphreys IAW Para. 5.4.9 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AE
| 12 |
| Months |
| OPTION |
| PM of Parking Structure and Exterior |
FFP
Site Work. The Contractor shall perform the Parking Structure and Exterior Site Work at Camp Humphreys IAW Para. 5.4.10 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
2002AF
| 12 |
| Months |
| OPTION |
| PM of CP TANGO |
FFP
The Contractor shall perform the PM for CP TANGO IAW Para. 5.4.11 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 300 |
| Job |
| OPTION |
| Unscheduled Maintenance and Repair |
FFP
The Contractor shall perform the Unscheduled Maintenance and Repair service IAW Para. 5.5 of PWS. The contractor shall provide repair part, material, equipment and labor cost for unscheduled maintenance. A Firm Fixed Price (FFP) Task Order will be issued after completion of negotiation for each task. Total estimated amount is KRW959,000,000 as needed basis. The Contractor shall not submit a price or amount for this CLIN.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| SERVICE CONTRACT REPORTING (SCR) |
FFP
IAW DFARS 252.204-7023, the Contractor shall submit data using the SAM.gov website.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Estimated Cost for War Hazard Losses is |
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Work Management |
FFP
The Contractor shall perform the Work Management in accordance with (IAW) Para. 5.3 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Preventive Maintenance and Minor Repair |
The Contractor shall perform the monthly Preventive Maintenance (PM) and minor repair services that has cost including labor and part/material of KRW1,500,000 or less per one repair IAW Para. 5.4 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3002AA
| 12 |
| Months |
| OPTION |
| PM of HVAC Work |
FFP
The Contractor shall perform the HVAC work at Camp Humphreys IAW Para. 5.4.6 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3002AB
| 12 |
| Months |
| OPTION |
| PM of Electrical Work |
FFP
The Contractor shall perform the Electrical Work at Camp Humphreys IAW Para. 5.4.7 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3002AC
| 12 |
| Months |
| OPTION |
| PM of Mechanical Work |
FFP
The Contractor shall perform the Mechanical Work at Camp Humphreys IAW Para. 5.4.8 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3002AD
| 12 |
| Months |
| OPTION |
| PM of Architectural Work |
FFP
The Contractor shall perform the Architectural Work at Camp Humphreys IAW Para. 5.4.9 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3002AE
| 12 |
| Months |
| OPTION |
| PM of Parking Structure and Exterior |
FFP
Site Work. The Contractor shall perform the Parking Structure and Exterior Site Work at Camp Humphreys IAW Para. 5.4.10 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
3002AF
| 12 |
| Months |
| OPTION |
| PM of CP TANGO |
FFP
The Contractor shall perform the PM for CP TANGO IAW Para. 5.4.11 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 300 |
| Job |
| OPTION |
| Unscheduled Maintenance and Repair |
FFP
The Contractor shall perform the Unscheduled Maintenance and Repair service IAW Para. 5.5 of PWS. The contractor shall provide repair part, material, equipment and labor cost for unscheduled maintenance. A Firm Fixed Price (FFP) Task Order will be issued after completion of negotiation for each task. Total estimated amount is KRW965,000,000 as needed basis. The Contractor shall not submit a price or amount for this CLIN.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| SERVICE CONTRACT REPORTING (SCR) |
FFP
IAW DFARS 252.204-7023, the Contractor shall submit data using the SAM.gov website.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Estimated Cost for War Hazard Losses is |
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 12 |
| Months |
| OPTION |
| Work Management |
FFP
The Contractor shall perform the Work Management in accordance with (IAW) Para. 5.3 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Preventive Maintenance and Minor Repair |
The Contractor shall perform the monthly Preventive Maintenance (PM) and minor repair services that has cost including labor and part/material of KRW1,500,000 or less per one repair IAW Para. 5.4 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4002AA
| 12 |
| Months |
| OPTION |
| PM of HVAC Work |
FFP
The Contractor shall perform the HVAC work at Camp Humphreys IAW Para. 5.4.6 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4002AB
| 12 |
| Months |
| OPTION |
| PM of Electrical Work |
FFP
The Contractor shall perform the Electrical Work at Camp Humphreys IAW Para. 5.4.7 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4002AC
| 12 |
| Months |
| OPTION |
| PM of Mechanical Work |
FFP
The Contractor shall perform the Mechanical Work at Camp Humphreys IAW Para. 5.4.8 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4002AD
| 12 |
| Months |
| OPTION |
| PM of Architectural Work |
FFP
The Contractor shall perform the Architectural Work at Camp Humphreys IAW Para. 5.4.9 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4002AE
| 12 |
| Months |
| OPTION |
| PM of Parking Structure and Exterior |
FFP
Site Work. The Contractor shall perform the Parking Structure and Exterior Site Work at Camp Humphreys IAW Para. 5.4.10 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
4002AF
| 12 |
| Months |
| OPTION |
| PM of CP TANGO |
FFP
The Contractor shall perform the PM for CP TANGO IAW Para. 5.4.11 of PWS.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| ESTIMATED QUANTITY |
| UNIT |
| UNIT PRICE |
| ESTIMATED AMOUNT |
| 300 |
| Job |
| OPTION |
| Unscheduled Maintenance and Repair |
FFP
The Contractor shall perform the Unscheduled Maintenance and Repair service IAW Para. 5.5 of PWS. The contractor shall provide repair part, material, equipment and labor cost for unscheduled maintenance. A Firm Fixed Price (FFP) Task Order will be issued after completion of negotiation for each task. Total estimated amount is KRW973,000,000 as needed basis. The Contractor shall not submit a price or amount for this CLIN.
ESTIMATED
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| 1 |
| Job |
| OPTION |
| SERVICE CONTRACT REPORTING (SCR) |
FFP
IAW DFARS 252.204-7023, the Contractor shall submit data using the SAM.gov website.
NET AMT
| ITEM NO |
| SUPPLIES/SERVICES |
| QUANTITY |
| UNIT |
| UNIT PRICE |
| AMOUNT |
| OPTION |
| Estimated Cost for War Hazard Losses is |
NET AMT
CLAUSES INCORPORATED BY REFERENCE
| 52.203-3 |
| Gratuities |
| APR 1984 |
| 52.204-7 |
| System for Award Management |
| OCT 2018 |
| 52.204-9 |
| Personal Identity Verification of Contractor Personnel |
| JAN 2011 |
| 52.204-13 |
| System for Award Management Maintenance |
| OCT 2018 |
| 52.212-1 |
| Instructions to Offerors--Commercial Items |
| SEP 2021 |
| 52.212-4 |
| Contract Terms and Conditions--Commercial Items |
| OCT 2018 |
| 52.214-34 |
| Submission Of Offers In The English Language |
| APR 1991 |
| 52.227-14 |
| Rights in Data--General |
| MAY 2014 |
| 52.228-4 |
| Workers' Compensation and War-Hazard Insurance Overseas |
| APR 1984 |
| 52.237-1 |
| Site Visit |
| APR 1984 |
| 52.237-3 |
| Continuity Of Services |
| JAN 1991 |
| 52.245-1 |
| Government Property |
| SEP 2021 |
| 52.245-9 |
| Use And Charges |
| APR 2012 |
| 52.246-4 |
| Inspection Of Services--Fixed Price |
| AUG 1996 |
| 52.246-25 |
| Limitation Of Liability--Services |
| FEB 1997 |
| 252.203-7002 |
| Requirement to Inform Employees of Whistleblower Rights |
| SEP 2013 |
| 252.211-7007 |
| Reporting of Government-Furnished Property |
| AUG 2012 |
| 252.222-7002 |
| Compliance With Local Labor Laws (Overseas) |
| JUN 1997 |
| 252.225-7041 |
| Correspondence in English |
| JUN 1997 |
| 252.228-7000 |
| Reimbursement for War-Hazard Losses |
| DEC 1991 |
| 252.232-7008 |
| Assignment of Claims (Overseas) |
| JUN 1997 |
| 252.243-7001 |
| Pricing Of Contract Modifications |
| DEC 1991 |
| 252.245-7001 |
| Tagging, Labeling, and Marking of Government-Furnished Property |
| APR 2012 |
| 252.245-7002 |
| Reporting Loss of Government Property |
| JAN 2021 |
| 252.245-7003 |
| Contractor Property Management System Administration |
| APR 2012 |
| 252.245-7004 |
| Reporting, Reutilization, and Disposal |
| DEC 2017 |
CLAUSES INCORPORATED BY FULL TEXT
52.204-24 REPRESENTATION REGARDING CERTAIN TELECOMMUNICATIONS AND VIDEO SURVEILLANCE SERVICES OR EQUIPMENT (OCT 2020)
The Offeror shall not complete the representation at paragraph (d)(1) of this provision if the Offeror has represented that it "does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument" in paragraph (c)(1) in the provision at 52.204-26, Covered Telecommunications Equipment or Services--Representation, or in paragraph (v)(2)(i) of the provision at 52.212-3, Offeror Representations and Certifications-Commercial Items. The Offeror shall not complete the representation in paragraph (d)(2) of this provision if the Offeror has represented that it "does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services" in paragraph (c)(2) of the provision at 52.204-26, or in paragraph (v)(2)(ii) of the provision at 52.212-3.
(a) Definitions. As used in this provision-
Backhaul, covered telecommunications equipment or services, critical technology, interconnection arrangements, reasonable inquiry, roaming, and substantial or essential component have the meanings provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Prohibition.
(1) Section 889(a)(1)(A) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2019, from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(2) Section 889(a)(1)(B) of the John S. McCain National Defense Authorization Act for Fiscal Year 2019 (Pub. L. 115-232) prohibits the head of an executive agency on or after August 13, 2020, from entering into a contract or extending or renewing a contract with an entity that uses any equipment, system, or service that uses covered telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system. This prohibition applies to the use of covered telecommunications equipment or services, regardless of whether that use is in performance of work under a Federal contract. Nothing in the prohibition shall be construed to--
(i) Prohibit the head of an executive agency from procuring with an entity to provide a service that connects to the facilities of a third-party, such as backhaul, roaming, or interconnection arrangements; or
(ii) Cover telecommunications equipment that cannot route or redirect user data traffic or cannot permit visibility into any user data or packets that such equipment transmits or otherwise handles.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for "covered telecommunications equipment or services."
(d) Representations. The Offeror represents that--
(1) It [] will, [] will not provide covered telecommunications equipment or services to the Government in the performance of any contract, subcontract or other contractual instrument resulting from this solicitation. The Offeror shall provide the additional disclosure information required at paragraph (e)(1) of this section if the Offeror responds "will" in paragraph (d)(1) of this section; and
(2) After conducting a reasonable inquiry, for purposes of this representation, the Offeror represents that--
It [] does, [] does not use covered telecommunications equipment or services, or use any equipment, system, or service that uses covered telecommunications equipment or services. The Offeror shall provide the additional disclosure information required at paragraph (e)(2) of this section if the Offeror responds "does" in paragraph (d)(2) of this section.
(e) Disclosures.
(1) Disclosure for the representation in paragraph (d)(1) of this provision. If the Offeror has responded "will" in the representation in paragraph (d)(1) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the original equipment manufacturer (OEM) or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the Product Service Code (PSC) of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(1) of this provision.
(2) Disclosure for the representation in paragraph (d)(2) of this provision. If the Offeror has responded "does" in the representation in paragraph (d)(2) of this provision, the Offeror shall provide the following information as part of the offer:
(i) For covered equipment--
(A) The entity that produced the covered telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known);
(B) A description of all covered telecommunications equipment offered (include brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); and
(C) Explanation of the proposed use of covered telecommunications equipment and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(ii) For covered services--
(A) If the service is related to item maintenance: A description of all covered telecommunications services offered (include on the item being maintained: Brand; model number, such as OEM number, manufacturer part number, or wholesaler number; and item description, as applicable); or
(B) If not associated with maintenance, the PSC of the service being provided; and explanation of the proposed use of covered telecommunications services and any factors relevant to determining if such use would be permissible under the prohibition in paragraph (b)(2) of this provision.
(End of provision)
52.204-26 COVERED TELECOMMUNICATIONS EQUIPMENT OR SERVICES--REPRESENTATION (OCT
2020)
(a) Definitions. As used in this provision, “covered telecommunications equipment or services” and "reasonable inquiry" have the meaning provided in the clause 52.204-25, Prohibition on Contracting for Certain Telecommunications and Video Surveillance Services or Equipment.
(b) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) (https://www.sam.gov) for entities excluded from receiving federal awards for “covered telecommunications equipment or services”.
(c) Representations.
(1) The Offeror represents that it [ ___ ] does, [ ___ ] does not provide covered telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument.
(2) After conducting a reasonable inquiry for purposes of this representation, the offeror represents that it [ ___ ] does, [ ___ ] does not use covered telecommunications equipment or services, or any equipment, system, or service that uses covered telecommunications equipment or services.
52.209-7 INFORMATION REGARDING RESPONSIBILITY MATTERS (OCT 2018)
(a) Definitions. As used in this provision--
Administrative proceeding means a non-judicial process that is adjudicatory in nature in order to make a determination of fault or liability (e.g., Securities and Exchange Commission Administrative Proceedings, Civilian Board of Contract Appeals Proceedings, and Armed Services Board of Contract Appeals Proceedings). This includes administrative proceedings at the Federal and State level but only in connection with performance of a Federal contract or grant. It does not include agency actions such as contract audits, site visits, corrective plans, or inspection of deliverables.
Federal contracts and grants with total value greater than $10,000,000 means--
(1) The total value of all current, active contracts and grants, including all priced options; and
(2) The total value of all current, active orders including all priced options under indefinite-delivery, indefinite-quantity, 8(a), or requirements contracts (including task and delivery and multiple-award Schedules).
Principal means an officer, director, owner, partner, or a person having primary management or supervisory responsibilities within a business entity (e.g., general manager; plant manager; head of a division or business segment; and similar positions).
(b) The offeror ( ) has ( ) does not have current active Federal contracts and grants with total value greater than $10,000,000.
(c) If the offeror checked “has” in paragraph (b) of this provision, the offeror represents, by submission of this offer, that the information it has entered in the Federal Awardee Performance and Integrity Information System (FAPIIS) is current, accurate, and complete as of the date of submission of this offer with regard to the following information:
(1) Whether the offeror, and/or any of its principals, has or has not, within the last five years, in connection with the award to or performance by the offeror of a Federal contract or grant, been the subject of a proceeding, at the Federal or State level that resulted in any of the following dispositions:
(i) In a criminal proceeding, a conviction.
(ii) In a civil proceeding, a finding of fault and liability that results in the payment of a monetary fine, penalty, reimbursement, restitution, or damages of $5,000 or more.
(iii) In an administrative proceeding, a finding of fault and liability that results in--
(A) The payment of a monetary fine or penalty of $5,000 or more; or
(B) The payment of a reimbursement, restitution, or damages in excess of $100,000.
(iv) In a criminal, civil, or administrative proceeding, a disposition of the matter by consent or compromise with an acknowledgment of fault by the Contractor if the proceeding could have led to any of the outcomes specified in paragraphs (c)(1)(i), (c)(1)(ii), or (c)(1)(iii) of this provision.
(2) If the offeror has been involved in the last five years in any of the occurrences listed in (c)(1) of this provision, whether the offeror has provided the requested information with regard to each occurrence.
(d) The offeror shall post the information in paragraphs (c)(1)(i) through (c)(1)(iv) of this provision in FAPIIS as required through maintaining an active registration in the System for Award Management, which can be accessed via https://www.sam.gov (see 52.204-7).
52.212-2 EVALUATION--COMMERCIAL ITEMS (OCT 2014)
A. BASIS FOR AWARD (ADDENDUM TO FAR 52.212-2, EVALUATION - COMMERCIAL ITEM):
(1) In accordance with FAR Parts 12 and 15, the award will be made based on the best overall (i.e., best value) proposal that is determined to be the most beneficial to the Government, with appropriate consideration given to the RFP# W91QVN22R0006 evaluation factors: Prime Contractor’s Business Registration & License, Key Personnel, Prime Contractor’s Prior Experience, Technical and Management, Past Performance, and Price/Cost.
(2) In accordance with FAR 15.101-1, Trade-Off process, an award may be made to other than the lowest priced Offeror. However, the Government will not pay a substantially higher amount for a minimal increase in capability.
(3) The Governments intends to execute a single Fixed Price Requirement contract for Operation and Maintenance of Communication Center at Camp Humphreys and CP TANGO.
(4) The Offeror must get an Acceptable rating for the Factor/Subfactor under Technical Phase I in order to be considered under the Technical Phase II Tradeoff criteria. Technical Phase I, Factors 1 and 2 will be rated as Acceptable/Unacceptable only (The unsuccessful letter including debriefing instruction will be sent to the Offerors who rated as “Unacceptable” under Technical Phase I).
(5) Under the Technical Phase II, the Technical Evaluation Factor 3 (Contractor's Prior Experience), 4 (Technical and Management), 5 (Past Performance), and Factor 6 (Price) are listed in descending order of importance from Factor 3 (most important) down to Factor 6 (least important). In order to be considered, for award, the offeror must get an at least an Acceptable rating in all factors and subfactors in Phase II. A rating of Marginal or Unacceptable under any Subfactor would result in a Marginal or Unacceptable rating for that Factor.
(6) Under Technical Phase II, only Factors and Subfactors will receive a rating. All subfactors under Factor 4 are of equal importance. All evaluation factors and significant subfactors other than cost or price, when combined, are significantly more importance than cost or price.
(7) Evaluation Factors Relative Order of Importance: All evaluation factors other than price, when combined, are significantly more important than the price factor.
| FACTOR |
| DESCRIPTIOIN |
| RELATIVE IMPORTANCE |
| 3 |
| Prime Contractor’s Experience |
| Most Important |
| 4 |
| Technical/Management |
| Less important than Factor 3, but more important than Factor 5 |
| 5 |
| Past Performance |
| Less important than Factor 4, but more important than Factor 6 |
| 6 |
| Price |
| Least Important. Factor 3, 4, and 5, when combined, are significantly more important than Factor 6 |
B. FACTORS AND SUBFACTORS TO BE EVALUATED:
The following factors/sub-factors will be used to evaluate offers:
TECHNICAL PHASE I (ACCEPTABLE/UNACCEPTABLE):
FACTOR 1 - PRIME CONTRACTOR’S BUSINESS REGISTRATION AND LICENSES:
(1) Facilities Maintenance and Management under Professional Construction Business Registration (전문건설업등록증 – 업종: 시설물유지관리업)
(2) License of Electrical System Repair (전기 공사업)
(3) License of Mechanical System Repair (기계설비공사업)
FACTOR 2 - KEY PERSONNEL:
SUBFACTOR 1 - CONTRACT MANAGER (CM)
SUBFACTOR 2 - SITE MANAGERS (SMs):
SUBFACTOR 3- SITE SAFETY & HEALTH OFFICER (SSHO)
SUBFACTOR 4- QUALITY CONTROL MANAGER (QCM
SUBFACTOR 5- ELECTRICAL ENGINEER
SUBFACTOR 6- CENTRAL UTILITY PLANT (CUP) MANAGER
SUBFACTOR 7- FIRE PREVENTION/SUPPRESSION SYSTEMS ENGINEER
SUBFACTOR 8 –GENERAL MAINTENANCE TECHNICIAN
TECHNICAL PHASE II (TRADE-OFF)
FACTOR 3 - PRIME CONTRACTOR’S PRIOR EXPERIENCE
FACTOR 4 -TECHNICAL MANAGEMENT
SUBFACTOR 1-TECHNICAL APPROACH
SUBFACTOR 2-QUALITY CONTROL PLAN (QCP)
SUBFACTOR 3-PHASE-IN PLAN (PIP)
FACTOR 5-PAST PERFORMANCE
FACTOR 6-PRICE
C. EVALUATION APPROACH: All proposal will be evaluated by the Source Selection Team (SST)
(1). The overarching evaluation approach for all factors and subfactors are as follows:
a. Adequacy of Response: The proposal will be evaluated to determine whether the Offeror’s methods and approach have adequately and completely considered, defined, and satisfied the requirements specified in the RFP. The proposal will be evaluated to determine the extent to which each requirement has been addressed in the proposal in accordance with the proposal submission section of the RFP.
b. Feasibility of Approach: The proposal will be evaluated to determine the extent to which the proposed approach is workable and the end results achievable. The proposal will be evaluated to determine the extent to which successful performance is contingent upon proven devices and techniques. The proposal will be evaluated to determine the extent to which the Offeror is expected to be able to successfully complete the proposed tasks and technical requirements within the required schedule.
(2). The technical evaluation is divided into the following two phases:
TECHNICAL PHASE I (ACCEPTABLE/UNACCEPTABLE): Under Technical Phase I, proposals will be evaluated in accordance with following rating method:
RATING DESCRIPTION
| Acceptable |
| Proposal meets the requirements of the solicitation |
| Unacceptable |
| Proposal does not meet the requirements of the solicitation |
FACTOR 1-PRIME CONTRACTOR’S BUSINESS REGISTRATION AND LICENSES. The Offeror will be evaluated on providing a copy of Prime Contractor's business registration and licenses issued by ROK Government in;
(1) Facilities Maintenance and Management under Professional Construction Business Registration (전문건설업등록증 – 업종: 시설물유지관리업)
(2) License of Electrical System Repair (전기 공사업)
(3) License of Mechanical System Repair (기계설비공사업)
*NOTE: Electrical System Repair (전기 공사업), and Mechanical System Repair (기계설비공사업) may be substituted by subcontractor’s license but prime contractor shall submit the documents to prove partnership or signed contract agreement between prime and sub-contractor.
FACTOR 2 – KEY PERSONNEL: Key personnel will be evaluated based on the resume and the following supporting documents. All resumes must clearly identify as required following:
· Name of Key Personnel
· A description of qualifying work experience
· Complete point of contact of employer (including name and phone no) and validating personnel
· Length of work experience (year/month/date-year/month/date)
· A copy of License if applicable
SUBFACTOR 1-CONTRACT MANAGER (CM): The Offeror will be evaluated on providing CM's resume with at least three (3) years of experience as a CM in Central Utility Plant (CUP) within the last five (5) years from the closing date of this solicitation.
SUBFACTOR 2 - SITE MANAGERS (SMs): The Offeror will be evaluated on providing SM's resume with at least three (3) years of experience as a SM(s) in working with construction or maintenance of HVAC system within the last five (5) years from the closing date of this solicitation. Additionally, the Offeror will be evaluated on providing a copy of valid SMs' license in Engineer Air-Conditioning Refrigerating Machine (공조냉동기계기사) OR higher grade issued by the ROK Government.
SUBFACTOR 3- SITE SAFETY & HEALTH OFFICER (SSHO): The Offeror will be evaluated on providing SSHO's resume with at least two (2) years of experience in specific heating ventilation and air conditioning experience with associated controls as a safety officer within the last five (5) years from the closing date of this solicitation. Additionally, the Offeror will be evaluated on providing a copy of valid SSHO's license in Engineer Air-Conditioning Refrigerating Machine (공조냉동기계기사) OR Engineer Electricity (전기기사) OR Engineer Industrial Safety (산업안전기사), OR higher grade issued by the ROK Government.
SUBFACTOR 4- QUALITY CONTROL MANAGER (QCM): The Offeror will be evaluated on providing QCM's resume with at least two (2) years of experience in working with specific heating ventilation and air conditioning within the last five (5) years from the closing date of this solicitation. Additionally, the Offeror will be evaluated on providing a copy of valid QCM's license in Engineer Air-Conditioning Refrigerating Machine (공조냉동기계기사) OR Engineer Electricity (전기기사) OR higher grade issued by the ROK Government.
SUBFACTOR 5-ELECTRICAL ENGINEER (EE): The Offeror will be evaluated on providing EE's resume with at least two (2) years of experience in the operation and maintenance of switch gears, transformers, transfer switches, protective equipment, and electrical controls and systems within the last five (5) years from the closing date of this solicitation. Additionally, the Offeror will be evaluated on providing a copy of valid EE's license in Engineer Electricity (전기기사) issued by the ROK Government.
SUBFACTOR 6- CENTRAL UTILITY PLANT (CUP) MANAGER: The Offeror will be evaluated on providing CUP Manager's resume with at least three (3) years of experience in working with similar capacity or larger central utility plant(s) within the last five (5) years from the closing date of this solicitation. Additionally, the Offeror will be evaluated on providing a copy of valid CUP Manager's license in Engineer Air-Conditioning Refrigerating Machine (공조냉동기계기사) OR higher grade issued by the ROK Government.
SUBFACTOR 7- FIRE PREVENTION/SUPPRESSION SYSTEMS ENGINEER: The Offeror will be evaluated on providing Fir Prevention/Suppression System Engineer's resume with at least two (2) years of experience in the specific maintenance service of fire prevention, protection, and FP200 suppression system in the building and structure within the last five (5) years from the closing date of this solicitation. Additionally, the offeror will be evaluated on providing a copy of valid Fire Prevention/Suppression System Engineer's license issued by the National Institute for Certification in Engineering Technologies (NICET) at Level 2 OR 3, and certified license in Engineer Fire Protection System - Mechanical (소방설비기사-기계) OR Engineer Fire Protection System - Electrical (소방설비기사-전기) OR higher grade issued by the ROK Government.
SUBFACTOR 8 – GENERAL MAINTENANCE TECHNICIAN: The Offeror will be evaluated on providing General Maintenance Technician's resume with at least two (2) years of experience in the facility maintenance and repairs within last five (5) years from the closing date of this solicitation. Additionally, the offeror will be evaluated on providing a copy of valid General Maintenance Technician's license in Craftsman Architectural Carpentering (건축목공 기능사) OR Master Craftsman Building General Work (건축일반시공 기능장) OR Craftsman Machinery Maintenance (기계정비 기능사) issued by ROK Government .
TECHNICAL PHASE II (TRADE-OFF):
FACTOR 3 – PRIME CONTRACTOR’S PRIOR EXPERIENCE
The Offeror will be evaluated on providing evidence of experience in repair and maintenance of administrative building with electric, HVAC, and direct digital control system during calendar year of 2019, 2020 and 2021. The experience of a subcontractor cannot substitute for the prime contractor’s experience. The Offeror shall provide evidence of prior experience in the following format:
- Title of the contract/Project
- A detail description of work completed
- Length of contract/Project (year/month/date – year/month/date)
- Value of contract/project in KW for total amount
- Complete name, phone number, and E-mail address of point of contact at Client Organization (Company) or Requiring Activity (RA)
- A copy of performance certificate issued by Construction Association of Korea (대한건설협회) or a copy of contract include value (total amount) and length of contract
Note: The prior experience without a copy of performance certificate issued by Construction Association of Korea (대한건설협회) or a copy of contract include value and length of contract will not be considered. The evaluation Criteria of Annual Sales Amount will be as below:
| Outstanding |
| Greater than KRW50,000,000,001 |
| Good |
| Between KRW25,000,000,001 and KRW50,000,000,000 |
| Acceptable |
| Between KRW15,000,000,001 and KRW25,000,000,000 |
| Marginal |
| Between KRW10,000,000,001 and KRW15,000,000,000 |
| Unacceptable |
| Less than KRW10,000,000,000 |
FACTOR 4 – TECHNICAL AND MANAGEMENT:
Technical Approach and Related Risk will be evaluated as shown on Table 1 below. This methodology considers risk, in conjunction with the strengths, weaknesses, certainties, and deficiencies in determining technical ratings as shown below definition:
Strength. An aspect of an offerors’ proposal that has merit or exceeds specified performance or capability requirements in a way that will be advantageous to the Government during contract performance.
Weakness. A flaw in the proposal that increases the risk of unsuccessful contract performance. See FAR 15.001.
Deficiency. A material failure of a proposal to meet a Government requirement or a combination of significant weaknesses in a proposal that increases the risk of unsuccessful contract performance to an unacceptable level. See FAR 15.001.
Uncertainty. Any aspect of a non-cost/price factor proposal for which the intent of the offeror is unclear (e.g., more than one way to interpret the offer or inconsistencies in the proposal indicating that there may have been an error, omission or mistake).
TABLE 1 – COMBINED TECHNICAL/RISK RATINGS
| Color |
| Rating |
| Description |
Blue
Outstanding Proposal indicates an exceptional approach and understanding of the requirements and contains multiple strengths, and risk of unsuccessful performance is low.
Purple
Good Proposal indicates a thorough approach and understanding of the requirements and contains at least one strength, and risk of unsuccessful performance is low to moderate.
Green
Acceptable Proposal meets requirements and indicates an adequate approach and understanding of the requirements, and risk of unsuccessful performance is no worse than moderate.
Yellow
Marginal Proposal has not demonstrated an adequate approach and understanding of the requirements, and/or risk of unsuccessful performance is high.
Red
Unacceptable Proposal does not meet requirements of the solicitation, and thus, contains one or more deficiencies, and/or risk of unsuccessful performance is unacceptable. Proposal is unawardable.
SUBFACTOR 1- TECHNICAL APPROACH: The Offeror will be evaluated on Technical Approach that demonstrate how the Contractor will complete all tasks contained in PWS paragraph 5 to show their understanding and capability in accomplishing all requirements specifically Collective Protective System, CO2 Scrubbing, Computer Room Air-Conditioning (CRAC) System, Geothermal system and Switchgear/Motor Control Center. The Offerors are cautioned that “mirroring/copying” the technical requirements of the PWS with a statement of intent to perform does not reflect an understanding of the requirement of capability to perform. The Offeror will be evaluated on providing staffing plan that clearly demonstrates how they will perform operation and maintenance of communication center and clearly identifies the labor mix and quantities by task, identifies the replacement strategy, backup policy, retention policy to ensure mitigation of turbulence caused by vacancies and leaves of absence to the execution of this requirement. The Offeror will be evaluated on providing the proposed Key Personnel and Non-Key Personnel, both full time and part time staff, detailing roles, experience, license and responsibilities of each position supporting the operation and maintenance of Communication Center.
SUBFACTOR 2- QUALITY CONTROL PLAN (QCP): The Offeror will be evaluated on providing a QCP that demonstrates the Offeror’s approach to conducting comprehensive quality control. The plan shall clearly describe the Offeror’s quality control methods and practices such as standardized procedures to monitor performance, identify discrepancies, service call responses, and take corrective action to prevent re-occurrences. As part of the QCP, the Offeror shall identify what items the Offeror will inspect under its comprehensive QC for each task listed in the PRS table. The QCP shall be used throughout the life of this contract and shall be updated by the Contractor when the changes affect the QCP. The plan shall include followings at minimum:
· A description of the preventive maintenance system to cover all services. The description shall specify the areas to be inspected on both a scheduled and unscheduled basis, frequency of inspection, and the title and organizational placement of the inspectors.
· A description of the methods to be used to identify and prevent defects in the quality of service performed.
· A description of the methods to update inventory of the equipment of the operation and maintenance of communication center.
· A description of the methods to maintain and utilize computerized maintenance management system for accounting maintenance works and track the status of maintenance works.
· A description of the method to maintain the record for preventive maintenance and repair works.
SUBFACTOR 3- PHASE-IN PLAN (PIP): The Offeror will be evaluated on providing Phase-In Plan that clearly demonstrate how the Offeror will prepare for 100% full performance in accordance with the PWS and transition. The Offeror shall include all general and administrative (G&A) functions and pre-hiring activities normally accomplished by contractor prior to physical phase-in performance. The Offeror shall describe in detail how the contractor will provide required personnel to perform the tasks in accordance with the PWS and milestone driven schedule of key events and procedures needed to assure readiness and 100% full performance under the contract by the end of three (3) months phase-in period. The approach must be designed to ensure successful transition to full performance of work by the conclusion of the phase in period.
FACTOR 5- PAST PERFORMANCE:
The Government will evaluate the Offeror’s record of past and current performance to ascertain the probability of successfully performing the required efforts of the PWS.
(1) Evaluation of past performance shall be in accordance with this plan utilizing the forms and questionnaires.
(2) The Government will focus its inquiries on the Offeror’s (and major subcontractor’s) record of performance as it relates to all solicitation requirements, including cost, schedule, performance and management of subcontractors. A significant achievement, problem, or lack of relevant data in any element of the work can become an important consideration in the evaluation process. Therefore, Offerors will be reminded to include the most recent and relevant efforts within the last three (3) years (calendar year 2019, 2020 and 2021) in their proposal. Absent any recent and relevant past performance history or when the performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned, the Offeror will be assigned a “neutral confidence rating” and its proposal will not be evaluated either favorably or unfavorably on past performance. The Government may use data provided by the Offeror in its proposal and data obtained from other sources, including data in Government files or data obtained through interviews with personnel familiar with the contractor and their current and past performance under Government or commercial contracts for same or similar services as compared to the NAICS 811310.
(3) Offerors shall submit Government and/or commercial contracts for the prime Offeror and each major subcontractor in performance or awarded within the last three (3) years (calendar year 2019, 2020 and 2021) which are relevant to the efforts required by this solicitation.
This is the start of the file's text. The full file is on GovTribe.
File details come from the government source that posted it. Updated .