Appendix C.pdf
PDF 582 KB Posted
- Solicitation number
- W912WJ26QA157
About this file
This document is a Performance Work Statement (PWS) for a Hazardous Building Materials Survey at Edward MacDowell Lake in Peterborough, New Hampshire, issued by the U.S. Army Corps of Engineers. The PWS references Appendix C, which contains two supporting documents: the Merrimack River Basin Asbestos Survey (dated June 12, 1995; 11 pages) and the Asbestos Removal Contract Summary of Work (DACW33-96-M-0903; dated July 17, 1996; 2 pages).
The Merrimack River Basin Asbestos Survey documents the Environmental Laboratory's collection and analysis of 14 plaster samples, 5 floor tile samples, 4 plaster board samples, 2 peg board samples, 1 ceiling tile sample, 1 insulation sample, and 1 ceramic tile sample from Edward MacDowell Lake facilities during May and early June 1995. Samples were analyzed using EPA Method 600/M4-82-020 for bulk asbestos identification. Laboratory data indicates varying asbestos content across samples, including chrysotile, amosite, and mineral wool compositions, with detailed percentages of asbestos, non-asbestos fiber, and non-fiber matter documented for each sample. The Asbestos Removal Contract Summary (DACW33-96-M-0903) outlines work to remove abandoned asbestos-insulated 3/4 inch steel heating pipe, asbestos-contaminated insulation from 1 inch diameter steel water pipe, and asbestos-contaminated loose vermiculite insulation located in attic spaces, along with providing new insulation and fiberglass batt insulation for attic flooring.
View the file
Other files
| File | Type | Posted |
|---|---|---|
| Amendment W912WJ26QA157-0003.pdf | ||
| Appendix A.pdf | ||
| Appendix B.pdf | ||
| Amendment W912WJ26QA157-0001.pdf | ||
| Solicitation W912WJ26QA157.pdf | ||
| Solicitation Survey 26QA157.pdf | ||
| Amendment W912WJ26QA157-0002.pdf |
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
HAZARDOUS BUILDING MATERIALS SURVEY
U.S. ARMY CORPS OF ENGINEERS
EDWARD MACDOWELL LAKE
PETERBOROUGH, NH
PERFORMANCE WORK STATEMENT
APPENDIX C
See Attached
Merrimack River Basin Asbestos Survey; June 12, 1995; 11 pages.
Asbestos Removal Contract Summary of Work; DACW33-96-M-0903; July 17, 1996; 2 pages.
I f
L
J
D-30738
D-30739
D-30740
D-30741
D-30850
D-30851 l0852
D-30853
D-30854
D-30855
D-30856
D-30857
D-30858
B-2
B-3
B-5
BM-1
BM-2
BM-3
BM-4
BM-5
BM-6
BM-7
Field
Description.
BM-8
EM-9
S°-A. A, AD.alyzed By: IBA
'O'.S. AJUCT CORPS OP IDIGDIBBJlS. BHVIROlllHBHTAL LABORATORY
Bullo:. A■be■to■
Te■t !fame
Percea.t Total Aabe•to•
Percea.t Total 111'oa.-Aabe■to■ Fiber
Percea.t Total Noa.-Piber Hatter
Percea.t Total A■be■to■
Percea.t Total 111'oa.-Aabe■to■ Fiber
Percea.t Total Noa.-Piber Hatter
Percea.t Total Aabesto•
Percea.t Total Noa.-Aabestos Fiber
Percaa.t Total Noa.•Piber Matter
Percaa.t Total Asbastos
Percaa.t Total Noa.-Aabesto■ Fiber
Percea.t Total Noa.-Piber Hatter
Percaa.t Total Asbestos
Percea.t Total Noa.-Asbestos Fiber
Percent Total Noa.-Fiber Matter
Percea.t Total Asbestos
Percent Total Noa.•Aabestoa Fiber
Percent Total Noa.-Piber Matter
Percaa.t Total Asbestos
Percent Total Noa.-Asbestos Piber
Percent Total Noa.-Fiber Matter
Percea.t Total Asbestos
Percent Total Noa.-Asbeatoa Fiber
Percent Total Noa.-Piber Matter
Percent Total Asbestos
Percent Total Noa.-Asbestos Fiber
Percaa.t Total Noa.-Fiber Matter
Percaa.t Total Asbestos
Percent Total Noa.-Asbestos Piber
Percent Total Noa.-Fiber Matter
Percea.t Total Aabestoa
Percent Total Noa.-Asbestos Fiber
Percent Total Noa.-Fiber Matter
Percent Total Asbestos
Percaa.t Total Noa.-Aabestoa Fiber
Percea.t Total Noa.-Fibar Matter
Percent Total Asbestos
Percent Total Noa.-Asbestoa Fiber
Percaa.t Total Noa.•Fiber Matter aeault
20 'II
0 '
80 'II
25 'II
10 'II
65 'II
13 'II
10 'II
77 'II
0 '
95 'II
5 '
0 '
40 'II
60. 'II
0 '
45 'II
55 'II
25 'II
0 '
75 'II
25 'II
10 'II
65 'II
32 'II
0 '
68 '
35 'II
5 '
,o'
40 'II
0 '
60 'II
0 '
30 'II
70 'II
20 'II
0 '
80 'II
June 12, 1995
CHRYSOTILB
LIMB, MINERAL GRAINS, RBSINS/BINDBRS
20'11 CHRYSOTILB , 5'11 AMOSITB
CBLL'O'LOSB
LIMB, MINERAL GRAINS
10 'II CHRYSOTILB , 3'11 AMOSITB
CBLL'O'LOSB
LIMB, MINERAL GRAINS
MINERAL WOOL
MINERAL GRAINS
MINERAL WOOL CBLLL'O'LOSB
MINBRAL GRAINS FLY ASH/SOOTS
MINERAL WOOL CBLL'O'LOSB
MINERAL GRAINS FLY ASH/SOOTS
CHRYSOTILB
MINERAL GRAINS RESINS/ASPHALT
20'11 AMOSITB, 5'11 CHRYSOTILB
CBLL'O'LOSB
MINBRAL GRAINS CLAY
30'11 AMOSITB , 2'11 CHRYSOTILB
MINERAL GRAINS
25'11 AMOSITB, 10'11 CHRYSOTILB
CBLL'O'LOSB
MINBRAL GRAINS
35'11 AMOSITB , 5'11 CHRYSOTILB
OPAQ'O'BS MINERAL GRAINS
SYNTHETIC FIBERGLASS CELL'O'LOSB
MINERAL GRAINS
CHRYSOTILB
MINERAL GRAINS LIMB
PRELIMINARY
fl�nding Review 8'J
•�•;,:ii,:,t Assurance Offic?.r
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Cross-Out
E6COMBJC
Line
E6COMBJC
Text Box Asbestos Removal Contract Summary of Work; DACW33-96-M-0903; July 17, 1996
File details come from the government source that posted it. Updated .