This is a sealed bid Invitation for Bid (IFB) solicitation for construction services issued by the U.S. Army Corps of Engineers, Fort Randall Project Office in Omaha, Nebraska.
The solicitation seeks a contractor to construct a natural surface trail link within the Lisa M. Durham Memorial Trail System at Fort Randall Dam, South Dakota. The project involves constructing approximately 2,100 to 2,250 linear feet of new trail through site preparation, bench excavation, switchback construction, drainage feature installation, and crushed aggregate surface application. The work must be completed within 90 calendar days from receipt of the Notice to Proceed, with performance required between September 14, 2026, and December 31, 2026. Quotations are due by 2:00 PM CDT on September 9, 2026, submitted electronically to Brandie Murphy at brandie.l.murphy@usace.army.mil. The Government will evaluate proposals on four factors of equal importance: Technical Approach and Understanding, Qualifications and Certifications, Past Performance, and Price. PTBA membership or equivalent certification is required. The solicitation is set aside for small businesses with a size standard of $41.5 million under NAICS code 237990 (Other Heavy and Civil Construction). The contractor must comply with Buy American requirements for construction materials, prevailing wage requirements, and provide minimum insurance coverage including $1,000,000 general liability and $100,000 workers' compensation. South Dakota state excise and use taxes must be included in the bid price. Performance and payment bonds are not required. Award will be made to the responsible offeror offering the most advantageous proposal to the Government considering price and other evaluation factors.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
(See ).
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair) IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
9. FOR
INFORMATION CALL:
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
SOLICITATION
1. SOLICITATION NUMBER
5. REQUISITION/PURCHASE REQUEST NUMBER
CODE
6. PROJECT NUMBER
8. ADDRESS OFFER TO
4. CONTRACT NUMBER
7. ISSUED BY
10. THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
11. The contractor shall begin performance within
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and
b. An offer guarantee
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than
STANDARD FORM 1442 (REV. 12/2022)
Prescribed by GSA - FAR (48 CFR) 53.236-1(d) calendar days for Government acceptance after the date offers are due will not be considered and will be rejected.
is, is not required.
local time containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
(date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes copies to perform the work required are due at the place specified in Item 8 by (hour) award, YES NO notice to proceed. This performance period is mandatory negotiable.
calendar days and complete it within calendar days after receiving
a. NAME b. TELEPHONE NUMBER (Include area code) (NO COLLECT CALLS)
12b. CALENDAR DAYS
2. TYPE OF SOLICITATION
SEALED BID (IFB)
INVITATION FOR BID
NEGOTIATED (RFP)
REQUEST FOR PROPOSAL
3. DATE ISSUED PAGE OF PAGES
Created On:
13 Aug 2026, 14:41 PM Central Daylight Time
AWARD (To be completed by Government)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement by the Government in writing within stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
OFFER (Must be fully completed by offeror)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than Item 14.)
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
21. ITEMS ACCEPTED:
22. AMOUNT
26. ADMINISTERED BY
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31c. DATE
STANDARD FORM 1442 (REV. 12/2022) BACK
31b. UNITED STATES OF AMERICA
BY
31a. NAME OF CONTRACTING OFFICER (Type or print)
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30b. SIGNATURE 30c. DATE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document and return and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
copies to issuing office.) Contractor agrees to furnish
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
23. ACCOUNTING AND APPROPRIATION DATA
ITEM
25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED STATES
CODE AT
27. PAYMENT WILL BE MADE BY
10 U.S.C. 3204(a) ( ) 41 U.S.C. 3304(a) ( )
20b. SIGNATURE 20c. OFFER DATE
Patrick.Ferguson Line
Patrick.Ferguson Line
Section A - Solicitation/Contract Form
FR Chalk Rock Link Trail ProjectInstrument Name:
Product Service Code : Y1PC
W9128F26QA081
Section B - Supplies or Services & Prices or Costs
Additional Information/Notes
Item Supplies/Service Quanti ty
Unit Unit Price Amount
0001 See Price Schedule
Product Service Code: Y1PC
North American Industry Classification System (NAICS):
237990
Pricing Arrangement: Firm Fixed Price
1 Job
Section C - Description/Specifications/Statement of Work
Requirements This project is to construct a natural surface link within the Lisa M. Durham Memorial Trail System at Fort Randall Dam, South Dakota
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.246-12 Inspection of Construction. 1996-08
Overall Contract Inspection/Acceptance Locations
0001 Inspection and Acceptance Location
Both Destination Instructions: IAW SOW
DoDAAC: 968808 CountryCode: USA
COE FT RANDALL PRJT OFC MNTN SECT
NTR RSC SC USAED OMAHACENWO-OD-FR-N, 399 POWERHOUSE ROAD
PICKSTOWN, SD 57367
UNITED STATES
Section F - Deliveries or Performance
0001 Delivery Schedule From date of lead time event to completion of performance 90 Calendar Days
Date of Notice to Proceed Receipt 1 JobQuantity
Address and POC Place of Performance DoDAAC: 968808 CountryCode: USA
COE FT RANDALL PRJT OFC MNTN SECT
NTR RSC SC USAED OMAHACENWO-OD-FR-N, 399 POWERHOUSE ROAD
PICKSTOWN, SD 57367 UNITED STATES
Period of Performance From 14 Sep 2026 To 31 Dec 2026
Section G - Contract Administration Data
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative.
1991-12
252.232-7003 Electronic Submission of Payment Requests and Receiving Reports.
2018-12
252.236-7000 Modification Proposals--Price Breakdown.
1991-12
Section I - Contract Clauses
FAR Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements.
2017-01
52.204-9 Personal Identity Verification of Contractor Personnel.
2011-01
52.204-13 System for Award Management- Maintenance. (Deviation 2026- O0038)
2026-02
52.209-10 Prohibition on Contracting With Inverted Domestic Corporations.
(Deviation 2026-O0038)
2026-02
52.219-6 Notice of Total Small Business Set-Aside. (Deviation 2026- O0038)
2026-02
52.222-6 Construction Wage Rate Requirements. (Deviation 2026- O0038)
2026-02
52.222-7 Withholding of Funds. (Deviation 2026-O0038)
2026-02
52.222-8 Payrolls and Basic Records.
(Deviation 2026-O0038)
2026-02
52.222-9 Apprentices and Trainees.
(Deviation 2026-O0038)
2026-02
52.222-10 Compliance with Copeland Act Requirements. (Deviation 2026- O0038)
2026-02
52.222-11 Subcontracts (Labor Standards).
(Deviation 2026-O0038)
2026-02
52.222-12 Contract Termination-Debarment. 2014-05
52.222-13 Compliance with Construction Wage Rate Requirements and Related Regulations.
2014-05
52.222-14 Disputes Concerning Labor Standards. (Deviation 2026- O0038)
2026-02
52.222-15 Certification of Eligibility. 2014-05
52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038)
2026-02
52.223-23 Sustainable Products. (Deviation 2026-O0038)
2026-02
52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving.
2024-05
52.232-27 Prompt Payment for Construction Contracts.
2017-01
52.232-33 Payment by Electronic Funds Transfer-System for Award Management.
2018-10
52.232-40 Providing Accelerated Payments to Small Business Subcontractors.
2023-03
52.233-1 Disputes. (Deviation 2026- O0038)
2026-02
52.233-3 Protest after Award. (Deviation 2026-O0038)
2026-02
52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026- O0038)
2026-02
52.236-2 Differing Site Conditions.
(Deviation 2026-O0038)
2026-02
52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation 2026-O0038)
2026-02
52.236-5 Material and Workmanship.
(Deviation 2026-O0038)
2026-02
52.236-6 Superintendence by the Contractor. (Deviation 2026- O0038)
2026-02
52.236-7 Permits and Responsibilities.
(Deviation 2026-O0038)
2026-02
52.236-8 Other Contracts. (Deviation 2026- O0038)
2026-02
52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation 2026-O0038)
2026-02
52.236-10 Operations and Storage Areas.
(Deviation 2026-O0038)
2026-02
52.236-12 Cleaning Up. (Deviation 2026- O0038)
2026-02
52.236-13 Accident Prevention. (Deviation 2026-O0038)
2026-02
52.236-14 Availability and Use of Utility Services. (Deviation 2026-O0038)
2026-02
52.236-17 Layout of Work. (Deviation 2026- O0038)
2026-02
52.236-21 Specifications and Drawings for Construction. (Deviation 2026- O0038)
2026-02
52.240-91 Security Prohibitions and Exclusions. (Deviation 2026- O0038)
2026-02
52.242-14 Suspension of Work. 1984-04
52.243-5 Changes and Changed Conditions. (Deviation 2026- O0038)
2026-02
52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038)
2026-04
52.246-21 Warranty of Construction. 1994-03
52.249-10 Default (Fixed-Price Construction).
1984-04
DFARS Clauses Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials.
2011-09
252.203-7002 Requirement to Inform Employees of Whistleblower Rights.
2022-12
252.204-7004 Antiterrorism Awareness Training for Contractors.
2023-01
252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting.
2024-05
252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services.
2023-01
252.223-7008 Prohibition of Hexavalent Chromium.
2023-01
252.225-7048 Export-Controlled Items. 2013-06
252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime.
2023-01
252.232-7010 Levies on Contract Payments. 2006-12
252.243-7002 Requests for Equitable Adjustment.
2022-12
252.247-7023 Transportation of Supplies by Sea.
2024-10
FAR Clauses Incorporated by Full Text
Alternate Deviation
Variation Effective Date
52.225-9 Buy American-Construction Materials. (Deviation 2026-
2026-02
Buy American-Construction Materials (Feb 2026) (Deviation 2026-O0038)
(a) Definitions. As used in this clause-
Commercially available off-the-shelf (COTS) item-
(1) Means any item of supply (including construction material) that is-
(i) A commercial product (as defined in paragraph (1) of the definition of "commercial product" at Federal Acquisition Regulation (FAR) 2.101);
(ii) Sold in substantial quantities in the commercial marketplace; and
(iii) Offered to the Government, under a contract or subcontract at any tier, without modification, in the same form in which it is sold in the commercial marketplace; and
(2) Does not include bulk cargo, as defined in 46 U.S.C. 40102(4), such as agricultural products and petroleum products.
"Construction material" means an article, material, or supply brought to the construction site by the Contractor or a subcontractor for incorporation into the building or work. The term also includes an item brought to the site preassembled from articles, materials, or supplies.
However, emergency life safety systems, such as emergency lighting, fire alarm, and audio evacuation systems, that are discrete systems incorporated into a public building or work and that are produced as complete systems, are evaluated as a single and distinct construction material regardless of when or how the individual parts or components of those systems are delivered to the construction site. Materials purchased directly by the Government are supplies, not construction material.
Cost of components means-
(1) For components purchased by the Contractor, the acquisition cost, including transportation costs to the place of incorporation into the construction material (whether or not such costs are paid to a domestic firm), and any applicable duty (whether or not a duty-free entry certificate is issued); or
(2) For components manufactured by the Contractor, all costs associated with the manufacture of the component, including transportation costs as described in paragraph (1) of this definition, plus allocable overhead costs, but excluding profit. Cost of components does not include any costs associated with the manufacture of the construction material.
Critical component means a component that is mined, produced, or manufactured in the United States and deemed critical to the U.S. supply chain. The list of critical components is at FAR 25.105.
Critical item means a domestic construction material or domestic end product that is deemed critical to U.S. supply chain resiliency. The list of critical items is at FAR 25.105.
Domestic construction material means-
(1) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both-
(i) An unmanufactured construction material mined or produced in the United States; or
(ii) A construction material manufactured in the United States, if-
(A) The cost of its components mined, produced, or manufactured in the United States exceeds 60 percent of the cost of all its components, except that the percentage will be 65 percent for items delivered in calendar years 2024 through 2028 and 75 percent for items delivered starting in calendar year 2029. Components of foreign origin of the same class or kind for which nonavailability determinations have been made are treated as domestic. Components of unknown origin are treated as foreign; or
(B) The construction material is a COTS item; or
(2) For construction material that consists wholly or predominantly of iron or steel or a combination of both, a construction material manufactured in the United States if the cost of foreign iron and steel constitutes less than 5 percent of the cost of all components used in such construction material. The cost of foreign iron and steel includes but is not limited to the cost of foreign iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the construction material and a good faith estimate of the cost of all foreign iron or steel components excluding COTS fasteners. Iron or steel components of unknown origin are treated as foreign. If the construction material contains multiple components, the cost of all the materials used in such construction material is calculated in accordance with the definition of "cost of components".
Fastener means a hardware device that mechanically joins or affixes two or more objects together. Examples of fasteners are nuts, bolts, pins, rivets, nails, clips, and screws.
Foreign construction material means a construction material other than a domestic construction material.
Foreign iron and steel means iron or steel products not produced in the United States.
Produced in the United States means that all manufacturing processes of the iron or steel must take place in the United States, from the initial melting stage through the application of coatings, except metallurgical processes involving refinement of steel additives. The origin of the elements of the iron or steel is not relevant to the determination of whether it is domestic or foreign.
Predominantly of iron or steel or a combination of both means that the cost of the iron and steel content exceeds 50 percent of the total cost of all its components. The cost of iron and steel is the cost of the iron or steel mill products (such as bar, billet, slab, wire, plate, or sheet), castings, or forgings utilized in the manufacture of the product and a good faith estimate of the cost of iron or steel components excluding COTS fasteners.
Steel means an alloy that includes at least 50 percent iron, between 0.02 and 2 percent carbon, and may include other elements.
"United States" means the 50 States, the District of Columbia, and outlying areas.
(b) Domestic preference.
(1) This clause implements 41 U.S.C. chapter 83, Buy American, by providing a preference for domestic construction material. In accordance with 41 U.S.C. 1907, the domestic content test of the Buy American statute is waived for construction material that is a COTS item, except that for construction material that consists wholly or predominantly of iron or steel or a combination of both, the domestic content test is applied only to the iron and steel content of the construction materials, excluding COTS fasteners. The Contractor shall use only domestic construction material in performing this contract, except as provided in paragraphs (b)(2) and (b)(3) of this clause.
(2) This requirement does not apply to information technology that is a commercial product or to the construction materials or components listed by the Government as follows:
____________[Contracting Officer to list applicable excepted materials or indicate "none"]
(3) The Contracting Officer may add other foreign construction material to the list in paragraph (b)(2) of this clause if the Government determines that-
(i) The cost of domestic construction material would be unreasonable.
(A) For domestic construction material that is not a critical item or does not contain critical components.
(1) The cost of a particular domestic construction material subject to the requirements of the Buy American statute is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent;
(2) For construction material that is not a COTS item and does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that is manufactured in the United States and does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest offer of foreign construction material that exceeds 55 percent domestic content as a domestic offer and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3)(i)(A)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(A)(2) of this clause will no longer apply as of January 1, 2030.
(B) For domestic construction material that is a critical item or contains critical components.
(1) The cost of a particular domestic construction material that is a critical item or contains critical components, subject to the requirements of the Buy American statute, is unreasonable when the cost of such material exceeds the cost of foreign material by more than 20 percent plus the additional preference factor identified for the critical item or construction material containing critical components listed at FAR 25.105.
(2) For construction material that does not consist wholly or predominantly of iron or steel or a combination of both, if the cost of a particular domestic construction material is determined to be unreasonable or there is no domestic offer received, and the low offer is for foreign construction material that does not exceed 55 percent domestic content, the Contracting Officer will treat the lowest foreign offer of construction material that is manufactured in the United States and exceeds 55 percent domestic content as a domestic offer, and determine whether the cost of that offer is unreasonable by applying the evaluation factor listed in paragraph (b)(3) (i)(B)(1) of this clause.
(3) The procedures in paragraph (b)(3)(i)(B)(2) of this clause will no longer apply as of January 1, 2030.
(ii) The application of the restriction of the Buy American statute to a particular construction material would be impracticable or inconsistent with the public interest; or
(iii) The construction material is not mined, produced, or manufactured in the United States in sufficient and reasonably available commercial quantities of a satisfactory quality.
(c) Request for determination of inapplicability of the Buy American statute.
(1)
(i) Any Contractor request to use foreign construction material in accordance with paragraph (b)
(3) of this clause shall include adequate information for Government evaluation of the request, including-
(A) A description of the foreign and domestic construction materials;
(B) Unit of measure;
(C) Quantity;
(D) Price;
(E) Time of delivery or availability;
(F) Location of the construction project;
(G) Name and address of the proposed supplier; and
(H) A detailed justification of the reason for use of foreign construction materials cited in accordance with paragraph (b)(3) of this clause.
(ii) A request based on unreasonable cost shall include a reasonable survey of the market and a completed price comparison table in the format in paragraph (d) of this clause.
(iii) The price of construction material shall include all delivery costs to the construction site and any applicable duty (whether or not a duty-free certificate may be issued).
(iv) Any Contractor request for a determination submitted after contract award shall explain why the Contractor could not reasonably foresee the need for such determination and could not have requested the determination before contract award. If the Contractor does not submit a satisfactory explanation, the Contracting Officer need not make a determination.
(2) If the Government determines after contract award that an exception to the Buy American statute applies and the Contracting Officer and the Contractor negotiate adequate consideration, the Contracting Officer will modify the contract to allow use of the foreign construction material. However, when the basis for the exception is the unreasonable price of a domestic construction material, adequate consideration is not less than the differential established in paragraph (b)(3)(i) of this clause.
(3) Unless the Government determines that an exception to the Buy American statute applies, use of foreign construction material is noncompliant with the Buy American statute or Balance of Payments Program.
(d) Data. To permit evaluation of requests under paragraph (c) of this clause based on unreasonable cost, the Contractor shall include the following information and any applicable supporting data based on the survey of suppliers:
Foreign and Domestic Construction Materials Price Comparison Construction material description Unit of measure Quantity Price (dollars)* Item 1:
Foreign construction material. ____ ____ ____ Domestic construction material. ____ ____ ____
Item 2:
Foreign construction material. ____ ____ Domestic construction material. ____ ____ ____ [* Include all delivery costs to the construction site and any applicable duty (whether or not a duty-free entry certificate is issued)].[List name, address, telephone number, and contact for suppliers surveyed. Attach copy of response; if oral, attach summary.][Include other applicable supporting information.] (End of clause)
52.228-13 Alternative Payment Protections. 2000-07
Alternative Payment Protections (July 2000)
(a) The Contractor shall submit one of the following payment protections:
(b) The amount of the payment protection shall be 100 percent of the contract price.
(c) The submission of the payment protection is required within ____ days of contract award.
(d) The payment protection shall provide protection for the full contract performance period plus a one-year period.
(e) Except for escrow agreements and payment bonds, which provide their own protection procedures, the Contracting Officer is authorized to access funds under the payment protection when it has been alleged in writing by a supplier of labor or material that a nonpayment has occurred, and to withhold such funds pending resolution by administrative or judicial proceedings or mutual agreement of the parties.
(f) When a tripartite escrow agreement is used, the Contractor shall utilize only suppliers of labor and material that signed the escrow agreement.
(End of clause)
52.232-5 Payments under Fixed-Price Construction Contracts.
2014-05
Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
____ (Name)
____ (Title)
____ (Date)
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the amount due the Contractor under this contract after-
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 ( 31 U.S.C.3727 and 41 U.S.C. 6305).
(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
(j) Interest computation on unearned amounts. In accordance with 31 U.S.C. 3903(c)(1), the amount payable under paragraph (d)(2) of this clause shall be-
(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and
(2) Deducted from the next available payment to the Contractor.
52.252-2 Clauses Incorporated by Reference. (Tailored)
1998-02
Clauses Incorporated By Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
www.acquisition.gov
52.252-6 Authorized Deviations in Clauses. (Tailored)
2020-11
Authorized Deviations in Clauses (Nov 2020)
The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR (a) Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
The use in this solicitation or contract of any (48 CFR ) clause with an authorized (b) DFARS 2 deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
DFARS Clauses Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
252.236-7001 Contract Drawings and Specifications. (Tailored)
2000-08
CONTRACT DRAWINGS AND SPECIFICATIONS (AUG 2000)
(a) The Government will provide to the Contractor, without charge, one set of contract drawings and specifications, except publications incorporated into the technical provisions by reference, in electronic or paper media as chosen by the Contracting Officer.
(b) The Contractor shall-
(1) Check all drawings furnished immediately upon receipt;
(2) Compare all drawings and verify the figures before laying out the work;
(3) Promptly notify the Contracting Officer of any discrepancies;
(4) Be responsible for any errors that might have been avoided by complying with this paragraph (b); and
(5) Reproduce and print contract drawings and specifications as needed.
(c) In general--
(1) Large-scale drawings shall govern small-scale drawings; and
(2) The Contractor shall follow figures marked on drawings in preference to scale measurements.
(d) Omissions from the drawings or specifications or the misdescription of details of work that are manifestly necessary to carry out the intent of the drawings and specifications, or that are customarily performed, shall not relieve the Contractor from performing such omitted or misdescribed details of the work. The Contractor shall perform such details as if fully and correctly set forth and described in the drawings and specifications.
(e) The work shall conform to the specifications and the contract drawings identified on the following index of drawings:
Title File Drawing No.
Attachment 1 Price Schedule Chalk Rock Link
Attachment 2 Statement of Work Chalk Rock Link
Attachment 3 Drawing Chalk Rock Link
Attachment 4 Map 1 Chalk Rock Link
Attachment 5 Map2 Chalk Rock Link
Attachment 6 Wage Determination
Section J - List of Attachments
Attachment 1 Price Schedule
Attachment 2 Statement of Work
Attachment 3 Drawing Chalk Rock Link
Attachment 4 Map 1
Attachment 5 Map 2
Attachment 6 Wage Determination
*** END OF NARRATIVE ***
Identifier Document Name
Document Description
Reference Identifier
Date Line Item
Page Numbers
Document Type
Provided Under Separate Cover
0001 Attachment 1 Price S chedule_Ch alk Rock L ink
Price Schedule 03 Aug
Attachment No
0002 Attachment 2 Stateme nt of Work _Chalk Roc k Trail Li nk_Fort Ra ndall
Statement of Work 12 Aug
Attachment No
0003 Attachment 3 Drawing Chalk Roc k Link
Drawings 03 Aug
Attachment No
0004 Attachment 4 Map 1_C halk Rock Link
Drawings 03 Aug
Attachment No
0005 Attachment 5 Map 2_C halk Rock Link
Drawings 03 Aug
Attachment No
0006 Attachment 6 Wage De terminatio n
Wage Determination
Aug
Attachment No
Section K - Representations, Certification, & Other Statements
FAR Provisions Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.240-90 Security Prohibitions and Exclusions Representations and Certifications. (Deviation 2026-
DFARS Provisions Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.203-7005 Representation Relating to Compensation of Former DoD Officials.
2022-09
252.204-7008 Compliance with Safeguarding Covered Defense Information Controls.
2016-10
252.225-7055 Representation Regarding Business Operations with the Maduro Regime.
2022-05
DFARS Provisions Incorporated by Full Text
Date
Alternate Deviation
Variation Effective Date
252.204-7017 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services-Representation.
2021-05
PROHIBITION ON THE ACQUISITION OF COVERED DEFENSE TELECOMMUNICATIONS
EQUIPMENT OR SERVICES-REPRESENTATION (MAY 2021)
The Offeror is not required to complete the representation in this provision if the Offeror has represented in the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it "does not provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument."
(a) Definitions. "Covered defense telecommunications equipment or services," "covered mission," "critical technology," and "substantial or essential component," as used in this provision, have the meanings given in the 252.204-7018 clause, Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services, of this solicitation.
(b) Prohibition. Section 1656 of the National Defense Authorization Act for Fiscal Year 2018 (Pub. L. 115-91) prohibits agencies from procuring or obtaining, or extending or renewing a contract to procure or obtain, any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system.
(c) Procedures. The Offeror shall review the list of excluded parties in the System for Award Management (SAM) at https://www.sam.gov for entities that are excluded when providing any equipment, system, or service to carry out covered missions that uses covered defense telecommunications equipment or services as a substantial or essential component of any system, or as critical technology as part of any system, unless a waiver is granted.
(d) Representation. If in its annual representations and certifications in SAM the Offeror has represented in paragraph (c) of the provision at 252.204-7016, Covered Defense Telecommunications Equipment or Services-Representation, that it "does" provide covered defense telecommunications equipment or services as a part of its offered products or services to the Government in the performance of any contract, subcontract, or other contractual instrument, then the Offeror shall complete the following additional representation:
The Offeror represents that it [ ] will [ ] will not provide covered defense telecommunications equipment or services as a part of its offered products or services to DoD in the performance of any award resulting from this solicitation.
(e) Disclosures. If the Offeror has represented in paragraph (d) of this provision that it "will provide covered defense telecommunications equipment or services," the Offeror shall provide the following information as part of the offer:
(1) A description of all covered defense telecommunications equipment and services offered (include brand or manufacturer; product, such as model number, original equipment manufacturer (OEM) number, manufacturer part number, or wholesaler number; and item description, as applicable).
(2) An explanation of the proposed use of covered defense telecommunications equipment and services and any factors relevant to determining if such use would be permissible under the prohibition referenced in paragraph (b) of this provision.
(3) For services, the entity providing the covered defense telecommunications services (include entity name, unique entity identifier, and Commercial and Government Entity (CAGE) code, if known).
(4) For equipment, the entity that produced or provided the covered defense telecommunications equipment (include entity name, unique entity identifier, CAGE code, and whether the entity was the OEM or a distributor, if known).
(End of provision)
Section L - Instructions, Conditions, & Notices to Offerors or Quoters
Instructions to Quoters - Other than Commercial Items
Please provide the following information with your quote:
Company's Name/Address as it appears on SAM:
CAGE CODE:
UEID:
TIN:
NAICS. The North American Industry Classification System (NAICS) code and small business size standard for this solicitation are: 237990- Other Heavy and Civil Construction with a small business size standard of $41.5M .
Submitting your quote. Submission of quotations. Submit quotations to the office specified in this solicitation at or before the exact time specified in this solicitation. Quotations may be submitted on the SF 18, letterhead stationery, or as otherwise specified in the solicitation.
Quotations are due by 2:00PM CDT. Send your completed quotation package to the attention of Brandie Murphy, Contract Specialist at brandie.l.murphy@usace.army.mil. Electronic quotations are required. You may submit more than one quote. If you do, we will evaluate each separately.
The Government may not consider any quotation received after the deadline.
As a minimum, quotations must show-
(1) The solicitation number;
(2) The name, address, email, and telephone number of the quoter;
(3) Price and any discount terms;
(4) Acknowledgment of solicitation amendments, if applicable;
(5) Evaluation Information (See Section M) - delete if no factors are utilized
If the quotation is not submitted on the SF 18, include a statement specifying the extent of agreement with all terms, conditions, and provisions included in the solicitation. Quotations that fail to furnish required representations or information, or reject the terms and conditions of the solicitation may be excluded from consideration. Representations and certifications are not required to be submitted so long as the offeror's representations and certifications in SAM are current, accurate, and complete. SAM will be utilized for the basis of determining an offeror's small business size status.
Issuance of purchase order. Your quote should contain your best terms. The Contracting Officer may reject any or all quotes. After the evaluation of quotes, the Contracting Officer may negotiate final terms with one or more quoters of the Government's choice before issuing a purchase order.
The Contracting Officer will not negotiate with any quoters other than those of the Government's choice and will not use the formal source selection procedures described in FAR Part 15.
The Contracting Officer may issue a purchase order to other than the quoter with the lowest price.
We might issue multiple orders, purchasing various items or groups of items from different quoters.
We might issue an order for less than the quantity on which your quote is based, at the quoted price, unless you tell us that you will not accept an order on that basis.
System for Award Management (SAM). Unless exempted by the Contracting Officer, you must register in SAM before we will issue a purchase order to you. If you do not register by the date set by the Contracting Officer, the Contracting Officer might issue the order to a different quoter. Once registered, you must remain registered throughout performance until final payment. Go to https://SAM.gov for information on SAM registration and annual confirmation.
Unique Entity ID (UEI). All entities that are registered in SAM.gov are assigned a Unique Entity ID.
If you are registered in SAM.gov now, you've already been assigned a Unique Entity ID. It's viewable on your entity registration record in SAM.gov. If your entity is not registered now, but you decide to register your entity in SAM.gov, you'll be assigned a Unique Entity ID as part of the registration process.
Insurance Required (FAR 52.228-5):
In accordance with FAR 28.307-2, "Liability," the contractor shall procure the following minimum insurance:
Type Amount
Workman's Compensation and Employer's Liability Insurance $100,000
General Liability Insurance $1,000,000 per occurrence
And, when automobiles are used in connection with performing the contract:
Type Amount
Automobile Liability Insurance $200,000 per person
Bodily Injury $500,000 per occurrence
Property Damage $ 20,000 per occurrence
And, when aircraft is used in connection with performing the contract:
Type Amount
Aircraft Public and Passenger Liability Insurance $200,000 per person
Bodily Injury (other than passenger injury) $500,000 per occurrence
Property Damage $200,000 per occurrence
Passenger Liability Bodily Injury $200,000 multiplied by the number of seats or passengers, whichever is greater
And, when contract performance involves use of vessels, the Contracting Officer shall require, as determined by the agency, vessel collision liability and protection and indemnity insurance. The contractor is responsible for contacting the state for compliance with its workman's compensation laws.
State and Local Taxes (FAR 52.229-3)
The bidder is responsible for investigating applicable federal, state, and local taxes and any specific exemptions that may exist and includes applicable Value-Added Taxes (VAT), sales, use, and excise taxes.
TAXES - STATE OF SOUTH DAKOTA
EXCISE TAX
There is an excise tax on the total gross receipts of all prime contractors and subcontractors engaged in realty improvement contracts. If applicable, South Dakota's "excise" and "use" taxes shall be included in the price or prices bid. These taxes include, but are not limited to, those imposed pursuant to S.D. Code Chapters 10-46, 10-46A, and 10-46B. For information concerning the taxes contact: http://dor.sd.gov/.
USE TAX
Government furnished construction material used by the Contractor in the performance of the work is subject to use tax. The value of the material furnished is set forth in the SECTION 01 30 00.24 OTHER ADMINISTRATIVE AND SPECIAL REQUIREMENTS provision "Government Furnished Property."
INFORMATION
The "excise" and "use" taxes shall be included in the price or prices bid. For information concerning the taxes contact: http://dor.sd.gov/
*** END OF NARRATIVE ***
FAR Provisions Incorporated by Reference
Number Title Effective Date
Alternate Deviation
Variation Effective Date
52.203-18 Prohibition on Contracting with Entities that Require Certain Internal Confidentiality Agreements or Statements- Representation.
2017-01
52.204-7 System for Award Management- Registration. (Deviation 2026- O0038)
2026-02
52.222-5 Construction Wage Rate Requirements-Secondary Site of the Work. (Deviation 2026-
DFARS Provisions Incorporated by Reference
Date
Alternate Deviation
Variation Effective Date
252.204-7024 Notice on the Use of the Supplier Performance Risk System.
2023-03
FAR Provisions Incorporated by Full Text
Date
Alternate Deviation
Variation Effective
52.252-1 Solicitation Provisions Incorporated by Reference.
(Tailored)
1998-02
Solicitation Provisions Incorporated by Reference (Feb 1998)
This solicitation incorporates one or more solicitation provisions by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. The offeror is cautioned that the listed provisions may include blocks that must be completed by the offeror and submitted with its quotation or offer. In lieu of submitting the full text of those provisions, the offeror may identify the provision by paragraph identifier and provide the appropriate information with its quotation or offer. Also, the full text of a solicitation provision may be accessed electronically at this/these address(es):
www.acquisition.gov
(End of provision)
52.252-5 Authorized Deviations in Provisions. (Tailored)
2020-11
Authorized Deviations in Provisions (Nov 2020)
The use in this solicitation of any Federal Acquisition Regulation (48 CFR Chapter 1) (a) provision with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the provision.
The use in this solicitation of any (48 CFR Chapter ) provision with an authorized (b) DFARS 2 deviation is indicated by the addition of "(DEVIATION)" after the name of the regulation.
(End of provision)
Section M - Evaluation Factors for Award
EVALUATION CRITERIA / BASIS FOR AWARD
(a) The Government will award a single contract resulting from this solicitation to the responsible offeror whose offer conforming to the solicitation will be most advantageous to the Government, price and other factors considered. To be considered for award, the offeror must submit all requested information, and the proposed price must be determined to be fair and reasonable. The evaluation process and submission instructions are as follows:
1. Factor 1: Technical Approach and Understanding
Submission Instruction: The offeror shall submit a brief narrative document detailing their technical approach. This document must explain the contractor's methodology for site preparation, bench excavation, construction of switchbacks, drainage features, and the installation of the crushed aggregate surface for the 2,100 to 2,250 linear feet of new trail at the Fort Randall location. This description should include a list of equipment that will be used during removal and construction activities.
Evaluation: The Government will review the submitted narrative to ensure the proposed methodology is feasible, aligns with sustainable trail building practices, and demonstrates a clear understanding of the site conditions and the required earthwork/drainage techniques.
2. Factor 2: Qualifications and Certifications
Submission Instruction: The offeror shall submit copies of all applicable industry qualifications, licenses, and certifications required to perform the work. Qualifications include the ability to safely operate equipment on steep slopes, knowledge of sustainable trail construction methods, and experience with tree clearing activities. PTBA membership or equivalent certification is required.
Evaluation: The Government will verify that the submitted personnel and company qualifications are current, valid, and demonstrate the specialized competence necessary for safe and sustainable trail construction. Qualifications will be evaluated on the basis of years of experience and person hours worked.
3. Factor 3: Past Performance
Submission Instruction: The offeror shall submit a list of up to three…