Appendix C.pdf

PDF 582 KB Posted

Attached to
Hazardous Building Material Survey, Edward MacDowell Lake, Peterborough, NH
Solicitation number
W912WJ26QA157
Issued by

About this file

This document is a Performance Work Statement (PWS) for a Hazardous Building Materials Survey at Edward MacDowell Lake in Peterborough, New Hampshire, issued by the U.S. Army Corps of Engineers. The PWS references Appendix C, which contains two supporting documents: the Merrimack River Basin Asbestos Survey (dated June 12, 1995; 11 pages) and the Asbestos Removal Contract Summary of Work (DACW33-96-M-0903; dated July 17, 1996; 2 pages).

The Merrimack River Basin Asbestos Survey documents the Environmental Laboratory's collection and analysis of 14 plaster samples, 5 floor tile samples, 4 plaster board samples, 2 peg board samples, 1 ceiling tile sample, 1 insulation sample, and 1 ceramic tile sample from Edward MacDowell Lake facilities during May and early June 1995. Samples were analyzed using EPA Method 600/M4-82-020 for bulk asbestos identification. Laboratory data indicates varying asbestos content across samples, including chrysotile, amosite, and mineral wool compositions, with detailed percentages of asbestos, non-asbestos fiber, and non-fiber matter documented for each sample. The Asbestos Removal Contract Summary (DACW33-96-M-0903) outlines work to remove abandoned asbestos-insulated 3/4 inch steel heating pipe, asbestos-contaminated insulation from 1 inch diameter steel water pipe, and asbestos-contaminated loose vermiculite insulation located in attic spaces, along with providing new insulation and fiberglass batt insulation for attic flooring.

View the file

Other files

File Type Posted
Amendment W912WJ26QA157-0003.pdf PDF
Appendix A.pdf PDF
Appendix B.pdf PDF
Amendment W912WJ26QA157-0001.pdf PDF
Solicitation W912WJ26QA157.pdf PDF
Solicitation Survey 26QA157.pdf PDF
Amendment W912WJ26QA157-0002.pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

HAZARDOUS BUILDING MATERIALS SURVEY

U.S. ARMY CORPS OF ENGINEERS

EDWARD MACDOWELL LAKE

PETERBOROUGH, NH

PERFORMANCE WORK STATEMENT

APPENDIX C

See Attached

Merrimack River Basin Asbestos Survey; June 12, 1995; 11 pages.

Asbestos Removal Contract Summary of Work; DACW33-96-M-0903; July 17, 1996; 2 pages.

I f

L

J

D-30738

D-30739

D-30740

D-30741

D-30850

D-30851 l0852

D-30853

D-30854

D-30855

D-30856

D-30857

D-30858

B-2

B-3

B-5

BM-1

BM-2

BM-3

BM-4

BM-5

BM-6

BM-7

Field

Description.

BM-8

EM-9

S°-A. A, AD.alyzed By: IBA

'O'.S. AJUCT CORPS OP IDIGDIBBJlS. BHVIROlllHBHTAL LABORATORY

Bullo:. A■be■to■

Te■t !fame

Percea.t Total Aabe•to•

Percea.t Total 111'oa.-Aabe■to■ Fiber

Percea.t Total Noa.-Piber Hatter

Percea.t Total A■be■to■

Percea.t Total 111'oa.-Aabe■to■ Fiber

Percea.t Total Noa.-Piber Hatter

Percea.t Total Aabesto•

Percea.t Total Noa.-Aabestos Fiber

Percaa.t Total Noa.•Piber Matter

Percaa.t Total Asbastos

Percaa.t Total Noa.-Aabesto■ Fiber

Percea.t Total Noa.-Piber Hatter

Percaa.t Total Asbestos

Percea.t Total Noa.-Asbestos Fiber

Percent Total Noa.-Fiber Matter

Percea.t Total Asbestos

Percent Total Noa.•Aabestoa Fiber

Percent Total Noa.-Piber Matter

Percaa.t Total Asbestos

Percent Total Noa.-Asbestos Piber

Percent Total Noa.-Fiber Matter

Percea.t Total Asbestos

Percent Total Noa.-Asbeatoa Fiber

Percent Total Noa.-Piber Matter

Percent Total Asbestos

Percent Total Noa.-Asbestos Fiber

Percaa.t Total Noa.-Fiber Matter

Percaa.t Total Asbestos

Percent Total Noa.-Asbestos Piber

Percent Total Noa.-Fiber Matter

Percea.t Total Aabestoa

Percent Total Noa.-Asbestos Fiber

Percent Total Noa.-Fiber Matter

Percent Total Asbestos

Percaa.t Total Noa.-Aabestoa Fiber

Percea.t Total Noa.-Fibar Matter

Percent Total Asbestos

Percent Total Noa.-Asbestoa Fiber

Percaa.t Total Noa.•Fiber Matter aeault

20 'II

0 '

80 'II

25 'II

10 'II

65 'II

13 'II

10 'II

77 'II

0 '

95 'II

5 '

0 '

40 'II

60. 'II

0 '

45 'II

55 'II

25 'II

0 '

75 'II

25 'II

10 'II

65 'II

32 'II

0 '

68 '

35 'II

5 '

,o'

40 'II

0 '

60 'II

0 '

30 'II

70 'II

20 'II

0 '

80 'II

June 12, 1995

CHRYSOTILB

LIMB, MINERAL GRAINS, RBSINS/BINDBRS

20'11 CHRYSOTILB , 5'11 AMOSITB

CBLL'O'LOSB

LIMB, MINERAL GRAINS

10 'II CHRYSOTILB , 3'11 AMOSITB

CBLL'O'LOSB

LIMB, MINERAL GRAINS

MINERAL WOOL

MINERAL GRAINS

MINERAL WOOL CBLLL'O'LOSB

MINBRAL GRAINS FLY ASH/SOOTS

MINERAL WOOL CBLL'O'LOSB

MINERAL GRAINS FLY ASH/SOOTS

CHRYSOTILB

MINERAL GRAINS RESINS/ASPHALT

20'11 AMOSITB, 5'11 CHRYSOTILB

CBLL'O'LOSB

MINBRAL GRAINS CLAY

30'11 AMOSITB , 2'11 CHRYSOTILB

MINERAL GRAINS

25'11 AMOSITB, 10'11 CHRYSOTILB

CBLL'O'LOSB

MINBRAL GRAINS

35'11 AMOSITB , 5'11 CHRYSOTILB

OPAQ'O'BS MINERAL GRAINS

SYNTHETIC FIBERGLASS CELL'O'LOSB

MINERAL GRAINS

CHRYSOTILB

MINERAL GRAINS LIMB

PRELIMINARY

fl�nding Review 8'J

•�•;,:ii,:,t Assurance Offic?.r

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Cross-Out

E6COMBJC

Line

E6COMBJC

Text Box Asbestos Removal Contract Summary of Work; DACW33-96-M-0903; July 17, 1996

File details come from the government source that posted it. Updated .