Solicitation W912WJ26QA168.pdf

PDF 3 MB Posted

Attached to
Snow Removal and Sanding Services, Hopkinton Lake, Hopkinton, NH
Solicitation number
W912WJ26QA168
Issued by

About this file

This is a Request for Quotation (RFQ) for snow removal and sanding services at Hopkinton Lake and Elm Brook Park in Hopkinton, New Hampshire, issued by the U.S. Army Corps of Engineers.

Solicitation Overview and Services Required:

Solicitation number W912WJ26QA168 is a 100% women-owned small business (WOSB) set-aside issued by W2SD ENDIST New England KO Contracting Division. The requirement is for snow plowing, shoveling, and sanding/salting services at two locations: Hopkinton Lake Project (2097 Maple Street) requiring access by 6:00 AM daily, and Elm Brook Park (100 Elm Brook Park Road) requiring access by 8:00 AM daily. The contract period runs from award date through May 31, 2027. Maximum quantities are 30 snow plowing events, 30 shoveling events, and 15 sanding/salting events, with actual quantities determined by snowstorm frequency and magnitude. Contractors must provide all equipment, materials, labor, and transportation, including a 3/4-ton four-wheel drive truck, 8-foot plow with four-way angling, and powered sander with one-yard minimum capacity. Sand/salt mixture with maximum 20% salt content and walkway salt must be contractor-provided.

Key Administrative Requirements and Award Criteria:

Quotes are due by September 30, 2026, at 2:00 PM ET to Alicia N. LaCrosse (Alicia.N.LaCrosse@usace.army.mil, 978-318-8902). NAICS code is 561730 with a $9.5 million size standard. The Government requires site visits prior to quote submission, a pre-work conference within 14 days of award, and submission of safety documentation including ENG Forms 6293, 6282, and Activity Hazard Analysis within 14 days of award. Monthly invoicing is required with payment made for actual services performed at contract unit prices. Award will be made to the responsible vendor offering the most advantageous quote considering technical capability, price, and past performance. Vendors must maintain active SAM registration and comply with all FAR Part 12 commercial items requirements, wage determinations, and security/antiterrorism training obligations.

View the file

Other files

File Type Posted
Amendment W912WJ26QA168-0003.pdf PDF
Amendment W912WJ26QA168-0002.pdf PDF
Amendment W912WJ26QA168-0001.pdf PDF
Attachments 26QA168.pdf PDF
Solicitation Survey 26QA168.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

Section A - Solicitation/Contract Form

Snow Removal and Sanding Services, Hopkinton Lake, Hopkinton, NHInstrument Name:

Product Service Code : S218

W912WJ26QA168

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

BID SCHEDULE:

SNOW PLOWING AND SANDING SERVICES

U.S. ARMY CORPS OF ENGINEERS

HOPKINTON LAKE

HOPKINTON, NEW HAMPSHIRE

BID SCHEDULE

ITEM # TASK UNIT QTY UNIT

PRICE

TOTAL

1 Snow Plowing Each 30

2 Snow Shoveling Each 30

3 Sanding/Salting Each 15

Total:

*** END OF NARRATIVE 1 ***

Section C - Description/Specifications/Statement of Work

INTERESTED VENDORS SHALL REVIEW SECTION L AND SECTION M OF THE

SOLICITATION FOR INSTRUCTIONS AND EVALUATION CRITERIA. VENDORS ARE

RESPONSIBLE FOR ENSURING THEIR QUOTE SUBMISSION MEETS ALL REQUIREMENTS.

FAILURE TO DO SO MAY RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND

REMOVED FROM CONSIDERATION.

THE MANDATORY SOLICITATION SURVEY ISSUED FOR THE SOLICITATION SHALL BE

COMPLETED IN ITS ENTIRETY AND RETURNED WITH QUOTES. FAILURE TO DO SO MAY

RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM

CONSIDERATION. USE OF A SOLICITATION SURVEY NOT ISSUED FOR THE RELEVANT

SOLICITATION WILL RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND

REMOVED FROM CONSIDERATION.

PERFORMANCE WORK STATEMENT:

SNOW PLOWING AND SANDING SERVICES

U.S. ARMY CORPS OF ENGINEERS

HOPKINTON LAKE

HOPKINTON, NEW HAMPSHIRE

PERFORMANCE WORK STATEMENT

I. General:

1. Scope - Furnish all labor, materials and equipment necessary to perform snow plowing, shoveling and sanding /salting services at Hopkinton Lake Project area and portions of the Elm Brook Park in Hopkinton, NH. All work shall be completed in accordance with the following Performance Work Statement.

NOTE: This work requires the following submittals prior to commencement of work (Refer to Section II. Technical Requirements for a full list of submittals):

ENG Form 6293 (Accident Prevention Plan Worksheet)

Activity Hazard Analysis; non-mandatory template available: ENG Form 6206 (Activity Hazard Analysis)

ENG Form 6282 (Site Safety and Health Officer Designation Letter)

First-Aid and CPR Personnel requirements

Safety Data Sheets - Prior to ordering

Contractor's Quality Control Plan

Applicable Certifications & Licenses as determined by the Performance Work Statement - Prior to the start of the field work.

2. Location - The Hopkinton Lake Project area is located at 2097 Maple Street in Hopkinton, New Hampshire, and the Elm Brook Park area is located at 100 Elm Brook Park Road in Hopkinton, New Hampshire.

3. Technical Point of Contact - The Technical Point of Contact (TPOC) for this contract will be Natural Resource Specialist, Pascal Carter (978-318-8333, 603-746-3601 ext. 333, or Pascal.A.

Carter@usace.army.mil).

4. Site Visit - Interested contractors should conduct a site visit to confirm understanding of the scope, inspect existing conditions, and familiarize themselves with the sites) prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with the site conditions and requirements. An appointment can be made by contacting the TPOC, Natural Resource Specialist, Pascal Carter. Site visits are generally scheduled between 07:00AM- 03:00PM Monday through Friday.

5. Schedule - The period of performance shall be from the Contract Award Date until 31 May 2027.

The Pre-Work Conference shall be completed within 14 days of Contract Award.

All Pre-Work submittals shall be submitted within 14 days of Contract Award. The Government reserves up to 14 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of Pre-Work submittals.

The following table identifies the task number, description, and quantity of services. The actual quantity required will be determined by the number and nature of snowstorms. The following table identifies the maximum number of services that could be required at each Service Location.

Task # Description Qty

1 Snow Plowing 30

2 Shoveling 30

3 Sanding / Salting 15

6. Safety Requirements:

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), Federal, State, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf

Project staff reserves the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work: https://www.publications.usace.army.mil/Portals/76 /Eng_Form_6293_Aug%202024%20-%20FINAL.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all affected on-site employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the TPOC upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis):

https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-% 20FINAL.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.

b and 2-4.b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter): https://www.

publications.usace.army.mil/Portals/76/Eng_Form_6282_Site%20Safety%20&%20Health% 20Officer%20(SSHO)%20Designation%20Letter_2024%2009%2013%20-%20Final.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.

Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent Person (CP) or Qualified Persons (QP) may be required per EM 385-1-1 and/or other sections of this Performance Work Statement, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the TPOC in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76/Publications /EngineerForms/Eng_Form_3394_2021Aug.pdf

h. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the TPOC by close of business on the 10th calendar day of the following month.

7. Flooding - Hopkinton Everett Lakes is primarily a Flood Risk Management Project. Occasional retention of floodwaters may inundate portions of the dam property or access roads in the areas covered by this contract. The TPOC will notify the Contractor as areas are closed as a result of floodwaters. When flooding ends and waters recede, the TPOC will notify the Contractor as areas reopen and services may resume.

8. Pre-Work Conference - Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Work Conference". The Contractor's Project Manager and Quality Control Personnel shall be physically present at this meeting. The Contractor shall directly oversee all work on the project and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the Contractor shall provide the name of the Project Superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-Work Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

ii. Contractor's Safety Program (including sub-contractors).

iii. Accident Prevention Plan and Activity Hazard Analysis

iv. Documented Safety Meetings

v. Accident Reporting (ENG Form 3394)

vi. Safety Data Sheet (SDS) requirements

vii. Contractor's Equipment

viii. Correspondence, Communication, Security and Administrative Procedures.

ix. Invoice and payment.

NOTE: Work cannot begin until all safety paperwork and proposed chemical(s) are submitted and accepted by the Government.

9. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

10. Security - The Contractor will comply with all established security policies at the Hopkinton Everett Lakes Project. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least 24-hour notice of any such closure.

11. Payment - The Contractor shall furnish the TPOC with one invoice per month. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, labor hours, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. Payment shall be made monthly for the actual services performed at the applicable contract unit price.

NOTE: Final Payment may be held until the Contractor has returned any and all issued keys to the TPOC at the completion of work. Any and all keys are required to be physically handed to the TPOC, or if mailed, the Contractor assumes all responsibility for loss (which may include the cost of rekeying the applicable project).

All invoices may be mailed to:

U.S. Army Corps of Engineers

Hopkinton Everett Lakes

Attn: Pascal Carter

2097 Maple Street

Hopkinton, New Hampshire 03229

Or emailed to: Pascal.A.Carter@usace.army.mil

II. Technical Requirements:

Part 1 General:

1. Summary - Provide all equipment, materials, labor, and transportation necessary to provide snow removal, shoveling, and sanding/salting services. The services shall be performed at the Hopkinton Dam area as described in Part 4 Service Requirements (below) and as shown on Exhibit A and B respectively. The Contractor's work and responsibility shall include, but not be limited to, all job planning, programming, scheduling, administration, inspection, personnel, equipment, vehicles, fuel, materials, supplies, supervision, and quality control necessary to perform the various services required herein.

2. Submittals - Although the Government reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 14 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in an acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and must be accepted by the Government.

Pre-Work Submittals: Submitted within 14 days of Contract Award. Submittals must be accepted prior to the commencement of any field work.

ENG Form 6293 (Accident Prevention Plan Worksheet)

Activity Hazard Analysis; non-mandatory template available: ENG Form 6206 (Activity Hazard Analysis)

ENG Form 6282 (Site Safety and Health Officer Designation Letter)

First-Aid and CPR Personnel requirements

Safety Data Sheets - Prior to ordering

Contractor's Quality Control Plan

Applicable Certifications & Licenses as determined by the Performance Work Statement - Prior to the start of the field work.

3. References - All work shall be in conformance with:

a. U.S. Army Corps of Engineers

i. EM-385-1-1 2024 Safety and Occupational Health Requirements, U.S. Army Engineering Manual.

b. Code of Federal Regulations

i. Title 36 - Parks, Forests, and Public Property; Chapter III, Part 327 - Corps of Engineers, Department of the Army.

c. Other applicable Federal, State, and local codes.

4. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.

5. Clean Up and Waste Disposal - The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any designated storage areas, free from accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from Contractor activities shall be restored by the Contractor to the satisfaction of the TPOC. All waste materials shall be disposed of offsite in accordance with all Federal, State, and local regulations.

6. Environmental Protection - Containers for excess and/ or waste materials, rubbish, etc. shall be provided by the Contractor at the site, and the site will be inspected/cleaned on a daily basis when working onsite. Water, air, and land resources shall not be adversely impacted during the course of the work. The Contractor will take necessary steps to ensure all Federal, State, and local environmental regulatory requirements are met at no additional cost to the Government.

Assurance of compliance with this section by subcontractors shall be the responsibility of the Contractor.

7. Personal Protective Equipment - It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

8. Government Resources - The Government shall provide the Contractor with gate keys to access all necessary locations. The Contractor shall supply his own means of communication (telephone).

There is not a restroom available at the contract sites, and there is no access to potable water at the contract sites. The Contractor would have to provide these resources or have an acceptable alternative plan for these resources.

9. Damage to Government and Private Property - The Contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the Contractor's operation. The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor's operation. The Contractor shall notify the TPOC immediately of damage to Government and private property and injury to any person resulting from the Contractor's operation. Also, the Contractor shall notify the TPOC of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the Contractor's operation. Damaged or destroyed grass areas shall be re-planted as directed by the TPOC, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

10. Contractor's Personnel -

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

Note: At least one (1) of the Contractor employees on site shall be able to communicate effectively and efficiently with project staff.

b. Employee Conduct - The Contractor shall be responsible for seeing that the Contractor's employees strictly comply with Code of Federal Regulations (CFR) Title 36, Chapter III, Part 327, and all Federal, State, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee(s).

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other Contractors.

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other Contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor's Employees - The TPOC may require the Contractor to immediately remove from the work site any employee of the Contractor or subcontractor, who, in the opinion of the TPOC, endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone, and shall be confirmed in writing as soon as possible.

No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

11. Quality Assurance - The Contractor is responsible for the quality control of the contract work.

The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

12. Inspections-

a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.

b. General Inspection - Upon the completion of each service requirement, the Contractor will perform an inspection of all areas under this contract to ensure compliance with the Performance Work Statement. The Contractor or their representative must be able to commit personnel, equipment, and resources to correct deficiencies. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.

c. Equipment/Supplies Inspections - The TPOC may inspect required equipment and supplies at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the TPOC. No such removal will reduce the Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

d. Government Inspections - The Government will monitor the Contractor's service performance and make deductions accordingly for work not corrected with the time permitted.

13. Receiving and Storing Materials -The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the Contractor's equipment or materials.

14. Omissions - This contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, State, or Federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

Part 2 Equipment:

1. Condition of Equipment- All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.

2. Type of Equipment-

a. The Contractor shall provide the appropriate equipment and tools of the trade to execute the requirements of the Performance Work Statement. The equipment should be able to handle heavy snow loads from normal falling snow, ice, and rain, to avoid encroaching snowbanks.

b. The minimum equipment shall include:

i. A 3/4 ton four-wheel drive truck.

ii. An 8-foot plow, equipped with four-way angling capabilities.

iii. A powered sander with a minimum of one-yard capacity.

3. Equipment Storage - No Government space or facilities shall be provided under this contract.

Part 3 Materials and Supplies:

1. Provided by Government:

a. Gate keys to access service areas.

2. Provided by Contractor:

a. Sand/Salt mix (for plowed areas). Note - Mixture will have a maximum salt content of 20%

b. Walkway salt

c. Warming device to thaw frozen locks.

Note: The Contractor shall submit one copy of the manufacturer's Safety Data Sheet for each chemical proposed for use.

Part 4 Service Requirements:

1. General: Provide all equipment, materials, labor, and transportation necessary to provide snow removal, shoveling and sanding / salting services. The services shall be performed at project areas shown on the attached maps: Exhibit A. & B.

a. Exhibit A: Hopkinton Lake Project Office Areas

b. Exhibit B: Elm Brook Park Areas

2. Service Definition:

a. One service is defined as a single completion of all requirements for each task as described in section 4, Service Tasks below. For example, one snow plowing service would include snow removal at all service locations as listed in Part 5, Service Locations.

b. Larger snowstorms may require more than one service at the discretion of the Government.

Snowfall is measured by project staff on site and is documented daily. The general guidelines are as follows:

i. 1" to 6" storm = 1 service

ii. 7" to 12" storm = 2 services

iii. 13" to 24" storm = 3 services

iv. 24" and greater storms = 4 services

c. The table above lists the maximum number of services the Government will pay for based on the storm total. Additional snow removal services performed by the Contractor at their own discretion will not be reimbursed by the Government.

d. Storm totals will be determined by measurement at the Project Office, with the amounts rounded to the nearest whole inch.

e. If the Government TPOC requests additional plowing, that work shall be considered a separate service and invoiced as such.

f. The Contractor shall only be paid for work fully completed. If a partial service is rendered, payment will be adjusted according to percent of area completed. Partial service is defined as completing anything other than all designated locations as identified in Part 5, Service Location(s) and Task Requirements.

3. Service Schedule:

a. Generally, all services shall be completed within 8 hours after completion of a snowstorm, unless otherwise directed. The service priority shall be to plow and shovel snow to provide vehicle access to the Hopkinton Lake Project office, the Merrimack River Basin Office, and the project garage bays by 6:00 am daily. The service priority for Elm Brook Park shall be to plow and shovel snow to provide vehicle access by 8:00 am daily.

b. The Contractor's schedule shall be coordinated with the TPOC depending on the timing and size of snowstorms. The Contractor shall be capable of rendering service 24/7 throughout the contract period of performance.

c. The Contractor shall coordinate timing of each service with the TPOC.

4. Service Tasks:

a. Snow Plowing:

i. Snow plowing will be required after accumulation of two (2) inches or more of snow, or upon notification by project staff during normal business hours.

ii. The Contractor shall plow snow from all paved surfaces shown in Exhibits A & B.

iii. Snow shall be pushed beyond the edge of pavement to areas shown in Exhibits A & B.

iv. Upon completion of plowing all pavement shall be neatly scraped clean, leaving no measurable snow.

v. The Contractor shall make sure to safely push back all banks along roadways and entry points to maintain access. All access shall be a minimum of sixteen (16) feet in width.

vi. Snow shall not be pushed against garage doors, entrance doors, fenced gates, or culverts.

vii. The Hopkinton Lake Project office main parking area has a drain on the West side of the parking area that cannot be blocked with snow or ice. All snow must be stored at the East side of the parking area as shown in Exhibit A.

viii. In addition to morning plowing, plowing will also be performed on weekends, holidays, and after normal working hours during the week to maintain access during storm events.

b. Snow Shoveling:

i. Snow shoveling will be required after accumulation of two (2) inches or more of snow, or upon notification by project staff.

ii. Snow shoveling will take place in front of all buildings and entry points, all garage bays, all sidewalks, and in front of all heating fuel fill points as shown on Exhibits A and B.

iii. Areas to be shoveled shall be clear to the existing pavement, concrete, or wood decking surface. If the areas are icy upon completion of shoveling, walkway salt/ice melt shall be spread to melt existing ice, prevent additional icing or hazardous conditions.

iv. The flagpole area of the Hopkinton Project Office Main Parking Area shall only be shoveled.

Plow equipment may not be used on the concrete surround of the flagpole.

v. Snow may not be placed against any building.

vi. In addition to morning shoveling, shoveling will also be performed on weekends, holidays, and after normal working hours during the week to maintain access during storm events.

c. Sanding / Salting:

i. Sanding / Salting shall be performed on an as needed basis. Only the TPOC may approve sanding/ salting services.

ii. In the event that roadway and parking areas become icy, the Contractor shall sand/salt all areas with the Sand/Salt mixture for plowed areas.

iii. In the event that any of the shoveled areas become icy, the Contractor shall apply walkway salt to all appropriate areas.

iv. The project staff may request additional sanding and salting as conditions require.

v. Sanding and salting will also be performed on weekends, holidays, and after normal working hours during the week if necessary. Sanding is not required for each snow plowing service unless unsafe icy conditions exist.

vi. When needed, sand shall be spread adequately to provide traction for driving and walking.

Part 5 Service Location(s) and Task Requirements:

1. Hopkinton Lake Project is located at 2097 Maple Street and all of the service areas MUST be accessible no later than 6:00 am daily. The Hopkinton Lake Project service areas include the following details (all measurements are approximate):

a. Snow Plowing

i. Main Parking Area: 22,000 square feet

ii. Rear Parking Area and Access Road Past 2-bay and 1-bay garages: 13,000 square feet.

iii. West Side Parking Lots at Dam: 2,500 square feet each. Total of Two (2) lots.

b. Snow Shoveling:

i. Hopkinton Lake Project Office: 90 linear feet

ii. Hopkinton Lake Project Flagpole: 145 square feet

iii. Merrimack River Basin Office Walkway: 150 square feet

iv. Merrimack River Basin Office Garage Area: 40 linear feet

v. Hopkinton Lake Project 2-bay garage: 50 linear feet

vi. Hopkinton Lake Project 1-bay garage: 15 linear feet

c. Salting / Sanding:

i. Main Parking Area: 22,000 square feet

ii. Hopkinton Lake Project Office: 90 linear feet

iii. Hopkinton Lake Project Flagpole: 145 square feet

iv. Merrimack River Basin Office Walkway: 150 square feet

v. Merrimack River Basin Office Garage Area: 40 linear feet

vi. Hopkinton Lake Project 2-bay garage: 50 linear feet

vii. West Side Parking Lots at Dam: 2,500 square feet each. Total of Two (2) lots.

2. Elm Brook Park is located approximately 2 miles from the Hopkinton Lake Project Office via Route 127 North the address is: 100 Elm Brook Park Road in Hopkinton, New Hampshire. All of the service areas MUST be accessible no later than 8:00 am daily. Elm Brook Park service area includes the following details (All measurements are approximate):

a. Snow Plowing

i. Parking area outside gates to Elm Brook Park: 7,000 square feet.

ii. Elm Brook Park Road from entrance gate to the access road below the Ranger Station: 15,000 square feet.

iii. Ranger Station Parking Lot: 7,800 square feet

b. Snow Shoveling:

i. Elm Brook Park Ranger Station Walkway: 388 square feet

ii. Gate bollards for Elm Brook Park Entry gate.

c. Sanding / Salting:

i. Parking area outside gates to Elm Brook Park: 7,000 square feet

ii. Elm Brook Park Road from entrance gate to above the access road, below the Ranger Station:

15,000 square feet. (No salt or sand on the lower access road)

iii. Ranger Station Parking Lot: 7,800 square feet

iv. Elm Brook Park Ranger Station Walkway: 388 square feet

*** END OF NARRATIVE 1 ***

Requirements Snow Removal and Sanding Services, Hopkinton Lake, Hopkinton, NH

Section G - Contract Administration Data

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.

2018-12

DFARS Clauses Incorporated by Full Text

Number Title Effective Date

Alternate Deviation

Variation Effective Date

252.232-7006 Wide Area WorkFlow Payment Instructions.

2023-01

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) Definitions. As used in this clause-

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) WAWF access. To access WAWF, the Contractor shall-

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web- Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.

(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:

(1) Document type. The Contractor shall submit payment requests using the following document type(s):

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.

[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]

(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.

Routing Data Table*

Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC ____ Issue By DoDAAC ____ Admin DoDAAC ____ Inspect By DoDAAC ____ Ship To Code ____ Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) ____

Service Acceptor (DoDAAC) ____ Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")

(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)

(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.

(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.

(g) WAWF point of contact.

(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.

(Contracting Officer: Insert applicable information or "Not applicable.")

(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.

(End of clause)

Section H - Special Contract Requirements

SECURITY REQUIREMENTS:

General security requirements and guidance: The security requirements described below apply to all contract personnel (including employees of the prime Contractor ("Contractor") and all subcontractor employees) supporting the performance requirements of this contract. The Contractor is responsible for compliance with these security requirements. Questions regarding security matters shall be addressed to the designated Government representative (eg., Contracting Officer Representative (COR), Requiring Activity (RA) representative, or Contracting Officer (if a COR or other RA representative is not appointed)). Contract personnel are critical to the overall security and safety of US Army Corps of Engineers (USACE) installations, facilities and activities, and security awareness training contributes to those efforts. The Department of Defense (DoD) and Army security training requirements specified below, if applicable, are performance requirements; all applicable contract personnel shall complete initial training within 30 days of contract award or the date new contract personnel begin performance on the contract. Within five business days from the completion of training, the Contractor shall provide written documentation (e.g., email or memorandum) to the Government representative. The documentation shall include the names of contract personnel trained and which training they completed; the Contractor shall maintain training records as part of their contract files and be prepared to provide copies of training certificates to the Government representative. Contractor personnel and vehicles are subject to search when entering federal installations. Additionally, all contract personnel shall comply with Force Protection Condition (FPCON) measures, Random Antiterrorism Measures (commonly referred to as "RAMs"), and Health Protection Condition (HPCON) measures. The Contractor is responsible for meeting performance requirements during elevated FPCON and/or HPCON levels in accordance with applicable RA plans and procedures -this includes identifying mission essential and non-mission essential personnel. In addition to the changes otherwise authorized by the changes clauses of this contract, should FPCON or HPCON levels at any individual facility or installation change, the Government may implement security changes that affect contract personnel. The Contractor shall ensure all contract personnel are aware of their security responsibilities, including any site-specific requirements identified in local policies or procedures.

Suspicious Activity Reporting training (e.g. iWATCH, CorpsWatch, or See Something, Say Something): All contract personnel shall receive initial and annual refresher training from the RA representative on the local suspicious activity reporting program. This locally developed training provides contract personnel with general information on suspicious behavior, and guidance on reporting suspicious activity to the project manager, security representative or law enforcement entity.

WAGE DETERMINATIONS:

The Wage Determination for this project can be found at:

https://sam.gov/wage-determination/2015-4023/36

W912WJ26QA168

https://sam.gov/wage-determination/2015-4023/36

Wage Determination No.: 2015-4023

Modification No.: 36

Revised Date: 13 August 2026

*** END OF NARRATIVE 1 ***

Section I - Contract Clauses

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate Deviation

Variation Effective Date

52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.

2017-01

52.204-9 Personal Identity Verification of Contractor Personnel.

2011-01

52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)

2026-02

52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.

(Deviation 2026-O0038)

2026-02

52.212-4 Terms and Conditions- Commercial Products and Commercial Services. (Deviation 2026-O0038)

2026-02

52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)

2026-02

52.222-3 Convict Labor. (Deviation 2026- O0038)

2026-02

52.222-41 Service Contract Labor Standards. (Deviation 2026- O0038)

2026-02

52.222-50 Combating Trafficking in 2026-02

Persons. (Deviation 2026-O0038)

52.222-55 Minimum Wages for Contractor Workers Under Executive Order 14026. (Deviation 2026-O0038)

2026-02

52.222-62 Paid Sick Leave Under Executive Order 13706. (Deviation 2026- O0038)

2026-02

52.222-90 Addressing DEI Discrimination by Federal Contractors.

(Deviation 2026-O0040, Revision 1)

2026-04

52.223-23 Sustainable Products. (Deviation 2026-O0038)

2026-02

52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.

2024-05

52.232-33 Payment by Electronic Funds Transfer-System for Award Management.

2018-10

52.232-40 Providing Accelerated Payments to Small Business Subcontractors.

2023-03

52.233-1 Disputes. (Deviation 2026- O0038)

2026-02

52.233-3 Protest after Award. (Deviation 2026-O0038)

2026-02

52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)

2026-02

52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)

2026-02

52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)

2026-04

DFARS Clauses Incorporated by Reference

Date

Alternate Deviation

Variation Effective Date

252.203-7000 Requirements Relating to Compensation of Former DoD Officials.

2011-09

252.203-7002 Requirement to Inform Employees of Whistleblower Rights.

2022-12

252.204-7003 Control of Government Personnel Work Product.

1992-04

252.204-7004 Antiterrorism Awareness Training for Contractors.

2023-01

252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. (DEVIATION 2024-

O0013 REVISION 1)

2024-05 Deviation 2024- O0013

2024-05

252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.

2023-01

252.204-7020 NIST SP 800-171 DoD Assessment Requirements.

2023-11

252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.

2023-01

252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region.

2023-06

252.232-7010 Levies on Contract Payments. 2006-12

252.237-7010 Prohibition on Interrogation of Detainees by Contractor Personnel.

2023-01

252.243-7001 Pricing of Contract Modifications. 1991-12

252.244-7999 Subcontracts for Commercial Products or Commercial Services. (DEVIATION 2026- O0015)

2026-02 Deviation 2026- O0015

2026-01

252.247-7023 Transportation of Supplies by Sea.

2024-10

FAR Clauses Incorporated by Full Text

Date

Alternate Deviation

Variation Effective Date

52.219-28 Postaward Small Business Program Rerepresentation.

(Deviation 2026-O0038)

2026-02

Postaward Small Business Program Rerepresentation (Feb 2026) (Deviation 2026-O0038)

(a) . As used in this clause-Definitions

Long-term contract means a contract of more than five years in duration, including options.

However, the term does not include contracts that exceed five years in duration because the period of performance has been extended for a cumulative period not to exceed six months under the clause at 52.217-8, Option to Extend Services, or other appropriate authority.

Small business concern-

(1) Means a concern, including its affiliates, that is independently owned and operated, not dominant in its field of operation, and qualified as a small business under the criteria in 13 CFR part 121 and the size standard in paragraph (c) of this clause.

(2) , as used in this definition, means business concerns, one of whom directly or Affiliates indirectly controls or has the power to control the others, or a third party or parties control or have the power to control the others. In determining whether affiliation exists, consideration is given to all appropriate factors including common ownership, common management, and contractual relationships. SBA determines affiliation based on the factors set forth at 13 CFR 121.103.

(b) If the Contractor represented that it was a small business concern, a small disadvantaged business concern, or a joint venture that was any of the small business concerns identified in 19.000(a)(3) prior to award of this contract, the Contractor shall rerepresent its size and socioeconomic status according to paragraph (e) of this clause or, if applicable, paragraph (g) of this clause, upon occurrence of any of the following:

(1) Within 30 days after execution of a novation agreement or within 30 days after modification of the contract to include this clause, if the novation agreement was executed prior to inclusion of this clause in the contract.

(2) Within 30 days after a merger or acquisition that does not require a novation or within 30 days after modification of the contract to include this clause, if the merger or acquisition occurred prior to inclusion of this clause in the contract.

(3) For long-term contracts-

(i) Within 60 to 120 days prior to the end of the fifth year of the contract; and

(ii) Within 60 to 120 days prior to the date specified in the contract for exercising any option thereafter.

(c) The Contractor shall rerepresent its size status in accordance with the size standard in effect at the time of this rerepresentation that corresponds to the North American Industry

Classification System (NAICS) code(s) assigned to this contract. The small business size standard corresponding to this NAICS code(s) can be found at https://www.sba.gov/document /support--table-size-standards.

(d) The small business size standard for a Contractor providing an end item that it does not manufacture, process, or produce itself, for a…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .