Solicitation_Development_Form.pdf
PDF 772 KB Posted
- Solicitation number
- RFQ- 24 - 109
- Issued by
- Pinellas County, Florida
About this file
The document is a Solicitation Development Form for a Progressive Design-Build construction project issued by a local government entity in Florida, specifically for the Northeast Water Reclamation Facility (NEWRF) and Northwest Water Reclamation Facility (NWWRF) Prestressed Concrete Cylinder Pipe (PCCP) Replacement (Project No. 23109-100). The project involves replacing approximately 7,000 linear feet of 36" PCCP along 77th/78th Avenue North and approximately 15,286 linear feet of 30" reclaimed water main supplied by NWWRF, addressing pipes manufactured with Class IV prestressing wire known for potential premature failures. The solicitation is for design-build services, with a Progressive Design-Build contract type, and has an acceptance period of 90 days.
The project is budgeted at $35,730,000, with funding sourced from CoSP (City of St. Petersburg), and will require background checks through the Water Resources Department (WRD). The solicitation includes attachments such as a Draft AIA Agreement, Design Build Exhibit, Detailed Design Criteria Package, Owner Direct Purchase Policy, Insurance and Bonds documentation, and Statement of Qualifications. The project committee is chaired by Brejesh Prayman, with committee members including Mike Renshaw, Scott Lewis, Diana Smillova, Hamza Bouloudene, and Mark Laney. The technical advisor listed is Chris Weingarten, and the document was developed with routing and approval from multiple city officials.
View the file
Other files
Show all 12
On GovTribe
Work with this file
- Download the original file
- Contacts named in this file
- Similar government files
- Ask GovTribe AI about this file
Text version
Rev: 1/29/24
Solicitation Development Form – Construction / CCNA RFQ
OpenGov Followers: Hamza Bouloudene and Christy Carlton Routing Council Items and Related Questions:
Hamza Bouloudene, Diana Smillova, Sarah Johnson, Brejesh Prayman, Janice MacKinnon, John Palenchar, Scott Lewis, Michael Renshaw
OpenGov Approvers: Diana Smillova and Brejesh Prayman
Contract Type, if applicable
Multi-Year - New Agreement (RFQ)
Multi-Year - Renewal Agreement (RFQ) Contract Terms, if applicable N/A
Charge Account 16904.23109-100.03.06.81142.4003 Budget $ 35,730,000
Funding Source / Grant Info, if known CoSP Acceptance Period 90 Days
Background Checks Parks & Rec Police Port WRD
Class Item Commodity Description
906.25 Design Build Services
913.40 Construction, Pipeline
913.60 Construction, Water System, Main and Service Line
Committee Members: Technical Advisors:
1. Chair: Brejesh Prayman 1. Chris Weingarten
2. Mike Renshaw 2.
3. Scott Lewis
4. Diana Smillova
5. Hamza Bouloudene
6. Mark Laney
Attachments
Draft AIA Agreement Exhibit D - Detailed Design Criteria Package
Draft AIA Design Build Exhibit Exhibit E - Owner Direct Purchase Policy
Exhibit A - Scope Design-Build Proposal
Exhibit B - Insurance and Bonds SF 330
Exhibit C - Statement of Qualifications Other:
Approvals To Submit To Procurement Sign and Date
Hamza Bouloudene hamza Bouloudene 02/02.24 - new dcp approved 3/12/24
Diana Smillova Diana Smillova 3/5/2024 - new dcp approved 3/12/24
Brejesh Prayman
Project No./Project Title 23109-100 NEWRF & NWERF PCCP Replacement
Type of Solicitation Construction Manager Fixed Design-Build Contract Purchase Agreement Construction Manager at Risk Progressive Design-Build
For ECID use only Yes No
03/12/24
File details come from the government source that posted it. Updated .