Solicitation - N0017326R0008.pdf

PDF 3 MB Posted

Attached to
Optoelectronics, Power Electronics and Radiation Effects
Solicitation number
N0017326R0008
Issued by

About this file

This is a Request for Proposal (RFP) for a Cost Plus Fixed Fee Term contract to provide research and development support in optoelectronics, power electronics, and radiation effects at the Naval Research Laboratory (NRL).

The contract requires the selected contractor to provide comprehensive R&D capability to NRL Codes 6810 and 6880, addressing expertise gaps in semiconductor materials, devices, and circuits development. Key task areas include: semiconductor material/device/circuit modeling and simulation; semiconductor growth and device fabrication using techniques such as molecular beam epitaxy (MBE), organometallic vapor phase epitaxy (OMVPE), and atomic layer deposition (ALD); semiconductor characterization using structural, electrical, and optoelectronic measurement techniques; reliability and environmental testing in simulated space environments; high power electronics development; and advanced optical measurement capabilities. Tasks 6-8 are classified at TS/SCI level and must be performed on-site at NRL within Sensitive Compartmented Information Facilities (SCIFs), while Tasks 1-5 are unclassified but performed on-site at the NRL facility in Washington, D.C. The base period is twelve months with four optional one-year periods (total five years), plus a potential six-month extension under FAR clause 52.217-8. The anticipated contract will be funded from multiple sources with estimated total labor costs of approximately $10.36 million across the five-year period. Proposals must include technical approach, past performance documentation, detailed cost proposals with substantiating data, and small business participation plans. Award will be based on a best-value tradeoff analysis with technical capability being significantly more important than cost, past performance, or small business participation factors. The proposal deadline is 16 October 2026 at 18:00 PM local time, submitted via email to the Contract Specialist. Personnel must possess required security clearances (minimum Secret for unclassified tasks, Top Secret/SCI for classified tasks), and key personnel identified in the proposal cannot be changed without contracting officer approval during the first twelve months.

View the file

Other files

Show all 11

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

SECTION

15A. NAME AND

ADDRESS

OF OFFEROR

SOLICITATION, OFFER, AND AWARD 1. This Contract is a Rated Order under the Defense Priorities and Allocations System (DPAS) - Code of Federal Regulations - at 15 CFR 700.

RATING PAGE OF PAGES

2. CONTRACT NUMBER 3. SOLICITATION NUMBER 4. TYPE OF SOLICITATION 5. DATE ISSUED 6. REQUISITION/PURCHASE NUMBER

CODE7. ISSUED BY 8. ADDRESS OFFER TO (If other than item 7)

NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid" and "bidder".

SOLICITATION

9. Sealed offers in original and copies for furnishings the supplies or services in the Schedule will be received at the place specified in item 8, or if hand carried, in the depository located in until local time

CAUTION - LATE Submissions, Modifications, and Withdrawals: See Section L, Provision Number 52.214-7 or 52.215-1. All offers are subject to all terms and conditions contained in this solicitation.

10. FOR

INFORMATION

CALL:

A. NAME B. TELEPHONE (NO COLLECT CALLS)

AREA CODE NUMBER EXTENSION

C. EMAIL ADDRESS

11. TABLE OF CONTENTS

(X) DESCRIPTION PAGE(S) (X) SECTION PAGE(S)DESCRIPTION

A B C D E F G H

I

J

K

L

M EVALUATION FACTORS FOR AWARD

INSTRUCTIONS, CONDITIONS, AND NOTICES TO OFFERORS

REPRESENTATIONS, CERTIFICATIONS AND OTHER

STATEMENTS OF OFFERORS

PART IV - REPRESENTATIONS AND INSTRUCTIONS

LIST OF ATTACHMENTS

PART III - LIST OF DOCUMENTS, EXHIBITS AND OTHER ATTACHMENTS

CONTRACT CLAUSESSOLICITATION/CONTRACT FORM

SUPPLIES OR SERVICES AND PRICES/COSTS

DESCRIPTION/SPECIFICATIONS/WORK STATEMENT

PACKAGING AND MARKING

INSPECTION AND ACCEPTANCE

DELIVERIES OR PERFORMANCE

CONTRACT ADMINISTRATION DATA

SPECIAL CONTRACT REQUIREMENTS

NOTE: Item 12 does not apply if the solicitation includes the provisions at 52.214-16, Minimum Bid Acceptance Period.

OFFER (Must be fully completed by offeror)

12. In compliance with the above, the undersigned agrees, if this offer is accepted within calendar days (60 calendar days unless a different period is inserted by the offeror) from the date for receipt of offers specified above, to furnish any or all items upon which prices are offered at the set opposite each item, delivered at the designated point(s), within the time specified in the schedule.

13. DISCOUNT FOR PROMPT PAYMENT

(See Section I, Clause Number 52.232-8)

14. ACKNOWLEDGMENT OF AMENDMENTS

(The offeror acknowledges receipt of amendments to the SOLICITATION for offerors and related documents numbered and dated):

10 CALENDAR DAYS (%) 20 CALENDAR DAYS (%) 30 CALENDAR DAYS (%) CALENDAR DAYS (%)

DATEAMENDMENT NUMBERAMENDMENT NUMBER DATE

CODE FACILITY 16. NAME AND THE TITLE OF PERSON AUTHORIZED TO SIGN OFFER

(Type or print)

15B. TELEPHONE NUMBER

AREA CODE NUMBER EXTENSION

15C. CHECK IF REMITTANCE ADDRESS IS

DIFFERENT FROM ABOVE - ENTER

SUCH ADDRESS IN SCHEDULE.

17. SIGNATURE 18. OFFER DATE

AWARD (To be completed by Government)

19. ACCEPTED AS TO ITEMS NUMBERED 20. AMOUNT 21. ACCOUNTING AND APPROPRIATION

22. AUTHORITY FOR USING OTHER THAN FULL OPEN COMPETITION UNDER THE

UNITED STATES CODE AT:

10 U.S.C. 3204(a) ( )41 U.S.C. 3304(a)

24. ADMINISTERED BY (If other than Item 7)

26. NAME OF CONTRACTING OFFICER (Type or print)

IMPORTANT - Award will be made on this Form, or on Standard Form 26, or by other authorized official written notice.

AUTHORIZED FOR LOCAL REPRODUCTION

Previous edition is unusable

23. SUBMIT INVOICES TO ADDRESS SHOWN IN

(4 copies unless otherwise specified)

25. PAYMENT WILL BE MADE BY

27. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

28. AWARD DATE

CODE

ITEM

STANDARD FORM 33 (REV. 12/2022)

Prescribed by GSA - FAR (48 CFR) 53.214 (c)

SEALED BID (IFB) INVITATION FOR BID

NEGOTIATED (RFP) REQUEST FOR

PROPOSAL

(Hour) (Date)

PART I - THE SCHEDULE PART II - CONTRACT CLAUSES

Created On:

16 Sep 2026, 21:22 PM Greenwich Mean Time

Section A - Solicitation/Contract Form

Optoelectronics, Power Electronics and Radiation Effects Research

N0017326R0008

Section B - Supplies or Services & Prices or Costs

Additional Information/Notes

B-1.0 TRAVEL COST

(a) The Contractor shall travel as required to meet the requirements of the Statement of Work. Travel shall be billed exclusive of fee. Travel will be reimbursed at actual direct cost in accordance with the limitations set forth in FAR 31.205-46 and IAW the Joint Travel Regulations (JTR).

(b) The Contractor shall obtain pre-approval from the Contracting Officer's Representative for all travel requirements (including plans, agenda, itinerary, or dates) (subject to local policy & procedures).

(c) Travel to other government facilities or other contractor facilities may be required and will be specified in the technical instruction.

(d) Relocation costs and travel costs incidental to relocation are allowable to the extent provided for in FAR 31.204- 35; however, contracting officer approval shall be required prior to incurring relocation expenses and travel costs incidental to relocation.

(e) The Contractor shall not be reimbursed for the following daily local travel costs:

i. Travel at U.S. military installations where government transportation is available;

ii. Travel performed for personal convenience/errands, including commuting to and from work; and

iii. Travel costs incurred in the replacement of personnel when such replacement is accomplished for the Contractor's or employee's convenience.

B-2.0 OTHER DIRECT COSTS (ODC)

(a) The Contractor shall furnish the necessary ODCs including equipment and material required to meet the requirements of the Statement of Work.

ODCs shall be billed exclusive of fee.

(b) The Contractor shall obtain pre-approval from the Contracting Officer's Representative for all purchases in excess of $50,000.00.

Item Supplies/Service Quantity Unit Unit Price Amount

Labor The Contractor shall provide research and development labor as specified in in the Statement of Work (SOW) in Section C.

Pricing Arrangement: Cost Plus Fixed Fee

1 Lot

Travel The Contractor shall travel as required to accomplish the requirements in specified in the SOW in Section C. Travel shall be billed exclusive of fee. Travel will be reimbursed at actual direct cost IAW with the limitations set forth in FAR 31.205-46. Travel is in support of efforts under CLIN 0001.

Pricing Arrangement: Cost No Fee

1 Lot

Material and ODC's The Contractor shall provide research and development materials, supplies and ODC's as specified in the SOW in Section C. Materials and ODC's are in support of efforts under CLIN 0001.

Pricing Arrangement: Cost No Fee

1 Lot

Contract Data Requirements List (CDRL) The Contractor shall prepare and deliver data item(s) set forth in Exhibit A, DD Form 1423, CDRLs A001 - A004 and Section C, Statement of Work 1 Lot

Pricing Arrangement: Firm Fixed Price

Option Line Item

Labor The Contractor shall provide research and development labor as specified in in the Statement of Work (SOW) in Section C.

Pricing Arrangement: Cost Plus Fixed Fee

1 Lot

Option Line Item

Travel The Contractor shall travel as required to accomplish the requirements in specified in the SOW in Section C. Travel shall be billed exclusive of fee. Travel will be reimbursed at actual direct cost IAW with the limitations set forth in FAR 31.205-46. Travel is in support of efforts under CLIN 1001.

Pricing Arrangement: Cost No Fee

1 Lot

Material The Contractor shall provide research and development materials and supplies as specified in the SOW in Section C.

Materials are in support of efforts under CLIN 1001.

Pricing Arrangement: Cost No Fee

1 Lot

Option Line Item

Contract Data Requirements List (CDRL) The Contractor shall prepare and deliver data item(s) set forth in Exhibit A, DD Form 1423, CDRLs A001 - A004 and Section C, Statement of Work

Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Labor The Contractor shall provide research and development labor as specified in in the Statement of Work (SOW) in Section C.

Pricing Arrangement: Cost Plus Fixed Fee

1 Lot

Option Line Item

Travel The Contractor shall travel as required to accomplish the requirements in specified in the SOW in Section C. Travel shall be billed exclusive of fee. Travel will be reimbursed at actual direct cost IAW with the limitations set forth in FAR 31.205-46. Travel is in support of efforts under CLIN 2001.

Pricing Arrangement: Cost No Fee

1 Lot

Material The Contractor shall provide research and development materials and supplies as specified in the SOW in Section C.

Materials are in support of efforts under CLIN 2001.

Pricing Arrangement: Cost No Fee

1 Lot

Option Line Item

Contract Data Requirements List (CDRL) The Contractor shall prepare and deliver data item(s) set forth in Exhibit A, DD Form 1423, CDRLs A001 - A004 and Section C, Statement of Work

Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Labor The Contractor shall provide research and development labor as specified in in the Statement of Work (SOW) in Section C.

Pricing Arrangement: Cost Plus Fixed Fee

1 Lot

Option Line Item

Travel The Contractor shall travel as required to accomplish the requirements in specified in the SOW in Section C. Travel shall be billed exclusive of fee. Travel will be reimbursed at actual direct cost IAW with the limitations set forth in FAR 31.205-46. Travel is in support of efforts under CLIN 3001.

Pricing Arrangement: Cost No Fee

1 Lot

Material The Contractor shall provide research and development materials and supplies as specified in the SOW in Section C.

Materials are in support of efforts under CLIN 3001.

Pricing Arrangement: Cost No Fee

1 Lot

Option Line Item

Contract Data Requirements List (CDRL) The Contractor shall prepare and deliver data item(s) set forth in Exhibit A, DD Form 1423, CDRLs A001 - A004 and Section C, Statement of Work

Pricing Arrangement: Firm Fixed Price

1 Lot

Option Line Item

Labor The Contractor shall provide research and development labor as specified in in the Statement of Work (SOW) in Section C.

Pricing Arrangement: Cost Plus Fixed Fee

1 Lot

Option Line Item

Travel The Contractor shall travel as required to accomplish the requirements in specified in the SOW in Section C. Travel shall be billed exclusive of fee. Travel will be reimbursed at actual direct cost IAW with the limitations set forth in FAR 31.205-46. Travel is in support of efforts under CLIN 4001.

Pricing Arrangement: Cost No Fee

1 Lot

Material The Contractor shall provide research and development materials and supplies as specified in the SOW in Section C.

Materials are in support of efforts under CLIN 4001.

Pricing Arrangement: Cost No Fee

1 Lot

Option Line Item

Contract Data Requirements List (CDRL) The Contractor shall prepare and deliver data item(s) set forth in Exhibit A, DD Form 1423, CDRLs A001 - A004 and Section C, Statement of Work

Pricing Arrangement: Firm Fixed Price

1 Lot

Section C - Description/Specifications/Statement of Work The work and services to be performed hereunder shall be subject to the requirements and standards contained in Section C, Exhibit A - Contract Data Requirements List, and all other Attachments cited in Section J, which are incorporated by reference into Section C.

C-1.0 SATEMENT OF WORK (SOW)

SOW Title: Optoelectronics, Power Electronics, and Radiation Effects Research

1.0 INTRODUCTION

The Electronic Sciences and Technology Division (ESTD) of the U.S. Naval Research Laboratory is tasked with producing novel electronic devices having advanced properties and capabilities, and transitioning these devices to the warfighter. This is achieved through coordinated modeling, simulation, and design efforts. Designs are realized in working devices through semiconductor growth and fabrication, and the device performance is measured in the characterization laboratories within ESTD. ESTD researches technologies ranging from basic electronic materials to high-powered electronics, high-speed microwave devices, and optoelectronics, each with their own critical performance parameters such as efficiency of operation, responsiveness, and power output.

Within ESTD, Codes 6810 and 6880 are engaged in the development of advanced semiconductor materials, devices, and circuits for use in a wide array of applications including photovoltaics, infrared imaging, and advanced materials and devices for space applications. The potential application areas for these new technologies address a broad range of ground and space-based military missions, so the research includes reliability testing, physics of failure analysis, and space environmental testing. The goal of this task is to provide scientific and engineering support for advanced semiconductor materials, devices, and circuits to increase capability and reliability of military missions for both terrestrial and space applications.

2.0 OBJECTIVE

With such a wide range of research, there are often gaps in expertise for specific technical areas. The objective of this work is to provide Research and Development (R&D) capability to Codes 6810 and 6880 in key technical gap areas. This work will bring technical versatility, and agility to Codes 6810 and 6880 by enabling access to technical skills in a variety of areas. By so doing, we will enable continued responsiveness to the warfighter.

3.0 SCOPE

The contractor shall provide expertise to assist in a wide range of NRL research activities related to optoelectronics, power electronics, and radiation effects. The following task areas and descriptions indicate the specific nature of these research efforts.

4.0 TASKS

All tasks and sub-tasks are subject to CDRL A001, "Technical Reports & Presentation Materials".

4.1 Task : Semiconductor Material/Device/Circuit Modeling, Simulation, and Design1

4.1.1. The Contractor shall perform theoretical research to develop physics-based numerical models of electronic and atomic structure of electronic and optoelectronic devices. The goal of these efforts is to develop a theoretical basis for understanding the physics of operation of these systems.

4.1.2. The Contractor shall conduct experimental research on device model execution and interpretation of experimental data for device operation.

4.1.3. The Contractor shall develop specialized physics-based computer models for the simulation of linear and nonlinear optical interactions of ultrashort optical pulses with semiconductor materials and devices, and apply those models to understanding carrier generation and transport in materials and devices.

4.2 Task Semiconductor Growth, Processing and Device Fabrication2:

4.2.1. The Contractor shall grow semiconductor materials for producing the devices modeled in 4.1. The growth techniques Task shall include molecular beam epitaxy (MBE), organometallic vapor phase epitaxy, (OMVPE), atomic layer deposition (ALD), and sputter deposition as well as those techniques specified by the Task Manager.

4.2.2. The Contractor shall fabricate devices from materials grown in 4.2.1. The goal of this effort is to produce functional devices such as optical detectors, solar cells, field-effect transistors (FETs), and diodes that can be electrically or optoelectronically measured.

4.2.3. The Contractor shall fabricate integrated circuits by using the devices developed in 4.2.2, and integrating commercial off-the-shelf (COTS) parts for applications to be specified by the Task Manager. The application of interest often requires development beyond the discrete part (e.g. an integrated circuit). In these cases, circuits are to be fabricated using the parts that have been developed, and COTS as appropriate. Examples include optoelectronic applications such as focal plane arrays and the associated read-out circuits and solar cell arrays.

4.2.4. The Contractor shall fabricate and process semiconductor devices including the following: Removal of residual oxides from the backs of silicon wafers using both wet chemistry and plasma processes; deposition of metals using both shadow and lithographic masks, including the use of special non-radiative deposition equipment; performs material characterization using spectroscopic ellipsometry, stylus profilometry, and other characterization techniques as required for the specified material system.

4.3 Task 3: Semiconductor Material and Device Characterization

4.3.1. The Contractor shall characterize structural attributes for the materials, devices, and circuits grown and fabricated under this project. Structural characterization techniques may include optical microscopy, ellipsometry, x-ray diffraction, and electron microscopy. The results of these characterizations determine the atomic and crystalline structure of the materials grown within the project.

4.3.2. The Contractor shall characterize electrical attributes for the materials, devices, and circuits that are grown and fabricated under this project. Electrical characterization techniques include current-voltage (I-V), capacitance-voltage (C-V), AC conductance, and Hall effect. Characterization of active and/or passive microwave devices involves use of network analyzers, spectrum analyzers and other microwave test equipment to determine the linear and/or nonlinear characteristics of the devices.

4.4 Task 4: Reliability and Environmental Testing of Semiconductor Materials and Devices in Simulated Space Environments.

4.4.1. The goal of this task is to determine how the devices and circuits of interest perform in operational environments.

4.4.2. The Contractor shall conduct reliability testing for devices studied in this project. The reliability testing refers to measurement of the pertinent parameters from the devices and circuits to include electrical, optical and/or thermal properties of the devices. The reliability testing also includes failure analysis of the failed devices to determine failure modes and mechanisms.

1.1.2. The Contractor shall perform space environmental testing to evaluate the effects of particle irradiation on satellite subsystems, including, but not limited to: low-energy proton testing, energetic particle testing of optoelectronics and imaging systems, and heavy-ion and proton evaluations of single particle interactions in devices and integrated circuits, including high-speed technologies operating at gigabit per second data rates. Environmental testing is done to demonstrate the device and/or circuit performance in a relevant environment. This testing includes device and circuit characterization before, during, and after exposure to various environmental factors including electrical bias, particle irradiation, and optical approaches to simulating particle radiation effects. These measurements also include annealing studies after the simulated space environmental exposure.

4.4.4. The Contractor shall develop and implement linear and nonlinear optical approaches for carrier injection into semiconductor materials and devices for the purposes of simulating the effects of particle radiation on the materials and devices.

This task includes laser source development, experimental optical beam line development and characterization, measurement of the linear and nonlinear optical properties of relevant materials and material systems, as well as linear and nonlinear-optical experimental design and implementation for the purposes simulating the effects of particle irradiation on the materials, devices, and circuits of interest.

4.4.5. The Contractor shall perform linear and nonlinear optical measurements to simulate the effects of particle irradiation on semiconductor devices and circuits. This task shall include sample preparation and mounting, test setup design and implementation, including board design for both static and high-speed measurements, optical system characterization and calibration, and data acquisition and analysis.

4.4.6. The Contractor shall perform linear and nonlinear optical measurements on materials of interest to this effort, as appropriate, including, but not limited the nonlinear-optical z-scan measurements, linear and nonlinear absorption, stimulated Raman gain, four-wave mixing, and pump-probe measurements.

4.5 Task 5: High Power Electronics

4.5.1. Power Electronic Circuits: The Contractor shall develop high performance, high efficiency power conversion circuits (including wireless power transfer) enabled by and implementing relevant wide bandgap power electronic materials and devices.

4.5.2. Modeling and Simulation: The Contractor shall develop semiconductor device models, utilize available simulation code, and apply each to novel wide bandgap semiconductor device structures.

4.5.3. Advanced Wide Bandgap Deposition and Characterization: The Contractor shall utilize advanced deposition techniques and optical/electrical techniques to characterize wide bandgap semiconductor materials and devices.

4.5.3.1: The Contractor shall utilize transient optical characterization techniques to characterize the properties of wide bandgap semiconductor materials and device.

4.5.3.2: The Contractor shall use Fourier Transform optical characterization techniques to characterize the properties of wide bandgap semiconductors.

4.5.3.3: The Contractor shall develop custom control software and hardware design and construction in support of wide bandgap semiconductor characterization efforts.

4.5.4: Wide Bandgap Semiconductor Device Fabrication: The Contractor shall use semiconductor deposition and processing techniques to fabricate a wide variety of wide bandgap semiconductor devices.

NOTE: The following Task descriptions 4.6 to 4.8 are unclassified, but the results will be CLASSIFIED AT A TS/SCI LEVEL. ALL

RESULTS MUST BE DELIVERED THROUGH SECURE CHANNELS.

4.6 Task 6. Semiconductor Device/Circuit Modeling, Simulation, and Design

4.6.1. The Contractor shall perform theoretical research to develop numerical models of electronic and atomic structures for optoelectronic, microwave, and power electronic devices. The goal of these efforts is to create a theoretical basis for the design of novel materials for advanced electronic devices.

4.6.2. The Contractor shall conduct experimental research on device model execution and interpretation of experimental data for device operation in its intended environment. Analyses are intended to produce a model for the operational environment and simulations and predictions of the device and circuit operation in the modeled environment. The results of these efforts will serve to validate the models produced in and provide insight into means for improving the models and new technological paths to 4.6.1.

pursue for new devices.

4.6.3. The Contractor shall develop specialized physics-based computer models for design, modeling, and simulation of novel materials and devices. The description of the novel materials and devices developed in this research may often require the development of new models based on the physical and engineering principles operative in these materials and devices.

4.7 Task 7 . Semiconductor Growth and Device/Circuit Fabrication

4.7.1. The Contractor shall grow semiconductor materials for producing the devices modeled in task 4.6. Growth techniques may include MBE, OMVPE, ALD and sputter deposition as well as those specified by the Task Manager. Deliverables:

Semiconductor materials grown for fabrication, CDRL A002.

The Contractor shall fabricate devices modeled in Task 4.6 to produce functional devices such as optical detectors, solar 4.7.2.

cells, FETs, and diodes. Devices fabricated from materials in Task 4.6.1, Deliverables: CDRL A003.

4.7.3. The Contractor shall fabricate integrated circuits by using the parts/devices of task 4.7.2 and integrating COTS parts for applications to be specified by the Task Manager. Examples include focal plane arrays and the associated read-out circuits, solar cell arrays, analog circuits for power conversion and switching devices, and waveguide and microstrip circuits for microwave applications. Circuits fabricated from devices in Task 4.7.3, Deliverables: CDRL A004.

4.8 Task 8. Semiconductor Material and Device Characterization in Simulated Environments

4.8.1. The Contractor shall characterize the structural attributes of the materials, devices, and circuits of Task 4.7. Structural characterization techniques may include optical microscopy, ellipsometry, x-ray diffraction, and electron microscopy. The results of these characterizations determine the atomic and crystalline structure of the materials grown within the project.

4.8.2. The Contractor shall characterize electrical attributes for the materials, devices, and circuits that are grown and fabricated under this project. Electrical characterization techniques include current-voltage (I-V), capacitance-voltage (C-V), AC conductance, and Hall effect. Characterization of active and/or passive microwave devices involves use of network analyzers, spectrum analyzers and other microwave test equipment to determine the linear and/or nonlinear characteristics of the devices.

4.8.3. The Contractor shall characterize optoelectronic attributes for the materials, devices, and circuits that are grown and fabricated under this project. Optoelectronic measurements include quantum efficiency, electroluminescence (EL), Fourier Transform Infrared Spectroscopy (FTIR), and I-V measurements under simulated solar illumination. The choice of specific technique depends on the material, device, or circuit under study.

5.0 PERIOD OF PERFORMANCE

The period of performance is expected to be one base year with 4 one-year option periods.

6.0 SECURITY REQUIREMENTS AND PERFORMANCE LOCATION

6.1. Tasks 4.1 - 4.5 above are unclassified but work will be performed on-site at NRL so each Contractor associated with these tasks shall have sufficient security clearance to gain access to the laboratory.

6.2. Tasks 4.6 - 4.8 are classified TS/SCI. Work shall be performed on-site at NRL. Each contractor associated with these tasks shall have sufficient clearance to access NRL SCIF facilities. (Details are included in form DD 254)

7.0 TRAVEL AND MATERIALS

7.1. Travel. Contractors may be required to travel to scientific conferences on occasion to disseminate the results of their scientific research. See for reference CDRL A001.

7.2. Materials. The vendor may be required to procure certain materials necessary for performing the tasks outlined in section 4 above.

5.En C-2.0 ENTERPRISE-WIDE CONTRACTOR MANPOWER REPORTING APPLICATION (ECMRA)

The Contractor shall report contractor labor hours (including subcontractor labor hours) required for performance of services provided under this contract for the Naval Research Laboratory via a secure data collection site. Contracted services excluded from reporting are based on Product Service Codes (PSCs). The excluded PSCs are:

(1) W, Lease/Rental of Equipment;

(2) X, Lease/Rental of Facilities;

(3) Y, Construction of Structures and Facilities;

(4) D, Automatic Data Processing and Telecommunications, IT and Telecom-Telecommunication (D304) and Internet (D322) ONLY;

(5) S, Utilities ONLY;

(6) V, Freight and Shipping ONLY.

The Contractor is required to completely fill in all required data fields using the following web address https://www.ecmra.mil.

Reporting inputs will be for the labor executed during the period of performance, during each Government fiscal year (FY), which runs October 1 through September 30. While inputs may be reported any time during the FY, all data shall be reported no later than October 31 of each calendar year.

Contractors may direct questions to the help desk, linked at https://www.ecmra.mil .

C-3.0 ELECTRONIC AND INFORMATION TECHNOLOGY (EIT)

In accordance with Section 508 of the Rehabilitation Act of 1973 (29 U.S.C. 794 d), all EIT supplies and services provided under this contract must comply with the applicable accessibility standards issued by the Architectural and Transportation Barriers Compliance Board at 36 CFR part 1194 (see FAR Subpart 39.2). Electronic and information technology (EIT) is defined at FAR 2.101.

C-4.0 REQUIREMENT FOR ON-SITE CONTRACTORS

For any work under this Contract performed at any NRL site, the Contractor shall comply with the requirements contained in Attachment 02, Requirements for On-Site Contractor.

Requirements The Naval Research Laboratory (NRL) anticipates awarding a Cost Plus Fixed Fee (CPFF) Term contract for the effort titled:

Optoelectronics, Power Electronics and Radiation Effects Research

The Period of Performance (PoP) for the Contract will be one (1) base period of twelve (12) months from date of award, plus four (4) twelve (12) month option periods for a total of five (5) years. Additionally, the anticipated contract will include FAR clause 52.217-8, which provides the Government the option to extend the support by six (6) months. The award of this contract is subject to the receipt of adequate and proper funding.

NOTE: This Contract Request for Proposal (RFP) is not an authorization to start work. The Government reserves the right to cancel this requirement.

This is a follow-on requirement, currently supported by Amentum under N00173-23-C-2004.

Section D - Packaging and Marking

D-1.0 PACKAGING AND MARKING

All unclassified data and deliverable contract line items shall be preserved, packaged, packed and marked and must conform to normal commercial packing standards to ensure safe delivery at destination.

D-2.0 UNCLASSIFIED AND CLASSIFIED MARKING

Unclassified data shall be prepared for shipment in accordance with requirements set forth in the SOW, or if none is specified, pursuant to industry standards.

Classified reports, data, and documentation shall be prepared for shipment in accordance with Part 117 of Title 32, Code of Federal Regulations

(CFR).

D-3.0 MARKING OF SHIPMENT AND REPORTS

The Contractor shall mark all shipments under this contract in accordance with the addition of ASTM-D-3951-18 "Standard Practice for Commercial Packaging" in effect on the date of the contract. The Contractor shall comply with FED STD 313-F (Symbols for Packages and Containers for Hazardous Industrial Chemical and Materials) to the extent applicable.

All reports delivered by the Contractor to the Government under this contract shall prominently show on the cover of the report: *

(1) Name and business address of the Contractor

(2) Contract number

*To be completed upon Award

Section E - Inspection and Acceptance

E-1.0 INSPECTION AND ACCEPTANCE

Inspection and acceptance of the final delivery will be accomplished by the Contracting Officer's Representative designated in Section G of this Contract. Inspection and acceptance will be performed at the Naval Research Laboratory, Washington DC 20375-5320.

Constructive Acceptance, in accordance with FAR 32.904, shall be deemed to have occurred on the 14th day after the final delivery.

E-2.0 INSPECTION AND ACCEPTANCE TERMS

Supplies/services will be inspected/accepted at:

CLIN INSPECT AT INSPECT BY ACCEPT AT ACCEPT BY

0001 Destination Government Destination Government

0002 N/A N/A N/A Government

0003 N/A N/A N/A Government

0004 N/A N/A N/A Government

1001 Destination Government Destination Government

1002 N/A N/A N/A Government

1003 N/A N/A N/A Government

1004 N/A N/A N/A Government

2001 Destination Government Destination Government

2002 N/A N/A N/A Government

2003 N/A N/A N/A Government

2004 N/A N/A N/A Government

3001 Destination Government Destination Government

3002 N/A N/A N/A Government

3003 N/A N/A N/A Government

3004 N/A N/A N/A Government

4001 Destination Government Destination Government

4002 N/A N/A N/A Government

4003 N/A N/A N/A Government

4004 N/A N/A N/A Government

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.246-9 Inspection of Research and Development (Short Form). Apr 1984

Section F - Deliveries or Performance

F-1.0 PLACE OF PERFORMANCE

The principal place of performance of this contract shall be at the Naval Research Laboratory, 4555 Overlook Ave SW, Washington, D.C. 20375.

Other locations may be designated by the COR during contract execution.

F-2.0 DELIVERABLES

Deliverables shall be in accordance with the specifications set forth in the attached DD Form 1423, Exhibit A, and Section C - Statement of Work, and Technical Directions.

F-2.0 PLACE OF DELIVERY - F.O.B. DESTINATION

If delivery of supplies are required, the Contractor shall deliver supplies, all transportation charges paid, to destination, in accordance with the FAR clause in Section F of the Schedule titled FAR 52.247-34 FOB Destination (NOV 1991).

All deliverables required under this Contract shall be shipped FOB Destination, to the Naval Research Laboratory, Washington, DC 20375- 5320, cosigned to:

Receiving Officer Naval Research Laboratory Contract Number [to be inserted at award] ATTN: [Name of Designated Contracting Officer's Representative at Section G] CODE: [To be provided at award] LOCATION: [To be provided at award] Bldg. 49 4555 Overlook Avenue, SW Washington DC 20375-5320

F-3.0 GOVERNMENT FURNISHED PROPERTY (GFP)

If during the performance of this contract, it is determined that Government Furnished Property (GFP) is necessary, the COR provide a list of GFP that will be incorporated into this contract via attachment, along with the following information:

-The GFP will be provided by: (Insert date).

-The Government shall deliver the GFP to the following address: (Insert location).

-Upon completion of award, the GFP will be returned to NRL to the location as directed by the COR.

(To be completed when applicable)

DELIVERY INFORMATION

CLIN DELIVERY DATE QUANTITY SHIP TO ADDRESS DODAAC / CAGE

0001 N/A N/A N/A N/A 0002 N/A N/A N/A N/A 0003 N/A N/A N/A N/A 0004 N/A N/A N/A N/A 1001 N/A N/A N/A N/A 1002 N/A N/A N/A N/A 1003 N/A N/A N/A N/A 1004 N/A N/A N/A N/A 2001 N/A N/A N/A N/A 2002 N/A N/A N/A N/A 2003 N/A N/A N/A N/A 2004 N/A N/A N/A N/A 3001 N/A N/A N/A N/A 3002 N/A N/A N/A N/A 3003 N/A N/A N/A N/A 3004 N/A N/A N/A N/A 4001 N/A N/A N/A N/A 4002 N/A N/A N/A N/A 4003 N/A N/A N/A N/A 4004 N/A N/A N/A N/A

Overall Contract Delivery Period

Contractor Destination

FAR Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

52.242-15 Stop-Work Order. Aug 1989 52.242-15 Stop-Work Order. (Alternate I) Aug 1989 Alternate I Apr 1984

Section G - Contract Administration Data

G-1.0 CONTRACT ADMINISTRATION

In order to expedite administration of this contract, the following delineation of duties is provided, including the names and contact information, for each individual or office specified. Contact the individual/position designated as having responsibility for any questions, clarifications or information regarding the functions assigned herein.

(a) The Administrative Contracting Officer (ACO), designated in Block 24 on the Standard Form 33, will expedite administration of the contract and direct inquiries to the appropriate off ice listed below: None

(b) The Contract Administration Office (CAO) designated in Block 24 on the Standard Form 33 is responsible for all matters specified in FAR 42.302

(a) and DFARS 242.302(a), except in those areas otherwise designated herein.

Contracting Officer: Brenda Green, Code 1340, brenda.j.green25.civ@us.navy.mil Contract Specialist: Maribel Ramirez, Code 1340, maribel.ramirez23.civ@us.navy.mil Security Matters: *To be provided at award Safety Matters: *To be provided at award Patent Matters : *To be provided at award Release of Data: *To be provided at award

(c) Contract administration functions withheld, additional contract administration functions assigned, or special instructions are set forth below:

(1) Contracting Officer will retain performance of these functions listed in FAR 42.302(a):

(30) Government property administration.

(44) Perform engineering analyses of contractor cost proposals.

(45) Review and analyze Contractor-proposed engineering and design studies and submit comments and recommendations to the Contracting Office, as required.

(46) Review engineering change proposals for proper classification, and when required, for need, technical adequacy of design, producibility, and impact on quality, reliability, schedule, and cost; submit comments to the Contracting Officer

(51) Consent to the placement of subcontracts, is withheld from DCMA ACO administration.

G-2.0 CONTRACTING OFFICER'S REPRESENTATIVE (COR) FUNCTIONS AND LIMITATIONS

(a) ,is hereby designated as the COR. Unless terminated sooner, this appointment is effective for the period of *To be updated upon award performance of this contract including any options, if exercised. COR authority may not be re-delegated. No change in COR assignment shall be made without written notice by the Contracting Officer, who will modify the contract to reflect the change of COR assignment. The Contracting Officer may designate assistant or alternate COR(s) to act for the COR by naming such assistant/alternate(s) in writing and transmitting a copy of such designation to the Contractor via contract modification.

(b) The responsibilities and limitations of the COR are as follows:

(1) Providing technical direction and guidance as necessary with respect to the performance of work under this contract. Technical direction and guidance may be used to provide technical advice/recommendations/clarifications on the statement of work/specifications. It MAY NOT be used to tell the contractor how to perform the work.

(2) Submitting interim and final Contractor Performance Assessment Reports (CPARS) at https://www.cpars.gov/.

(3) Quality assurance of services performed or deliveries made.

(4) Inspection and acceptance of services or deliverables.

(5) Ensuring that Government Furnished Property, to include any contractor use of on-site equipment and/or IT resources is adequately monitored and accounted for.

(6) Security requirements on Government installation, such as the request and retrieval of personnel security badges and vehicle passes.

(7) Monitoring Contractor's performance and promptly report problems and recommendations for corrective action to the PCO.

(8) Annually, furnish a written report on performance of the contractor to the PCO. And, if deemed necessary, attending a follow-up meeting to discuss.

(9) Attend post award conference, if conducted.

(10) Ensuring a copy of all Government technical correspondence, to include Technical Direction Memorandums/Guidance, is forwarded to the PCO for placement in the contract file.

(11) Monitoring of funds expended.

(12) Ensuring that the Contractor does not exceed the defined statement of work set forth in the contract.

(c) Limitations: The COR is not authorized to take any action, either directly or indirectly, that could result in a change in the cost/price, quantity, quality, place of performance, delivery schedule, or any other terms or conditions of the contract. If, as a result of technical discussions, it is desirable to alter contract obligations or the statement of work/specifications, a modification must be issued in writing and signed by the Contracting Officer in order to effect such changes. No such changes shall be made without the express written prior authorization/direction of the Contracting Officer.

G-3.0 TECHNICAL DIRECTION

(a) Performance of the work hereunder is subject to the technical direction of the Program Officer/COR designated in this contract, or their duly authorized representative. For the purposes of this clause, technical direction includes the following:

(1) Direction to the Contractor which shifts work emphasis between work areas or tasks, requires pursuit of certain lines of inquiry, fills in details or otherwise serves to accomplish the objectives described in the statement of work;

(2) Guidelines to the Contractor which assist in the interpretation of drawings, specifications or technical portions of work description.

(b) Technical direction must be within the general scope of work stated in the contract. Technical direction may not be used to:

(1) Assign additional work under the contract;

(2) Direct a change as defined in the contract clause entitled "Changes";

(3) Increase or decrease the estimated contract cost, the fixed fee, or the time required for contract performance; or

(4) Change any of the terms, conditions or specifications of the contract.

(c) The only individual authorized to in any way amend or modify any of the terms of this contract shall be the Contracting Officer. When, in the opinion of the Contractor, any technical direction calls for effort outside the scope of the contract or inconsistent with this special clause, the Contractor shall notify the Contracting Officer in writing within ten working days after its receipt. The Contractor shall not proceed with the work affected by the technical direction until the Contractor is notified by the Contracting Officer that the technical direction is within the scope of the contract.

(d) Nothing in the foregoing paragraphs may be construed to excuse the Contractor from performing that portion of work statement, which is not affected by the disputed technical direction.

G-4.0 TECHNICAL DIRECTION MEMORANDUM (TDM)

(a) For the purposes of this clause, technical direction includes the following:

(1) Direction to the Contractor which shifts work emphasis between work areas or tasks, requires pursuit of certain lines of inquiry, fills in details or otherwise describes work which will accomplish the objectives described in the statement of work;

(2) Guidelines to the Contractor, which assist in interpretation of drawings, specifications or technical portions of, work description.

(b) Technical Direction Memorandums must be within the scope of work stated in the contract. Technical Direction Memorandums may not be used to:

(1) Assign additional work under the contract:

(2) Direct a change as defined in the contract clause entitled "Changes"

(3) Increase or decrease the estimated contract cost, the fixed fee, or the time required for contract performance; or

(4) Change any of the terms, conditions or specifications of the contract

(c) The TDM shall be written by the Contracting Officer's Representative (COR), with the original given to the Contractor and a copy retained in the CORs file. Technical direction may be issued orally only in emergency situations. If technical direction is issued orally, a TDM must follow within two (2) working days from the date of the oral direction. Amendments, corrections, or changes to TDMs shall also be in written format and shall include all the information set forth in paragraph (e) below.

(d) A TDM shall be considered issued when the Government deposits it in the mail, or if transmitted by other means, when it is physically delivered to the contractor.

(e) TDMs shall include, at a minimum, the following information:

(1) Date of TDM,

(2) Contract Number,

(3) Reference to the relevant portion or item in the Statement of Work,

(4) The specific technical direction or clarification,

(5) The type of work to be performed, i.e., (a) SETA support or (b) R&D work,

(6) A reference to the appropriate CLIN or SubCLIN,

(7) The anticipated level of effort, materials and travel expected as a result of the TDM,

(8) The JON, Program Element, and associated dollar amount, and

(9) The signature of the COR

(f) CORs shall provide a copy of each TDM with the necessary increment of funds to the Contracting Officer for retention in the official contract file. CORs shall retain all files containing TDMs for a period of two (2) years after the final contract completion date.

(g) The only individual authorized in any way to amend or modify any of the terms of this contract shall be the Contracting Officer. When, in the opinion of the Contractor, any technical direction calls for effort outside the scope of the contract or inconsistent with this special clause, the Contractor shall notify the Contracting Officer in writing within ten (10) working days after its receipt.

G-5.0 INFORMATIONAL SUBLINE ITEMS

It is anticipated that the research and development services performed under this contract will be paid for from multiple sources of funds.

Informational subline items will be established as necessary to identify each accounting citation classification for each technical direction and/or project. The Contractor shall segregate cost incurred for each project at the designated CLIN, SLIN and ACRN item level.

G-6.0 PAYMENT INSTRUCTIONS - OTHER (PGI 204-7.108(d)(12)):

This contract is a cost and cost-type contract funded by multiple funding types and/or customers, spanning several years. Funding for the CLINs contained in this contract are received from various funding sources and applied to specific tasking as defined in the funding modifications. Based on the type of work contracted for on behalf of DOD/Navy customers, payment by CLIN/SLIN/ACRN is significantly important and using any of the payment methods specified in the table identified in PGI 204.7108(b)(2) would result in the funding resources of one customer being paid for work received by another customer. The contractor completes the effort in a fluid environment; therefore, in order to accurately track and account for funding expenditures in accordance with the specific tasking associated with each funding line, payment instruction (d)(12) "Other" applies as expenditures must reflect the actual work performed, in alignment with the type of funding to avoid violations to the Anti-Deficiency Act.

Payment shall be made in accordance with the Contracting Officer/DCAA approved billing whereby the contractor shall include identification of the CLIN, SLIN, and ACRN on each invoice. This will allow for appropriate contractor invoicing based on the unique customer requirement funding and Contracting Officer's instructions. This approach also allows for proper matching of the charge to the activity that have received the service/product with the application of the payment to the corresponding entity.

G-7.0 SUBCONTRACTORS/CONSULTANTS

(b) Advance notification or requests for consent pursuant to the contract clause entitled "Subcontracts" (FAR 52.244-2) shall be directed to the cognizant administrative contracting officer (ACO).

(c) Paragraph (j) of FAR 52.244-2 is filled in as follows. The following subcontractor/consultants have been identified in the Contractor's proposal as necessary for performance of this contract and were evaluated during negotiations:

SUBCONTRACTOR/CONSULTANT NAME ESTIMATED TOTAL COST

Insert Name $Number

Insert Name $Number

G-8.0 INCREMENTAL FUNDING

Pursuant to the Limitation of Funds clause (FAR 52.232-22), the total amount presently available for payment and allotted to CLIN *Insert Number of this is ; including an estimated cost of and a fixed fee of . It is contract OR modification *$Insert Amount *$Insert Amount *$Insert Amount estimated that the amount allotted for this CLIN will cover the period of date of award through *Insert Date.

*(Information to be provided at contract award)

DFARS Clauses Incorporated by Reference

Number Title Effective Date

Alternate/ Deviation

Variation Effective Date

252.201-7000 Contracting Officer's Representative. Dec 1991 252.204-7006 Billing Instructions-Cost Vouchers May 2023 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018

DFARS Clauses Incorporated by Full Text

252.232-7006 Wide Area WorkFlow Payment Instructions. (Tailored) (Jan 2023)

WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)

(a) As used in this clause- Definitions.

"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.

"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).

"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.

"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(b) The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as Electronic invoicing.

authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.

(c) To access WAWF, the Contractor shall- WAWF access.

(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and

(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.

(d) The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice WAWF training.

Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/

(e) Document submissions may be via web entry, Electronic Data Interchange, or File Transfer WAWF methods of document submission.

Protocol.

(f) The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF payment instructions.

WAWF for this contract or task or delivery order:

(1) The Contractor shall submit payment requests using the following document type(s): Document type.

(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.

(ii) For fixed price line items-

(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.

(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)

(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.

(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)

(iii) For customary progress payments based on costs incurred, submit a progress payment request.

(iv) For performance based payments, submit a performance based payment request.

(v) For commercial financing, submit a commercial financing request.

(2) ) Fast Pay requests are only permitted when…

This is the start of the file's text. The full file is on GovTribe.

File details come from the government source that posted it. Updated .