This is a Request for Quote (RFQ) solicitation for the rental of six self-contained walk-in refrigerated units for use at Norfolk Naval Shipyard in Portsmouth, Virginia.

The primary line item (0001) requires rental of six electric, self-contained walk-in refrigerated units for 11 months, with firm fixed pricing. Each unit must measure a minimum of 8 feet wide by 8 feet high by 40 feet long, maintain temperatures between -3 and 42 degrees Fahrenheit, be hurricane-proof to 110 mph winds, and be rated at 200 amps or less. Units must include exterior camlok electrical connections feeding a 600-volt, 40-amp circuit breaker with transformer, fluorescent interior lighting, and be capable of forklift or overhead lifting. All units shall be cleaned, disinfected, and ready for food or medicine storage prior to delivery. The contract includes two optional line items for six-month extension periods (Option 1001: May 15–November 15, 2026; Option 2001: October 15, 2027–May 15, 2028), allowing the government to extend the rental or reduce the number of units based on operational needs. The base performance period runs June 15, 2026, through May 15, 2027, with delivery to Norfolk Naval Shipyard, Building 276, Portsmouth, Virginia 23709.

The solicitation is issued as a Women-Owned Small Business (WOSB) set-aside with 100 percent set-aside eligibility. Offerors must certify technical capability by completing detailed capability statements confirming compliance with all specifications. The contractor is responsible for delivery, installation, connection of accessory equipment, 24/7 on-call repair service with response within 12 hours and repairs completed within 16 hours, provision of commercial operating manuals, and coordination with shipyard personnel for security clearances and access. The government will provide utilities connection and disconnection. Inspection and acceptance occur at Norfolk Naval Shipyard with Contracting Officer's Representative Leisa Wilson (757-396-0127). Quotes are due April 20, 2026, at 10:00 AM local time. Payment will be made via Electronic Funds Transfer through the Wide Area WorkFlow (WAWF) system. Contract administration points of contact include Procurement Contracting Officer Rebekah Riggins and Contract Specialist Theresa Clark.

View the file

Other files

File Type Posted
Solicitation Amendment N4215826Q00100001.pdf PDF
QUESTIONS ANSWERS INDUSTRY.pdf PDF
Specifications .pdf PDF

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

WOMEN-OWNED SMALL

BUSINESS (WOSB)

SOLICITATION/CONTRACT/ORDER FOR COMMERCIAL PRODUCTS AND COMMERCIAL SERVICES

1. REQUISITION NUMBER PAGE 1 OF

2. CONTRACT NUMBER 3. AWARD/EFFECTIVE

DATE

4. ORDER NUMBER 5. SOLICITATION NUMBER 6. SOLICITATION ISSUE

DATE

7. FOR SOLICITATION

INFORMATION CALL:

a. NAME b. TELEPHONE NUMBER (No collect calls)

8. OFFER DUE DATE/

LOCAL TIME

9. ISSUED BY

13b. RATING

14. METHOD OF SOLICITATION

CODE

15. DELIVER TO 16. ADMINISTERED BY CODE

18a. PAYMENT WILL BE MADE BY CODE17a. CONTRACTOR/

OFFEROR

CODE

FACILITY

CODE

CODE

TELEPHONE NUMBER

17b. CHECK IF REMITTANCE IS DIFFERENT AND PUT SUCH ADDRESS IN

OFFER

18b. SUBMIT INVOICES TO ADDRESS SHOWN IN BLOCK 18a UNLESS BLOCK

BELOW IS CHECKED

REQUEST

FOR QUOTE

(RFQ)

INVITATION

FOR BID

(IFB)

REQUEST

FOR

PROPOSAL

(RFP)

SEE ADDENDUM

19.

ITEM NUMBER

20.

SCHEDULE OF SUPPLIES/SERVICES

21.

QUANTITY

22.

UNIT

23.

UNIT PRICE

24.

AMOUNT

(Use Reverse and/or Attach Additional Sheets as Necessary)

25. ACCOUNTING AND APPROPRIATION DATA 26. TOTAL AWARD AMOUNT (For Government Use Only)

28. CONTRACTOR IS REQUIRED TO SIGN THIS DOCUMENT AND RETURN

COPIES TO ISSUING OFFICE. CONTRACTOR AGREES TO FURNISH

AND DELIVER ALL ITEMS SET FORTH OR OTHERWISE IDENTIFIED ABOVE AND

ON ANY ADDITIONAL SHEETS SUBJECT TO THE TERMS AND CONDITIONS

SPECIFIED

29. AWARD OF CONTRACT: REFERENCE OFFER

DATED . . YOUR OFFER ON SOLICITATION

(BLOCK 5), INCLUDING ANY ADDITIONS OR CHANGES WHICH ARE

SET FORTH HEREIN, IS ACCEPTED AS TO ITEMS:

30a. SIGNATURE OF OFFEROR/CONTRACTOR

30b. NAME AND TITLE OF SIGNER (Type or print) 30c. DATE SIGNED

31a. UNITED STATES OF AMERICA (SIGNATURE OF CONTRACTING OFFICER)

31b. NAME OF CONTRACTING OFFICER (Type or print) 31c. DATE SIGNED

AUTHORIZED FOR LOCAL REPRODUCTION

PREVIOUS EDITION IS NOT USABLE

STANDARD FORM 1449 (REV. 11/2021)

Prescribed by GSA - FAR (48 CFR) 53.212

10. THIS ACQUISITION IS UNRESTRICTED OR

NORTH AMERICAN

INDUSTRY CLASSIFICATION

STANDARD (NAICS):

SIZE STANDARD:

13a. THIS CONTRACT IS A

RATED ORDER UNDER

THE DEFENSE PRIORITIES

AND ALLOCATIONS

SYSTEM - DPAS (15 CFR 700)

SET ASIDE: % FOR:

11. DELIVERY FOR FREE ON

BOARD (FOB) DESTINATION

UNLESS BLOCK IS MARKED

SEE SCHEDULE

12. DISCOUNT TERMS

ARE ARE NOT ATTACHED

ARE ARE NOT ATTACHED

27a. SOLICITATION INCORPORATES BY REFERENCE (FEDERAL ACQUISITION REGULATION) FAR 52.212-1, 52.212-4. FAR 52.212-3

AND 52.212-5 ARE ATTACHED. ADDENDA

27b. CONTRACT/PURCHASE ORDER INCORPORATES BY REFERENCE FAR 52.212-4. FAR 52.212-5 IS ATTACHED. ADDENDA

8(A)

ECONOMICALLY

DISADVANTAGED

WOMEN-OWNED SMALL

BUSINESS (EDWOSB)

SERVICE-DISABLED

VETERAN-OWNED

SMALL BUSINESS

(SDVOSB)

HUBZONE SMALL

BUSINESS

SMALL BUSINESS

NOTE: OFFEROR TO COMPLETE BLOCKS 12, 17, 23, 24, AND 30.

Section A - Solicitation/Contract Form

H.P. Compressor Rental - Walk-in Refrigerated Units

N4215826Q0010

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

Item Supplies/Service Quantity Unit Unit Price Amount

Rental of SIX (6) self-contained walk-in refrigerated units (electric) for acceptable space of food and medicine storage.

Pricing Arrangement: Firm Fixed Price

11 Months

Option Line Item

Rental of SIX (6) self-contained walk-in refrigerated units (electric) for acceptable space of food and medicine storage.

Pricing Arrangement: Firm Fixed Price

6 Months

Rental of SIX (6) self-contained walk-in refrigerated units (electric) for acceptable space of food and medicine storage.

Pricing Arrangement: Firm Fixed Price

6 Months

Additional Regulation or Supplemental Clauses Incorporated by Full Text

B-232-H001 PAYMENTS--BASIC (NAVSEA) (JAN 2019) (Jan 2019)

(a) Computation of Payments

(1) Until such time as physical progress in the performance of work on a vessel is fifty percent (50%) complete, the Government, upon submission by the Contractor of invoices certified by the Contractor as hereinafter provided, will promptly make payments, on account of the total contract price(s), at ninety percent (90%) of the amount determined by multiplying the allocated total contract price of such vessel by the percentage of physical progress in the performance of work on such vessel as certified by the Contractor subject to the approval of the Supervisor; , that provided no such payment shall be made in an amount which when added to the total of all payments previously made with respect to such vessel under paragraph (a) of this requirement exceeds one hundred percent (100%) of the allowable costs certified by the Contractor on the related invoice to have been incurred in the performance of work on such vessel.

(2) After the percentage of physical progress in the performance of work on a vessel has reached fifty percent (50%), the Government, upon submission by the Contractor of invoices certified by the Contractor as hereinafter provided, will promptly make payments, on account of the total contract price(s), of one hundred percent (100%) of the amount determined by: (i) multiplying the allocated total contract price of such vessel by the percentage of physical progress in the performance of work on such vessel as certified by the Contractor subject to the approval of the Supervisor, and (ii) subtracting from that product five percent (5%) of the allocated total contract price of such vessel; , that no such provided payment shall be made in an amount which when added to the total of all payments made previously with respect to such vessel under paragraph

(a) of this requirement exceeds one hundred five percent (105%) of the allowable costs certified by the Contractor on the related invoice to have been incurred in the performance of work on such vessel; , , that the Contractor furnishes data on actual cumulative costs and provided further estimated future costs acceptable to the Supervisor which demonstrates to the satisfaction of the Supervisor that the Contractor will make a profit of at least five percent (5%) on completion of the contract, and the Contractor provides updated information on a quarterly basis. If updated data indicate the Contractor will not make a profit of at least five percent (5%) on completion of the contract, the progress payments shall be adjusted retroactively so that the total of all payments made with respect to the vessel under paragraph (a) of this requirement shall not exceed one hundred percent (100%) of the allowable costs certified by the Contractor on the related invoice to have been incurred in the performance of work on such vessel.

(b) Billing Price

(1) For the purpose of this requirement, until the establishment of the total final price(s) in accordance with paragraph (d) of the clause of this contract entitled "Incentive Price Revision--Firm Target (FAR 52.216-16)", the term "total contract price" means the billing price; initially the billing price shall be the initial total contract target price(s), and there after the billing price shall be revised as provided in paragraph (b)(2) below. After establishment of the total final price(s) in accordance with paragraph (d) of the "Incentive Price Revision--Firm Target (FAR52.216- 16)" clause, the billing price shall be the total final price(s) so established.

(2) Within fifteen (15) days after each calendar quarter the Contractor shall submit in writing a proposed revised billing price which shall be established as follows:

(i) The Contractor shall certify to the Contracting Officer the percentage of physical progress in the performance of the contract as a whole as of the end of the calendar quarter. Such percentage of physical progress shall be expressed as a decimal carried to four decimal places and shall be subject to the approval of the Supervisor.

(ii) The revised billing price shall be the sum of a projected final cost(s), and a projected profit, and the Total EPA Amount (positive or negative), as determined in the contract requirement entitled "Economic Price Adjustment", computed as follows:

(A) A projected final cost shall be computed by (i) determining the cumulative sum of the costs as of the end of the calendar quarter, and (ii) dividing this amount by the percentage of physical progress certified and approved as set forth in subparagraph (i) above. From this amount, the Total EPA Amount (positive or negative) incurred through the end of the applicable billing period, as determined in the contract requirement entitled "Economic Price Adjustment" will be subtracted.

(B) A projected profit shall be determined by applying to the projected final cost(s) as calculated in paragraph 2(ii)(A), the incentive formula set forth in paragraph(d)(2) of the "Incentive Price Revision--Firm Target (FAR 52.216-16)" clause.

(C) The sum of the projected final cost, as calculated in paragraph (A), and the projected profit, as calculated in paragraph (B), shall not exceed the total Ceiling Price set forth in Section B.

(D) The sum of (C) above and the EPA Adjustment amount (positive or negative) shall be the revised billing price; provided that in no event shall the revised billing price exceed the sum of (i) the product of four point zero (4.0) percentage points applied to the Section B Target Cost plus (ii) the Section B Ceiling Price.

(iii) The revised billing price determined as stated above shall be set forth separately in a supplemental agreement to this contract, which also shall set forth the computations upon which the revision of the billing price is based.

(iv) Any revision of the billing prices shall not affect the determination of the total final price(s) under paragraph (d) of the "Incentive Price Revision--Firm Target (FAR 52.216-16)" clause. After execution of the contract modification referred to in subparagraph (d)(3) of said clause, the total amount paid or to be paid on all invoices or vouchers shall be adjusted to reflect the total final price(s), and any additional payments, refunds, or credits resulting therefrom shall be promptly made.

(c) Allocated Total Contract Price of Each Vessel

For the purpose of this requirement, the allocated total contract price of each vessel shall be established by multiplying the total contract price(s) by a percentage, expressed as a decimal carried to four decimal places, equal to that fraction whose numerator is the original unit target price of the vessel and whose denominator is the original total target price. The resulting dollar amount shall be rounded to the nearest one hundred thousand dollar ($100,000), upward or downward; provided that in no event shall the sum of the allocated total contract price of the vessel(s) exceed the total contract price(s). The aforesaid percentages of each vessel shall be revised, by contract modification, in the event that either:

(1) Equitable adjustments to the unit target prices of the vessels result in unit target prices of a substantially different proportion to the total target prices than previously provided for under this subparagraph (c); or

(2) Incurred costs indicate that a revision to the percentages is appropriate; , , any such revision shall not be made more provided however frequently than at the end of a calendar quarter unless the total contract price(s) is(are) limited to the contract ceiling price(s) and the contract ceiling price(s) is(are) adjusted during the calendar quarter.

(d) Invoices

Invoices may be submitted every two weeks, but not more frequently; , , that if after contract award more frequent progress provided however payments are approved by the cognizant Government authority, this requirement shall be modified accordingly without additional consideration by the Contractor to the Government for such modification. No payment will be required to be made upon invoices aggregating less than five thousand dollars ($5,000).

The Contractor shall certify on each invoice:

(1) The percentage of physical progress in the performance of work on the vessel as a decimal carried to four places; and

(2) The allowable costs incurred in the performance of the work on the vessel as of the date the invoice is submitted. Such certification shall provide for cost category reporting in accordance with the Contractor's normal accounting system and shall be broken down into direct material, direct labor, and indirect costs.

(e) Physical Progress and Weighting Factors

(1) Within sixty (60) days after contract award the Contractor shall submit a progressing system description for review and approval by the Contracting Officer. Upon approval of such system, progress payments shall be in accordance with the approved system. Subsequent revisions to the approved system shall be submitted to the Contracting Officer for approval prior to implementation.

(2) The mutually agreed upon weighting factors for the categories of labor and material for each vessel are set forth in Attachment , to this contract. The weighting factors shall be revised quarterly concurrent with the billing price revisions specified in paragraph (b). Notwithstanding the above, revision of weighting factors may be requested by either party when factual data indicate that the weighting factors then in use are no longer representative of the actual labor and material distribution. Revisions of weighting factors shall be supported by detailed (estimated final) direct material, direct labor, and indirect costs and additional data concerning the cause of the change in the weighting factors. Any change in the weighting factors shall be set forth in a supplemental agreement to this contract.

(f) Incurred Costs

For the purpose of this contract requirement, "incurred costs" are those costs identified through the use of the accrual method of accounting, as supported by the records maintained by the Contractor and which are allowable in accordance with Part 31 of the Federal Acquisition Regulation (FAR) and Part 231 of the Department of Defense FAR Supplement (DFARS) in effect on the effective date of this contract and include only:

(1) Costs for items or services purchased directly for the contract that have been paid by cash, check, or other form of actual payment; or when the Contractor is not delinquent in paying costs of contract performance in the ordinary course of business, costs incurred, but not necessarily paid, for items or services purchased directly for the contract and associated financing payments to subcontractors provided payments will be made;

(i) In accordance with the terms and conditions of a subcontract or invoice; and

(ii) Ordinarily prior to the submission of the Contractor's next payment request to the Government; and

(2) Costs incurred, but not necessarily paid, for materials issued from the Contractor's stores inventory and placed in the production process for use on the contract, for direct labor, for direct travel, for other direct in-house costs and for properly allocable and allowable overhead (indirect) costs, all as shown by records maintained by the Contractor for the purpose of obtaining payment under Government contracts, provided that the Contractor is not delinquent in payment of costs of contract performance in the ordinary course of business; and

(3) With respect to allocated and allowable costs of pension contributions, when pension contributions are paid by the Contractor to the retirement fund less frequently than quarterly, accruals of the costs of these pension contributions shall be excluded from the Contractor's incurred costs until such costs are paid. If pension contributions are paid on a quarterly or more frequent basis, accruals of such costs may be included in the Contractor's incurred costs, provided that the pension contributions are paid to the retirement fund within thirty (30) days after the close of the period covered by payment. If payments are not paid within such thirty (30) day period, pension contributions shall be excluded from the Contractor's incurred costs until payment therefor has been made.

(4) Incurred costs shall not include any costs which are required under any requirement of this contract "" to be reimbursed or paid by the Government to the Contractor or by the Contractor to the Government other than through an equitable adjustment in the contract price(s).

(5) If an overpayment is made relative to this paragraph (f), interest shall be charged at the prevailing per annum rate established by the Secretary of the Treasury, pursuant to Public Law 92-41, from the date such overpayment is made until the date the overpayment is fully recovered.

(g) Retentions

(1) Upon preliminary acceptance of each vessel and upon the submission of properly certified invoices, the Government will pay to the Contractor the amount withheld under paragraph (a) of this requirement in respect of that vessel in excess of (i) a performance reserve in the amount of one and one-half percent (1.5%) of the total contract price for such vessel, or (ii) one hundred thousand dollars ($100,000), whichever is greater. If at any time it shall appear to the Government that the amount of performance reserve may be insufficient to meet the cost to the Government of finishing any unfinished work under the contract for which the Contractor is responsible, or of correcting defects for which the Contractor is responsible which are discovered prior to preliminary acceptance or during the guaranty period of any vessel, the Government may, in making payments under this requirement, deduct or withhold such additional amounts as it may determine to be necessary to render such reserve adequate;

, that any additional amounts deducted or withheld on account of defects which are discovered during the guaranty period of the vessel provided shall not exceed the limit of the Contractor's liability as set forth in the contract requirement entitled "Limitation Of Contractor's Liability For Correction Of Defects", reduced by the amounts of the cost incurred by the Contractor for work on such vessel because of Contractor responsible deficiencies which are discovered during the guaranty period of the vessel.

(2) The Government may, in its discretion, make payments prior to final settlement on account of the reserves established under this requirement, subject to such conditions precedent as the Contracting Officer may prescribe.

(3) The Government shall, at the time of final settlement, in accordance with the provisions of the contract requirement entitled "Final Settlement", pay the Contractor the balance owing to it under the contract promptly after the amount of such balance shall have been determined.

(h) Certifications and Audits

At any time or times prior to final payment under this contract, the Contracting Officer may have any invoices and statements or certifications of costs audited. The Contracting Officer may require the Contractor to submit, or make available for examination by the Contracting Officer or his designated representative, the supporting documentation upon which invoices, statements or certifications of costs are based. Each payment theretofore made shall be subject to reduction as necessary to reflect the exclusion of amounts included in the invoices or statements or certifications of costs which are found by the Contracting Officer, on the basis of such audit, not to constitute allowable costs. Any payment may be reduced for overpayments, or increased for underpayments on preceding invoices.

(i) Reduction or Suspension

The Contracting Officer may reduce or suspend payments after finding on substantial evidence any of the following conditions:

(1) The Contractor failed to comply with any material requirement of this contract (including but not limited to such requirements as quality, safety, care and protection).

(2) Performance of this contract is endangered by the Contractor's

(i) Failure to make progress; or

(ii) Unsatisfactory financial condition

(3) Inventory allocated to this contract substantially exceeds reasonable requirements.

(End of Text)

Section C - Description/Specifications/Statement of Work

1. Scope:

1.1 Title: WALK-IN REFRIGERATED BOX

1.2 Job Order: TBD

1.3 Six (6) each: Self-contained walk-in refrigerated box (electric) for acceptable space for food and medicine storage.

1.4 Location of work:

1.4.1 NORFOLK NAVAL SHIPYARD (NNSY) Inside NNSY waterfront CIA area in support of the Project at Pier 5A. (location subject to change within NNSY).

2. Reference and Guiding Documents:

2.1 Refrigerated boxes shall comply with all governing codes and Naval Standards including the most recent Unified Facilities Criteria, International Building Code 2012, ADA and Requirements for Lifting Equipment.

2.2 United Facilities Criteria (UFC) 1-200-01, 3-301-01, 3-600-01.

2.3 National Fire Protection Association (NFPA) 1, Fire Code.

2.4 National Fire Protection Association (NFPA) 70, National Electrical Code (NEC).

2.5 Federal Specification RR-C-271H.

2.6 Hazardous Energy Control (HEC) procedures as identified in NAVSEA's Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision) (See web site in section 8.1.(b)).

3. General Specifications and Requirements:

3.1 Equipment Requirements:

3.1.1 Unit(s) will be cleaned, disinfected, and ready to store food or medicine prior to delivery.

3.1.2 Each unit shall be a minimum of 8' wide x 8' high (not including refrigeration unit) x 40' long.

3.1.3 Unit shall be electrically powered and capable of running 24 hours a day / 7 days a week. See attached enclosures (1), (2), (3) and (4).

3.1.4 Unit shall be rated at 200 amps or less. See attached enclosures (1), (2), (3) and (4).

3.1.5 Unit shall be capable of keeping a constant temperature of -3 degrees to 42 degrees (Fahrenheit).

3.1.6 Each unit shall be hurricane proof to 110 MPH winds and must be water resistant.

3.1.7 Each unit that has forklift connections in lieu of overhead rigging equipment and associated gear shall have forklift channels 5"x10" inside dimension the full width of the unit and enclosed on sides.

3.1.8 There shall be no windows in the units.

3.1.9 Each unit shall have exterior camlok connections to box feeding a 600 Volt, 40A (amp) 2-pole circuit breaker enclosed in a NEMA 3R enclosure feeding a 15kva, 440/240V primary:240/120V secondary, single-phase transformer. This is to feed a 15 kva, 480/240 volt primary, 240/120 volt secondary single phase transformer (see enclosure (2)). See enclosure (4) for a list of exterior equipment. Equivalent material may be substituted. Power cable end fittings (camlok) will be lugged and color coded to indicate proper phasing. See attached enclosures (1), (2), (3) and (4).

3.1.10 Each unit shall be in compliance with applicable NFPA and NEC requirements.

3.1.11 Each unit shall comply with the applicable OSHA regulations.

3.1.12 Provide a decal on each unit with the following information: Contractor company name, contract number and a unique number. The unique number must be different on each unit. The decal shall have the following: minimum of 8.5" x 11" in size, white in color with black writing. The decal is to be located on one of the doors of the unit. If the half of the unit does not have a door, an 11/3" x 4" at minimum label shall be placed on the electrical panel on the inside of the unit.

3.1.13 Each unit doors are to swing outward, and the doors must be capable of being locked.

3.1.14 Units shall be capable of being moved via forklift and/or lifting pad eyes. Unit shall have weight clearly marked for lifting purposes.

3.1.15 The equipment shall be outfitted with suitable attachments for overhead lifting (if applicable). This is not applicable for forklift lifting.

3.1.16 Each lifting attachment shall be capable of supporting one half the gross weight of the equipment with a design factor of five to one based on ultimate strength.

3.1.17 Each lifting attachment shall be designed to accept a standard anchor shackle (Federal Specification RR-C-271D, type IVA) which is capable of supporting one half the gross weight of the equipment.

3.1.18 Design of the lifting attachments shall be such that the shackles are not side loaded. This is not applicable for forklift lifting.

3.1.19 Each lifting attachment shall be conspicuously marked in a contrasting color "Lift Here". Letters shall have a minimum height of 1".

3.1.20 The equipment shall be provided with a lifting sketch / rigging diagram.

3.1.21 The lifting sketch shall detail any specific requirements and / or configurations that must be meet prior to lifting (i.e. "engage swing lock", "Tilt mast back fully", "Rotate lifting basket over side", "Utilize 10' minimum length slings", "Spreader beam required", etc.). This is not applicable for forklift lifting.

3.2 One row of surface mount fluorescent twin tube strip type interior light fixtures with energy efficient electronic ballast and 32 watt fluorescent bulbs. Mount in center of enclosure. Light fixtures shall be blast proof.

3.3 All Wire must be THHN or THWN, 75 degrees Celsius (min), size as indicated. Do not substitute wiring type/temperature rating unless the ampacity of wire and conduit fill requirements are evaluated to ensure NEC compliance.

3.4 Electrical Metallic Tubing (EMT) is specified on drawings. The NEC requires EMT to be supported within 3 ft of each box or conduit body and supported every 10 ft (min).

3.5 Liquid Tight Flexible Metal Conduit (LFMC) may be used on the exterior instead of EMT. The NEC requires LFMC to be supported within 1 ft of each box or conduit body and supported every 4.5 ft (min).

3.6 The NEC requires the following color code for electrical wires:

3.6.1 Neutral (grounded conductor) = white

3.6.2 Note: may be phased taped white if larger than #6 AWG.

3.6.3 Ground (Equipment grounding conductor) = green

3.7 Contractor may use a fusible disconnect switch, NEMA 3R with current limiting fuses rated the same size as the circuit breaker in the enclosure (2) (PC-4 and PC- 5).

3.8 Receptacles: 120 volt, 20 Amp Quad type receptacles wired on a #12 AWG (min of two Quad Receptacles per circuit). Provide (1) ea 120 volt, 15 amp duplex GFCI test type receptacle wired on a dedicated circuit mounted on the exterior in a weatherproof box beside the unit.

3.9 Receptacles: 120 volt, 20 Amp Quad type receptacles wired on a #12 AWG (min of two Quad Receptacles per circuit). Provide (1) ea 120 volt, 15 amp duplex GFCI test type receptacle wired on a dedicated circuit mounted on the exterior in a weatherproof box beside the unit.

3.10 A typical transformer wiring diagram is shown in enclosure (3) in the drawing, use the manufacturers wiring schematic to connect transformer (schematic usually located on front panel of transformer). Transformer size may be adjusted depending on load demand of walk in refrigerated box enclosure.

3.11 Transformer frame shall be bonded to unit frame using appropriate size bonding jumper from NEC table 250.122, per NEC.

3.12 Markings:

3.12.1 The equipment shall be marked in a prominent location with vendor Point Of Contact information (i.e. Name and cell phone number) and date of end of contract.

3.12.2 The equipment shall be marked in a prominent location with the gross weight. Marking shall be upper case letters of a contrasting color, with a minimum height of 1". Marking shall include the units (i.e. "pounds", "long tons", etc.).

4. Period of Performance:

4.1 JUNE15, 2026 through MAY 15, 2027 (Allow for change of date. Start time may change due to ship's schedule.) Contract shall include the option to extend the contract for up to two (2) each six (6) month periods in one (1) month increments. Rental extensions may terminate the rental of one or more units based on use by NNSY. This charge will be prorated.

5. Contractor Requirements:

5.1 Provide POC information (name and phone number) on the equipment for NNSY to notify contractor of equipment failures.

5.1.1 One-Day Passes, Contact Temporary Service Zone Manager (TSZM) and fill out visit request form, NNSY 5512/104, also this request form must be presented to Pass Office by (TSZM) POC at least one day (M-F) prior to the visit or earlier. Prior to visit contact delivery POC to assist in one day pass at the pass office and delivery POC will provide shipyard site (escort). Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

5.2 Delivery crew security clearance request is required for shipment offload within the Controlled Industrial Area at NNSY. Contractor shall arrange the Security clearance request with the pass office at NNSY. See DBIDS section 10.1 through 10.14 for DBIDS participants.

5.2.1 One-Day Passes, Contact Temporary Service Zone Manager (TSZM) and fill out visit request form, NNSY 5512/104, also this request form must be presented to Pass Office by (TSZM) POC at least one day (M-F) prior to the visit or earlier. Prior to visit contact delivery POC to assist in one day pass at the pass office and delivery POC will provide shipyard site (escort). Participation in the DBIDS is not mandatory, and if the Contractor chooses to not participate, the Contractor's personnel will have to obtain daily passes, be subject to daily mandatory vehicle inspection, and will have limited access to the installation. The Government will not be responsible for any cost or lost time associated with obtaining daily passes or added vehicle inspections incurred by non-participants in the DBIDS.

5.3 Deliver and retrieve the walk-in refrigerated box to Norfolk Naval Shipyard, Portsmouth Virginia, inside the Controlled Industrial Area.

(Exact location to be shown upon delivery by escort or (TSZM)).

5.4 Connect the accessory equipment that is not integral to the walk-in refrigerated box. See attached enclosures (1), (2), (3) and (4).

5.5 Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on location of work cognizance must adhere to Federal OSHA requirements for hazardous energy control lAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA's Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY (TSZM) Points of Contact (TPOCs) and/or Contracting Officer's Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work require the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.8-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags- Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.

5.6 Provide commercial operating instruction manuals for the walk-in refrigerated box to (TSZM) POC.

5.7 Provide 24 hour a day, seven-day a week on-call repair service during the rental period. The vendor will be responsible for initiating repairs on-site, at Norfolk Naval Shipyard, within 12 hours of verbal or written notification that the equipment has malfunctioned. The contractor will replace the malfunctioning component if the system cannot be returned to service within 16 hours of being notified of the original malfunction.

5.8 Before any leased/purchased temporary production facility will be accepted by the government an inspection at location of work will be performed to ensure that the contractor has provided a product that conforms to the agreed specifications. If the inspection is not satisfactory, the contractor has 3 business days to correct the discrepancies (at contractor's cost) or the temporary production facility will not be accepted by the government.

5.9 Contractor provides a representative within 24 hours in order to modify units in the event the customer determines the units do not meet contract specifications.

5.10 Contractor personnel shall notify the (TSZM) POC for authorization prior to any work or maintenance on rental unit.

5.11 Lost items by Government personnel and equipment damaged beyond normal wear and tear Contractor must submit a claim separate from rental. This is to be submitted within 30 days of the end of the rental period.

5.12 The rental period shall be for slightly over three months with the option to return the unit to the contractor prior to end of contract allowing for a contract price reduction prorated per the monthly rate. The contract shall also include options for increasing the length of the rental for up to two six months increments beyond original contract.

5.13 Contractor to contact (TSZM) prior to the end of rental period to confirm pickup date.

6. Government Responsibility:

6.1 Government shall provide contractor ready access to the job location during contractor's working hours (i.e., weekdays between the hours of 7:30 AM and 4:00 PM). Emergent services outside these hours will require government approval and will be no cost to the government. The government is responsible for the cost of all additional approved or requested maintenance and repairs not specifically covered under this Agreement or any applicable warranties. The government will prevent anyone other than contractor from maintaining, repairing or modifying its product.

6.2 The government agrees to, upon satisfactory delivery and installation; connect walk in refrigerated boxes to temporary services. The government will also have temporary services disconnected upon completion of the contract in order to allow the contractor to remove the container or equipment from the shipyard.

6.3 The government will provide a COR, from code 400 to this project to maintain the contract is being completed and a C400/COR representative will be the point of contact to escort, if needed, once the contract is award.

7. Points Of Contact:

7.1 Technical POC:

TBD

Invoice Certifier / Delivery POC / Temporary Service Zone Manager (TSZM):

TBD

Contracting Officer Representive:

TBD

8. Safety Requirements:

8.1 "Per FAR 22.102-1(a) entitled "Safety", Contractors are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard cognizance must follow Federal and State OSHA requirements OSHE OSHECM Chapter Hazardous Energy Control (HEC) requirements or safety requirements for site specific location of the contract.

a. Contractors and Non-NNSY Government Agencies (NNGAs) are hereby informed that their employees or representatives present on property under Norfolk Naval Shipyard (NNSY) cognizance must adhere to Federal OSHA requirements for hazardous energy control IAW 29 CFR 1915.89 and must follow Hazardous Energy Control (HEC) procedures as identified in NAVSEA's Occupational Safety, Health, and Environment Corporate Manual (OSHECM) Chapter 250 (latest revision), when performing work under NNSY contract. All HEC work to be performed by Contractors and NNGAs requires that NNSY Technical Points of Contact (TPOCs) and/or Contracting Officer's Representatives (CORs) be notified of the HEC scope of work prior to starting work. Any changes or deviations in the initial scope of HEC work requires the NNSY TPOCs and/or CORs be informed of the change/deviation. Appendix 250.B-1 through B-3 of OSHECM Chapter 250 for multiple employer work identifies when Contractors and NNGAs are required to assign their Lockout/Tags-Plus Coordinator (LOTC) to coordinate HEC work with the cognizant NNSY LOTC. HEC locks shall be provided by the contractor or NNGA for their employees use. The HEC locks shall have red bodies with name labels or name tags affixed, identifying who installed the HEC lock(s) and a point of contact telephone number. HEC lock name labels and tags must be made of materials that will hold up to the environment to which they are exposed. HEC tags used for Tags-Plus HEC work shall be provided by the cognizant NNSY LOTC to the contractor or NNGA for their use if machinery, equipment, or systems (MES) cannot be locked out. OSHECM Chapter 250 Tags-Plus procedures will be strictly followed.

b. Contractors and NNGAs may obtain electronic copies of OSHECM Chapter 250 (latest revision) and access the OSHA 1915.89 web site by using the following link to NNSY's public access web site: http://www.navsea.navy.mil/shipyards/norfolk/default.aspx

c. Names and contact information for NNSY LOTCs and/or the Building Monitor will be provided by NNSY TPOC and/or Contracting Officer Representative set forth elsewhere in this award document.

Defense Biometric Identification System and NAVSEA Badging (REQUIRED FOR ALL CONTRACTS)

All contractors, with the exception of permanent party (or "seated" contractors with Common Access Cards (CACs), will be required to obtain a DBIDS card to gain access to NNSY.

Procedure for receiving a DBIDS card:

a. Contractor will complete the SECNAV 5512 form(s) and forward them to their NNSY Sponsor/Contracting Officer's Representative (COR).

b. The sponsor will complete the CVS spreadsheet utilizing the information on the completed SECNAV5512 forms and forward all documents to Commander Navy region Mid-Atlantic (CNRMA) for vetting.

c. CNRMA will add the contractor to the "179-Day List" which is utilized by the Pass and ID office to create the DBIDS card.

d. Once on the 179-Day List, the contractor may go to Pass and ID to have their DBIDS card generated.

e. Green NAVSEA access badges can be generated at this point with contractors providing proof of U.S. Citizenship (Birth Certificate/ US Passport).

Portable Electronic Devices (PEDs) (REQUIRED FOR ALL CONTRACTS)

A PED is defined as any non-stationary electronic apparatus with singular or multiple capabilities of, but not limited to recording, storing, and /or transmitting data, voice, video, or photo images (e.g., cell phones, laptops, tablets and wearable devices such as fitness bands and smart watches).

a. NAVSEA 04 Ser 04/281 IMPLEMENTATION PLAN FOR ALLOWING CAMERA-PORTABLE ELECTRONIC DEVICES WITHIN

THE CONTROLLED INDSUTRIAL AREA

b. NAVSEAINST 2200.1A PORTABLE ELECTRONIC DEVICES POLICY

c. SECPROMAN Vol 1 5510.36 Rev E In accordance with ref (a), personally owned camera enabled PEDs will be authorized inside of the Controlled Industrial Area (CIA) and all Security Islands. Camera enabled PEDs will remain unauthorized within Controlled Nuclear Information Areas (CNIAs), Nuclear Work Areas (NWAs) and Open Storage Areas.

All PEDs, camera enabled or not, are still prohibited within NWAs and Open Storage Areas.

The allowance of camera enabled PEDs inside of the CIA and Security Islands does not negate existing photography policies. Unofficial photography, filming of video, or live streaming from the camera-enabled PED remains prohibited within the CIA or any NAVSEA controlled space outside of the CIA. Further, audio recordings (both digitally or magnetically) in NAVSEA spaces is prohibited without the approval of the Code 1120 Security Director.

Submarine SPECIFIC PEDs Instructions: In accordance with COMSUBLANT/ COMSUBPACINST 2075.1C, the use of PEDs while in or on Department of Navy Submarines are prohibited.

Access to Classified Information or Spaces

All contractors executing this contract are required to have a minimum security clearance of ___________ (Completed by SME).

All contractors requiring access to classified information, or those spaces containing un-sanitized classified information, shall possess a final security clearance.

In addition to completing the steps above, if the contractor in accordance with the requirements of the contract, the contracting company's Facility Security Officer is required to submit a visit request in the Defense Information System for Security (DISS) to Security Management Office (SMO) Code 001816.

The SMO Code(s) of the ship or command the contractor is visiting are not to be utilized.

After receiving a DBIDS card, their visit request, security clearance and access permissions (verified in DISS) are reviewed to ensure they meet the minimum security requirements set forth in the contract. Once verified, the contractor will receive the appropriate NAVSEA access badge.

RESTRICTED DATA SPECIFIC

All contractors requiring a red NAVSEA badge and access to Restricted Data (RD) shall have a final security clearance.

Red NAVSEA badge personnel may require access to Nuclear Areas, Nuclear Information, Nuclear equipment, Naval Nuclear Propulsion Information (NNPI), RD, and Not Releasable to Foreign Nationals (NOFORN) data due to the nature of the work being performed on Naval Nuclear propulsion systems.

A red NAVSEA badge is necessary for the execution of nuclear and some non-nuclear work; inclusive of the propulsion plant and secondary spaces as well as those systems which support the propulsion plants which may not be located in the propulsion plant when any of those spaces can't be sanitized.

Access to RD and the issuance of red NAVSEA badges will be issued in accordance with NAVSEA M-5510.2.

CONTROLLED UNCLASSIFIED INFORMATION ACCESS

The DoD will provide information to contractors and will identify all information which is Controlled Unclassified Information (CUI) via the contracting vehicle, in whole or part, and will mark such documents, material, or media in accordance with this issuance.

When CUI is generated by non-DoD entities protective measures and dissemination controls, including those directed by relevant law, regulation, or government-wide policy, will be articulated in the contract, grant, or other legal agreement, as appropriate. DoD contracts must require contractors to monitor CUI for aggregation and compilation based on the potential to generate classified information pursuant to security classification guidance addressing the accumulation of unclassified data or information. DoD contracts require contractors to report the potential classification of aggregated or compiled CUI to a DoD representative.

Contractors, pursuant to mandatory DoD contract provisions, will submit unclassified DoD information for review and approval for release in accordance with the standard DoD Component processes and DoDI 5230.09.

All CUI records must follow the approved mandatory disposition authorities whenever the DoD provides CUI to, or CUI is generated by, non- DoD entities in accordance with Section 1220-1236 of Title 36, CFR, Section 3301a of Title 44, U.S.C., and this issuance.

SEATED CONTRACTOR SPECIFIC

All contractors who receive CACs and are granted access to Navy or NNSY information technology systems and are stationed at NNSY as their permanent work location are considered to be "seated" contractors.

All seated contractors will be required to report to BLDG 1502, 2nd floor to the Personnel Security Office (Code 1127) for check-in. Code 1127 will own the seated contractor in the system of record and will be responsible for the maintenance for the contractor's security profile.

All seated contractors will be required to attend, at a minimum, the security education portion of NNSY New Employee Orientation.

The security education portion will contain, but is not limited to, Antiterrorism Level 1, Combatting Trafficking in Persons, Active Shooter training, Information Security, Personnel Security, and Operations Security Awareness training.

Further, all seated contractors will be required to complete all annual computer based security refresher training, which is tracked and verified by the training coordinator for the code to which the contractor is assigned.

Requirements H.P. Compressor Rental - Walk-in Refrigerated Units for Organization 1210 - Waterfront Business Operations Division FY: 2026, AMS: N42158-26-SIMACQ-NNSY-1210-0039

Additional Regulation or Supplemental Clauses Incorporated by Full Text

C-202-H001 ADDITIONAL DEFINITIONS--BASIC (Oct 2018)

(a) Department means the Department of the Navy.

(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) . The number assigned to each approved Item Identification under the National Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.

(2) . The National Stock Number (NSN) for an item of supply consists of the applicable National Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(Endof Text)

C-202-H002 ADDITIONAL DEFINITIONS–ALTERNATE I (Oct 2018)

(a) Department means the Department of the Navy.

(b) Commander, Naval Sea Systems Command means the Commander of the Naval Sea Systems Command of the Department of the Navy or his duly appointed successor.

(c) References to The Federal Acquisition Regulation (FAR) All references to the FAR in this contract shall be deemed to also reference the appropriate sections of the Defense FAR Supplement (DFARS), unless clearly indicated otherwise.

(d) National Stock Numbers Whenever the term Federal Item Identification Number and its acronym FIIN or the term Federal Stock Number and its acronym FSN appear in the contract, order or their cited specifications and standards, the terms and acronyms shall be interpreted as National Item Identification Number (NIIN) and National Stock Number (NSN) respectively which shall be defined as follows:

(1) . The number assigned to each approved Item Identification under the National Item Identification Number (NIIN) Federal Cataloging Program. It consists of nine numeric characters, the first two of which are the National Codification Bureau (NCB) Code. The remaining positions consist of a seven digit nonsignificant number.

(2) . The National Stock Number (NSN) for an item of supply consists of the applicable National Stock Number (NSN) four-position Federal Supply Class (FSC) plus the applicable nine-position NIIN assigned to the item of supply.

(e) NAVSEA 08 means the Deputy Commander, Nuclear Propulsion Directorate, Naval Sea Systems Command of the Department of the Navy.

(f) Lead Shipbuilder, Lead Yard or Lead Shipyard mean in its capacity as Contractor under Contract No. ( )List contractor (List for the construction of the Contract) (List first ship of the class).

(g) Follow Shipbuilder, Follow Yard or Follow Shipyard mean a prime contractor performing a contract for the construction of follow ships of the (List ship class) Class.

(h) Lead Ship or First Ship of the Class mean the ( .)List first ship

(i) Follow Ship - means any ship of the Class other than the first ship.( )List class

(j) Design Agent means in its capacity as Design Agent, not in its capacity as shipbuilding contractor.( )List contractor

(End of Text)

C-211-H020 PROTECTION OF THE VESSEL (NAVSEA) (MAR 2019) (Mar 2019)

(a) The Contractor shall exercise reasonable care, as agreed upon with the Supervisor, to protect the vessel from fire, and shall maintain a system of inspection over the activities of its welders, burners, riveters, painters, pipe fitters, and similar workers, and of its subcontractors, particularly where such activities are undertaken in the vicinity of the vessel's magazines, fuel oil tanks, or store rooms containing inflammable materials. All ammunition, fuel oil, motor fuels, and cleaning fluids shall have been offloaded and the tanks cleaned, except as may be mutually agreed upon between the Contractor and the Supervisor prior to work on the vessel by the Contractor. Fire hose lines shall be maintained by the Contractor ready for immediate use on the vessel at all times while the vessel is berthed alongside the Contractor's pier or in dry dock. All tanks under alteration or repair shall be cleaned, washed, and steamed out or otherwise made safe to the extent necessary, and the Contractor shall furnish the vessel's Gas Free Officer and the Supervisor with a "Gas Chemists' Certificate" before any hot work is done. The Contractor shall maintain a fire watch aboard the vessel in areas where the Contractor is working. All other fire watches aboard the vessel shall be the responsibility of the Government.

(b) Except as otherwise provided in contractually invoked technical specifications or NAVSEA furnished directives, while the vessel is at the Contractor's plant and when the temperature becomes as low as thirty five degrees Fahrenheit, the Contractor shall assist the Government when requested in keeping all pipelines, fixtures, traps, tanks, and other receptacles on the vessel drained to avoid damage from freezing, or if this is not practicable, the vessel shall be kept heated to prevent such damage.

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .