Hazardous Building Material Survey, Edward MacDowell Lake, Peterborough, NH
Solicitation number
W912WJ26QA157
Issued by

About this file

This is a Request for Quotations (RFQ) for a Hazardous Building Materials Survey at Edward MacDowell Lake in Peterborough, New Hampshire. The U.S. Army Corps of Engineers solicitation number W912WJ26QA157 was issued on July 31, 2026, with an offer due date of August 17, 2026, at 2:00 PM Eastern Time. The contract is designated as a Women-Owned Small Business (WOSB) set-aside with a 100% set-aside requirement. This is a firm fixed-price procurement under FAR Part 12 for commercial services with a performance period of 120 calendar days from award.

The contractor must conduct comprehensive hazardous building materials surveys on four separate buildings: the Operator's Quarters Building (approximately 1,653 square feet), Project Office Building (approximately 2,272 square feet), Single Bay Garage (approximately 264 square feet), and Gatehouse Building (approximately 1,025 square feet). Work includes site walkthroughs, development of sampling and work plans, and surveys to identify, sample, and assess asbestos-containing materials (ACM), lead-based paint (LBP), materials containing lead (MCL), polychlorinated biphenyls (PCBs), mercury-containing materials, and other regulated hazardous materials. The contractor must employ a licensed Asbestos Inspector certified by the New Hampshire Department of Environmental Services and a Lead Risk Assessor certified by the New Hampshire Department of Health and Human Services. All work must comply with USACE Safety and Occupational Health Requirements (EM 385-1-1), OSHA standards, EPA regulations (40 CFR Parts 61, 761, and 763), and New Hampshire environmental protection requirements. Pre-work submittals must be completed within 21 days of contract award, including an Accident Prevention Plan, Activity Hazard Analysis, Site Safety and Health Officer designation letter, sampling/work plan, schedule, and safety data sheets. The contractor must provide all labor, materials, equipment, and transportation at no additional cost to the Government. Payment will be made monthly for actual services performed at the applicable contract unit price, submitted via the Wide Area WorkFlow (WAWF) system. Evaluation criteria include technical capability, price, and past performance, with award to the responsible vendor providing the best value.

View the file

Other files

File Type Posted
Amendment W912WJ26QA157-0003.pdf PDF
Appendix A.pdf PDF
Appendix C.pdf PDF
Appendix B.pdf PDF
Amendment W912WJ26QA157-0001.pdf PDF
Solicitation Survey 26QA157.pdf PDF
Amendment W912WJ26QA157-0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect 8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

calls)

Section A - Solicitation/Contract Form

Hazardous Building Material Survey, Edward MacDowell Lake, Peterborough, Instrument Name:

NH

Product Service Code : F107

W912WJ26QA157

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quanti ty

Unit Unit Price Amount

0001 Operator's Quarters Building Hazardous Building Material Survey Contractor shall furnish all labor, materials, and equipment necessary to perform a hazardous building materials survey for the Operator's Quarters Building at Edward MacDowell Lake, Peterborough, NH in accordance with the Performance Work Statement.

Product Service Code: F107

North American Industry Classification System (NAICS):

541620

Pricing Arrangement: Firm Fixed Price

1 Job

0002 Project Office Hazardous Building Material Survey Contractor shall furnish all labor, materials, and equipment necessary to perform a hazardous building materials survey for the Project Office Building at Edward MacDowell Lake, Peterborough, NH in accordance with the Performance Work Statement.

Product Service Code: F107

1 Job

North American Industry Classification System (NAICS):

541620

Pricing Arrangement: Firm Fixed Price

0003 Single Bay Garage Hazardous Building Material Survey Contractor shall furnish all labor, materials, and equipment necessary to perform a hazardous building materials survey for the Single Bay Garage at Edward MacDowell Lake, Peterborough, NH in accordance with the Performance Work Statement.

Product Service Code: F107

North American Industry Classification System (NAICS):

541620

Pricing Arrangement: Firm Fixed Price

1 Job

0004 Gatehouse Hazardous Building Material Survey Contractor shall furnish all labor, materials, and equipment necessary to perform a hazardous building materials survey for the Gatehouse at Edward MacDowell Lake, Peterborough, NH in accordance with the Performance Work Statement.

Product Service Code: F107

1 Job

North American Industry Classification System (NAICS):

541620

Pricing Arrangement: Firm Fixed Price

Section C - Description/Specifications/Statement of Work

INTERESTED VENDORS SHALL REVIEW SECTION L AND SECTION M FOR INSTRUCTIONS

AND EVALUATION CRITERIA. VENDORS ARE RESPONSIBLE FOR ENSURING THEIR

QUOTE SUBMISSION MEETS ALL REQUIREMENTS. FAILURE TO DO SO MAY RESULT IN

QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM CONSIDERATION.

THE MANDATORY SOLICITATION SURVEY ISSUED FOR THE SOLICITATION SHALL BE

COMPLETED IN ITS ENTIRETY AND RETURNED WITH QUOTES. FAILURE TO DO SO MAY

RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND REMOVED FROM

CONSIDERATION. USE OF A SOLICITATION SURVEY NOT ISSUED FOR THE RELEVANT

SOLICITATION WILL RESULT IN QUOTES BEING DEEMED NON-RESPONSIVE AND

REMOVED FROM CONSIDERATION.

HAZARDOUS BUILDING MATERIALS SURVEY

U.S. ARMY CORPS OF ENGINEERS

EDWARD MACDOWELL LAKE

PETERBOROUGH, NH

PERFORMANCE WORK STATEMENT

I. General:

1. Scope - The Contractor shall provide all equipment, materials, labor, and transportation to perform a Hazardous Building Materials (HBM) Survey on the interior and exterior (as applicable) of four separate buildings at the Edward MacDowell Lake Project. The four buildings include the Operator's Quarters, the Project Office, the Single Bay Garage, and the Gatehouse buildings. The HBM Survey shall identify, sample, and assess the condition and physical characteristics of materials suspected to be asbestos containing material (ACM), lead based paint (LBP) or material containing lead (MCL), and miscellaneous hazardous materials that may require special handling or disposal, to include polychlorinated biphenyls (PCBs) and mercury. The goal of the survey is to collect a representative number of building materials for laboratory analysis and reporting and use the laboratory data to estimate the overall quantity of hazardous and regulated building materials.

All work shall be completed in accordance with the following Performance Work Statement.

NOTE: This work requires the following submittals prior to commencement of work (Refer to Section II. Technical Requirements for a full list of submittals):

ENG Form 6293 (Accident Prevention Plan Worksheet)

Activity Hazard Analysis; non-mandatory template available: ENG Form 6206 (Activity Hazard Analysis)

ENG Form 6282 (Site Safety and Health Officer Designation Letter)

First-Aid and CPR Personnel requirements

Sampling/Work Plan

Schedule of work.

Safety Data Sheets.

Licensed Asbestos Inspector certified by the New Hampshire Department of Environmental Services.

Lead Risk Assessor certified by the New Hampshire Department of Health and Human Services.

Any applicable Certifications and Licenses as determined by the Performance Work Statement.

2. Location(s) - The Edward MacDowell Lake Project Area is located at 75 Wilder Street in Peterborough, New Hampshire.

3. Technical Point of Contact - After Contract Award, contact the Technical Point of Contact (TPOC) to begin coordination. The TPOC for this Contract is Civil Engineering Technician Bradley Clark ((978) 318-8342 or email at bradley.j.clark@usace.army.mil).

4. Site Visit - Site visits are strongly recommended to gauge the full scope of work and provide an accurate quote. Interested vendors should attend the site visit to confirm understanding of the scope, inspect existing conditions, and familiarize themselves with the site(s) prior to submitting a quote. No extra payment will be allowed for perceived additional work caused by unfamiliarity with site conditions and requirements.

Site visits will be held on the specified dates and times listed below only:

a. August 11, 2026 at 10:00 AM Eastern

b. August 12, 2026 at 10:00 AM Eastern

Meeting location will be 75 Wilder St., Peterborough, NH

Please Note - Site visits outside of the specified date and time are not permitted unless additional site visit dates/times are publicized in an amendment. All questions during site visits will be sent to the Contract Specialist as indicated in the Instructions to Vendors and responses will be provided in an amendment. Information incorporated into the solicitation via amendment will become binding.

5. Schedule - The period of performance shall be 120 days from Contract Award. Work shall be performed Monday through Friday from 8:00 AM to 4:00 PM unless otherwise approved in advance by the TPOC. No work shall be done on weekends or Government holidays, unless otherwise approved in advance by the TPOC. The Pre-Work Conference shall be completed within 21 days of Contract Award.

All Pre-Work submittals shall be submitted within 21 days of Contract Award. The Government reserves up to 14 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall be resubmitted to the Government in an acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing. No field work may proceed prior to the acceptance of Pre-Work submittals.

Work shall be performed in a timely manner and to the satisfaction of the TPOC or their representative.

6. Safety Requirements

a. General:

All work shall be conducted in accordance with the U.S. Army Corps of Engineers (USACE) Safety and Occupational Health Requirements (EM 385-1-1, most recent edition), and all applicable Occupational Safety and Health Administration (OSHA), Federal, State, and local safety and health requirements. A copy of EM 385-1-1 can be accessed electronically at the following link:

https://www.publications.usace.army.mil/Portals/76/EM%20385-1-1%20_EFFECTIVE% 2015March2024.pdf

Project staff reserve the right to cease work at any time should the safety of employees, Contractors, and/or the public become jeopardized.

b. Accident Prevention Plan (APP):

The Contractor shall prepare a site-specific Accident Prevention Plan. The APP must be written by a Competent Person (CP) and document the specific work processes, equipment, materials to be used, hazards and applicable control measures.

The mandatory ENG Form 6293 (Accident Prevention Plan Worksheet) must be submitted and accepted prior to beginning on site work: https://www.publications.usace.army.mil/Portals/76 /Eng_Form_6293_Aug%202024%20-%20FINAL.pdf

A preparatory meeting shall be conducted by the Prime Contractor to discuss the APP contents with all affected onsite employees. The Prime Contractor is responsible for informing the subcontractors of the safety provisions under the terms of the contract, the penalties for noncompliance, and inspecting subcontractor operations to ensure that accident prevention responsibilities are being carried out.

Daily safety meetings shall be held and documented. Records shall be available to the TPOC upon request.

c. Activity Hazard Analysis (AHA):

An AHA shall be submitted and accepted for each definable feature of work (DFOW) in accordance with EM 385-1-1, Chapter 2-6. A DFOW is defined as any task, which is separate and distinct from other tasks, has separate control requirements, or is identified as different trades or disciplines. The AHA shall be continuously reviewed and revised to address changing site conditions as appropriate.

For a non-mandatory formatted outline of an AHA, see ENG Form 6206 (Activity Hazard Analysis) https://www.publications.usace.army.mil/Portals/76/Eng_Form_6206_Sep%202024%20-% 20FINAL.pdf

d. Site Safety and Health Officer (SSHO) Requirements:

The Contractor shall employ a minimum of one person to function as a Level 3, SSHO. A Level 3 SSHO is a designated Qualified Person (QP) or Competent Person (CP) with Safety and Occupational Health (SOH) responsibility that meets the requirements of EM 385-1-1, Chapter 2-3.

b. and 2-4.b.

Level 3 SSHOs must have training, knowledge, and/or experience identifying hazards and implementing controls for the work being performed.

The SSHO shall be present at the project site and be responsible for overseeing the implementation of the Prime Contractor's SOH program. Contractor shall designate all SSHOs on a mandatory ENG Form 6282 (Site Safety and Health Officer Designation Letter): https://www.

publications.usace.army.mil/Portals/76/Eng_Form_6282_Site%20Safety%20&%20Health% 20Officer%20(SSHO)%20Designation%20Letter_2024%2009%2013%20-%20Final.pdf

e. First-Aid and CPR Personnel Requirements:

For shifts with multiple employees, provide at least two employees that are certified to administer First Aid and CPR. When employees work alone, they must be certified in First Aid and be provided an effective means of communication to call for assistance in the event of an emergency.

Minimum First Aid and CPR qualifications are outlined in EM 385-1-1, Chapter 3-3.

f. Additional Personnel Requirements:

Other Competent or Qualified Persons may be required per EM 385-1-1 and/or other sections of this Performance Work Statement, based on the definable features of work for this project.

g. Accident Reporting:

All accidents and near misses shall be investigated by the Contractor and reported to the TPOC in accordance with EM 385-1-1, Table 2-1.

The mandatory ENG Form 3394 shall be completed and submitted to the TPOC within seven (7) days of an incident: https://www.publications.usace.army.mil/Portals/76/Publications /EngineerForms/Eng_Form_3394_2021Aug.pdf

For OSHA-Recordable mishaps and USACE Reportable property damage incidents, the contractor shall prepare and submit a Lessons-Learned Document within seven (7) days of the incident.

h. Employee Exposure Data:

The Contractor shall electronically report total employee work hours (including subcontractors) to the TPOC by close of business on the 10th calendar day of the following month.

7. Specific Safety Section - Site Walkthrough:

a. General: The Contractor shall conduct an initial site walkthrough (pre-survey site assessment).

The purpose of the site walkthrough is to observe and document existing conditions and to support the development of a project-specific Sampling/Work Plan. Prior to conducting the site walkthrough, the Contractor shall submit an Accident Prevention Plan (APP) in accordance with Section 6.

b. The site walkthrough shall include inspection of all accessible interior and exterior areas of the structure(s); review of available as-built drawings and specifications; review of previous hazardous building material surveys and historical building use and renovation records, if available;

identification of homogeneous material groupings based on similar material composition, age, appearance, and function; identification of suspect hazardous building materials, including asbestos-containing materials (ACM), lead-containing materials (LCM), PCB-containing materials, mercury-containing equipment, and other regulated materials; identification of areas of limited accessibility, including but not limited to locked rooms, confined spaces, and interstitial spaces;

identification of materials or locations that may require destructive sampling, if authorized;

evaluation of building systems, including structural, mechanical, and electrical systems; and identification of safety hazards associated with sampling activities.

8. Specific Safety Section - Sampling/Work Plan:

a. General: Following completion of the site walkthrough, the Contractor shall develop and submit a project-specific Sampling/Work Plan. The purpose of the Sampling/Work Plan is to ensure that sampling efforts are representative, technically defensible, and to minimize the potential for incomplete or non-defensible survey results.

b. The Sampling/Work Plan shall be submitted to the Government for review and acceptance prior to the start of any field sampling activities. Sampling and analytical activities shall not proceed until the plan has been formally accepted. The Contractor shall incorporate all review comments and submit a final Sampling/Work Plan for acceptance. Any deviations from the accepted plan shall be documented, technically justified, and approved by the Government prior to implementation.

c. The Sampling/Work Plan shall describe the methodology and procedures to locate, identify, characterize, and quantify hazardous building materials in accordance with applicable Federal, State, and local regulations, including U.S. Army Corps of Engineers (USACE) requirements, U.S.

Environmental Protection Agency regulations (including 40 CFR Part 61, 40 CFR Part 761, and 40 CFR Part 763), and New Hampshire Department of Environmental Protection requirements. The plan shall include, at a minimum, a description of project purpose and background; names, qualifications, and certifications of personnel performing the work; a summary of pre-survey site assessment findings; identification of homogeneous material groupings and corresponding sampling strategy; proposed number and location of samples for each material type, including ACM, LCM, PCB-containing materials, mercury-containing materials, and other regulated materials; sampling methodologies, including asbestos bulk sampling, lead assessment methods such as X-Ray Fluorescence (XRF) and/or paint chip sampling, PCB bulk sampling of caulk, sealants, and substrates, and Toxicity Characteristic Leaching Procedure (TCLP) sampling for waste characterization as applicable; analytical methods and laboratory accreditation requirements; identification of the analytical laboratory and sample turnaround time;

decontamination procedures and waste handling protocols; a rationale demonstrating that the proposed sampling approach is representative of site conditions and sufficient for regulatory compliance and waste determination; identification of assumptions and limitations; identification of areas requiring destructive sampling, if applicable; and identification of inaccessible areas and the proposed approach for addressing those areas.

9. Pre-Work Conference - Prior to the start of any work, the TPOC will schedule and conduct a "Pre-Work Conference". The Contractor's Project Manager and Quality Control Personnel shall be physically present at this meeting. The Contractor shall directly oversee all work on the project, and the Project Manager and Quality Control Personnel shall have the authority to act on behalf of the Contractor. This conference will be held at the time and location agreeable to the Government and the Contractor. No work may be performed under this contract prior to this conference. The purpose of the conference is to enable the TPOC to outline the procedures that will be followed by the Government in its administration of the contract, and to discuss the performance that will be expected from the Contractor. This conference will allow the Contractor an opportunity to ask questions about the Government's administration and inspection of contract work or obtain other pertinent information that might be required. At the Pre-Work Conference the Contractor shall provide the name of the Project Superintendent with a telephone number for project coordination.

The following is a general list of items for discussion during this Pre-Work Conference:

i. Authority of the Technical Point of Contact and Quality Assurance Inspectors.

ii. Contractor's Safety Program (including sub-contractors).

iii. Accident Prevention Plan and Activity Hazard Analysis

iv. Documented Safety Meetings

v. Accident Reporting (ENG Form 3394)

vi. Safety Data Sheet (SDS) requirements

vii. Contractor's Equipment

viii. Correspondence, Communication, Security and Administrative Procedures

ix. Invoice and Payment

10. Permits - The Contractor shall, without additional expense to the Government, be responsible for obtaining any necessary licenses, permits, and letters of certification. The Contractor shall comply with any applicable Federal, State, county, and municipal laws, codes, and regulations in connection with the performance of the work specified under this contract.

11. Security - The Contractor will comply with all established security policies at the Edward MacDowell Dam. Due to periods of heightened security that may affect the access to the areas covered under this contract, the Government reserves the right to close any property or portion of property and reschedule and/or cancel any subsequent service. The Contractor shall be given at least 24-hour notice of any such closure.

12. Payment - The Contractor shall furnish the TPOC with one invoice per month. The invoice shall include the invoice date, contract number, dates of service, description of work, quantities, labor hours, and total amount due per line item. The invoice must also include the company letterhead, and this must match the data that is registered in the System for Award Management (SAM) registry. Payment shall be made monthly for the actual services performed at the applicable contract unit price.

All invoices may be mailed to:

U.S. Army Corps of Engineers

75 Wilder Street

Peterborough, NH 03458

Or emailed to: bradley.j.clark@usace.army.mil

II. Technical Requirements:

Part 1 General:

1. Summary - The Contractor shall provide all equipment, materials, labor, and transportation to perform a Hazardous Building Materials (HBM) Survey on the interior and exterior (as applicable) of four separate buildings at the Edward MacDowell Lake Project. The four buildings include the Operator's Quarters, the Project Office, the Single Bay Garage, and the Gatehouse buildings. All work shall be completed in accordance with the following Performance Work Statement.

2. Submittals - Although the Government reviews submissions required by this Performance Work Statement, it is emphasized that the Contractor's work must be completed using proper internal controls and review procedures. The Government reserves up to 14 days for review and acceptance on each submittal/resubmittal from the date of receipt. If revisions are necessary to the submittals, the Contractor shall make such revisions and shall resubmit to the Government in an acceptable form within 7 days of the Government's response, unless additional time is granted by the Government in writing.

The documents identified below must be prepared in accordance with the applicable standards, submitted to the TPOC for review and must be accepted by the Government.

Pre-Work Submittals: Submitted within 21 days of Contract Award. Submittals must be accepted prior to the commencement of any field work.

ENG Form 6293 (Accident Prevention Plan Worksheet)

Activity Hazard Analysis; non-mandatory template available: ENG Form 6206 (Activity Hazard Analysis)

ENG Form 6282 (Site Safety and Health Officer Designation Letter)

First-Aid and CPR Personnel requirements

Sampling/Work Plan

Schedule of work.

Safety Data Sheets.

Licensed Asbestos Inspector certified by the New Hampshire Department of Environmental Services.

Lead Risk Assessor certified by the New Hampshire Department of Health and Human Services.

Any applicable Certifications and Licenses as determined by the Performance Work Statement.

3. References - All work shall be in conformance with:

a. U.S. Army Corps of Engineers

i. EM-385-1-1 2024 Safety and Occupational Health Requirements, U.S. Army Engineering Manual.

b. Code of Federal Regulations

i. Title 36 - Parks, Forests, and Public Property; Chapter III, Part 327 - Corps of Engineers, Department of the Army.

c. U.S. Environmental Protection Agency

i. 40 CFR Part 61

ii. 40 CFR Part 761

iii. 40 CFR Part 763

d. U.S. Environmental Protection Agency National Emission Standards for Hazardous Air Pollutants (NESHAP)

i. 40 CFR Part 61, Subpart M, RSA 141-E Asbestos Management and Control

ii. Env-A 1800

e. New Hampshire Department of Environmental Services (NHDES)

i. Env-A 1816.04

ii. Env-A 1816.05

iii. Env-A 1816.06

f. New Hampshire Department of Health and Human Services, Division of Public Health

i. NH RSA 130-A:12

ii. He-P 1600

g. Other applicable Federal, State, and local codes.

4. Existing Conditions:

a. Site Access:

i. All buildings are located at 75 Wilder St. Peterborough, NH and are within close proximity to each other as shown on Informational Map 1 in Appendix A.

b. General Descriptions of Buildings:

i. Operator's Quarters Building:

This building was constructed in 1949.

This building was originally constructed as a two-story, timber-built building with a full concrete basement in the classical revival style. In the 1980's the first floor of the building was removed along with the fireplace and chimney. The basement was filled except for a small hallway leading to an electric panel and access to a small cold storage room. Once the basement was filled and a concrete floor was poured, the second floor was supported with a steel I-Beam and vertical posts.

The north facing first story wall was removed to install two garage bay doors. The second story remained untouched except for the removal of the chimney up to the attic elevation.

The approximate building area consists of a 30' by 25' structure. With the main level (garage section) and the second floor, this approximates to 1,500 sq. ft. This does not incorporate the basement hallway and small cold storage room or the side porches.

The basement hallway and cold storage room area is approximately 153 sq.ft. in total.

The building was sided with wood clapboards and painted with paint that has been tested to show it does contain lead, though the concentration and quantity has not been calculated.

The building has since been sided with vinyl siding over the clapboards and some of the fascia boards have been wrapped in aluminum.

The heat and water for the building have been disconnected.

The second-floor windows have been replaced, the first-floor windows are original.

The glazing around the first-floor windows has tested positive for PCB's though concentration and quantity analysis has not been calculated.

In 1995 an Asbestos survey was conducted to inventory potential sources of Asbestos. Asbestos was found in the first-floor ceiling boards, around pipes in the pipe insulation, in the tile flooring, and in the drywall. Please reference the Merrimack River Basin Asbestos Survey; June 12, 1995, in Appendix C.

A 1996 Asbestos Removal contract did not require any removal of asbestos in this building;

however, drywall was installed over the asbestos ceiling panels in order to contain the asbestos.

Please see Informational Photos 1 through 11 in Appendix A.

Please see Informational Drawings 1 through 3 in Appendix B.

ii. Project Office Building:

This building was constructed in 1949.

The original building measured 72' by 25'. In the early 1960's a public bathroom addition was added (16' by 9') thus making the approximate area of the existing main level of the building 1,944 sq.ft. There is a small basement under the south end of the office that is approximately 328 sq.ft.

The Project Office is a timber-built, single-story structure with an attic.

The structure was sided with wood clapboards which had been painted with paint containing lead.

The structure has since been insulated with thin insulation board and sided with vinyl siding over the existing clapboards, and the fascia boards have been wrapped in aluminum.

The roof material is asphalt shingles with aluminum ice belt panels along the drip edge on each side of the roof.

Most of the windows have been replaced with vinyl windows except for two, four-pane deadlight transom windows. One of these windows is above the main entrance door, and the other is in the north wall of the garage above where a door had originally been located and has since been covered over. These two windows may contain PCBs in their glazing or caulking similar to those in the Operator's Quarters building.

In 1995 an Asbestos survey was conducted to inventory potential sources of Asbestos. Asbestos was found in the attic as loose vermiculite, around pipes in the pipe insulation, in ceiling boards, in the tile flooring, and in the drywall. Please reference the Merrimack River Basin Asbestos Survey;

June 12, 1995, in Appendix C.

In 1996 a contract was awarded for the removal of asbestos materials from the Project Office building. There is little documentation remaining of what actually was removed, but the basic summary was to remove the loose vermiculite in the attic, remove the pipe insulation, and to decontaminate any items that were contaminated with asbestos. Please see the Asbestos Removal Contract Summary of Work; DACW33-96-M-0903; July 17, 1996, in Appendix C.

At some point in time, the asbestos ceiling boards were covered over with drywall in the garage area, and a drop ceiling was installed in the office area.

The subfloor is painted, poured concrete. The paint has tested positive for lead, although concentration and quantity are unknown. There are floor tiles in the front entrance room that may contain asbestos. Most of the floor has been covered with carpet that was glued in place. Recently laminate plank flooring was installed over the carpet and floor tiles.

There is currently an air handler system in the attic with ducts to ceiling vents for the air conditioning system.

The basement area contains a propane boiler, a water pressure tank and water filtration system, storage shelves for office supplies, a masonry block storage room for flammable materials with the original steel doors, as well as the Information Technology equipment.

The original garage had two doors. When the garage doors were replaced with a single garage door, a steel support beam with two vertical posts was put in place to carry the building after the small dividing wall between the previous garage doors was removed.

The Project Office was formerly known as the Utility Building. There are still references to the Utility Building in the Informational Drawings.

Please see Informational Photos 12 through 27 in Appendix A.

Please see Informational Drawings 4 and 5 in Appendix B.

iii. Single Bay Garage Building:

This building was constructed in 1949.

The garage is approximately 22' by 12' (approx. 264 sq.ft.).

The garage is a timber-built structure on a concrete slab.

The structure was sided with wood clapboards and was most likely painted with paint containing lead, similar to the other buildings.

The garage has been sided with vinyl siding over the existing clapboards, and the painted fascia boards have been wrapped with aluminum.

The roofing is asphalt shingles.

The garage door and the personnel door are not original to the structure.

A side shed was added to the structure at some point after original construction.

Please see Informational Photos 28 and 29 in Appendix A.

Please see Informational Drawing 6 in Appendix B.

iv. Gatehouse Building:

This structure was constructed in 1949.

Primarily this structure is constructed of concrete, steel and masonry.

There is a flat rubber membrane roof.

There are two floors that are actively used in the course of normal duties in this building. The operating floor is the floor where gate changes and the gate operators are located as well as the emergency generator, and this is the level that is accessed directly from the service bridge. The level below the operating floor is the heating room floor where the furnace is located along with heating oil tank and other stored materials for the operation of the gatehouse.

The rough floor area of each floor is approximately 512.5 sq.ft.

Much of the base layers of paint on the floor, railings, and crane related steel has tested positive for lead though concentration; however, quantity analysis has not been calculated.

The floor, railings and some of the crane's steel components have been painted with non-lead containing paint to try and contain the lead containing paint beneath it.

The gate operators have been removed, blasted clean of lead containing paint, repainted with non-lead containing paint and reinstalled in the gatehouse.

The windows have been replaced except for the steel transoms between the upper and lower window sections on each window (See Informational Photos 33 and 34 in Appendix A). These sections may still have lead containing paint covering them.

In 1995 an Asbestos survey was conducted to inventory potential sources of Asbestos. The insulation around the generator exhaust piping appears to have been tested and it appears that it does not contain asbestos. Please reference the Merrimack River Basin Asbestos Survey; June 12, 1995, in Appendix C.

The Informational Drawings have the Gatehouse Building listed as Gate House.

Please see Informational Photos 30 through 39 in Appendix A.

Please see Informational Drawings 7 through 9 in Appendix B.

NOTE: For Informational Map and Informational Photos please reference attached Appendix A.

For Informational Design Drawings please reference attached Appendix B. For previous survey information and previous asbestos removal contract summary, please reference attached Appendix C.

NOTE: Informational Drawings in Appendix B are for informational purposes only. Updates to the original design drawings to show the closest current representation of the existing conditions but may not include all changes.

NOTE: Previous survey information and previous asbestos removal contract summary is intended for informational purposes only, and a full comprehensive re-evaluation of all areas is required.

5. Other Contracts - The Government may undertake or award other contracts for additional work not related to this contract, and the Contractor shall fully cooperate with other contractors and Government employees. The Contractor shall not commit or permit any act which will interfere with the performance of work by another contractor or by Government employees.

6. Preferred Sequence for Work Schedules - The Contractor must provide sufficient personnel, equipment, and materials to accomplish the services stated in the contract. The Contractor will coordinate a work schedule for each service and approximate times for beginning and ending each required service listed with the TPOC. Any proposed changes to an approved schedule must be submitted in writing, coordinated, and approved by the TPOC in advance of actual schedule changes.

7. Clean Up and Waste Disposal - The Contractor shall practice good housekeeping to maintain a safe job site. The Contractor shall keep the work area, including any designated storage areas free from accumulation of waste materials. Upon completing work in an area, the Contractor shall remove any tools, equipment, and materials that are not the property of the Government. Any and all disturbed areas resulting from Contractor activities shall be restored by the Contractor to the satisfaction of the TPOC. All waste materials shall be disposed of offsite in accordance with all Federal, State, and local regulations.

8. Environmental Protection - Water, air and land resources shall not be adversely impacted during the course of the work. The Contractor will take necessary steps to ensure all Federal, State, and local environmental regulatory requirements are met at no additional cost to the Government.

Assurance of compliance with this section by sub-contractors shall be the responsibility of the Contractor.

9. Personal Protective Equipment - It is the Contractor's responsibility to furnish and supply personnel with the proper personal protective equipment necessary for performing the work.

10. Government Resources - The Contractor shall supply his own means of communication (telephone) and potable drinking water. The Government will provide the Contractor with access to all contract sites. There are public restrooms available for Contractor use.

11. Damage to Government and Private Property - The Contractor shall be responsible for restoring all Government facilities or structures damaged as a result of the Contractor's operation.

The Contractor shall also be responsible for any damage to private property or injury to any person as a result of the Contractor's operation. The Contractor shall notify the TPOC immediately of damage to Government and private property and injury to any person resulting from the Contractor's operation. Also, the Contractor shall notify the TPOC of damage to Government facilities due to vandalism or other causes on the day such damage is first noticed. Trucks and/or trailers will be driven on existing roads only and not across or through park areas to facilities. The Contractor shall also restore landscape features (shrubs, flowers, grasses, etc.), which are damaged or destroyed by the Contractor's operation. Damaged or destroyed grass areas shall be re-planted as directed by the TPOC, and shrubs and flowers which are damaged or destroyed shall be replaced from nursery stock of like size and kind.

12. Contractor's Qualifications -

a. Experience:

i. The Contractor shall be able to demonstrate at least 3 years' experience with hazardous material survey work.

b. License and/or Certifications:

i. All work shall be performed by Qualified Personnel.

ii. The Contractor shall have the appropriate current license issued by the State of New Hampshire for the work required and shall obtain and comply with any other necessary licenses or permits prior to beginning any work.

iii. The Contractor shall provide documentation of the applicable licenses and certifications to the

TPOC.

13. Contractor's Personnel -

a. Minimum Personnel Requirements - The Contractor shall provide an adequate number of fully qualified personnel to perform the specified service properly and efficiently within the time limits specified. The Contractor shall provide a list of the names and contact phone numbers for all employees prior to them working on Government Property.

Note: At least one of the Contractor employees on site shall be able to communicate effectively and efficiently with project staff.

b. Employee Conduct - The Contractor shall be responsible for seeing that the Contractor's employees strictly comply with Code of Federal Regulations (CFR) Title 36, Chapter III, Part 327, and all Federal, State, and municipal laws. Any personnel activity, which, in the opinion of the Government, is deemed detrimental to the performance of the contract may result in the removal of Contractor employee(s).

Examples of unbecoming actions or conduct include but are not limited to the following:

i. Cursing, harassment, or discrimination of and/or unwarranted physical contact with visitors, USACE personnel, or other Contractors.

ii. Recurring written and/or verbal complaints from visitors, USACE personnel, or other Contractors.

iii. Unsafe operation of vehicles while on USACE property.

c. Removal of Contractor's Employees - The TPOC may require the Contractor to immediately remove from the work site any employee of the Contractor or sub-contractor, who, in the opinion of the TPOC, endangers persons or property, or whose physical or mental condition is such that it would impair the employee's ability to satisfactorily perform assigned work. Notification to the Contractor shall be promptly made in writing if time and circumstances permit. Otherwise, notification shall be verbal or by telephone and shall be confirmed in writing as soon as possible.

No such removal, however, will reduce the Contractor's obligation to perform all work required under this contract, and immediate replacement will be made as required. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

14. Quality Assurance - The Contractor is responsible for the quality control of the contract work.

The Contractor shall establish and maintain a quality control system to assure compliance with the contract requirements. The Government has the right to inspect and test all items called for by the contract, to the extent practicable at all times and at all places during the term of the contract.

15. Inspections -

a. Contractor Quality Control - The Contractor is responsible for establishing and maintaining an adequate quality control system to satisfactorily inspect and ensure that all work performed by the Contractor's organization in each separate service is in full compliance with this contract and the instructions, provisions, specifications, drawings, and maps herein.

b. General Inspection - Upon the completion of each service requirement, the Contractor will perform an inspection of all areas under this contract to ensure compliance with the Performance Work Statement. The Contractor or their representative must be able to commit personnel, equipment, and resources to correct deficiencies. A Government representative may accompany the Contractor on an inspection of completed work and will identify any contract deficiencies. Any deficiencies noted will be corrected within original contract time frames or appropriate deductions in payment will be made.

c. Equipment/Supplies Inspections - The TPOC may inspect required equipment and supplies at any time when in use on Government property. Any equipment found deficient shall be removed from service immediately until faulty conditions have been corrected and passed by the TPOC. No such removal will reduce the Contractor's obligation to perform all work required within the time scheduled under this contract. This requirement shall not be made the basis of any claim for compensation or damages against the United States or any of its officers or agents.

d. Government Inspections - The Government will monitor the Contractor's service performance and make deductions accordingly for work not corrected with the time permitted.

16. Receiving and Storing Materials - The Contractor is responsible for receiving and unloading of delivered goods. Government employees will not receive materials or supplies for the Contractor and will not be responsible for damage to the Contractor's equipment or materials.

17. Omissions - This Contract may not cover all specified activities, steps, and procedures required to supply the contract product. In case of omission, the normal industry, State, or Federal standards, practices, specifications, and/or guides shall prevail. In no instance shall an omission be reason to produce less than an acceptable product.

Part 2 Equipment:

1. Condition of Equipment - All equipment used to perform work under this contract must be in good operating and mechanical condition and comply with EM 385-1-1, Army Corps of Engineers Safety and Occupational Health Requirements. A regular schedule of preventive maintenance must be followed on all equipment. All vehicles utilized under this contract will be presentable, serviceable, and shall comply with safety standards.

2. Type(s) of Equipment -

a. The Contractor shall provide the appropriate equipment and tools of the trade to execute the requirements of the Performance Work Statement.

b. Types of equipment for this work may include, but not be limited to hand tools, ladders, sampling tools, calibrated X-ray fluorescence (XRF) analyzer, camera(s), measuring devices, and personal protective equipment.

3. Equipment Storage - No Government space or facilities shall be provided under this contract.

Part 3 Materials and Supplies:

1. Provided by Government:

a. Access to sites, buildings, and spaces.

2. Provided by Contractor:

a. Notepaper or means to record findings, sample location(s), sample numbering, etc.

b. Any sample containers required.

c. Any hand tools and any materials required to accomplish the different requirements of this Performance Work Statement.

d. Heavy duty trash bags for any waste generated.

Part 4 Service Requirements:

1. General: The Contractor shall provide all equipment, materials, labor, and transportation to perform a Hazardous Building Materials (HBM) Survey on the interior and exterior (as applicable) of four separate buildings at the Edward MacDowell Lake Project. The four buildings include the Operator's Quarters, the Project Office, the Single Bay Garage, and the Gatehouse building. All work shall be completed in accordance with the following Performance Work Statement.

2. Service Tasks:

a. Site Walkthrough: Conduct an initial site walkthrough (pre-survey site assessment) per the requirements listed in: I. General, 7. Specific Safety Section - Site Walkthrough above.

b. Sampling/Workplan: Develop and submit a Sampling/Workplan with the data gathered during the Site Walkthrough. The Sampling/Workplan shall be developed to meet all of the requirements listed in: I. General, 8. Specific Safety Section - Sampling/Workplan above. This plan must be reviewed and accepted by the Government prior to the start of any field sampling activities.

c. Hazardous Building Materials Survey: A Hazardous Building Materials Survey shall be performed to identify, locate, sample, characterize, and quantify asbestos-containing materials (ACM), lead-based paint (LBP) and other materials containing lead (LCM), and other regulated hazardous building materials, including but not limited to polychlorinated biphenyls (PCBs), mercury-containing materials, and miscellaneous hazardous materials requiring special handling or disposal. The survey shall be conducted in accordance with the approved Sampling/Work Plan and Accident Prevention Plan (APP) and shall reflect the findings of the pre-survey site walkthrough.

i. The survey shall include representative sampling of building materials in all areas of the buildings. Sampling strategies shall be sufficient to characterize materials in accordance with applicable Federal, State, and local regulations and guidance, and to support regulatory compliance, waste determination, and project planning. The Contractor shall assess and estimate quantities of hazardous and regulated building materials based on field observations and analytical results.

ii. All accessible interior and exterior areas shall be included in the survey, including interstitial spaces, wall cavities, above ceilings, and below flooring systems, to the extent practicable.

Limitations and inaccessible areas shall be clearly documented in the report, including the reason for inaccessibility, and shall include recommendations for additional investigation or clearly stated assumed conditions where materials could not be directly observed.

iii. A comprehensive final report shall be submitted documenting the results of the survey. The report shall be consistent with the approved Sampling/Work Plan and shall include a summary of the site walkthrough, a description of sampling methodologies, and documentation of any deviations from the approved plan, including justification. The report shall include sample locations for each material type, sample identification numbers, number and types of samples collected, field observations, analytical methods, laboratory reports, chain-of-custody documentation, decontamination procedures, photographic documentation, names and qualifications of field personnel, and annotated drawings indicating sample locations and material extents. The report shall also include recommendations for abatement or remediation actions.

iv. Analytical results shall be used to classify materials and segregate them into appropriate waste streams. The Contractor shall provide estimated quantities, waste classifications (e.g., Resource Conservation and Recovery Act (RCRA), Toxic Substances Control Act (TSCA)), waste segregation strategies, and recommended handling and disposal pathways.

v. The survey report shall include a planning-level cost estimate for abatement, removal, and disposal of identified regulated hazardous building materials based on project scope. Cost estimates shall be provided on a unit basis (e.g., square feet, linear feet, or each, as applicable) and shall be correlated to the quantities and locations identified during the survey. The estimate shall be for planning and budgeting purposes only and shall include clearly stated assumptions, unit rates, and exclusions reflective of typical market conditions.

vi. Specific Survey Requirements for Hazardous Building Materials - Asbestos:

a. The Asbestos Inspection shall be performed by a licensed Asbestos Inspector certified by the New Hampshire Department of Environmental Services (NHDES) and shall be conducted in accordance with applicable requirements of U.S. Environmental Protection Agency National Emission Standards for Hazardous Air Pollutants (NESHAP), 40 CFR Part 61, Subpart M, RSA 141-E Asbestos Management and Control and Env-A 1800. The inspection shall identify and assess suspect ACM subject to disturbance. Sample documentation shall include material descriptions, homogeneous area designation, location referenced to as-built drawings, estimated quantities (square feet or linear feet), condition, material classification (e.g., thermal system insulation, surfacing material, or miscellaneous material), and asbestos type and concentration (percent by weight). Materials containing greater than one percent (>1%) asbestos shall be considered ACM unless otherwise specified.

b. Bulk sample analysis shall be performed by an AIHA-accredited laboratory and participate in the AIHA Proficiency Analytical Testing (PAT) program using Polarized Light Microscopy (PLM) in accordance with EPA Method 600/R-93/116 or equivalent methods.

vii. Specific Survey Requirements for Hazardous Building Materials - Lead:

a. The Lead Inspection shall be performed by a Lead Risk Assessor certified by the New Hampshire Department of Health and Human Services. The inspection shall be conducted to identify the presence, quantity, condition and location of lead-based paint and other materials containing lead within the building in advance of any planned interior renovation activities and to support determinations regarding appropriate…