Solicitation Summary: Matsushima Membrane Shelter Design-Build
This is a Request for Proposal (RFP) for design-build construction services issued by the United States Air Force (FA5025 356 ECEG PK). The solicitation number is FA502526RB006, with a project number of PMWH26-3531. The Government seeks to design and construct four (4) pre-engineered membrane-shelled buildings, each 450 square meters, for Pacific Air Forces (PACAF) equipment storage at Matsushima Japan Air Self-Defense Force (JASDF) Base. The contract is firm fixed-price with a delivery period of 294 calendar days from notice to proceed, expected between September 30, 2026 and July 21, 2027. Sealed offers are due by 12:00 AM local time on September 11, 2026, with a mandatory 60-calendar-day acceptance window. Performance and payment bonds are required within 20 calendar days of award.
Proposals must be submitted in two separate volumes: a technical proposal limited to 20 pages demonstrating corporate experience on up to five similar projects completed within Japan in the past five years (with at least one design or design-build project at or past 95% completion), and a price proposal in electronic spreadsheet format with detailed cost breakdowns by design services, construction labor (CSI MasterFormat divisions), equipment and mobilization, materials, and overhead/G&A/profit. Evaluation will use a best-value trade-off methodology with technical merit being significantly more important than price. A valid Japanese Construction Business License from the Ministry of Land, Infrastructure, Transport and Tourism must be submitted in the Prime Offeror's name, with failure to provide resulting in an "Unacceptable" rating. The solicitation includes deviations for performance on a JASDF installation, requiring compliance with Japanese Industrial Safety and Health Law, host-nation security protocols, base access procedures, and coordination through the USAF Project Manager and JASDF Base Commander. The Contracting Officer is Cameron Smith (6716892961 or 208-828-0743).
View the file
Other files
Show all 11
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
SOLICITATION, OFFER,
AND AWARD
(Construction, Alteration, or Repair)
1. SOLICITATION
NUMBER
FA502526RB006
2. TYPE OF SOLICITATION
SEALED BID (IFB) INVITATION
FOR BID
NEGOTIATED (RFP) REQUEST
FOR PROPOSAL
3. DATE ISSUED PAGE 1 OF 34
IMPORTANT - The "offer" section on the reverse must be fully completed by offeror.
4. CONTRACT NUMBER 5. REQUISITION/PURCHASE REQUEST NUMBER 6. PROJECT NUMBER
PMWH26-3531
7. ISSUED BY CODE: FA5025
FA5025 356 ECEG PK
UNIT 14053, APO AP 96543
APO, AP 96543
UNITED STATES
CAMERON SMITH, Email: cameron.smith.16@us.af.mil Telephone: 6716892961 CAMERON SMITH, Email: cameron.smith.16@us.af.mil Telephone: 208-828-0743
8. ADDRESS OFFER TO
FA5025 356 ECEG PK
UNIT 14053, APO AP 96543
APO, AP 96543
UNITED STATES
9. FOR
INFORMATION
CALL:
a. NAME
CAMERON SMITH
b. TELEPHONE NUMBER (include area code) (NO COLLECT CALLS) 6716892961
SOLICITATION
NOTE: In sealed bid solicitations "offer" and "offeror" mean "bid and "bidder".
10.THE GOVERNMENT REQUIRES PERFORMANCE OF THE WORK DESCRIBED IN THESE DOCUMENTS (Title, identifying number, date)
Project Title: Matsushima Membrane Shelter Design-Build Project Location: Matsushima JASDF Base, Japan
Design and construct four (4) 450 Square Meter (SM) membrane-shelled pre-engineered buildings (membrane structures) for Pacific Air Forces' (PACAF) equipment storage.
11. The contractor shall begin performance within calendar days and complete it within calendar days after receiving 40 294 award, notice to proceed. This performance period is mandatory negotiable. (See ). FAR 52.211-10
12a. THE CONTRACTOR MUST FURNISH ANY REQUIRED PERFORMANCE AND PAYMENT BONDS?
(If "YES", indicate within how many calendar days after award in Item 12b.)
YES NO
12b. CALENDAR DAYS
13. ADDITIONAL SOLICITATION REQUIREMENTS:
a. Sealed offers in original and copies to perform the work required are due at the place specified in Item 8 by (hour) 12:00 AM local time (date). If this is a sealed bid solicitation, offers will be publicly opened at that time. Sealed envelopes 11 Sep 2026 containing offers shall be marked to show the offeror's name and address, the solicitation number, and the date and time offers are due.
b. An offer guarantee is, is not required.
c. All offers are subject to the (1) work requirements, and (2) other provisions and clauses incorporated in the solicitation in full text or by reference.
d. Offers providing less than calendar days for Government acceptance after the date offers are due will not be considered and will be rejected. 60
Computer generated. STANDARD FORM 1442 (REV. 12/2022) Prescribed by GSA-FAR (48CFR) 53.236-1(d)
Created On:
10 Aug 2026, 21:23 PM Mountain Daylight Time
OFFER (Must be fully completed by offeror)
14. NAME AND ADDRESS OF OFFEROR (Include ZIP Code)
CODE FACILITY CODE
15. TELEPHONE NUMBER (Include area code)
16. REMITTANCE ADDRESS (Include only if different than item 14.)
17. The offeror agrees to perform the work required at the prices specified below in strict accordance with the terms of this solicitation, if this offer is accepted by the Government in writing within calendar days after the date offers are due. (Insert any number equal to or greater than the minimum requirement stated in Item 13d. Failure to insert any number means the offeror accepts the minimum in Item 13d.)
AMOUNTS
18. The offeror agrees to furnish any required performance and payment bonds.
19. ACKNOWLEDGMENT OF AMENDMENTS
(The offeror acknowledges receipt of amendments to the solicitation -- give number and date of each)
AMENDMENT
NUMBER
DATE
20a. NAME AND TITLE OF PERSON AUTHORIZED TO SIGN OFFER (Type or print)
20b. SIGNATURE 20c. OFFER DATE
AWARD (To be completed by Government)
21. ITEMS ACCEPTED:
22. AMOUNT 23. ACCOUNTING AND APPROPRIATION DATA
24. SUBMIT INVOICES TO ADDRESS SHOWN IN
(4 copies unless otherwise specified)
ITEM 25. OTHER THAN FULL AND OPEN COMPETITION PURSUANT TO THE UNITED
STATES CODE AT
10 U.S.C 3204(a) ( ) 41 U.S.C. 3304(a) ( )
26. ADMINISTERED BY 27. PAYMENT WILL BE MADE BY
CONTRACTING OFFICER WILL COMPLETE ITEM 28 OR 29 AS APPLICABLE
28. NEGOTIATED AGREEMENT (Contractor is required to sign this document
Contractor agrees to furnish and return copies to issuing office.)
and deliver all items or perform all work requirements identified on this form and any continuation sheets for the consideration stated in this contract. The rights and obligations of the parties to this contract shall be governed by (a) this contract award, (b) the solicitation, and (c) the clauses, representations, certifications, and specifications incorporated by reference in or attached to this contract.
29. AWARD (Contractor is not required to sign this document.) Your offer on this solicitation is hereby accepted as to the items listed. This award consummates the contract, which consists of (a) the Government solicitation and your offer, and (b) this contract award. No further contractual document is necessary.
30a. NAME AND TITLE OF CONTRACTOR OR PERSON AUTHORIZED TO SIGN (Type or print)
31a. NAME OF CONTRACTING OFFICER (Type or print)
30b. SIGNATURE 30c. DATE 31b. UNITED STATES OF AMERICA
BY
31c. DATE
Computer generated. STANDARD FORM 1442 (REV. 12/2022) BACK
Section A - Solicitation/Contract Form
MATSUSHIMA STORAGE MEMBRANE SHELTERS
NAICS: 236220
Size Standard: USD 45,000,000.00 Annual receipts
Product Service Code: Y1GZ
FA502526RB006
Section B - Supplies or Services & Prices or Costs Additional Information/Notes
Item Supplies / Services Quantity Unit Unit Price Amount
CLIN 0001 - Constructions RBCP Storage Site
Product Type Code: Y1EB Product Service Code: Y1JZ Pricing Arrangement: Firm Fixed Price
1 Lot Not to Exceed
Section C - Description/Specifications/Statement of Work
Requirements
FY26 F7413 142T50 HQ PACAF A4R FM9 PWM MATSHUSHIMA STORAGESTOR ESP G3
Section D - Packaging and Marking
Section E - Inspection and Acceptance
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.246-12 Inspection of Construction. Aug 1996 Overall Contract Inspection/Acceptance Locations
Inspection and Acceptance Location
Both Other Instructions: See Statement of Work (SOW) or Performance Work Statement (PWS) for Acceptance/inspection criteria.
DoDAAC: FA5025 CountryCode: USA
FA5025 356 ECEG PK
UNIT 14053, APO AP 96543
APO, AP 96543
UNITED STATES
Section F - Deliveries or Performance Overall Contract Delivery Period
Line Item Delivery Schedule Quantity Address and POC
Delivery Schedule From date of lead time event to completion of performance 294 Calendar Days Date of Notice to Proceed Receipt
1 Lot Ship To DoDAAC: FA5025 CountryCode: USA
FA5025 356 ECEG PK
UNIT 14053, APO AP 96543
APO, AP 96543
UNITED STATES
Period of Performance From 30 Sep 2026 To 21 Jul 2027
Section G - Contract Administration Data
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.232-10 Payments under Fixed-Price Architect-Engineer Contracts. Apr 2010
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.201-7000 Contracting Officer's Representative. Dec 1991 252.231-7000 Supplemental Cost Principles Dec 1991 252.232-7003 Electronic Submission of Payment Requests and Receiving Reports. Dec 2018 252.232-7008 Assignment of Claims (Overseas). Jun 1997 252.236-7000 Modification Proposals--Price Breakdown. Dec 1991
DFARS Clauses Incorporated by Full Text
252.232-7006 Wide Area WorkFlow Payment Instructions. (Jan 2023)
WIDE AREA WORKFLOW PAYMENT INSTRUCTIONS (JAN 2023)
(a) Definitions. As used in this clause-
"Department of Defense Activity Address Code (DoDAAC)" is a six position code that uniquely identifies a unit, activity, or organization.
"Document type" means the type of payment request or receiving report available for creation in Wide Area WorkFlow (WAWF).
"Local processing office (LPO)" is the office responsible for payment certification when payment certification is done external to the entitlement system.
"Payment request" and "receiving report" are defined in the clause at 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(b) Electronic invoicing. The WAWF system provides the method to electronically process vendor payment requests and receiving reports, as authorized by Defense Federal Acquisition Regulation Supplement (DFARS) 252.232-7003, Electronic Submission of Payment Requests and Receiving Reports.
(c) WAWF access. To access WAWF, the Contractor shall-
(1) Have a designated electronic business point of contact in the System for Award Management at https://www.sam.gov; and
(2) Be registered to use WAWF at https://wawf.eb.mil/ following the step-by-step procedures for self-registration available at this web site.
(d) WAWF training. The Contractor should follow the training instructions of the WAWF Web-Based Training Course and use the Practice Training Site before submitting payment requests through WAWF. Both can be accessed by selecting the "Web Based Training" link on the WAWF home page at https://wawf.eb.mil/
(e) WAWF methods of document submission. Document submissions may be via web entry, Electronic Data Interchange, or File Transfer Protocol.
(f) WAWF payment instructions. The Contractor shall use the following information when submitting payment requests and receiving reports in WAWF for this contract or task or delivery order:
(1) Document type. The Contractor shall submit payment requests using the following document type(s):
(i) For cost-type line items, including labor-hour or time-and-materials, submit a cost voucher.
(ii) For fixed price line items-
(A) That require shipment of a deliverable, submit the invoice and receiving report specified by the Contracting Officer.
(Contracting Officer: Insert applicable invoice and receiving report document type(s) for fixed price line items that require shipment of a deliverable.)
(B) For services that do not require shipment of a deliverable, submit either the Invoice 2in1, which meets the requirements for the invoice and receiving report, or the applicable invoice and receiving report, as specified by the Contracting Officer.
Invoice 2in1
(Contracting Officer: Insert either "Invoice 2in1" or the applicable invoice and receiving report document type(s) for fixed price line items for services.)
(iii) For customary progress payments based on costs incurred, submit a progress payment request.
(iv) For performance based payments, submit a performance based payment request.
(v) For commercial financing, submit a commercial financing request.
(2) ) Fast Pay requests are only permitted when Federal Acquisition Regulation (FAR) 52.213-1 is included in the contract.
[Note: The Contractor may use a WAWF "combo" document type to create some combinations of invoice and receiving report in one step.]
(3) Document routing. The Contractor shall use the information in the Routing Data Table below only to fill in applicable fields in WAWF when creating payment requests and receiving reports in the system.
Routing Data Table*
Field Name in WAWF Data to be entered in WAWF Pay Official DoDAAC FA87700 Issue By DoDAAC FA5025 Admin DoDAAC FA5025 Inspect By DoDAAC FA5025 Ship To Code FA5025 Ship From Code ____ Mark For Code ____ Service Approver (DoDAAC) FA5025 Service Acceptor (DoDAAC) FA5025 Accept at Other DoDAAC ____ LPO DoDAAC ____ DCAA Auditor DoDAAC ____ Other DoDAAC(s) ____ (*Contracting Officer: Insert applicable DoDAAC information. If multiple ship to/acceptance locations apply, insert "See Schedule" or "Not applicable.")
(**Contracting Officer: If the contract provides for progress payments or performance-based payments, insert the DoDAAC for the contract administration office assigned the functions under FAR 42.302(a)(13).)
(4) Payment request. The Contractor shall ensure a payment request includes documentation appropriate to the type of payment request in accordance with the payment clause, contract financing clause, or Federal Acquisition Regulation 52.216-7, Allowable Cost and Payment, as applicable.
(5) Receiving report. The Contractor shall ensure a receiving report meets the requirements of DFARS Appendix F.
(g) WAWF point of contact.
(1) The Contractor may obtain clarification regarding invoicing in WAWF from the following contracting activity's WAWF point of contact.
Not Applocable
(Contracting Officer: Insert applicable information or "Not applicable.")
(2) Contact the WAWF helpdesk at 866-618-5988, if assistance is needed.
(End of clause)
Section H - Special Contract Requirements
Section I - Contract Clauses
5352.201-9101 OMBUDSMAN PACAF (JUL 2023)
(a) An ombudsman has been appointed to hear and facilitate the resolution of concerns from offerors, potential offerors, and others for this acquisition. When requested, the ombudsman will maintain strict confidentiality as to the source of the concern. The existence of the ombudsman does not affect the authority of the program manager, contracting officer, or source selection official. Further, the ombudsman does not participate in the evaluation of proposals, the source selection process, or the adjudication of protests or formal contract disputes. The ombudsman may refer the interested party to another official who can resolve the concern.
(b) Before consulting with an ombudsman, interested parties must first address their concerns, issues, disagreements, and/or recommendations to the contracting officer for resolution. Consulting an ombudsman does not alter or postpone the timelines for any other processes (e.g., agency level bid protests, GAO bid protests, requests for debriefings, employee-employer actions, contests of OMB Circular A-76 competition performance decisions).
(c) If resolution cannot be made by the contracting officer, the interested party may contact the ombudsman, AFICC/KH (Chief Enlisted Manager), 25 E Street, Suite B-100, Concerns, issues, disagreements, and recommendations that cannot JBPH-H, HI 96853-5427, Phone: (808) 449-8569, FAX: (808) 449-8571, e-mail: afica.kh@us.af.mil.
be resolved at the Center/MAJCOM/FLDCOM/DRU ombudsman level, may be brought by the interested party for further consideration to the Department of the Air Force ombudsman, Associate Deputy Assistant Secretary (ADAS) (Contracting), SAF/AQC, 1060 Air Force Pentagon, Washington DC 20330-1060, phone number (571) 256-2395, facsimile number (571) 256-2431.
(d) The ombudsman has no authority to render a decision that binds the agency.
(e) Do not contact the ombudsman to request copies of the solicitation, verify offer due date, or clarify technical requirements. Such inquiries shall be directed to the contracting officer.
5352.223-9000 ELIMINATION OF USE OF CLASS I OZONE DEPLETING SUBSTANCES (ODS) (JUL 2023)
(a) Contractors shall not:
(1) Provide any service or product with any specification, standard, drawing, or other document that requires the use of a Class I ODS in the test, operation, or maintenance of any system, subsystem, item, component, or process; or
(2) Provide any specification, standard, drawing, or other document that establishes a test, operation, or maintenance requirement that can only be met by use of a Class I ODS as part of this contract/order.
[Note: This prohibition does not apply to manufacturing.]
1.
2.
(b) For the purposes of Department of the Air Force policy, the following products that are pure (i.e., they meet the relevant product specification identified in AFI 32-7086) are Class I ODSs:
(1) Halons: 1011, 1202, 1211, 1301, and 2402;
(2) Chlorofluorocarbons (CFCs): CFC-11, CFC-12, CFC-13, CFC-111, CFC-112, CFC-113, CFC-114, CFC-115, CFC-211, CFC-212, CFC-213, CFC-214, CFC-215, CFC-216, and CFC-217, and the blends R-500, R-501, R-502, and R-503; and
(3) Carbon Tetrachloride, Methyl Chloroform, and Methyl Bromide.
[NOTE: Material that uses one or more of these Class I ODSs as minor constituents do not meet the Department of the Air Force definition of a Class I ODS.]
(DEVIATION - JASDF MATSUSHIMA BASE PERFORMANCE)5352.223-9001 HEALTH AND SAFETY ON GOVERNMENT INSTALLATIONS (JUL 2023)[MA1]
(a) In performing work under this contract on the host-nation Japan Air Self-Defense Force (JASDF) installation (Matsushima Air Base), which is deemed a "Government installation" solely for the administrative purposes of this clause, the contractor shall:
Take all reasonable steps and precautions to prevent accidents and preserve the health and safety of contractor, Government, and host-nation JASDF personnel performing or in any way coming in contact with the performance of this contract; and
Take such additional immediate precautions as the Contracting Officer (in coordination with host-nation JASDF base authorities) may reasonably require for health and safety purposes.
(b) JASDF-ONLY MODIFICATION - SAFETY REGULATORY ALIGNMENT:
Host-Nation Primacy: The contractor and all subcontractors shall perform all construction operations in strict compliance with the Japanese Industrial Safety and Health Law and all associated Japanese labor safety regulations.
Bilateral Coordination: The Contracting Officer may, by written order, direct Department of the Air Force Occupational Safety and Health (AFOSH) Standards, US Army Corps of Engineers Safety Manual (EM 385-1-1) provisions, and/or other US safety standards as may be required in the performance of this contract.
Conflict Resolution: In the event of a direct conflict between a Japanese Industrial Safety regulation and a US standard, the contractor shall immediately notify the Contracting Officer in writing. The Contracting Officer, in consultation with the USAF Engineering Liaison and JASDF Safety Command, will issue written guidance. Generally, the standard that is more stringent or protective of human health and safety shall govern.
(c) Any violation of these health and safety rules and requirements, or host-nation JASDF safety mandates, unless promptly corrected as directed by the Contracting Officer or the on-site JASDF safety marshals, shall be grounds for termination of this contract in accordance with the Default clause of this contract.
(End of clause)
1.
2.
3.
4.
5.
5352.242-9000 CONTRACTOR ACCESS TO THE DEPARTMENT OF THE AIR FORCE INSTALLATIONS (JUN 2024) (DEVIATION - JASDF Installation)
(a) The contractor shall obtain base identification and vehicle passes, if required, for all contractor personnel who make visits to or perform work on the host-nation Japan Air Self-Defense Force (JASDF) installation (Matsushima Air Base) cited in the contract. Contractor personnel are required to wear or prominently display installation identification badges issued by host-nation authorities while visiting or performing work on the installation.
(b) The contractor shall submit a written request on company letterhead to the Contracting Officer listing the following: contract number, location of work site, start and stop dates, and names of employees and subcontractor employees needing access to the base. The letter will also specify the individual(s) authorized to sign for a request for base identification credentials or vehicle passes.
JASDF-ONLY MODIFICATION - LIAISON ROUTING: Because Matsushima Air Base is a sovereign Japanese military installation under the exclusive control of the Japan Self-Defense Forces, the US Air Force Contracting Officer (or designated US Air Force Civil Engineer/Liaison Office) will act strictly as a liaison. The US Government will endorse the contractor's request and submit it to the for final host-nation security vetting, approval, JASDF Base Commander's Security Section and credentialing.
[JASDF MODIFICATION - SUBMISSION TIMELINE]: The contractor shall submit all base access request packages to the Contracting Officer no later than forty-prior to the requested start date of work or site mobilization. five (45) calendar days
[REQUIRED PASSENGER & VEHICLE DOCUMENTATION]: When reporting to the JASDF pass and registration office, the authorized contractor individual(s) must provide:
A valid Japanese Driver's License (or international driving permit with passport).
A valid Vehicle Registration Valid compulsory third-party vehicle insurance and voluntary vehicle insurance certificates.
Completed JASDF Base Entry Application Forms (provided by the USAF Project Manager upon contract award).
Proof of Japanese citizenship or legal residency status (National ID, card, or residence card).My Number
(c) During performance of the contract, the contractor shall be responsible for obtaining required identification for newly assigned personnel and for prompt return of credentials and vehicle passes for any employee who no longer requires access to the work site.
(d) JASDF-ONLY MODIFICATION - HOST-NATION SECURITY CONTROL: Because the work site is located entirely within a sovereign Japanese military installation, local . Standard US Air Force security regulations (such as security regulations established by the JASDF Base Commander govern all physical security, access, and movement
AFI 31-101 and AFMAN 16-1405) do not apply to physical access controls on this installation.
The contractor shall coordinate all entry into areas with the US Air Force Liaison Office to secure necessary military escorts and host-nation approvals.
(e) Upon completion or termination of the contract, completion of the temporary storage construction, or expiration of the identification passes, the prime contractor shall ensure that all base identification passes issued to employees and subcontractor employees are returned directly to the issuing JASDF Base Commander's Security Section, with written confirmation of return provided to the USAF Contracting Officer.
(f) The contractor shall provide an after-hours contact number or after-hours email for each of their on-site personnel to the USAF Contracting Officer for emergency coordination. Since Matsushima Air Base is not a US DoD facility, the standard Department of the Air Force Emergency Mass Notification System (EMNS) may not be available on-site; the contractor must maintain independent, reliable communication lines with the USAF Project Manager at all times.
(g) Failure to comply with these security and access requirements may result in withholding of final payment.
FAR Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
52.202-1 Definitions. Jun 2020 52.203-3 Gratuities. Apr 1984 52.203-6 Restrictions on Subcontractor Sales to the Government. Jun 2020 52.203-6 Restrictions on Subcontractor Sales to the Government. (Alternate I) Jun 2020 Alternate I Nov 2021 52.203-12 Limitation on Payments to Influence Certain Federal Transactions. Jun 2020 52.203-13 Contractor Code of Business Ethics and Conduct. Nov 2021 52.203-19 Prohibition on Requiring Certain Internal Confidentiality Agreements or Statements. Jan 2017 52.204-13 System for Award Management-Maintenance. (Deviation 2026-O0038) Feb 2026 52.204-19 Incorporation by Reference of Representations and Certifications. Dec 2014 52.209-6 Protecting the Government's Interest When Subcontracting With Contractors Debarred, Suspended, Proposed for Debarment, or Voluntarily Excluded. (Deviation 2026-O0038) Feb 2026
52.209-9 Updates of Publicly Available Information Regarding Responsibility Matters. (Deviation 2026-O0038) Feb 2026 52.209-10 Prohibition on Contracting With Inverted Domestic Corporations. (Deviation 2026-O0038) Feb 2026 52.212-4 Terms and Conditions-Commercial Products and Commercial Services. (Deviation 2026-O0038) Feb 2026 52.215-8 Order of Precedence-Uniform Contract Format. (Deviation 2026-O0038) Feb 2026 52.215-19 Notification of Ownership Changes. (Deviation 2026-O0038) Feb 2026 52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data-
Modifications. (Deviation 2026-O0038) Feb 2026
52.217-2 Cancellation Under Multi-year Contracts. Oct 1997 52.222-50 Combating Trafficking in Persons. (Deviation 2026-O0038) Feb 2026 52.226-8 Encouraging Contractor Policies to Ban Text Messaging While Driving. May 2024 52.227-4 Patent Indemnity-Construction Contracts. Dec 2007 52.229-6 Taxes-Foreign Fixed-Price Contracts. Feb 2026 52.232-8 Discounts for Prompt Payment. Feb 2002 52.232-17 Interest. May 2014 52.232-26 Prompt Payment for Fixed-Price Architect-Engineer Contracts. Jan 2017 52.232-27 Prompt Payment for Construction Contracts. Jan 2017 52.232-33 Payment by Electronic Funds Transfer-System for Award Management. Oct 2018 52.232-40 Providing Accelerated Payments to Small Business Subcontractors. Mar 2023 52.233-3 Protest after Award. (Deviation 2026-O0038) Feb 2026 52.233-4 Applicable Law for Breach of Contract Claim. (Deviation 2026-O0038) Feb 2026 52.236-2 Differing Site Conditions. (Deviation 2026-O0038) Feb 2026 52.236-3 Site Investigation and Conditions Affecting the Work. (Deviation 2026-O0038) Feb 2026 52.236-5 Material and Workmanship. (Deviation 2026-O0038) Feb 2026 52.236-6 Superintendence by the Contractor. (Deviation 2026-O0038) Feb 2026 52.236-7 Permits and Responsibilities. (Deviation 2026-O0038) Feb 2026 52.236-8 Other Contracts. (Deviation 2026-O0038) Feb 2026 52.236-9 Protection of Existing Vegetation, Structures, Equipment, Utilities, and Improvements. (Deviation 2026-
O0038) Feb 2026
52.236-10 Operations and Storage Areas. (Deviation 2026-O0038) Feb 2026 52.236-11 Use and Possession Prior to Completion. (Deviation 2026-O0038) Feb 2026 52.236-12 Cleaning Up. (Deviation 2026-O0038) Feb 2026 52.236-13 Accident Prevention. (Deviation 2026-O0038) Feb 2026 52.236-15 Schedules for Construction Contracts. (Deviation 2026-O0038) Feb 2026 52.236-17 Layout of Work. (Deviation 2026-O0038) Feb 2026 52.236-21 Specifications and Drawings for Construction. (Deviation 2026-O0038) Feb 2026 52.236-23 Responsibility of the Architect-Engineer Contractor. (Deviation 2026-O0038) Feb 2026 52.236-24 Work Oversight in Architect-Engineer Contracts. Apr 1984 52.240-91 Security Prohibitions and Exclusions. (Deviation 2026-O0038) Feb 2026 52.242-13 Bankruptcy. Jul 1995 52.242-14 Suspension of Work. Apr 1984 52.243-4 Changes. (Deviation 2026-O0038) Feb 2026 52.244-4 Subcontractors and Outside Associates and Consultants (Architect-Engineer Services). Aug 1998 52.244-6 Subcontracts for Commercial Products and Commercial Services. (Deviation 2026-O0038) Apr 2026 52.249-2 Termination for Convenience of the Government (Fixed-Price). Apr 2012 52.249-7 Termination (Fixed-Price Architect-Engineer). Apr 1984 52.249-10 Default (Fixed-Price Construction). Apr 1984
DFARS Clauses Incorporated by Reference
Number Title Effective Date Alternate/ Deviation
Variation Effective Date
252.203-7000 Requirements Relating to Compensation of Former DoD Officials. Sep 2011 252.203-7002 Requirement to Inform Employees of Whistleblower Rights. Dec 2022 252.204-7003 Control of Government Personnel Work Product. Apr 1992 252.204-7012 Safeguarding Covered Defense Information and Cyber Incident Reporting. May 2024 252.204-7018 Prohibition on the Acquisition of Covered Defense Telecommunications Equipment or Services. Jan 2023
252.205-7000 Provision of Information to Cooperative Agreement Holders. Oct 2024 252.209-7004 Subcontracting with Firms that are Owned or Controlled by the Government of a Country that is a State
Sponsor of Terrorism.
May 2019
252.222-7002 Compliance with Local Labor Laws (Overseas). Jun 1997 252.223-7006 Prohibition on Storage, Treatment, and Disposal of Toxic or Hazardous Materials. Sep 2014 252.223-7008 Prohibition of Hexavalent Chromium. Jan 2023 252.225-7005 Identification of Expenditures in the United States . Jun 2005 252.225-7012 Preference for Certain Domestic Commodities. Apr 2022 252.225-7041 Correspondence in English. Jun 1997 252.225-7048 Export-Controlled Items. Jun 2013 252.225-7056 Prohibition Regarding Business Operations with the Maduro Regime. Jan 2023 252.225-7058 Postaward Disclosure of Employment of Individuals Who Work in the People's Republic of China. Jan 2023 252.225-7060 Prohibition on Certain Procurements from the Xinjiang Uyghur Autonomous Region. Jun 2023 252.226-7001 Utilization of Indian Organizations, Indian-Owned Economic Enterprises, and Native Hawaiian Small
Business Concerns.
Jan 2023
252.232-7010 Levies on Contract Payments. Dec 2006 252.233-7001 Choice of Law (Overseas). Jun 1997 252.236-7005 Airfield Safety Precautions. Dec 1991 252.243-7001 Pricing of Contract Modifications. Dec 1991 252.243-7002 Requests for Equitable Adjustment. Dec 2022 252.247-7023 Transportation of Supplies by Sea. Oct 2024
FAR Clauses Incorporated by Full Text
52.211-12 Liquidated Damages-Construction. (Sep 2000)
Liquidated Damages-Construction (Sept 2000)
(a) If the Contractor fails to complete the work within the time specified in the contract, the Contractor shall pay liquidated damages to the Government in the amount of ____[Contracting Officer insert amount] for each calendar day of delay until the work is completed or accepted.
(b) If the Government terminates the Contractor's right to proceed, liquidated damages will continue to accrue until the work is completed. These liquidated damages are in addition to excess costs of repurchase under the Termination clause.
(End of clause)
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data- Modifications. (Deviation 2026-O0038) (Alternate I)
(Feb 2026) Alternate I (Feb 2026)
Alternate I-(Feb 2026) (Deviation 2026-O0038). As prescribed in 15.110(u)(1), substitute the following paragraph (b)(1) for paragraph (b)(1) of the basic clause.
(b)(1) The Contractor shall submit certified cost or pricing data, data other than certified cost or pricing data, and supporting attachments prepared in the following format:
Detailed Price Breakdowns in electronic spreadsheet format________[Insert description of the data and format that are required and include access to records necessary to permit an adequate evaluation of the proposed price in accordance with 15.408-2, Table 15-1, Note 2. The description may be inserted at the time of issuing the request for proposals, or the Contracting Officer may specify that the offeror's format will be acceptable, or the description may be inserted as the result of negotiations.]
52.215-21 Requirements for Certified Cost or Pricing Data and Data Other Than Certified Cost or Pricing Data- Modifications. (Deviation 2026-O0038) (Alternate IV)
(Feb 2026) Alternate IV (Feb 2026)
Alternate IV-(Feb 2026) (Deviation 2026-O0038). As prescribed in 15.110(u)(4), replace the text of the basic clause with the following:
(a) Submission of certified cost or pricing data is not required.
(b) Provide data described below:____________[Insert description of the data and the format that are required, including the access to records necessary to permit an adequate evaluation of the proposed price in accordance with 15.4 .]
52.232-5 Payments under Fixed-Price Construction Contracts. (May 2014)
Payments under Fixed-Price Construction Contracts (May 2014)
(a) Payment of price. The Government shall pay the Contractor the contract price as provided in this contract.
(b) Progress payments. The Government shall make progress payments monthly as the work proceeds, or at more frequent intervals as determined by the Contracting Officer, on estimates of work accomplished which meets the standards of quality established under the contract, as approved by the Contracting Officer.
(1) The Contractor's request for progress payments shall include the following substantiation:
(i) An itemization of the amounts requested, related to the various elements of work required by the contract covered by the payment requested.
(ii) A listing of the amount included for work performed by each subcontractor under the contract.
(iii) A listing of the total amount of each subcontract under the contract.
(iv) A listing of the amounts previously paid to each such subcontractor under the contract.
(v) Additional supporting data in a form and detail required by the Contracting Officer.
(2) In the preparation of estimates, the Contracting Officer may authorize material delivered on the site and preparatory work done to be taken into consideration. Material delivered to the Contractor at locations other than the site also may be taken into consideration if-
(i) Consideration is specifically authorized by this contract; and
(ii) The Contractor furnishes satisfactory evidence that it has acquired title to such material and that the material will be used to perform this contract.
(c) Contractor certification. Along with each request for progress payments, the Contractor shall furnish the following certification, or payment shall not be made: (However, if the Contractor elects to delete paragraph (c)(4) from the certification, the certification is still acceptable.)
I hereby certify, to the best of my knowledge and belief, that-
(1) The amounts requested are only for performance in accordance with the specifications, terms, and conditions of the contract;
(2) All payments due to subcontractors and suppliers from previous payments received under the contract have been made, and timely payments will be made from the proceeds of the payment covered by this certification, in accordance with subcontract agreements and the requirements of Chapter 39 of Title 31, United States Code;
(3) This request for progress payments does not include any amounts which the prime contractor intends to withhold or retain from a subcontractor or supplier in accordance with the terms and conditions of the subcontract; and
(4) This certification is not to be construed as final acceptance of a subcontractor's performance.
____ (Name)
____ (Title)
____ (Date)
(d) Refund of unearned amounts. If the Contractor, after making a certified request for progress payments, discovers that a portion or all of such request constitutes a payment for performance by the Contractor that fails to conform to the specifications, terms, and conditions of this contract (hereinafter referred to as the "unearned amount"), the Contractor shall-
(1) Notify the Contracting Officer of such performance deficiency; and
(2) Be obligated to pay the Government an amount (computed by the Contracting Officer in the manner provided in paragraph (j) of this clause) equal to interest on the unearned amount from the 8th day after the date of receipt of the unearned amount until-
(i) The date the Contractor notifies the Contracting Officer that the performance deficiency has been corrected; or
(ii) The date the Contractor reduces the amount of any subsequent certified request for progress payments by an amount equal to the unearned amount.
(e) Retainage. If the Contracting Officer finds that satisfactory progress was achieved during any period for which a progress payment is to be made, the Contracting Officer shall authorize payment to be made in full. However, if satisfactory progress has not been made, the Contracting Officer may retain a maximum of 10 percent of the amount of the payment until satisfactory progress is achieved. When the work is substantially complete, the Contracting Officer may retain from previously withheld funds and future progress payments that amount the Contracting Officer considers adequate for protection of the Government and shall release to the Contractor all the remaining withheld funds. Also, on completion and acceptance of each separate building, public work, or other division of the contract, for which the price is stated separately in the contract, payment shall be made for the completed work without retention of a percentage.
(f) Title, liability, and reservation of rights. All material and work covered by progress payments made shall, at the time of payment, become the sole property of the Government, but this shall not be construed as-
(1) Relieving the Contractor from the sole responsibility for all material and work upon which payments have been made or the restoration of any damaged work; or
(2) Waiving the right of the Government to require the fulfillment of all of the terms of the contract.
(g) Reimbursement for bond premiums. In making these progress payments, the Government shall, upon request, reimburse the Contractor for the amount of premiums paid for performance and payment bonds (including coinsurance and reinsurance agreements, when applicable) after the Contractor has furnished evidence of full payment to the surety. The retainage provisions in paragraph (e) of this clause shall not apply to that portion of progress payments attributable to bond premiums.
(h) Final payment. The Government shall pay the amount due the Contractor under this contract after-
(1) Completion and acceptance of all work;
(2) Presentation of a properly executed voucher; and
(3) Presentation of release of all claims against the Government arising by virtue of this contract, other than claims, in stated amounts, that the Contractor has specifically excepted from the operation of the release. A release may also be required of the assignee if the Contractor's claim to amounts payable under this contract has been assigned under the Assignment of Claims Act of1940 ( 31 U.S.C.3727 and 41 U.S.C. 6305).
(i) Limitation because of undefinitized work. Notwithstanding any provision of this contract, progress payments shall not exceed 80 percent on work accomplished on undefinitized contract actions. A "contract action" is any action resulting in a contract, as defined in FAR subpart 2.1, including contract modifications for additional supplies or services, but not including contract modifications that are within the scope and under the terms of the contract, such as contract modifications issued pursuant to the Changes clause, or funding and other administrative changes.
(j) Interest computation on unearned amounts. In accordance with 31 U.S.C. 3903(c)(1), the amount payable under paragraph (d)(2) of this clause shall be-
(1) Computed at the rate of average bond equivalent rates of 91-day Treasury bills auctioned at the most recent auction of such bills prior to the date the Contractor receives the unearned amount; and
(2) Deducted from the next available payment to the Contractor.
(End of clause)
52.236-22 Design Within Funding Limitations. (Deviation 2026-O0038) (Feb 2026)
Design Within Funding Limitations (Feb 2026) (Deviation 2026-O0038)
(a) The Contractor shall accomplish the design services required under this contract to permit the award of a contract, using standard Federal Acquisition Regulation procedures for the construction of the facilities designed at a price that does not exceed the estimated construction contract price as set forth in paragraph (d) of this clause.
(1) When bids or proposals for the construction contract are received that exceed the estimated price, the Contractor shall perform such redesign and other services as are necessary to permit contract award within the funding limitation.
(2) These additional services shall be performed at no increase in the price of this contract.
(3) The Contractor shall not be required to perform such additional services at no cost to the Government if the unfavorable bids or proposals are the result of conditions beyond its reasonable control.
(b) The Contractor will promptly provide written notice to the Contracting Officer if it finds that the project will exceed or is likely to exceed the funding limitations and it is unable to design a usable facility within these limitations.
(1) Upon receipt of such written notice, the Contracting Officer will review the Contractor's revised estimate of construction cost.
(2) The Government may, if it determines that the estimated construction contract price set forth in this contract is so low that award of a construction contract not in excess of such estimate is improbable,-
(i) Authorize a change in scope or materials as required to reduce the estimated construction cost to an amount within the estimated construction contract price set forth in paragraph (d) of this clause; or
(ii) The Government may adjust such estimated construction contract price.
(c) When bids or proposals are not solicited or are unreasonably delayed, the Government shall prepare an estimate of constructing the design submitted and such estimate shall be used in lieu of bids or proposals to determine compliance with the funding limitation.
(d) The estimated construction contract price for the project described in this contract is $____.
(End of clause)
52.248-3 Value Engineering-Construction. (Oct 2025)
Value Engineering-Construction (Oct 2025)
(a) General. The Contractor is encouraged to develop, prepare, and submit value engineering change proposals (VECP's) voluntarily. The Contractor shall share in any instant contract savings realized from accepted VECP's, in accordance with paragraph (f) of this clause.
(b) Definitions. "Collateral costs," as used in this clause, means agency costs of operation, maintenance, logistic support, or Government-furnished property.
Collateral savings, as used in this clause, means those measurable net reductions resulting from a VECP in the agency's overall projected collateral costs, exclusive of acquisition savings, whether or not the acquisition cost changes.
Contractor's development and implementation costs, as used in this clause, means those costs the Contractor incurs on a VECP specifically in developing, testing, preparing, and submitting the VECP, as well as those costs the Contractor incurs to make the contractual changes required by Government acceptance of a VECP.
Government costs, as used in this clause, means those agency costs that result directly from developing and implementing the VECP, such as any net increases in the cost of testing, operations, maintenance, and logistic support. The term does not include the normal administrative costs of processing the VECP.
Instant contract savings, as used in this clause, means the estimated reduction in Contractor cost of performance resulting from acceptance of the VECP, minus allowable Contractor's development and implementation costs, including subcontractors' development and implementation costs (see paragraph (h) of this clause).
Value engineering change proposal (VECP) means a proposal that-
(1) Requires a change to this, the instant contract, to implement; and
(2) Results in reducing the contract price or estimated cost without impairing essential functions or characteristics; provided, that it does not involve a change-
(i) In deliverable end item quantities only; or
(ii) To the contract type only.
(c) VECP preparation. As a minimum, the Contractor shall include in each VECP the information described in paragraphs (c)(1) through (7) of this clause. If the proposed change is affected by contractually required configuration management or similar procedures, the instructions in those procedures relating to format, identification, and priority assignment shall govern VECP preparation. The VECP shall include the following:
(1) A description of the difference between the existing contract requirement and that proposed, the comparative advantages and disadvantages of each, a justification when an item's function or characteristics are being altered, and the effect of the change on the end item's performance.
(2) A list and analysis of the contract requirements that must be changed if the VECP is accepted, including any suggested specification revisions.
(3) A separate, detailed cost estimate for (i) the affected portions of the existing contract requirement and (ii) the VECP. The cost reduction associated with the VECP shall take into account the Contractor's allowable development and implementation costs, including any amount attributable to subcontracts under paragraph (h) of this clause.
(4) A description and estimate of costs the Government may incur in implementing the VECP, such as test and evaluation and operating and support costs.
(5) A prediction of any effects the proposed change would have on collateral costs to the agency.
(6) A statement of the time by which a contract modification accepting the VECP must be issued in order to achieve the maximum cost reduction, noting any effect on the contract completion time or delivery schedule.
(7) Identification of any previous submissions of the VECP, including the dates submitted, the agencies and contract numbers involved, and previous Government actions, if known.
(d) Submission. The Contractor shall submit VECP's to the Resident Engineer at the worksite, with a copy to the Contracting Officer.
(e) Government action.
(1) The Contracting Officer will notify the Contractor of the status of the VECP within 45 calendar days after the contracting office receives it. If additional time is required, the Contracting Officer will notify the Contractor within the 45-day period and provide the reason for the delay and the expected date of the decision. The Government will process VECP's expeditiously; however, it will not be liable for any delay in acting upon a VECP.
(2) If the VECP is not accepted, the Contracting Officer will notify the Contractor in writing, explaining the reasons for rejection. The Contractor may withdraw any VECP, in whole or in part, at any time before it is accepted by the Government. The Contracting Officer may require that the Contractor provide written notification before undertaking significant expenditures for VECP effort.
(3) Any VECP may be accepted, in whole or in part, by the Contracting Officer's award of a modification to this contract citing this clause. The Contracting Officer may accept the VECP, even though an agreement on price reduction has not been reached, by issuing the Contractor a notice to proceed with the change. Until a notice to proceed is issued or a contract modification applies a VECP to this contract, the Contractor shall perform in accordance with the existing contract. The decision to accept or reject all or part of any VECP is a unilateral decision made solely at the discretion of the Contracting Officer.
(f) Sharing-
(1) Rates. The Government's share of savings is determined by subtracting Government costs from instant contract savings and multiplying the result by-
(i) 45 percent for fixed-price contracts; or
(ii) 75 percent for cost-reimbursement contracts.
(2) Payment. Payment of any share due the Contractor for use of a VECP on this contract shall be authorized by a modification to this contract to-
(i) Accept the VECP;
(ii) Reduce the contract price or estimated cost by the amount of instant contract savings; and
(iii) Provide the Contractor's share of savings by adding the amount calculated to the contract price or fee.
(g) Collateral savings. If a VECP is accepted, the Contracting Officer will increase the instant contract amount by 20 percent of any projected collateral savings determined to be realized in a typical year of use after subtracting any Government costs not previously offset. However, the Contractor's share of collateral savings will not exceed the contract's firm-fixed-price or estimated cost, at the time the VECP is accepted, or $100,000, whichever is greater. The Contracting Officer is the sole determiner of the amount of collateral savings.
(h) Subcontracts. The Contractor shall include an appropriate value engineering clause in any subcontract of $90,000 or more and may include one in subcontracts of lesser value. In computing any adjustment in this contract's price under paragraph (f) of this clause, the Contractor's allowable development and implementation costs shall include any subcontractor's allowable development and implementation costs clearly resulting from a VECP accepted by the Government under this contract, but shall exclude any value engineering incentive payments to a subcontractor. The Contractor may choose any arrangement for subcontractor value engineering incentive payments; provided, that these payments shall not reduce the Government's share of the savings resulting from the VECP.
(i) Data. The Contractor may restrict the Government's right to use any part of a VECP or the supporting data by marking the following legend on the affected parts:
These data, furnished under the Value Engineering-Construction clause of contract ____, shall not be disclosed outside the Government or duplicated, used, or disclosed, in whole or in part, for any purpose other than to evaluate a value engineering change proposal submitted under the clause. This restriction does not limit the Government's right to use information contained in these data if it has been obtained or is otherwise available from the Contractor or from another source without limitations.
If a VECP is accepted, the Contractor hereby grants the Government unlimited rights in the VECP and supporting data, except that, with respect to data qualifying and submitted as limited rights technical data, the Government shall have the rights specified in the contract modification implementing the VECP and shall appropriately mark the data. (The terms "unlimited rights" and "limited rights" are defined in part 27 of the Federal Acquisition Regulation.)
(End of clause)
52.252-2 Clauses Incorporated by Reference. (Feb 1998)
Clauses Incorporated By Reference (Feb 1998)
This contract incorporates one or more clauses by reference, with the same force and effect as if they were given in full text. Upon request, the Contracting Officer will make their full text available. Also, the full text of a clause may be accessed electronically at this/these address(es):
https://www.acquisition.gov/far-overhaul https://www.acquisition.gov/browse/index/far ____[Insert one or more Internet addresses]
(End of clause)
52.252-4 Alterations in Contract. (Apr 1984)
Alterations in Contract (Apr 1984)
Portions of this contract are altered as follows:
(End of clause)
52.252-6 Authorized Deviations in Clauses. (Nov 2020)
Authorized Deviations in Clauses (Nov 2020)
(a) The use in this solicitation or contract of any Federal Acquisition Regulation (48 CFR Chapter 1) clause with an authorized deviation is indicated by the addition of "(DEVIATION)" after the date of the clause.
(b) The use in this solicitation or contract of any ____[insert regulation name] (48 CFR ____) clause with an authorized…