Solicitation Amendment FA480021R00050001 - 2 Apr 2021.pdf

PDF 545 KB Posted

Attached to
Simplified Acquisition of Base Engineer Requirements (SABER) Indefinite Delivery Indefinite Quantity (IDIQ) Contract Services
Solicitation number
FA480021R0005
Issued by

About this file

This is a request for proposal for a Simplified Acquisition of Base Engineer Requirements indefinite delivery indefinite quantity contract. The contract will be awarded by the 633 Contracting Squadron at Joint Base Langley-Eustis to provide maintenance, repair, minor and new construction work on real property at JBLE. The work includes a broad range of services. The contract is set aside for 8(a) small businesses located in SBA Region III. The contract type is firm-fixed-price, for a base year and four option years with a total ceiling of $95 million. A site visit will be held on March 19, 2021 for the seed project at facility 15 on Langley AFB. The proposal response date is April 14, 2021.

View the file

Other files

File Type Posted
JBLE SABER Seed Project Sign-In Sheet.pdf PDF
Solicitation Amendment FA480021R00050003 - 2 Jun 21.pdf PDF
Revised - Atch 6 - WD VA20210155 - Building - Sandston - 7 May 21.pdf PDF
Atch 21 - Gov Response to RFI - Amendment 0003 - 2 Jun 21.pdf PDF
Revised - Atch 5 - WD VA20210159 - Building - NN - 7 May 21.pdf PDF
Revised - Atch 7 - WD VA20210167 - Building - VA Beach - 7 May 21.pdf PDF
Revised - Atch 17 - Section L - Instructions - Amendment 0003 - 2 Jun 21.pdf PDF
Revised - Atch 9 - WD VA20210053 - Heavy - NN - 7 May 21.pdf PDF
Revised - Atch 4 - WD VA20210022 - Building - Hampton - 7 May 21.pdf PDF
Revised Atch 2 - SABER Seed Project SOW - Amendment 0003 - 2 Jun 21.pdf PDF
Solicitation Amendment FA480021R00050002 - 14 May 21.pdf PDF
Revised - Atch 17 - Section L - Instructions - Amendment 0002 - 14 May 21.pdf PDF
Revised Atch 3 - Pricing Schedule - Amendment 0002 - 14 May 21.xlsx XLSX spreadsheet
Revised Atch 18 - Section M - Eval Factors - Amendment 0002 - 14 May 21.pdf PDF
Revised Atch 18 - Section M - Eval Factors - 2 Apr 21.pdf PDF
Atch 21 - Gov Response to RFI - 2 Apr 21.xlsx XLSX spreadsheet
Revised Atch 1 - SABER General Provisions - 2 Apr 21.pdf PDF
Revised Atch 17 - Section L - Instructions - 2 Apr 21.pdf PDF
Revised Atch 2 - SABER Seed Project SOW - 2 Apr 21.pdf PDF
Atch 9 - WD VA20210053 - Heavy - NN.pdf PDF
Atch 10 - WD VA20210001 - Heavy - VA Statewide.pdf PDF
Atch 11 - WD VA20210126 - Highway - Sandston.pdf PDF
Atch 2 - SABER SEED Project SOW.pdf PDF
Atch 8 - WD VA20210047 - Heavy - Hampton.pdf PDF
Atch 18 - Section M - Eval Factors.docx DOCX document
Atch 17 - Section L - Instructions.docx DOCX document
Atch 4 - WD VA20210022 - Building - Hampton.pdf PDF
Atch 7 - WD VA20210167 - Building - VA Beach.pdf PDF
Atch 16 - WD VA20210145 - Residental - Va Beach.pdf PDF
Solicitation - FA480021R0005.pdf PDF
Atch 14 - WD VA20210140 - Residental - NN.pdf PDF
Atch 20 - AFCEC Builder Required Systems Review.xlsx XLSX spreadsheet
Atch 19 - Project Builder Data Collection Form.xlsx XLSX spreadsheet
Atch 1 - SABER General Provisions.pdf PDF
Atch 13 - WD VA20210138 - Residental - Hampton.pdf PDF
Atch 12 - WD VA20210195 - Highway - VA Statewide.pdf PDF
Atch 6 - WD VA20210155 - Building - Sandston.pdf PDF
Atch 5 - WD VA20210159 - Building - NN.pdf PDF
Atch 3 - Pricing Schedule.xlsx XLSX spreadsheet
Atch 15 - WD VA20210139 - Residental - Sandston.pdf PDF
Show all 40

On GovTribe

Work with this file

  • Download the original file
  • Contacts named in this file
  • Similar government files
  • Ask GovTribe AI about this file

Text version

R

11. THIS ITEM ONLY APPLIES TO AMENDMENTS OF SOLICITATIONS

The above numbered solicitation is amended as set forth in Item 14. The hour and date specified for receipt of Offers is extended. is not extended.

Offers must acknowledge receipt of this amendment prior to the hour and date specified in the solicitation or as amended, by one of the following methods:

(a) By completing items 8 and 15, and returning copies of the amendment; (b) By acknowledging receipt of this amendment on each copy of the offer submitted;

or (c) By separate letter or electronic communication which includes a reference to the solicitation and amendment numbers. FAILURE OF YOUR ACKNOWLEDGMENT TO BE RECEIVED AT THE PLACE DESIGNATED FOR THE RECEIPT OF OFFERS PRIOR TO THE HOUR AND DATE SPECIFIED MAY RESULT IN REJECTION OF YOUR OFFER. If by virtue of this amendment you desire to change an offer already submitted, such change may be made by letter or electronic communication, provided each letter or electronic communication makes reference to the solicitation and this amendment, and is received prior to the opening hour and date specified.

12. ACCOUNTING AND APPROPRIATION DATA (If required)

13. THIS ITEM APPLIES ONLY TO MODIFICATIONS OF CONTRACTS/ORDERS.

IT MODIFIES THE CONTRACT/ORDER NUMBER AS DESCRIBED IN ITEM 14.

CHECK ONE A. THIS CHANGE ORDER IS ISSUED PURSUANT TO: (Specify authority) THE CHANGES SET FORTH IN ITEM 14 ARE MADE IN THE CONTRACT ORDER

NUMBER IN ITEM 10A.

B. THE ABOVE NUMBERED CONTRACT/ORDER IS MODIFIED TO REFLECT THE ADMINISTRATIVE CHANGES (such as changes in paying office, appropriation data, etc.) SET FORTH IN ITEM 14, PURSUANT TO THE AUTHORITY OF FAR 43.103(b).

C. THIS SUPPLEMENTAL AGREEMENT IS ENTERED INTO PURSUANT TO AUTHORITY OF:

D. OTHER (Specify type of modification and authority)

E. IMPORTANT: Contractor is not is required to sign this document and return copies to the issuing office.

14. DESCRIPTION OF AMENDMENT/MODIFICATION (Organized by UCF section headings, including solicitation/contract subject matter where feasible.)

Except as provided herein, all terms and conditions of the document referenced in Item 9A or 10A, as heretofore changed, remains unchanged and in full force and effect.

15A. NAME AND TITLE OF SIGNER (Type or print) 16A. NAME AND TITLE OF CONTRACTING OFFICER (Type or print)

15B. CONTRACTOR/OFFEROR

(Signature of person authorized to sign)

15C. DATE SIGNED 16B. UNITED STATES OF AMERICA

(Signature of Contracting Officer)

16C. DATE SIGNED

Previous edition unusable STANDARD FORM 30 (REV. 11/2016) Prescribed by GSA FAR (48 CFR) 53.243

AMENDMENT OF SOLICITATION/MODIFICATION OF CONTRACT 1. CONTRACT ID CODE PAGE OF PAGES

2. AMENDMENT/MODIFICATION NUMBER 3. EFFECTIVE DATE 4. REQUISITION/PURCHASE REQUISITION NUMBER 5. PROJECT NUMBER (If applicable)

6. ISSUED BY CODE 7. ADMINISTERED BY (If other than Item 6) CODE

8. NAME AND ADDRESS OF CONTRACTOR (Number, street, county, State and ZIP Code) (X) 9A. AMENDMENT OF SOLICITATION NUMBER

9B. DATED (SEE ITEM 11)

10A. MODIFICATION OF CONTRACT/ORDER NUMBE

10B. DATED (SEE ITEM 13)

CODE FACILITY CODE

SECTION SF 30 BLOCK 14 CONTINUATION PAGE

SUMMARY OF CHANGES

The purpose of Amendment 0001 is to provide the Government's response to potential Block 14 (Description of Amendment/Modification):

offerors' request for information (RFI), revise the solicitation, and extend the proposal due date. This amendment incorporates the following:

A. Attachment 21 is hereby added to incorporate the Government's response to industry's RFI.

B. Revisions to the solicitation are hereby incorporated as follows (all attachment revisions are highlighted in yellow):

Section B - CLIN structure was modified to allow for easier fill-in of coefficient and minimal design fee amounts (no changes to requirements);

Revised Atch 1 - SABER General Provisions - 2 Apr 21;

Revised Atch 2 - SABER Seed Project SOW - 2 Apr 21;

Revised Atch 17 - Section L - Instructions - 2 Apr 21; and Revised Atch 18 - Section M - Eval Factors - 2 Apr 21.

C. The proposal due date is hereby changed from 9 Apr 2021 to 14 Apr 2021. Proposals are due no later than 4:30 PM ET.

D. All other terms and conditions remain unchanged.

Section A - Solicitation/Contract Form

The following changes have been made:

INFORMATION FROM TO

Contract Description

Scope of Work: The SABER requirements are for a broad range of maintenance, repair, minor and new construction work on real property on JBLE.

This acquisition is a competitive procurement pursuant to Section 8(a) of the Small Business Administration (SBA) Act (15 U.S.C. 637(a)), in accordance with FAR 19.805 and FAR 6.204.

In accordance with Title 13 of the Code of Federal Regulations, 124.507(c)(2), the SBA has determined that the U.S. Department of the Air Force, JBLE may compete this award among 8(a) Business Development Program participants headquartered, with an approved bona fide place of business, within SBA's Region III.

Therefore, competition for this award is limited to the SBA's Region III, which includes the states of Delaware, Maryland, Pennsylvania, Virginia, Washington D.C. and West Virginia.

This award is a firm-fixed-price (FFP), single award, IDIQ contract. This IDIQ includes a base year and four option year periods with an overall ceiling capacity of $95,000,000.

The contract minimum guarantee is $4,000. If a SABER project is not readily available after award of the IDIQ, the minimum guarantee will be awarded via a task order.

The guarantee amount of $4,000 will then be deducted from the first task order for SABER services.

Offeror shall follow instructions in Section L of this solicitation and complete its offer accordingly. Offeror shall submit/complete the following:

(a) Section A, complete SF 1442; Blocks 14, 15, 16, 17, 19 (if applicable), and 20a, b, & c;

(b) Section B, Atch 3, Pricing Schedule, complete for Base & all Option Years;

(c) Section K, complete appropriate certification section;

and

(d) Section I, complete fill-ins as applicable.

Scope of Work: The SABER requirements are for a broad range of maintenance, repair, minor and new construction work on real property on JBLE.

This acquisition is a competitive procurement pursuant to Section 8(a) of the Small Business Administration (SBA) Act (15 U.S.C. 637(a)), in accordance with FAR 19.805 and FAR 6.204.

In accordance with Title 13 of the Code of Federal Regulations, 124.507(c)(2), the SBA has determined that the U.S. Department of the Air Force, JBLE may compete this award among 8(a) Business Development Program participants headquartered, with an approved bona fide place of business, within SBA's Region III.

Therefore, competition for this award is limited to the SBA's Region III, which includes the states of Delaware, Maryland, Pennsylvania, Virginia, Washington D.C. and West Virginia.

This award is a firm-fixed-price (FFP), single award, IDIQ contract. This IDIQ includes a base year and four option year periods with an overall ceiling capacity of $95,000,000.

The contract minimum guarantee is $4,000. If a SABER project is not readily available after award of the IDIQ, the minimum guarantee will be awarded via a task order.

The guarantee amount of $4,000 will then be deducted from the first task order for SABER services.

Offeror shall follow instructions in Section L of this solicitation and complete its offer accordingly. Offeror shall submit/complete the following:

(a) Section A, complete SF 1442; Blocks 14, 15, 16, 17, 19 (if applicable), and 20a, b, & c;

(b) Section B, pages 4 - 6 of the SF 1442 and Section B, Atch 3, Pricing Schedule, complete for Base & all Option Years;

(c) Section K, complete appropriate certification section;

and

(d) Section I, complete fill-ins as applicable.

Response Due Date

09 Apr 2021 14 Apr 2021

FA480021R00050001

Section B - Supplies or Services & Prices or Costs

The following CLIN(s) / SLIN(s) were modified:

INFORMATION FROM TO

Description

Joint Base Langley-Eustis (JBLE) Simplified Acquisition of Base Civil Engineer Requirements (SABER) -- Base Year

The contractor shall provide all labor, materials, equipment, tools, supplies, management, transportation, supervision, and all other required services to perform all operations necessary to execute task orders against the SABER contract in accordance with the General Provisions at Attachment 1. The JBLE coefficients and design fees for the Base Year are as follows:

Fort Eustis Coefficients -- Standard: XXX / Nonstandard: XXX Minimal Design Fees -- Low: $XX / Medium: $XX / High: $XX

Langley Coefficients -- Standard: XXX / Nonstandard: XXX Minimal Design Fees -- Low: $XX / Medium: $XX / High: $XX

Joint Base Langley-Eustis (JBLE) Simplified Acquisition of Base Civil Engineer Requirements (SABER) -- Base Year

The contractor shall provide all labor, materials, equipment, tools, supplies, management, transportation, supervision, and all other required services to perform all operations necessary to execute task orders against the SABER contract in accordance with the General Provisions at Attachment 1. The JBLE coefficients and design fees for the Base Year are as follows:

Fort Eustis Coefficients Standard:

Nonstandard:

Fort Eustis Minimal Design Fees Low: $ Medium: $ High: $

Langley Coefficients Standard:

Nonstandard:

Langley Minimal Design Fees Low: $ Medium: $ High: $

Option Line Item 1001

INFORMATION FROM TO

Description

Joint Base Langley-Eustis (JBLE) Simplified Acquisition of Base Civil Engineer Requirements (SABER) -- Option Year 1 (OY1)

The contractor shall provide all labor, materials, equipment, tools, supplies, management, transportation, supervision, and all other required services to perform all operations necessary to execute task orders against the SABER contract in accordance with the General Provisions at Attachment 1. The JBLE coefficients and design fees for OY1 are as follows:

Fort Eustis Coefficients -- Standard: XXX / Nonstandard: XXX Minimal Design Fees -- Low: $XX / Medium: $XX / High: $XX

Langley Coefficients -- Standard: XXX / Nonstandard: XXX Minimal Design Fees -- Low: $XX / Medium: $XX / High: $XX

Joint Base Langley-Eustis (JBLE) Simplified Acquisition of Base Civil Engineer Requirements (SABER) -- Option Year 1 (OY1)

The contractor shall provide all labor, materials, equipment, tools, supplies, management, transportation, supervision, and all other required services to perform all operations necessary to execute task orders against the SABER contract in accordance with the General Provisions at Attachment 1. The JBLE coefficients and design fees for OY1 are as follows:

Fort Eustis Coefficients Standard:

Nonstandard:

Fort Eustis Minimal Design Fees Low: $ Medium: $ High: $

Langley Coefficients Standard:

Nonstandard:

Langley Minimal Design Fees

Low: $ Medium: $ High: $

Option Line Item 2001

INFORMATION FROM TO

Description

Joint Base Langley-Eustis (JBLE) Simplified Acquisition of Base Civil Engineer Requirements (SABER) -- Option Year 2 (OY2)

The contractor shall provide all labor, materials, equipment, tools, supplies, management, transportation, supervision, and all other required services to perform all operations necessary to execute task orders against the SABER contract in accordance with the General Provisions at Attachment 1. The JBLE coefficients and design fees for OY2 are as follows:

Fort Eustis Coefficients -- Standard: XXX / Nonstandard: XXX Minimal Design Fees -- Low: $XX / Medium: $XX / High: $XX

Langley Coefficients -- Standard: XXX / Nonstandard: XXX Minimal Design Fees -- Low: $XX / Medium: $XX / High: $XX

Joint Base Langley-Eustis (JBLE) Simplified Acquisition of Base Civil Engineer Requirements (SABER) -- Option Year 2 (OY2)

The contractor shall provide all labor, materials, equipment, tools, supplies, management, transportation, supervision, and all other required services to perform all operations necessary to execute task orders against the SABER contract in accordance with the General Provisions at Attachment 1. The JBLE coefficients and design fees for OY2 are as follows:

Fort Eustis Coefficients Standard:

Nonstandard:

Fort Eustis Minimal Design Fees Low: $ Medium: $ High: $

Langley Coefficients Standard:

Nonstandard:

Langley Minimal Design Fees Low: $ Medium: $ High: $

Option Line Item 3001

INFORMATION FROM TO

Description

Joint Base Langley-Eustis (JBLE) Simplified Acquisition of Base Civil Engineer Requirements (SABER) -- Option Year 3 (OY3)

The contractor shall provide all labor, materials, equipment, tools, supplies, management, transportation, supervision, and all other required services to perform all operations necessary to execute task orders against the SABER contract in accordance with the General Provisions at Attachment 1. The JBLE coefficients and design fees for OY3 are as follows:

Fort Eustis Coefficients -- Standard: XXX / Nonstandard: XXX Minimal Design Fees -- Low: $XX / Medium: $XX / High: $XX

Langley Coefficients -- Standard: XXX / Nonstandard: XXX Minimal Design Fees -- Low: $XX / Medium: $XX / High: $XX

Joint Base Langley-Eustis (JBLE) Simplified Acquisition of Base Civil Engineer Requirements (SABER) -- Option Year 3 (OY3)

The contractor shall provide all labor, materials, equipment, tools, supplies, management, transportation, supervision, and all other required services to perform all operations necessary to execute task orders against the SABER contract in accordance with the General Provisions at Attachment 1. The JBLE coefficients and design fees for OY3 are as follows:

Fort Eustis Coefficients Standard:

Nonstandard:

Fort Eustis Minimal Design Fees Low: $ Medium: $ High: $

Langley Coefficients Standard:

Nonstandard:

Langley Minimal Design Fees Low: $ Medium: $ High: $

Option Line Item 4001

INFORMATION FROM TO

Description

Joint Base Langley-Eustis (JBLE) Simplified Acquisition of Base Civil Engineer Requirements (SABER) -- Option Year 4 (OY4)

The contractor shall provide all labor, materials, equipment, tools, supplies, management, transportation, supervision, and all other required services to perform all operations necessary to execute task orders against the SABER contract in accordance with the General Provisions at Attachment 1. The JBLE coefficients and design fees for OY4 are as follows:

Fort Eustis Coefficients -- Standard: XXX / Nonstandard: XXX Minimal Design Fees -- Low: $XX / Medium: $XX / High: $XX

Langley Coefficients -- Standard: XXX / Nonstandard: XXX Minimal Design Fees -- Low: $XX / Medium: $XX / High: $XX

Joint Base Langley-Eustis (JBLE) Simplified Acquisition of Base Civil Engineer Requirements (SABER) -- Option Year 4 (OY4)

The contractor shall provide all labor, materials, equipment, tools, supplies, management, transportation, supervision, and all other required services to perform all operations necessary to execute task orders against the SABER contract in accordance with the General Provisions at Attachment 1. The JBLE coefficients and design fees for OY4 are as follows:

Fort Eustis Coefficients Standard:

Nonstandard:

Fort Eustis Minimal Design Fees Low: $ Medium: $ High: $

Langley Coefficients Standard:

Nonstandard:

Langley Minimal Design Fees Low: $ Medium: $ High: $

Section J - List of Attachments

Miscellaneous text in this section has been modified to:

Twenty-one (21) Attachments:

Attachment 1 -- General Provisions for SABER, Dated 26 Jan 2021 Attachment 2 -- SABER Seed Project/Statement of Work for Facility 15 Attachment 3 -- Pricing Schedule Attachment 4 -- Building Wage Decision VA20210022, Dated 01/08/2021 - Hampton , VA Attachment 5 -- Building Wage Decision VA20210159, Dated 01/08/2021 - Newport News, VA Attachment 6 -- Building Wage Decision VA20210155, Dated 01/08/2021 - Sandston, VA Attachment 7 -- Building Wage Decision VA20210167, Dated 01/08/2021 - Virginia Beach, VA Attachment 8 -- Heavy Wage Decision VA20210047, Dated 01/01/2021- Hampton, VA Attachment 9 -- Heavy Wage Decision VA20210053, Dated 01/01/2021- Newport News, VA Attachment 10 -- Heavy Wage Decision VA20210001, Date 01/01/2021- Virginia Statewide Attachment 11 -- Highway Wage Decision VA20210126, Dated 01/01/2021- Sandston, VA Attachment 12 -- Highway Wage Decision VA20210195, Dated 01/01/2021- Virginia Statewide Attachment 13 -- Residential Wage Decision VA20210138, Dated 01/08/2021- Hampton, VA Attachment 14 -- Residential Wage Decision VA20210140, Dated 01/08/2021- Newport News, VA Attachment 15 -- Residential Wage Decision VA20210139, Dated 01/01/2021- Sandston, VA Attachment 16 -- Residential Wage Decision VA20210145, Dated 01/08/2021- Virginia Beach, VA Attachment 17 -- Section L, Instructions, Conditions, and Notices to Offerors Attachment 18 -- Section M, Evaluation Factors for Award Attachment 19 -- Project Builder Data Collection Form

Attachment 20 -- AFCEC Builder Required Systems Review Attachment 21 -- Government Response to Requests for Information

Section L - Instructions, Conditions, & Notices to Offerors or Quoters

Miscellaneous text in this section has been modified to:

Section L Instructions, Conditions and Notices to Offerors.

L-1. GENERAL INSTRUCTIONS.

L-1.1. Notice To Offeror(s). This section of the RFP provides general guidance for preparing proposals as well as specific instructions on the format and content of the required proposal volumes. Each proposal must include all data and information requested in the RFP. Offerors are cautioned to strictly comply with all instructions within this solicitation to ensure submission of a complete proposal. Failure to furnish a complete proposal at the time of proposal submission may result in the proposal being unacceptable to the Government and thereby eliminated from consideration for award. The offeror's proposal must reflect a thorough understanding of the services required and display a logical development of the offeror's plans to implement all General Provision requirements as assessed by the RFP evaluation criteria.

L-1.2. The Government reserves the right to cancel this solicitation at any point before contract award. In the event this solicitation is cancelled, the Government has no obligation to reimburse offerors for any costs incurred.

L-1.3. This acquisition is a competitive procurement pursuant to Section 8(a) of the Small Business Administration (SBA) Act (15 U.S.C. 637(a)), in accordance with FAR Part 19.8, Contracting with the SBA (The 8(a) Program) and FAR Part 6.204, Section 8(a) competition. The applicable North American Industry Classification System (NAICS) code is 236220, Commercial and Institutional Building Construction and the Product Service Code (PSC) is Z2AA, Repair of Alteration of Office Buildings.

L-1.4. The Government intends to award one Indefinite Delivery Indefinite Quantity (IDIQ) contract from this solicitation to the responsible offeror (IAW FAR Part 9) whose proposal represents the best value after evaluation in accordance with the factors and subfactors in the solicitation (FAR 52.215-1(f)(1)).

L-1.5. Offerors shall acknowledge awareness of all amendments to the solicitation by signing and dating Block 19, Page 2 of the Standard Form 1442.

L-1.6. The Government expects adequate competition and intends to award a contract without discussions.

Therefore, the offeror's initial proposal should contain the offeror's best terms for all factors/subfactors in its initial proposal.

L-1.7. Complete the necessary fill-ins and certifications in all provisions/clauses throughout the solicitation.

Failure to complete these items may result in the proposal being found non-responsive and/or non-responsible.

L-1.8. Proposals shall be clear and concise, and shall include sufficient detail to permit the Government to adequately evaluate and substantiate proposal statements.

L-2. SUBMISSION OF QUESTIONS.

L-2.1. Questions in response to this solicitation are due no later than 4:30 PM ET on 22 Mar 2021. All questions shall be submitted via email and only to the points of contact (POCs) noted below. It is the offeror's responsibility to confirm receipt.

Mr. Phillip Nease: phillip.nease.1@us.af.mil Mr. Ian Barnes: ian.barnes.11@us.af.mil Ms. Valarie Fleming: valarie.fleming.1@us.af.mil Please note the following in the subject line: "Questions: SABER Sol FA480021R0005"

L-2.2. Questions shall be submitted in the following format, compatible with Microsoft Office 2013 or newer:

Document / Section Paragraph / Reference Question / Issue / Concern

Offerors' questions with Government responses will be posted to beta.SAM.gov as an amendment to this solicitation.

L-3. PROPOSAL SUBMISSION AND FORMAT.

L-3.1. Proposals in response to this solicitation shall be valid for 365 calendar days after the date offers are due.

L-3.2. SAFE SUBMISSION. Electronic proposals shall be submitted via Department of Defense (DoD) Safe Access File Exchange (SAFE) at https://safe.apps.mil . The Government will not accept proposals through any other medium.

L-3.2.1. In order to submit a proposal, offerors must notify the POCs listed in L-2 no later than 30 Mar 2021 of their intent to propose. The notification email shall include the name and email address of the offeror representative submitting the proposal. On 02 Apr 2021, the Government will send a 'drop-off request' through DoD SAFE to the offeror email provided. This request will provide the link required to submit proposals. It is the offeror's responsibility to confirm receipt once proposals are submitted.

Intent notifications due: 30 Mar 2021 Drop-off request sent: 02 Apr 2021 Proposals due: 14 Apr 2021, NLT 4:30 PM ET

L-3.3. Operating System and Applications. Proposals will be accessed with the Microsoft Windows 10 Operating System. Proposal files shall be submitted using only the applications listed below:

Application / File Valid Extensions Portable Document Files .pdf Microsoft Word .doc / .docx Microsoft Excel .xls / .xlsx Microsoft Power Point .ppt / .pptx

L-3.4. File Naming Convention. Offerors shall follow the basic structure of the file naming convention below for file submissions, where "#" represents the sequential file number. Offerors shall keep the file name under 40 characters.

L-3.4. Table 1: NAMING CONVENTIONS

Section (Business):

Cover Page (FAR 52.215-1(c)(2)) ----- File Name = Offeror name BUS Cover#

Model Contract ----- File Name = Offeror name BUS Kt# --Signed SF1442 (and SF30s as applicable)

--Section B, Section I, and Section K

Pre-award Clearances documentation ----- File Name = Offeror name BUS Clear#

Partnering documentation ----- File Name = Offeror name BUS PA#

Section (Factors):

Technical Capability (Factor 1)* ----- File Name = Offeror name FAC1 MC# --Program Management Plan, Subfactor A ----- File Name = Offeror name FAC1 SubA# --Staffing Plan, Subfactor B ----- File Name = Offeror name FAC1 SubB# --Seed Project, Subfactor C ----- File Name = Offeror name FAC1 SubC#

Past Performance (Factor 2) ----- File Name = Offeror name FAC2 PP#

Price (Factor 3) ----- File Name = Offeror name FAC3 Price#

*Offerors may submit either one file to address all three subfactors, or three separate files for each individual subfactor.

L-3.5. Hyperlinks. Offerors may use hyperlinks within and among proposal factor files. However, there shall be no links from price factor files to non-price factor files. NOTE: Each factor submission shall be on a stand-alone basis. Any information required for evaluation, and not found in its designated file, is assumed omitted from the proposal.

L-3.6. Virus Free Electronic Submission. Offerors shall ensure that proposals are virus free. The offeror shall certify, in the proposal cover letter, that all electronic proposal information delivered throughout the evaluation (e.g., initial proposal, responses to evaluation notices, final proposal revisions) is virus free. Offerors should specify the software, version, and virus definition used to check the data.

L-3.7. Multimedia and Graphics. Sound and video (e.g., MPEG) files shall not be imbedded within the proposal.

Offerors shall:

a. Avoid submitting large files;

b. Simplify color palettes and minimize the use of color images or graphics;

c. Minimize size of graphics files; and

d. Avoid scanned images.

L-3.8. Pre-award Clearance.

VETS-4212 (FAR 52.222-38): Provide documentation that the prime, and any subcontractors over $150K (total value), is current with their reporting as required by FAR Subpart 22.13.

L-3.9. Proposal Format.

L-3.9.1. Fonts: Proposal text fonts shall not be smaller than Microsoft Word Times New Roman 11 or Arial Narrow 12 point font, single column, normal character spacing and position. The text for charts, tables, graphs, and figures shall be no smaller than Microsoft Word, Times New Roman or Arial Narrow, 9 point font. Line spacing shall be at least single-spaced.

L-3.9.2. Pages: All pages shall be formatted as 8.5" x 11" letter size with one-inch margins all around. 11" x 17" is allowed for charts, tables, and graphs only. Any proposal text included on these pages, other than the information specific to the graphics, will not be considered in the evaluation. One 11" x 17" page will be counted as two pages. All material shall be contained within the page limits identified below for each section, and all appendices, charts, graphs, diagrams, tables, photographs, drawings, etc., are included in the page count.

Not included in the page count are title pages, tables of content, glossaries of abbreviations, acronyms, or definitions. Evaluators will only evaluate up to the maximum number of pages specified in Table 2 below.

L-3.9.3. Headers and Footers: Information contained in headers and footers shall only provide company name, solicitation number, proposal section (e.g. Factor 2, Past Performance), disclosure markings (FAR 52.215-1(e)), dates, or page numbers. Text sizes shall be no smaller than Microsoft Word, Times New Roman or Arial Narrow, 9 point font.

L-3.9. Table 2: PROPOSAL PAGE LIMITS

Section (Business):

Cover Page (FAR 52.215-1(c)(2)) -- 3 Pages Model Contract -- No Limit Pre-award Clearances documentation -- No Limit Partnering documentation -- No Limit

Section (Factors):

Technical Capability (Factor 1)* -- 70 Total Pages for all Subfactors (breakout at Offeror's discretion) --Program Management Plan Subfactor A --Staffing Plan Subfactor B --Seed Project Subfactor C

Past Performance (Factor 2) -- 3 Pages (Overview in relation to the solicitation) --PPIs -- 5 Pages Per Reference --PPQs -- No Limit

Price (Factor 3) -- No Limit

L-4. PROPOSAL CONTENT.

L-4.1. Business.

L-4.1.1. Cover Page and Model Contract: Provide a completed Section B, pages 4 - 6 of the SF 1442 and Section B, Atch 3, Pricing Schedule. Provide a filled-in Section I. Provide completion confirmation of the required Representations and Certifications (Section K) in System for Award Management (SAM) located at https://www.sam.gov.

L-4.1.2. Pre-Award Documentation: Include any of the documentation provided in accordance with section L-

3.8. above.

L-4.1.3. Section 8(a) Status: Include letter from the Small Business Administration showing proof of Section 8

(a) status. Offeror shall include the Section 8(a) status letter with its Pre-Award Clearance Documentation.

L-4.1.4. Partnering Documentation: Provide documentation identifying the arrangement and disclosing company relationships (FAR 9.603) for any Joint Venture, Teaming Arrangement, Mentor-Protege, etc. established for the purposes of this solicitation.

L-4.2. Factor 1: Technical Capability

L-4.2.1. Subfactor A, Program Management Plan. Describe your integrated management approach to provide an organizational structure that consists of an appropriate leadership hierarchy, assigned roles and responsibilities, lines of authority, and cohesive functional relationships to ensure satisfactory performance of all the program areas noted in the SABER General Provisions at Attachment 1. Also, provide your communications approach with effective lines of communication, reporting, progress checkpoints, and interfaces between management, technical staff, subcontractors/teaming partners, and the Government to ensure continuity and mission success.

L-4.2.2. Subfactor B, Staffing Plan. Provide your integrated approach for hiring and retaining qualified management and technical personnel for the job categories/positions required by the SABER General Provisions at Attachment 1. The staffing plan shall state the qualifications of positions outlined in the General Provisions.

Resumes are not requested nor will they be evaluated.

L-4.2.3. Subfactor C, Seed Project. Offeror shall provide a proposal for Langley Project MUHJ 20-4072, Renovate Interior Auditorium of Facility 15 - reference solicitation Attachment 2. The proposal shall capture all required labor, tools, materials, supplies, equipment and all other items necessary to successfully complete the project. The proposal shall include a separate technical proposal and a separate price proposal. The technical proposal shall include an AF Form 3064, Contract Progress Schedule that properly denotes all expected disciplines and efforts required to complete the project in a feasible manner that coincides with the requested period of performance of one hundred thirty (130) calendar days. Furthermore, the technical proposal shall include a detailed AF Form 66, Schedule of Material Submittals. The proposal shall also include a detailed price proposal that identifies the necessary line items/tasks from the applicable R.S. Means guides dated 2020. The price proposal shall properly include all expected disciplines required to complete the project and that each discipline is priced according with R.S. Means at an expected level of effort per the statement of work. The price proposal shall include the bid coefficient.

L-4.2.3.1. Subfactor C, Seed Project Site Visit. A site visit for the seed project will be held on 19 Mar 2021 at 9:

00 AM ET at Facility 15 on Langley AFB. Offeror shall email the POCs noted in Section L paragraph L-2 above no later than 4:30 PM ET on 16 Mar 2021 to advise of their intent to attend the site visit. Offeror shall submit: Company Name, Full Name of Individual(s) attending (to include their middle initial), Gender, and Date of Birth. Offeror is allowed no more than two personnel to attend the site visit. The site visit is not mandatory, but it will provide a more in-depth insight to the project and thus should allow offeror to submit a more precise seed project proposal for evaluation. It is the Government's intention to award a task order for the seed project at the SABER awardee's proposed price soon after award of the IDIQ.

L-4.3. Factor 2: Past Performance.

L-4.3.1. This acquisition is a best value source selection utilizing a subjective tradeoff evaluation methodology whereby past performance may be traded for price. Past performance history will be evaluated on a basis significantly more important than cost or price considerations; however, cost/price will contribute substantially to the selection decision.

L-4.3.2. Offeror shall submit thorough, accurate, and complete past performance information (PPI). Offeror submitted PPIs and Contractor Performance Assessment Reports (CPARs) will be the primary sources used in evaluation. The Government may use additional sources of information in its evaluation, at its discretion.

Additional information can come from any sources available to the Government.

L-4.3.3. Offeror shall submit the Commercial and Government Entity (CAGE) code and Data Universal Numbering System (DUNS) number of the Prime Offeror and each team member, partner or subcontractor included in your proposal. Include written consent from all subcontractor or team members to allow the Government to address any evaluated past performance directly with the Prime Offeror.

L-4.3.4. If PPI is submitted from prior organization structures, (e.g. mergers, subsidiaries, purchases, novation's, etc.) submit a detailed change history, to include company names, CAGE codes, DUNS numbers, and specific dates.

L-4.3.5. Past Performance Information (PPI) Reference Sheets (Section L: Attachment 1): Submit a minimum of three and a maximum of six separate PPIs for contracts, task orders, or calls that are recent and relevant as defined in Section M. It is the offeror's responsibility to explain how their chosen PPIs are relevant; however, the Government is not bound by the offeror's opinion in determining relevancy. Three of the submitted PPIs should be for the Prime Offeror if available. PPIs submitted for a basic IDIQ or Blanket Purchase Agreement (BPA) will be considered a single PPI reference.

L-4.3.6. Past Performance Questionnaires (PPQ) (Section L: Attachment 2): If a submitted PPI reference does not have a Contractor Performance Assessment Report (CPAR), the Government shall use the attached PPQ as a tool for evaluating. All PPQs are to be submitted to the Government by the POC identified in Section 3 of the Attached PPQ, via email to the 633 CONS personnel listed in paragraph L-2.1. above. Any PPQs submitted directly by an offeror will not be considered. It is the sole responsibility of the offeror to send out and track the completion of a PPQ to ensure it is received by the proposal deadline.

L-4.4. Factor 3: Price

L-4.4.1. The Unit Price Guide (UPG) to be utilized for this contract is R.S. Means. All line items in the R.S.

Means Facilities Construction Guide are considered pre-priced line items. The offeror will be responsible for proposing two priced elements -- coefficient rates and design fees.

L-4.4.2. Coefficient Rates. Offeror's coefficient rates shall represent its costs for labor, overhead, profit, general & administrative expenses, bond premiums, taxes, mobilization, demobilization, and all other associated costs as noted in the General Provisions at Attachment 1. Coefficient rates will be multiplied against the localized unit prices in the R.S. Means Facilities Construction Guide and then multiplied by the City Cost Index (CCI) to calculate the finalized task order price. The coefficient shall represent "net" (equal to 1.0) or a percentage "decrease from" (e.g. .82) or an "increase from" (e.g. 1.12) to the unit prices listed in the appropriate R.S. Means Facility Construction Cost Data Unit Price Book. The pricing coefficient is not subject to economic price adjustments and will remain unchanged for the existing terms and conditions of the contract.

L-4.4.2.1. Since JBLE is separated into two geographical locations, an independent coefficient rate for Langley AFB and Fort Eustis may be proposed by the offeror. Furthermore, an independent coefficient rate may be proposed for the 203 Red Horse Squadron (Camp Pendleton State Military Reservation, Virginia Beach, VA) and the 200 Weather Flight (Sandston, VA). Note: the 192 Virginia Air National Guard Contracting Office (located on Langley AFB) will be given decentralized authority to write its own task orders using the SABER IDIQ in support of the 203 Red Horse Squadron and the 200 Weather Flight.

L-4.4.2.2. The IDIQ contract will be awarded with a single standard and nonstandard coefficient rate for Langley AFB, Fort Eustis, Virginia Beach, and Sandston (unless offeror elects to propose same coefficient for all locations). Projects categorized as standard take place during normal working hours (0730 - 1630), Monday through Friday excluding federal holidays. Projects categorized as nonstandard typically take place outside of the normal working hours, or in a secure area where the contractor must be escorted. The nonstandard coefficient may be utilized to account for loss of productivity while working in secure areas, working on weekends, and working during nonstandard hours only. In addition, the nonstandard coefficient may be used to accelerate contractor's performance to include multiple shifts during both standard and nonstandard hours.

L-4.4.3. Minimal Design. The concept of the SABER program provides for a 35% design level of effort.

However, on occasion some portions of a design may require up to a 65 to 80% design effort depending upon the nature and complexity (i.e. mechanical/electrical) of the project. A 100% design level effort may be necessary when Professional Engineer (PE) Certification is required. For purposes of supplying a minimum design fee, the offeror shall price at a 35% design level of effort.

L-4.4.3.1. Minimal Design Ranges/Fees. The minimal design ranges are broken out into the following three categories of magnitude. The offeror shall provide a FFP design fee amount for each minimum design range category for the base and all option year periods.

Category 1 (Low), minimum design range: $2,000.01 - $50,000.00 Category 2 (Medium), minimum design range: $50,000.01 - $300,000.00 Category 3 (High), minimum design range: Over $300,000.00

L-4.4.4. Pricing Schedule - Solicitation Attachment 3. Offerors shall complete the Pricing Schedule at Attachment 3 of the solicitation by inserting its proposed standard and nonstandard coefficient rates and minimum design fees for each Contract Line Item Number (CLIN), including all option periods. The three minimum design fee amounts shall be inserted as single project amounts.

L-4.4.4.1. The pre-built Pricing Schedule formula will add the offeror's standard and nonstandard coefficient rates together and multiply that total by $19M (estimated dollar value per year for the contract) to reach the total coefficient amount for the base and each option period for Langley AFB, Fort Eustis, Virginia Beach, and Sandston. The pre-built formula will add the sum of the offeror's three proposed minimum design fee amounts for the base and each option period to the total coefficient amount to reach the offeror's overall total proposed price.

L-4.4.5. Offerors shall fully explain the basis for development of its coefficients and design fees. Unreasonably high or unrealistically low coefficient rates or minimum design fees, initially or subsequently, may be grounds for eliminating a proposal from competition either on the basis that the offeror does not understand the requirements or the coefficient/minimum design amount represent an unacceptable risk to the Government.

L-4.4.6. Total Evaluated Price (TEP). The TEP consists of all offeror proposed amounts for the base and all option periods (including the 6-month extension of services period IAW FAR 52.217-8, Option to Extend Services). The SABER Seed Project noted at paragraph L-4.2.3. is not a factor of the TEP and therefore shall not be included in this total.

L-4.4.7. Certified Cost or Pricing Data. Since adequate price competition is expected, contract award will be made without obtaining certified cost or pricing data; however, other than cost or pricing data may be requested after receipt and evaluation of proposals if necessary to make a determination of price reasonableness.

L-4.4.8. Responsibility Determination. In order to expedite the responsibility determination required by FAR 9.103(b), offeror shall provide documentation from its financial institution showing its adequate financial resources, or the ability to obtain them (see FAR 9.10403(a)). This documentation will only be used to establish responsibility in the event of contract award, and will not be used to evaluate proposed pricing.

Section M - Evaluation Factors for Award

Miscellaneous text in this section has been modified to:

Section M - Evaluation Factors for Award

M-1. BASIS FOR CONTRACT AWARD.

M-1.1. A tradeoff source selection process will obtain best value in accordance with (IAW) Federal Acquisition Regulation (FAR) Part 15, Contracting by Negotiation, Department of Defense (DoD) Source Selection Procedures effective 31 Mar 2016, and Air Force Federal Acquisition Regulation (AFFARS) Mandatory

Procedures (MP) 5315.3 for Source Selection, 2019 Edition.

M-1.2. An award can be made to a higher rated, higher priced offeror if the Source Selection Authority (SSA) determines that it is in the best interest of the Government to do so.

M-1.3. Per FAR 52.215-1(f)(4), the Government intends to award without discussions. Should the SSA determine that discussions are necessary, a competitive range determination will be made prior to conducting.

This range will be comprised of the most highly rated proposals based on the ratings of all factors.

M-1.4. The Contracting Officer (CO) will notify offerors in writing when their proposals are excluded from the competitive range or otherwise eliminated from the competition. That notice shall state the basis for the determination and that a proposal revision will not be considered.

M-1.5. Evaluation Notices (ENs) will be issued to offerors in the competitive range. Formal responses to ENs and final proposal revisions (FPRs) will be considered in making the source selection decision for award.

M-1.6. FPRs will be submitted by each offeror in the competitive range at the conclusion of discussions.

Unexplained, or inadequately explained, revisions or exceptions to terms and conditions may significantly impact evaluation of the offeror's proposal. Significant departures from previous proposal submissions may render the offer unacceptable to the Government.

M-2. EVALUATION FACTORS AND METHODOLOGY

M-2.1. Proposals will be evaluated using three evaluation factors: (1) Technical Capability, (2) Past Performance, and (3) Price. Past Performance is the most important. Past Performance and Technical Capability when combined are significantly more important than price; however, price will contribute substantially to the selection decision. The greater the equality of proposals for factors other than price, the more important price becomes in selecting the best value for the government.

M-2.2. Evaluating Factor 1: Technical Capability.

M-2.2.1. Technical will be rated as acceptable or unacceptable. There are three subfactors under the Technical evaluation factor. All three subfactors are equal in importance and all three must be found acceptable for the Technical Capability factor to be determined acceptable. Any technical proposal determined unacceptable will be ineligible for award. Proposals will be evaluated on the offeror's demonstration of the following for each subfactor:

M-2.2.2. Subfactor A, Program Management Plan. The offeror provided an effective integrated management approach that demonstrates an organizational structure that consists of an appropriate leadership hierarchy, assigned roles and responsibilities, lines of authority, and cohesive functional relationships to meet satisfactory performance of all the program areas noted in the SABER General Provisions at Attachment 1. The offeror provided a compressive communications approach that consists of effective lines of communication, reporting, progress checkpoints, and interfaces between management, technical staff, subcontractors/teaming partners, and the Government to ensure continuity and mission success.

M-2.2.3. Subfactor B, Staffing Plan. The offeror provided an effective integrated approach for hiring and retaining qualified management and technical personnel for the job categories/positions required by the SABER General Provisions at Attachment 1. The offeror's staffing plan stated the qualifications of positions outlined in the General Provisions.

M-2.2.4. Subfactor C, Seed Project. The offeror provided a proposal for Langley Project MUHJ 20-4072, Renovate Interior Auditorium of Facility 15. The offeror's proposal captured all required labor, tools, materials, supplies, equipment and all other items necessary to successfully complete the project. The offeror's proposal included a separate technical proposal and a separate price proposal. The offeror's technical proposal included an AF Form 3064, Contract Progress Schedule that properly denoted all expected disciplines and efforts required to complete the project in a feasible manner that coincides with the requested period of performance of one hundred thirty (130) calendar days. The offeror's technical proposal included a properly detailed AF Form 66, Schedule of Material Submittals. The offeror's proposal included a detailed price proposal that identified the necessary line items/tasks from the applicable R.S. Means guides dated 2020. The offeror's price proposal properly included all expected disciplines required to complete the project and each discipline was properly priced in accordance with R.S. Means at an expected level of effort per the statement of work. The offeror's price proposal included the bid coefficient.

M-2.2.5. Factor 1 Ratings. Each subfactor above will be assigned a technical rating from the following chart.

The ratings for each of the subfactors will focus on each offeror's proposal meeting or not meeting the requirements of the solicitation.

Technical Ratings for Factor 1

Adjectival Rating of Acceptable Description: Proposal meets the requirements of the solicitation.

Adjectival Rating of Unacceptable Description: Proposal does not meet the requirement of the solicitation

M-2.2.6. Evaluating Factor 2: Past Performance.

M-2.2.6.1. A Performance Confidence Rating will be assigned to each offeror based on three aspects of past performance evaluation, (1) Recency, (2) Relevancy, and (3) Quality. Past performance information (PPI) determined non-recent or not relevant will not be further evaluated.

M-2.2.6.2. Recency. Each PPI must be determined recent in order to be considered relevant. Recent is an active contract performance (minimum of 6 months) during the last five years as of the release date of this solicitation.

Contracts that were started prior to this time, but still in effect with active performance (minimum of 6 months) as of five years from the date of this solicitation, will be considered recent.

M-2.2.6.3. Relevancy. The following criteria will be used to determine the relevancy of each recent PPI submitted:

Relevancy Ratings for Factor 2

Rating of Very Relevant Description: Present/past performance effort involved essentially the same scope and magnitude of effort and complexities this solicitation requires.

Rating of Relevant Description: Present/past performance effort involved similar scope and magnitude of effort and complexities this solicitation requires.

Rating of Somewhat Relevant Description: Present/past performance effort involved some of the scope and magnitude of effort and complexities this solicitation requires.

Rating of Not Relevant Description: Present/past performance effort involved little or none of the scope and magnitude of effort and complexities this solicitation requires.

M-2.2.6.4. Quality. The Government will review all recent and relevant past performance information collected and determine the quality of the offeror's performance, general trends, and usefulness of the information and incorporate these into the performance confidence assessment. A separate quality assessment rating will not be assigned, but rather the offeror's overall record of performance quality will be used to assign a confidence rating.

M-2.2.6.5. Performance Confidence Assessment Rating: Each offeror will receive one overall performance confidence rating, as follows:

Performance Confidence Assessment Ratings for Factor 2

Rating of Substantial Confidence Description: Based on the offeror's recent/relevant performance record, the Government has a high expectation that the offeror will successfully perform the required effort.

Rating of Satisfactory Confidence Description: Based on the offeror's recent/relevant performance record, the Government has a reasonable expectation that the offeror will successfully perform the required effort.

Rating of Neutral Confidence Description: No recent/relevant performance record is available or the offeror's performance record is so sparse that no meaningful confidence assessment rating can be reasonably assigned. The offeror may not be evaluated favorably or unfavorably on the factor of past performance.

Rating of Limited Confidence Description: Based on the offeror's recent/relevant performance record, the Government has a low expectation that the offeror will successfully perform the required effort.

Rating of No Confidence Description: Based on the offeror's recent/relevant performance record, the Government has no expectation that the offeror will be able to successfully perform the required effort.

M-2.2.6.6. Adverse past performance is defined as past performance information that supports 1) a less than satisfactory rating on any evaluation subfactor; or 2) any unfavorable comments received from sources without a formal rating system that cause evaluator concern. When a relevant performance record indicates performance problems, the Government will consider the number and severity of the problems and the appropriateness and effectiveness of any corrective actions taken (not just planned or promised). The Government may review more recent contracts or performance evaluations to ensure corrective actions have been implemented and to evaluate their effectiveness. In accordance with FAR 15.306(b)(4), communications must be held with any offeror who will be excluded from competition because of adverse past performance information, unless the offeror has previously had the opportunity to comment on such information.

M-2.2.6.7. Offerors without a record of relevant and recent past performance or for whom information on past performance is not available will not be evaluated favorably nor unfavorably, and as a result, will receive a "Neutral Confidence" rating for this factor.

M-2.2.7. Evaluating Factor 3: Price

M-2.2.7.1. Price proposals will be evaluated using techniques established in FAR 15.404-1 to ensure the Government receives a fair, reasonable, and balanced price. Comparison of proposed prices in response to the solicitation is the preferred and intended price analysis technique. The basis for a fair and reasonable determination will be the offeror's Total Evaluated Price (TEP). The TEP consists of the total proposed prices for the base period, option years 1 through 4, and 50 percent of the option year 4 price to represent the price for the optional extension of services in accordance with FAR Clause 52.217-8, Option to Extend Services.