_Solicitation_Development_Form_Internal_Use_Only.docx
DOCX document 25 KB Posted
- Attached to
- Shore Acres Resiliency Infrastructure Project (Connecticut Ave & Vicinity SDI) (Project No. 22033-110)
- Solicitation number
- RFQ- 25 - 158
- Issued by
- Pinellas County, Florida
About this file
The document is a Solicitation Development Form for the City of St. Petersburg, Florida, involving a Resiliency Infrastructure Project (Project No. 22033-110) at Connecticut Avenue and vicinity. The project seeks a construction management firm to improve stormwater conveyance capacity, with key elements including constructing a stormwater pump station, installing box culverts, abandoning existing infrastructure, and adjusting roadway elevations. The solicitation is for a Construction Manager at Risk contract, with a 90-day acceptance period and a total budget of $24 million, funded through CoSP and FDEP Grant sources.
The project will be overseen by a committee chaired by Brejesh Prayman, with committee members including Roger Johnson and Sean Snow. The solicitation includes standard attachments such as Exhibit B (Insurance and Bonds), Standard Form 330, and grant requirements. The project is specifically located near the intersection of Bayshore Boulevard NE and Connecticut Avenue NE in St. Petersburg, Florida, with the primary goal of mitigating recurrent flooding through comprehensive infrastructure improvements. The technical aspects will be advised by Scott Murray, and the contract development involves multiple OpenGov followers and approvers.
View the file
Other files
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Solicitation Development Form – Construction / CCNA RFQ
| Project No./Project Title |
| 22033-110 Acres Resiliency Infrastructure Project (Connecticut Ave & Vicinity SDI) |
| Type of Solicitation | ||||
| |_| Construction Manager | |_| Fixed Design-Build | |_| Contract Purchase Agreement | ||
| |X| Construction Manager at Risk | |_| Progressive Design-Build |
| For ECID use only |
| |X| Yes |_| No |
| OpenGov Followers: | Sean Snow and Christy Carlton |
| Routing Council Items and Related Questions: |
Sean Snow, Roger Johnson, Sarah Johnson, Brejesh Prayman, and Janice MacKinnon
OpenGov Approvers: Roger Johnson and Brejesh Prayman
Contract Type, if applicable
| N/A |
| Contract Terms, |
if applicable N/A
| Charge Account |
| 19207 / 22033-110.01.03 / 81964 / 4013 |
| Budget |
| $ 24 million |
Funding Source / Grant Info, if known
| CoSP, FDEP Grant |
| Acceptance Period |
| 90 Days |
| Background Checks |
| |_| Parks & Rec |_| Police |_| Port |X| WRD |
| Class Item |
| Commodity Description |
| 958.26 |
| Construction Management Services |
| 914.00 |
| Construction Services |
| 913.45 |
| Construction, Sewer and Storm Drain |
| Committee Members |
| Technical Advisors |
| 1. | Chair: Brejesh Prayman |
| 1. | Scott Murray |
| 2. | Roger Johnson |
| 2. |
3. Sean Snow
4.
5.
6.
Attachments:
| |_| | Drafts - AIA A133-2019 and A201-2017 |
| |_| | Exhibit E – Owners Direct Purchase Policy |
| |_| | Exhibit A - Scope of Services |
| |_| | Exhibit C - Statement of Qualifications |
| |X| | Exhibit B - Insurance and Bonds |
| |X| | Standard Form 330 |
| |_| | Exhibit D – Intentionally Left Blank |
| |X| | Attachment – Grant Requirements |
Rev: 1/29/24